Amendment W912WJ26QA044-0002.pdf

PDF 4 MB Posted

Attached to
Mold Remediation Services, Colebrook Lake, Colebrook, CT
Solicitation number
W912WJ26QA044
Issued by

About this file

This document is Amendment 0002 to solicitation W912WJ26QA044, issued by the W2SD Endist New England KO Contracting Division on February 18, 2026. The amendment extends the solicitation closing deadline to February 19, 2026 at 2:00 PM Eastern and provides responses to 15 industry questions regarding mold remediation services at the Colebrook River Lake office in Connecticut.

Key clarifications include: contractors must follow Connecticut S520 Guide for Professional Mold Remediation requirements regardless of state of origin; prevailing wage requirements apply; the building has been tested and confirmed to contain mold; pesticide applicator certification need not be Connecticut-based; a roof leak is suspected but unconfirmed; work includes the utility room area with visible mold; the building will remain occupied during remediation; personal protective equipment and safety approvals are not required for site visits; the Solicitation Survey 26QA044 must be completed and submitted with quotes; recent demolition work occurred within the past four months; the roof has not been repaired; work encompasses approximately 200 square feet in the main office but excludes the adjacent small office. The amendment also modifies FAR clause 52.212-2 to establish evaluation criteria of Technical, Price, and Past Performance for quote award determination.

View the file

Other files

File Type Posted
Amendment W912WJ26QA044-0001.pdf PDF
Solicitation Survey 26QA044.pdf PDF
Solicitation W912WJ26QA044.pdf PDF
Attachments 26QA044.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

Miscellaneous text in this section has been modified to:

REQUEST FOR INFORMATION:

QUESTION 1: We are based out of New York and we have strict state regulated guidelines to follow. Does CT have similar guidelines or can a firm based out of NY perform this work?

RESPONSE 1: Contractors shall follow Connecticut guidelines included in the S520 Guide for Professional Mold Remediation as stated in the Performance Work Statement. A firm based in a state outside of Connecticut is permitted to perform the remediation services as long as the guideline requirements stated in the Performance Work Statement are followed.

QUESTION 2: Is this Prevailing Wage work?

RESPONSE 2: Yes, a link to the Wage Determinations is provided in the solicitation.

QUESTION 3: Has the building been tested for mold?

RESPONSE 3: Yes, the Colebrook River Lake office had an air quality and surface sample mold test completed to confirm the presence of mold.

QUESTION 4: Does the pesticide applicator certification requirement have to be a Connecticut state-based certification?

RESPONSE 4: No, the pesticide applicator certification does not have to be a Connecticut state-based certification.

QUESTION 5: Is there a leak in the garage roof?

RESPONSE 5: A leak in the roof has not been positively confirmed, but it is believed that the roof may have been leaking.

QUESTION 6: In the utility room, is work to be done to the right of the electrical components where there looks to be visible mold?

RESPONSE 6: Yes, this area is included in the mold remediation requirements.

QUESTION 7: Will the deadline for quotes be extended?

RESPONSE 7: The solicitation closing deadline has been extended until February 19, 2026 at 2:00 PM Eastern.

W912WJ26QA0440002

QUESTION 8: During the mold remediation process, will the building be empty, or will it remain occupied?

RESPONSE 8: The building will be occupied during the mold remediation process.

QUESTION 9: Is PPE required during a site visit and are there any safety restrictions or approvals required for a site visit?

RESPONSE 9: No, PPE is not required during a site visit and there are no safety restrictions or approvals required for a site visit.

QUESTION 10: Is the document titled "Solicitation Survey 26QA044" required to be completed and submitted with the quote?

RESPONSE 10: Yes, the Solicitation Survey 26QA044 is required to be completed and submitted with the quote submission in order for the quote to be considered responsive.

Vendors should note that the form should not be edited and no changes should be made to the certification boxes. Copies of the required certifications must be included in the quote submission. Vendors should refer to the addendum for 52.212-1 and 52.212-2 for additional information and instructions.

QUESTION 11: How did this problem happen?

RESPONSE 11: It is unknown what exactly caused the mold, but the roof leak may have been the cause.

QUESTION 12: Was the demolition work that happened recent?

RESPONSE 12: Yes, the demolition occurred within the past 4 months.

QUESTION 13: Has the roof been fixed yet?

RESPONSE 13: No, the roof has not been fixed.

QUESTION 14: Is the front wall in the main office included in this work?

RESPONSE 14: Please refer to the solicitation and photos provided in Attachments 26QA044 which indicates the 200 square foot work area in the main office.

QUESTION 15: Is the small office located to the left of the main office (same room, but separated by door partition) included in the removal?

RESPONSE 15: No, the small office located to the left of the main office is not included in this work.

Addendum to Contract Clauses

Additional Information/Notes

The following clauses were modified:

52.212-2Evaluation-Commercial Products and Commercial Services.Feb 2026 hereby reads as follows:

Evaluation-Commercial Products and Commercial Services (Feb 2026)

(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate quotes:

i. Technical

ii. Price

iii. Past Performance

(b) . The Government will evaluate quotes for award purposes by adding Options (if applicable) the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).

(End of provision)

IDCode: J
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 18 FEB 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA044
SolDate: 06 FEB 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry and make changes to provision 52.212-2. Questions #11 - #15 are applicable to this amendment.

Solicitation closing remains February 19, 2026 at 2:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 18 FEB 2026