This is an Amendment of Solicitation (SF 30, Amendment 0001) issued by the W92D Endist New England KO Contracting Division on February 17, 2026, for solicitation W912WJ26QA044. The amendment extends the solicitation closing deadline from February 17, 2026 to February 19, 2026 at 2:00 PM Eastern. The amendment is necessary to provide responses to questions submitted by industry regarding the solicitation requirements.

The amendment includes ten questions and responses addressing key project requirements. Contractors must follow Connecticut guidelines per the S520 Guide for Professional Mold Remediation as stated in the Performance Work Statement, though out-of-state firms may perform the work if they comply with these guidelines. The project involves mold remediation work at the Colebrook River Lake office, which has been tested and confirmed to contain mold. The work is subject to prevailing wage requirements. Contractors must possess a pesticide applicator certification (not required to be Connecticut-based) and include work in the utility room near electrical components. The building will remain occupied during remediation. No PPE or safety approvals are required for site visits. Prospective contractors must complete and submit the Solicitation Survey 26QA044 with their quote submission to be considered responsive, along with copies of required certifications as referenced in FAR 52.212-1 and 52.212-2. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
Amendment W912WJ26QA044-0002.pdf PDF
Solicitation Survey 26QA044.pdf PDF
Solicitation W912WJ26QA044.pdf PDF
Attachments 26QA044.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date 17 Feb 2026 19 Feb 2026

Miscellaneous text in this section has been added to:

REQUEST FOR INFORMATION:

QUESTION 1: We are based out of New York and we have strict state regulated guidelines to follow. Does CT have similar guidelines or can a firm based out of NY perform this work?

RESPONSE 1: Contractors shall follow Connecticut guidelines included in the S520 Guide for Professional Mold Remediation as stated in the Performance Work Statement. A firm based in a state outside of Connecticut is permitted to perform the remediation services as long as the guideline requirements stated in the Performance Work Statement are followed.

QUESTION 2: Is this Prevailing Wage work?

RESPONSE 2: Yes, a link to the Wage Determinations is provided in the solicitation.

QUESTION 3: Has the building been tested for mold?

RESPONSE 3: Yes, the Colebrook River Lake office had an air quality and surface sample mold test completed to confirm the presence of mold.

QUESTION 4: Does the pesticide applicator certification requirement have to be a Connecticut state-based certification?

RESPONSE 4: No, the pesticide applicator certification does not have to be a Connecticut state-based certification.

QUESTION 5: Is there a leak in the garage roof?

RESPONSE 5: A leak in the roof has not been positively confirmed, but it is believed that the roof may have been leaking.

QUESTION 6: In the utility room, is work to be done to the right of the electrical components where there looks to be visible mold?

RESPONSE 6: Yes, this area is included in the mold remediation requirements.

W912WJ26QA0440001

QUESTION 7: Will the deadline for quotes be extended?

RESPONSE 7: The solicitation closing deadline has been extended until February 19, 2026 at 2:00 PM Eastern.

QUESTION 8: During the mold remediation process, will the building be empty, or will it remain occupied?

RESPONSE 8: The building will be occupied during the mold remediation process.

QUESTION 9: Is PPE required during a site visit and are there any safety restrictions or approvals required for a site visit?

RESPONSE 9: No, PPE is not required during a site visit and there are no safety restrictions or approvals required for a site visit.

QUESTION 10: Is the document titled "Solicitation Survey 26QA044" required to be completed and submitted with the quote?

RESPONSE 10: Yes, the Solicitation Survey 26QA044 is required to be completed and submitted with the quote submission in order for the quote to be considered responsive.

Vendors should note that the form should not be edited and no changes should be made to the certification boxes. Copies of the required certifications must be included in the quote submission. Vendors should refer to the addendum for 52.212-1 and 52.212-2 for additional information and instructions.

W912WJ26QA0440001

IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 17 FEB 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA044
SolDate: 06 FEB 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry.

Solicitation closing is extended until February 19, 2026 at 2:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 17 FEB 2026