This document is an Amendment to Solicitation W912WJ24B0012 for the Natick Soldier System Center - Building 15 South Wing Barracks Replacement project. The amendment releases the site-visit sign-in sheet and the first round of Requests for Information (RFIs), while all other aspects of the solicitation remain the same.
The key details provided in the amendment include:
- Responses to 8 RFI questions covering topics such as hazardous materials surveys, the scope of the front vestibule replacement, electrical and fire protection systems, solar panel requirements, and circuit breaker specifications.
- The base bid line item and an optional line item for replacement of the front glass entryway.
- The required minimum 15 kW solar photovoltaic system capacity, with a minimum of 5 kW per inverter string.
- The effective date of the amendment is July 1, 2024.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to release the site-visit sign in sheet as w ell as the first round of RFI's. All other aspects remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24B0012
X 9B. DATED (SEE ITEM 11)
12-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ24B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Site-Visit Sign In Sheet Will Cook – Benaka Inc. – wcook@Benakainc.com Anthony Daunte – DePrizio Construction Ed Whelhan – Commodore Builders Caroline Tisdale – ctisdale@pwccompanies.com Tim Halverson – tim.halverson@richardgroupllc.com Whitey Morris – CCI Alliance – wmorris@cci-alliance.com Roger Ploof – S+R Corporation – rrploof@sandrcorp.com Peter Bernard – Doyon Government Group – peter.bernard@doyongovgrp.com Chad Anderson – chada@envirovantage.com Brent Watkins – JE Watkins Construction – jewatkinsconstruction@gmail.com
RFI 0001
1. Was a survey for the building produced?
"An Asbestos Containing Material Survey Report was prepared by CEI-PARS North Atlantic, LLC, in December 2020. A Pre-Demolition Hazardous Materials Survey Report prepared by Mabbett & Associates, Inc, in June 2021. Results from both surveys indicate that no ACM has been detected in Building 15. See Specifications – Vol. 1, Section 02 84 16, Pre-Demolition Hazardous Materials Survey Report."
2. Is replacing the front vestibule part of the base tasks?
Line Item 0001 compromise the Base Bid, Line Item 0002, Replacement of Front Glass Entryway is an Optional Line Item. See Bidding Schedule.
3. Is just the front vestibule being replace or is the landscape included?
See drawing AD102, Keynote 16, Remove Concrete Pavement, Coordinate With Civil Drawings For Extent. See drawing CS101, Keynote 10. Install Door Stoop, See Note 6. Install Handicap Access Striping.
4. Is the South Wing electrically fed from the other wing?
See Panelboard Schedules, EP601-603 and Power Plan, EP101. Supply is from (existing) SWB1.
5. Are the sprinklers connected to the other wing?
See drawing FD101, A1. Demolish existing fire protection main up to existing control valve outside of scope boundary. See drawing FX101, A7. Provide fire hose valve connection. See specification Section 21 12 00, 1.3 Design and provide new combination wet Class I standpipe and fire sprinkler system.
W912WJ24B0012
6. Please provide make and model number for circuit breakers to be added to the existing 2,000-amp switchboard. There is an extreme variation in the cost of different types of switchboard circuit breakers, especially if the existing switchboard is a draw-out type or if the breakers are obsolete.
See Image Below
7. The specifications call for 315-watt solar panels whereas one-line diagram is asking for minimum of 5-KW for each of three inverters. This would require a total of 48 solar panels. Drawing EP-703 shows 30 solar panels, and this seems consistent with the amount of roof space allotted for these panels. Please provide final quantity and type of solar panels and provide layout showing how they will fit in allotted roof space including mounting angle of panels and required safety walkway area.
"Specification 26 31 00 2.2.3 defines the minimum PV module size. Contractor to submit all PV components required to achieve the 15KW minimum capacity indicated on EP103 keyed note 1. Drawing EP103 keyed note 1 calls for the contractor to provide a minimum 15kW system EP703 defines the minimum string capacity. Contractor to submit the required number of panels and inverter to meet the minimum 5KW per string. Components shown are for reference only and not the actual quantities being installed."
8. Please verify that there should be five solar panels per string and confirm this will meet the minimum number of panels required to activate the inverter.
EP703 defines the minimum string capacity. Components shown are for reference only and not the actual quantities being installed. Contractor to submit the required number of panels and inverter to meet minimum 5KW per string.
(End of Summary of Changes)