Attachments 26QA044.pdf
PDF 3 MB Posted
- Solicitation number
- W912WJ26QA044
About this file
This is a Performance Work Statement (PWS) for mold remediation services at the U.S. Army Corps of Engineers Colebrook River Lake Office in Colebrook, Connecticut. The document consists primarily of informational photographs depicting the extent of mold damage and water damage throughout the facility, with minimal narrative text describing the scope of work.
The photographs document mold contamination in multiple areas of the building, including the main office room, hallways, utility room, bathroom, locker room, and garage ceiling. Key areas identified for remediation include drywall removal and replacement in the bathroom and locker room where mold is visible on walls, ceilings, and trim; cleaning and encapsulation of drywall on the utility room side of the wall between the utility room and bathroom (where equipment must be protected and de-energized); and remediation of water-damaged and mold-affected areas throughout hallways and the garage ceiling. The PWS notes that a separate contract will address chimney removal in the utility room, and the contractor is not required to cover any resulting hole from that removal. Photo documentation indicates significant water damage requiring drywall replacement to properly remediate mold growth, with some walls potentially requiring additional drywall thickness to align with existing wall surfaces. The work scope encompasses assessment, removal of contaminated materials, cleaning, encapsulation, and drywall installation to restore affected areas to functional condition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA044-0002.pdf | ||
| Amendment W912WJ26QA044-0001.pdf | ||
| Solicitation Survey 26QA044.pdf | ||
| Solicitation W912WJ26QA044.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOLD REMEDIATION
U.S. ARMY CORPS OF ENGINEERS
COLEBROOK RIVER LAKE OFFICE
COLEBROOK, CT
PERFORMANCE WORK STATEMENT
Informational Photos
Photo #1. Colebrook River Lake, exterior of building for reference
COLEBROOK RIVER LAKE OFFICE
COLEBROOK, CT
Photo #2. Main office room, area for removal
COLEBROOK RIVER LAKE OFFICE
Photo #3: Hallway
COLEBROOK RIVER LAKE OFFICE
Photo #4 - Hallway
COLEBROOK RIVER LAKE OFFICE
Photo #5: Utility room chimney and previous water damage (chimney will be removed shortly under another contract).If chimney is removed contract will drywall the area. Contractor is not required to cover over hole from chimney if present during work.
COLEBROOK RIVER LAKE OFFICE
Photo #6: Utility room leading to bathroom
COLEBROOK RIVER LAKE OFFICE
Photo #7: Wall between utility room and bathroom. The bathroom side of the wall shall be remediated(note equipment on utility room side of wall). Drywall on the utility side of this wall shall not be removed but will be cleaned and encapsulated. Contractor will work from side without equipment, ensuring equipment is de-energized.
COLEBROOK RIVER LAKE OFFICE
Photo #8: Utility room door
COLEBROOK RIVER LAKE OFFICE
Photo #9: Bathroom
COLEBROOK RIVER LAKE OFFICE
Photo #10: Bathroom
COLEBROOK RIVER LAKE OFFICE
Photo #11:Locker room
COLEBROOK RIVER LAKE OFFICE
Photo #12: Locker room
COLEBROOK RIVER LAKE OFFICE
Photo #13: Locker room
COLEBROOK RIVER LAKE OFFICE
Photo #14: Example, locker room Drywall. Some walls may require additional thickness of drywall installation to line up with existing drywall.
COLEBROOK RIVER LAKE OFFICE
Photo #15: Garage ceiling with previous water damage, mold
COLEBROOK RIVER LAKE OFFICE
Photo #16: Garage ceiling with previous water damage/mold
File details come from the government source that posted it. Updated .