Solicitation Amendment W912WJ25BA0010006.pdf

PDF 724 KB Posted

Attached to
Winhall Brook Campground Restroom Renovation, Ball Mountain Lake, Londonderry, VT.
Solicitation number
W912WJ25BA001
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Winhall Brook Campground Restroom Renovation project. Amendment 0006 provides responses to five Requests for Information (RFIs) addressing technical specifications and project requirements. Key clarifications include: (1) restroom locations are to be treated as wet locations due to regular cleaning, (2) detailed specifications for propeller-type overhead fans including occupancy sensor controls and air change requirements, (3) confirmation that electric water shutdown valves are not part of the project scope, (4) guidance on subcontractor licensing (no Vermont license required for federal project), and (5) confirmation of an existing asbestos survey showing no asbestos-containing materials in the restroom structures. The amendment does not change the overall contract terms and is issued by the U.S. Army Corps of Engineers New England District for restroom renovations at Ball Mountain Lake in Londonderry, Vermont.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 3

0006 24 APR 2025 107592

W912WJ

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ANN ADLEY, EMAIL: ANN.M.ADLEY@USACE.ARMY.MIL TELEPHONE: 978-318-8255

SCD: PAS:

W912WJ25BA001

12 MAR 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

AMENDMENT 0006 IS NECESSARY TO PROVIDE RESPONSES TO REQUEST FOR INFORMATION (RFIS).

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

ERIN E. BRADLEY

24 APR 2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 01 00 00 - General Requirements

The Requirements text has been modified to:

Amendment 0006 is necessary to provide responses to Request for Information (RFIs).

QUESTION 1: Does everything need to be rated for damp/wet location?

RESPONSE 1: Per NFPA 70, a damp location is a location protected from weather and not subject to saturation with water or other liquids but subject to other moderated degrees of moisture. These restrooms fall within this category (outside of the shower areas which are wet locations); however, restroom interiors are regularly cleaned by hosing them down, so these spaces need to be treated as a wet location.

QUESTION 2: What are the specifications for the new fans?

RESPONSE 2: Amend Technical Requirements, Part 2 Products as follows:

A. Insert subparagraph 2.35 titled PROPELLER TYPE OVERHEAD FANS:

Provide propeller blade, overhead type fans, installed with appropriate clearance for temporary personnel passage. Refer to electrical guidelines, specifications, and plans for electrical maximum connection capacity. Refer to manufactures recommendations for installation and coordination guidelines with all other trades. Final finish size, color, and equipment shall be by coordinated with COR and Operations Project Manager.

Fans shall have occupancy sensor control with automatic shut off of fifteen (15) minute runtime intervals.

(See electrical specifications for further information). Fan shall have singular speed and be sized for no more than seven (7) air changes per hour for each structure. Equipment shall be residential type in style, performance, and connections to the structure in all manners per manufactures recommendations. Low profile design may be required in certain areas.

QUESTION 3: Is the electric water shutdown valve part of the scope?

RESPONSE 3: Specifications include power requirements for automatic flush valves throughout the restrooms electrically but not an electric water shutdown valve.

QUESTION 4: Will subcontractors be required to be licensed in the state of Vermont or just the state they are incorporated in since this is a federal project?

RESPONSE 4: USACE does not require a Vermont license, however, contractor is responsible to comply with state and local regulations.

QUESTION 5: Have you conducted an asbestos survey report? If so, can you please provide us with the report? If not, do you intend to conduct one before the bid date or the period of performance?

RESPONSE 5: Refer to Specifications, Section 01 11 00, Part 1 General, 1.2 Work Covered by Contract Documents, that states, The existing facilities have been sampled and tested for the presence of lead and asbestos. There are no asbestos-containing materials present in the restroom structures. Lead has been found in the paint coatings applied to two items at the restrooms, the water well pipes and privacy fence

W912WJ25BA0010006

brackets, however these items are not involved in the renovation work and the Contractor shall not disturb them.

W912WJ25BA0010006