This document is an amendment to a solicitation for the Building 15 South Wing Barracks Replacement project at the Natick Soldiers Systems Center in Natick, MA. It provides responses to the second round of Requests for Information (RFIs) and releases Amendments 0002 - Attachments 1 through 4.
Key details include:
- The amended solicitation number is W912WJ24B0012.
- The amendment extends the offer due date from 12-Jul-2024 to 17-Jul-2024.
- It provides clarifications and revisions to the electrical and fire alarm system requirements, including the photovoltaic system specifications.
- It confirms the required blast-resistant exterior and glazing specifications.
- It addresses questions related to temporary power, metering, and lighting control.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to respond to the second round of RFI's and release Amendment 0002 - Attachments 1 through 4. All other aspects remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24B0012
X 9B. DATED (SEE ITEM 11)
12-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jul-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ24B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
RFI 0002
1. How many days before does the contractor need to request a cap off for electricity?
See revised Drawing, Amendment 0002 – Attachment 1, ES101 Electrical Site Plan and Amendment 0002
– Attachment 2, revised specification Section 01 11 00 Summary of Work
2. "Drawing A-405 shows new doors & frames for vestibule entrance, there is no spec for these. Also, being a government base, should the exterior be 'Blast Resistance’"? The glass spec 08 81 00 page 10, 2.5 f Type 2 (GL-2) is not a true 'Blast Resistance’glass make-up. Also I believe the window frames should be 'Blast Resistance' as well. Please advise.
See Amendment 0002 –Attachment 3, Specification Section 08 41 13 Aluminum - Framed Entrances and Storefronts and revised Submittal Registry.
New Windows, Glazing and Door Replacement: New windows will meet provisions listed in Standard 10.
New doors will meet provisions listed in Standard 12. (See UFC 4-010-01.)
3. Please advise if temporary electric service will be allowed to tap into existing building electrical service and metering. If not, please advise source of temporary electric service.
Temporary electric service is allowed. See response to number 1. The contractor is responsible for providing power to the buildings affected by its work. The contractor is responsible for submiting a request to/gaining approval from the DPW for approval if the use of a generator is requried, etc. The contractor shall provide to DPW, minimally, the meaning/source of the proposal before the taping as well as how long the “temporary” connection is going to last, including date/time.
4. Drawing EP-702 calls for the 100-amp feeder to the photovoltaic panel (PV1) to be 2” conduit with 4#1+#8G; however, Drawing ES101 shows this feed to be 2-4” conduits. Which is the correct size? If 2- 4” conduits is the correct size, should this conduit be reduced on the outside of the building (since 4” conduit will not fit in a 100-amp disconnect switch)?
Drawings EP-702 & EP-703 have been revised (See Amendment 0002 – Attachement 1). (2) 4” conduits (1 active, 1 spare) shall be terminated in a pullbox above grade. (1) 2” with 4#1+#8G conduit shall leave the pullbox and feed the 100A disconnect switch, from which (1) 2” with 4#1+#8G conduit shall leave the disconnect switch and rise along the building exterior to the PV system on the roof.
5. Note 4 on EP702 requires that we do amp readings with a data logger over a 30-day period for each existing panel and switchboard (total 15). Are these recordings to be done simultaneously or one at a time?
If simultaneously, with an equipment cost of over $5000 per setup, cost would be prohibitive. If one at a time, the time period would exceed one year and delay the project substantially. Please advise on process here and advise if standard code calculation of existing loads may be substituted for these readings.
Per note 4 on EP702 “Provide amp probe readings for each existing panelboard or switchboard by this scope of work.” Only SWB1 and PP1 are required to be metered as they are affected by this scope of work.
Metering can be conducted simultaneously.
6. Detail A11 on Drawing EL701 indicates a “UL924 fire alarm relay (as indicated on plans)” for override of lighting control; however, a UL924 relay is not listed for fire alarm use and the fire alarm drawings make no reference to this override.
Connection and programming information has been added to sheets FA601 and FA602 ( See Amendment 0002 – Attachment 4) in coordination with electrical detail. Provide output with dry contact for connection to relay (provided by electrical).
7. Is this relay a UL924 relay for bypassing light switching the event of a normal power loss or is this a fire alarm relay tied to the fire alarm system although not shown on fire alarm drawings?
Connection to relay is required in NFPA 101 7.8 for egress where lighting is controlled by motion sensors.
8. Amendment #1 does not completely address the questions posed on the photovoltaic system. In order to provide 15-KW of photovoltaic generation in the roof space allotted, we would need panels rated at least 500-watts. The only 500-watt panels that appear to be commercially available, are not Buy American Compliant. The largest BAA compliant model we can find is rated 410-watts.
410-watts is acceptable. The minimum panel size is 315W as stated in specification 26 31 00 section 2.2.3.
9. We see no specific details for the PV system, how many PV Support Details (K3/A-571) should be carried to provide an accurate roofing cost?
See Amendment 0001, RFI Responses No. 7 & 8
10. Please provide a spec on the aluminumEX120 and 121 entrance doors.
See Amendment 0002, RFI Response No.2.
11. Can you please confirm these labels are in scope? (Please see below) if yes so can you provide sizes and quantity?
Confirmed. See Amendement 0001, RFI Response No. 7 & 8
12. On S-515 the composite metal deck slab schedule refers you back to the framing plans for Stud counts but there is no stud count on the framing plans. Please advise.
The studs are applicable to one beam only, at the west penthouse wall support beam at main roof level, Grid N2.6. Please refer to sheet S-104 Roof/Penthouse Framing Plan, and Section J11/S-511.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 12-Jul-2024 01:00 PM to 17-Jul-2024 01:00 PM.