This document is a Standard Form 30 Amendment to Solicitation W912WJ25BA001 for the Winhall Brook Campground Restroom Renovation project. The amendment (Amendment 0002) provides responses to six Requests for Information (RFIs) submitted by potential bidders, addressing technical and logistical questions about the project. Key clarifications include: confirmation that the electrical contractor must replace the transformer at the Northside Restrooms, a requirement to maintain two separate roles (SSHO/QC and Super) despite the project's limited scope, and details about concurrent bridge widening work anticipated to be completed in late April 2025.

The solicitation involves renovating three restrooms at the Winhall Brook Campground in Londonderry, Vermont, which were damaged in July 2023 storms. The renovation work includes updates to fixtures, interior spaces, and construction of new shower stalls requiring roofline alterations. The government has specified that existing exterior wood framing should remain unless specifically noted on drawings, and that while the campground is closed, the area remains accessible by foot during daylight hours. The amendment emphasizes that bidders must strictly follow specifications and that no additional site visits will be conducted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Amendment 0002 is necessary to provide Block 14 (Description of Amendment/Modification):

responses to RFIs.

QUESTION 1: The spec calls for a project sign. Will one be required as the campground is closed and there is no thru traffic?

RESPONSE 1: Bidders shall follow requirements within the specification.

QUESTION 2: Are we replacing the transformer at the Northside Restrooms? The spec calls for it, but in the demo notes in the spec it says to retain the transformer.

RESPONSE 2: At the Northside restroom, the electrical contractor shall demolish and replace the existing 37.5kVA, 480V-120/240V, 1, 3W Transformer within the restroom's utility closet. The existing pole(s), pole-mounted 7.2kV-240/480V, 1, 2W+G Transformer, and aerial secondary feeder conductors to the restroom are anticipated to remain.

QUESTION 3: The spec call for two hats, SSHO/QC and a Super. Due to the limited size/scope can this project be done with one hat?

RESPONSE 3: No

QUESTION 4: Can we get some info on the bridge work to determine how it may impact our project?

(Any scheduled road shutdowns, are they removing the bridge or closing it at any time, etc.)

RESPONSE 4: The work for this project included widening the approach for vehicles using the bridge.

The widening work in contract W912WJ24C0011, issued to Lucianos Excavating, Inc., is anticipated to be completed in late April 2025.

QUESTION 5: Is there any existing exterior wood scheduled to be replaced on the restrooms?

RESPONSE 5: Framing should remain unless indicated on drawings. Roofs that are being replaced should be demolished, including the wood sheathing (replaced with new sheathing), but the framing should remain unless noted otherwise.

QUESTION 6: Can I get contact info for the Ranger that was at the site meeting? I may need to stop by one more time as my subs have questions.

RESPONSE 6: The Government does not intend to conduct additional site visits. The campgrounds are open and accessible by foot during daylight hours.

W912WJ25BA0010002

IDCode: J
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 28 MAR 2025
ReqNo:
ProjNo: 107592
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ANN ADLEY, EMAIL: ANN.M.ADLEY@USACE.ARMY.MIL TELEPHONE: 978-318-8255

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ25BA001
SolDate: 12 MAR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE SCHEDULE
ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .