This document is Amendment 0002 to the solicitation for the Building 15 South Wing Barracks Replacement project at the Natick Soldiers Systems Center in Natick, MA. The solicitation is being issued by the U.S. Army Corps of Engineers, Engineering District New England.
The project involves the reconstruction of the south wing of Building 15 at the Natick facility. Key components include demolition, concrete, masonry, metals, woods and plastics, thermal and moisture protection, openings, finishes, specialties, fire suppression, plumbing, HVAC, integrated automation, electrical, and exterior improvements. The project has a set-aside for small businesses. Pricing is based on a fixed-price contract. Relevant submittal requirements, performance standards, and other administrative details are provided in the amendment.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 15 Reconstruction South Wing Natick SSC
131780
PROJECT TABLE OF CONTENTS
AMENDMENT 0002
*02
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 41 00 BIDDING SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 22 00 04/94 MEASUREMENT AND PAYMENT
01 30 00 11/20, CHG 1: 08/21 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18 SUBMITTAL PROCEDURES
02/21
11/20, CHG
4:
08/23
SUSTAINABILITY REQUIREMENTS AND
REPORTING
GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16 QUALITY CONTROL
00.15
20.00
11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
TESTING FOR MECHANICAL AND ELECTRICAL
01 45 35
11/20
SYSTEMS
SPECIAL INSPECTIONS
05/18
11/15, CHG
5:
08/21
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19 PROJECT IDENTIFICATION
07/14
05/19
COLLECTION AND DISPOSAL OF
CONSTRUCTION AND DEMOLITION (C&D)
WASTE STREAMS
CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 91 00.15 05/23 BUILDING COMMISSIONING
01 91 19 05/23 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20
05 12 00
05/22
08/18, CHG 2: 05/21
POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 52 00 02/18 METAL RAILINGS
131780
*02
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER SOUND INSULATION
07 21 23 05/11, CHG 4: 08/18 LOOSE FILL THERMAL INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 08/22 SCHEDULES FOR FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
131780
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 05/22 VIBRATION AND SEISMIC CONTROLS FOR
HVAC PIPING AND EQUIPMENT
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 73 13.00 40 05/17 DEDICATED OUTDOOR AIR SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR LOW IMPACT HVAC
DIRECT DIGITAL CONTROL SYSTEMS
25 05 11.02 05/21 CYBERSECURITY FOR MODERATE IMPACT FIRE
ALARM CONTROL SYSTEM
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
131780
UNDER 600 VOLTS
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS (BID OPTION)
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 16 19 05/18 CURBS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
Bui l di ng 15 Reconst r uct i on Sout h Wi ng 131780 Nat i ck SSC
SECTI ON TABLE OF CONTENTS
DI VI SI ON 08 - OPENI NGS
SECTI ON 08 41 13
ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08/ 18, CHG 1: 08/ 18
PART 1 GENERAL
1. 1 REFERENCES
1. 2 ADMI NI STRATI VE REQUI REMENTS
1. 2. 1 Pr e- I nst al l at i on Meet i ngs
1. 3 SUBMI TTALS
1. 4 QUALI TY CONTROL
1. 4. 1 Qual i f i cat i ons
1. 4. 1. 1 I nst al l er Qual i f i cat i ons
1. 4. 1. 2 Manuf act ur er Qual i f i cat i ons
1. 4. 2 Si ngl e- Sour ce Responsi bi l i t y
1. 5 DELI VERY, STORAGE, AND HANDLI NG
1. 5. 1 Or der i ng
1. 5. 2 Packi ng, Shi ppi ng, Handl i ng and Unl oadi ng
1. 5. 3 St or age and Pr ot ect i on
1. 6 PROJECT / SI TE CONDI TI ONS
1. 6. 1 Fi el d Measur ement s
1. 7 WARRANTY
PART 2 PRODUCTS
2. 1 SYSTEM DESCRI PTI ON
2. 1. 1 Desi gn Requi r ement s f or Al umi num ( Ent r ances, Openi ngs and
Component s)
2. 1. 1. 1 Mat er i al St andar d
2. 1. 1. 2 Recycl ed Cont ent
2. 1. 1. 3 Seal ant s
2. 1. 1. 4 Ther mal Bar r i er
2. 2 FABRI CATI ON
2. 2. 1 Ent r ance Syst em Fabr i cat i on
2. 2. 2 Shop Assembl y
2. 2. 2. 1 Wel di ng
2. 2. 3 Fi ni sh
2. 2. 4 Fabr i cat i on Tol er ance
2. 2. 4. 1 Mat er i al Cut s
2. 2. 4. 2 Maxi mum Of f set at Consecut i ve Member s
2. 2. 4. 3 Maxi mum Of f set at Gl azi ng Pocket Cor ner s
2. 2. 4. 4 Joi nt s
2. 2. 4. 5 Var i at i on
2. 2. 4. 6 Fl at ness
2. 3 MATERI ALS
2. 3. 1 Seal ant s
2. 3. 2 Gl ass
2. 4 ACCESSORI ES
2. 4. 1 Fast ener s
2. 4. 2 Per i met er Anchor s
SECTI ON 08 41 13 Page 1
2. 4. 2. 1 I nser t s and Anchor age Devi ces
2. 4. 3 St andar d Ent r ance Har dwar e
2. 4. 3. 1 Weat her st r i ppi ng
2. 4. 3. 2 Thr eshol d
2. 4. 3. 3 Of f set Pi vot s
2. 4. 3. 4 Pani c Devi ce
2. 4. 3. 5 Cl oser
PART 3 EXECUTI ON
3. 1 EXAMI NATI ON
3. 1. 1 Si t e Ver i f i cat i on of Condi t i ons
3. 2 PREPARATI ON
3. 2. 1 Adj acent Sur f aces Pr ot ect i on
3. 2. 2 Al umi num Sur f ace Pr ot ect i on
3. 3 I NSTALLATI ON
3. 3. 1 Tol er ances
3. 3. 2 Adj ust i ng
3. 3. 3 Rel at ed Pr oduct s I nst al l at i on Requi r ement s
3. 3. 3. 1 Seal ant s ( Per i met er )
3. 3. 3. 2 Gl ass
3. 4 FI ELD QUALI TY CONTROL
3. 4. 1 Ai r I nf i l t r at i on
3. 4. 2 Wi nd Loads
3. 4. 3 Def l ect i on
3. 4. 4 Condensat i on Resi st ance and Ther mal Tr ansmi t t ance
3. 4. 5 Wat er I nf i l t r at i on
3. 5 ADJUSTI NG AND CLEANI NG
3. 5. 1 Pr ot ect i on
3. 5. 2 Cl eani ng
3. 6 WARRANTY
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 08 41 13 Page 2
Amendment 0002* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
SECTI ON 08 41 13
ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08/ 18, CHG 1: 08/ 18
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ALUMI NUM ASSOCI ATI ON ( AA)
AA DAF45 ( 2003; Reaf f i r med 2009) Desi gnat i on Syst em f or Al umi num Fi ni shes
AMERI CAN ARCHI TECTURAL MANUFACTURERS ASSOCI ATI ON ( AAMA)
AAMA 501 ( 2015) Met hods of Test f or Ext er i or Wal l s
AAMA 611 ( 2014) Vol unt ar y Speci f i cat i on f or Anodi zed Ar chi t ect ur al Al umi num
AAMA 800 ( 2016) Vol unt ar y Speci f i cat i ons and Test Met hods f or Seal ant s
AAMA 1503 ( 2009) Vol unt ar y Test Met hod f or Ther mal Tr ansmi t t ance and Condensat i on Resi st ance of Wi ndows, Door s and Gl azed Wal l Sect i ons
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 7- 16 ( 2017; Er r at a 2018; Supp 1 2018) Mi ni mum Desi gn Loads and Associ at ed Cr i t er i a f or Bui l di ngs and Ot her St r uct ur es
ASTM I NTERNATI ONAL ( ASTM)
ASTM B221 ( 2021) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Ext r uded Bar s, Rods, Wi r e, Pr of i l es, and Tubes
ASTM E283 ( 2019) St andar d Test Met hod f or Det er mi ni ng t he Rat e of Ai r Leakage Thr ough Ext er i or Wi ndows, Cur t ai n Wal l s, and Door s Under Speci f i ed Pr essur e Di f f er ences Acr oss t he Speci men
ASTM E330/ E330M ( 2014) St r uct ur al Per f or mance of Ext er i or Wi ndows, Door s, Skyl i ght s and Cur t ai n Wal l s by Uni f or m St at i c Ai r Pr essur e Di f f er ence
ASTM E331 ( 2000; R 2016) St andar d Test Met hod f or
SECTI ON 08 41 13 Page 3
Wat er Penet r at i on of Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s by Uni f or m St at i c Ai r Pr essur e Di f f er ence
ASTM E783 ( 2002; R 2018) St andar d Test Met hod f or Fi el d Measur ement of Ai r Leakage Thr ough I nst al l ed Ext er i or Wi ndows and Door s
ASTM E1105 ( 2015) St andar d Test Met hod f or Fi el d Det er mi nat i on of Wat er Penet r at i on of I nst al l ed Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s, by Uni f or m or Cycl i c St at i c Ai r Pr essur e Di f f er ence
ASTM E1424 ( 1991; R 2016) St andar d Test Met hod f or Det er mi ni ng t he Rat e of Ai r Leakage Thr ough Ext er i or Wi ndows, Cur t ai n Wal l s, and Door s Under Speci f i ed Pr essur e and Temper at ur e Di f f er ences Acr oss t he Speci men
ASTM E1886 ( 2019) St andar d Test Met hod f or Per f or mance of Ext er i or Wi ndows, Cur t ai n Wal l s, Door s, and I mpact Pr ot ect i ve Syst ems I mpact ed by Mi ssi l e( s) and Exposed t o Cycl i c Pr essur e Di f f er ent i al s
ASTM F1642/ F1642M ( 2017) St andar d Test Met hod f or Gl azi ng and Gl azi ng Syst ems Subj ect t o Ai r bl ast Loadi ngs
BUI LDERS HARDWARE MANUFACTURERS ASSOCI ATI ON ( BHMA)
ANSI / BHMA A156. 4 ( 2013) Door Cont r ol s - Cl oser s
ANSI / BHMA A156. 10 ( 2017) Power Oper at ed Pedest r i an Door s
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2018) I nt er nat i onal Bui l di ng Code
U. S. GENERAL SERVI CES ADMI NI STRATI ON ( GSA)
FS TT- P- 645 ( Rev C; Not i ce 1) Pr i mer , Pai nt , Zi nc- Mol ybdat e, Al kyd Type
UNDERWRI TERS LABORATORI ES ( UL)
UL 325 ( 2017; Repr i nt Feb 2020) UL St andar d f or Saf et y Door , Dr aper y, Gat e, Louver , and Wi ndow Oper at or s and Syst ems
1. 2 ADMI NI STRATI VE REQUI REMENTS
1. 2. 1 Pr e- I nst al l at i on Meet i ngs
Conduct a meet i ng bef or e i nst al l at i on begi ns t o ver i f y t he pr oj ect r equi r ement s, subst r at e condi t i ons, manuf act ur er ' s i nst al l at i on i nst r uct i ons, and manuf act ur er ' s war r ant y r equi r ement s.
SECTI ON 08 41 13 Page 4
Wi t hi n 30 days of t he Cont r act Awar d, submi t t he f ol l owi ng f or r evi ew and appr oval by t he Cont r act i ng Of f i cer :
a. Li st of pr oduct i nst al l at i ons
b. Sampl e war r ant y
c. Fi ni sh and col or sampl es
d. Manuf act ur er ' s cat al og dat a
Concur r ent l y submi t cer t i f i ed t est r epor t s showi ng compl i ance wi t h speci f i ed per f or mance char act er i st i cs and UL 325 f or t he f ol l owi ng:
a. Wi nd Load Resi st ance i n accor dance wi t h AAMA 501
b. Def l ect i on i n accor dance wi t h ASTM F1642/ F1642M
c. Condensat i on Resi st ance and Ther mal Tr ansmi t t ance Per f or mance Requi r ement s i n accor dance wi t h AAMA 1503
d. Wat er I nf i l t r at i on i n accor dance wi t h ASTM E331
e. St r uct ur al Requi r ement s i n accor dance wi t h ASTM F1642/ F1642M
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Sampl e War r ant y; G RO
Li st of Pr oduct I nst al l at i ons; G RO
SD- 02 Shop Dr awi ngs
I nst al l at i on Dr awi ngs; G RO
Fabr i cat i on Dr awi ngs; G RO
SD- 03 Pr oduct Dat a
Manuf act ur er ' s Cat al og Dat a; G RO
Fi ni sh; G RO
Recycl ed Cont ent of Al umi num Mat er i al ; S RO
SD- 04 Sampl es
Fi ni sh and Col or Sampl es; G RO
SD- 06 Test Repor t s
SECTI ON 08 41 13 Page 5
Cer t i f i ed Test Repor t s; G RO
Def l ect i on
Ai r I nf i l t r at i on
Condensat i on Resi st ance and Ther mal Tr ansmi t t ance
Wat er I nf i l t r at i on
SD- 08 Manuf act ur er ' s I nst r uct i ons
Manuf act ur er ' s I nst r uct i ons
SD- 11 Cl oseout Submi t t al s
Manuf act ur er ' s Pr oduct War r ant y
1. 4 QUALI TY CONTROL
1. 4. 1 Qual i f i cat i ons
1. 4. 1. 1 I nst al l er Qual i f i cat i ons
Pr ovi de document at i on of t he i nst al l er ' s exper i ence i n per f or mi ng t he wor k speci f i ed i n t hi s sect i on.
Ensur e t hat t he i nst al l er s ar e speci al i zed i n wor k s i mi l ar t o t hat r equi r ed f or t hi s pr oj ect , and t hat t hey ar e accept abl e t o pr oduct manuf act ur er .
1. 4. 1. 2 Manuf act ur er Qual i f i cat i ons
Ensur e t hat manuf act ur er s meet t he r equi r ement s speci f i ed i n t hi s sect i on and pr oj ect dr awi ngs.
Ensur e t hat t he manuf act ur er i s capabl e of pr ovi di ng f i el d ser vi ce r epr esent at i on dur i ng const r uct i on, appr ovi ng accept abl e i nst al l er s and appr ovi ng appl i cat i on met hods.
1. 4. 2 Si ngl e- Sour ce Responsi bi l i t y
When al umi num ent r ances ar e par t of a bui l di ng encl osur e syst em, t hat i ncl udes st or ef r ont f r ami ng, wi ndows, a cur t ai n wal l syst em, and r el at ed pr oduct s, pr ovi de bui l di ng encl osur e syst em pr oduct s f r om a si ngl e- sour ce manuf act ur er .
Use a s i ngl e sour ce manuf act ur er wi t h sol e r esponsi bi l i t y f or pr ovi di ng desi gn, st r uct ur al engi neer i ng, and cust om f abr i cat i on f or door por t al syst ems and f or suppl y i ng component s, mat er i al s, and pr oduct s. Do not use pr oduct s pr ovi ded f r om numer ous sour ces f or assembl y at t he s i t e. Ensur e t hat t he f ol l owi ng wor k i t ems and component s ar e f abr i cat ed or suppl i ed by a s i ngl e sour ce ar e:
a. Door assembl i es t o be i nst al l ed i n door por t al s as speci f i ed i n t hi s sect i on.
b. Gl azed wal l s t o be const r uct ed ar ound door por t al s as speci f i ed i n
SECTI ON 08 41 13 Page 6 t hi s Sect i on.
c. Door oper at i ng har dwar e t o be i nst al l ed on or wi t hi n door por t al s as speci f i ed i n Sect i on 08 71 00 DOOR HARDWARE.
d. Gl ass as speci f i ed i n Sect i on 08 81 00 GLAZI NG.
1. 5 DELI VERY, STORAGE, AND HANDLI NG
1. 5. 1 Or der i ng
To avoi d const r uct i on del ays, compl y wi t h t he manuf act ur er ' s l ead- t i me r equi r ement s and i nst r uct i ons f or or der i ng.
1. 5. 2 Packi ng, Shi ppi ng, Handl i ng and Unl oadi ng
Del i ver mat er i al s i n t he manuf act ur er ' s or i gi nal , unopened, undamaged cont ai ner s wi t h i dent i f i cat i on l abel s i nt act .
1. 5. 3 St or age and Pr ot ect i on
St or e mat er i al s i n a way t hat pr ot ect s t hem f r om exposur e t o har mf ul weat her condi t i ons. Avoi d damagi ng t he st or ef r ont mat er i al and component s dur i ng handl i ng. Pr ot ect st or ef r ont mat er i al agai nst damage f r om el ement s, const r uct i on act i v i t i es, and ot her hazar ds bef or e, dur i ng, and af t er st or ef r ont i nst al l at i on.
Do not use adhesi ve paper s or spr ayed coat i ngs t hat become f i r ml y bonded when exposed t o sunl i ght . Do not l eave coat i ng r esi due on sur f aces.
1. 6 PROJECT / SI TE CONDI TI ONS
1. 6. 1 Fi el d Measur ement s
Ver i f y act ual measur ement s or openi ngs by t aki ng f i el d measur ement s bef or e f abr i cat i on; r ecor d t hese measur ement s on shop dr awi ngs. To avoi d const r uct i on del ays, coor di nat e f i el d measur ement s, and f abr i cat i on schedul e wi t h const r uct i on pr ogr ess.
1. 7 WARRANTY
Pr ovi de a wr i t t en manuf act ur er ' s war r ant y, execut ed by a company of f i c i al , war r ant i ng agai nst def ect s i n mat er i al s and pr oduct s f or 5 year s f r om t he dat e of shi pment . War r ant t hat t he door cor ner const r uct i on i s f or t he l i f e of t he pr oj ect . Pr ovi de a wr i t t en i nst al l er ' s war r ant y, war r ant i ng wor k t o be wat er t i ght and f r ee f r om def ect i ve mat er i al s, def ect i ve wor kmanshi p, and gl ass br eakage as a r esul t of def ect i ve desi gn, and agr eei ng t o r epl ace component s t hat f ai l wi t hi n 5 year s.
The war r ant y st at es t he f ol l owi ng:
a. Wat er t i ght and ai r t i ght syst em i nst al l at i on i s compl et ed wi t hi n speci f i ed t ol er ances.
b. The compl et ed i nst al l at i on r emai ns f r ee of r at t l es, wi nd whi st l es and noi se caused by t her mal movement and wi nd pr essur e.
c. Syst em i s st r uct ur al l y sound and f r ee f r om di st or t i on.
d. Gl ass and gl azi ng gasket s wi l l not br eak or " pop" f r om f r ames as a
SECTI ON 08 41 13 Page 7 r esul t of desi gn, wi nd l oad pr essur e, movement caused by expansi on or cont r act i on, or st r uct ur al l oadi ng.
e. Gl azi ng seal ant s and gasket s r emai n f r ee of abnor mal det er i or at i on or di s l ocat i on as a r esul t of sunl i ght , weat her , or oxi dat i on.
Pr ovi de a wr i t t en t her mal i nt egr i t y war r ant y f or 10 year s f r om shi p dat e agai nst t her mal bar r i er syst em f ai l ur e r esul t i ng f r om t he f ol l owi ng:
a. Longi t udi nal and t r ansver se t her mal bar r i er shr i nkage.
b. Ther mal bar r i er cr acki ng.
c. St r uct ur al f ai l ur e of t he t her mal bar r i er mat er i al .
d. Loss of adhesi on or l oss of pr escr i bed edge pr essur e on gl azi ng mat er i al , r esul t i ng i n excessi ve ai r and wat er i nf i l t r at i on.
PART 2 PRODUCTS
2. 1 SYSTEM DESCRI PTI ON
Pr ovi de al umi num ent r ances, wi t h gl ass and gl azi ng, door har dwar e, and component s.
Al umi num ent r ances i ncl ude i mpact r esi st ance ent r ances; wi de st y l e f or hi gh- t r af f i c / i mpact - r esi st ant appl i cat i ons:
Pr ovi de t her mal l y br oken ent r ance syst em. Door st i l e t hi ckness as r equi r ed f or i nsul at ed gl ass uni t s.
Pr ovi de t her mal l y br oken al umi num st or ef r ont f r ami ng f or f i xed openi ngs.
2. 1. 1 Desi gn Requi r ement s f or Al umi num ( Ent r ances, Openi ngs and Component s)
Pr ovi de a door por t al syst em desi gned t o wi t hst and t he f ol l owi ng l oads wi t hout br eakage, l oss, f ai l ur e of seal s, pr oduct det er i or at i on, or ot her def ect s.
a. Dead and Li ve Loads: Det er mi ned by ASCE 7- 16 and cal cul at ed i n accor dance wi t h appl i cabl e codes.
b. Sei smi c Loads: Desi gn and i nst al l t he syst em t o compl y wi t h t he sei smi c r equi r ement s f or t he pr oj ect l ocat i on i n accor dance wi t h Sect i on 1613 of t he I nt er nat i onal Bui l di ng Code, I CC I BC.
c. Wi nd Loads: Desi gn and i nst al l t he syst em so t hat t he ef f ect s of wi nd l oad act i ng i nwar d and out war d nor mal t o t he pl ane of t he wal l ar e i n accor dance wi t h ASTM E330/ E330M.
d. Ther mal Loads And Movement :
( 1) Ambi ent Temper at ur e Range: 120 degr ees F
( 2) Mat er i al Sur f aces Range: 180 degr ees F
e. Wat er and Ai r Resi st ance: Pr ovi de weat her st r i ppi ng, ext er i or gasket s, seal ant s, and ot her accessor i es t o r esi st wat er and ai r penet r at i on.
SECTI ON 08 41 13 Page 8 f . I mpact - Pr ot ect i ve Syst ems Pr ovi de an i mpact - pr ot ect i ve syst em i n accor dance wi t h ASTM E1886.
2. 1. 1. 1 Mat er i al St andar d
ASTM B221; 6063- T5 al l oy and t emper ed.
Pr ovi de door st i l e and r ai l f ace di mensi ons of t he ent r ance door s as f ol l ows:
Pr ovi de door st i l e and r ai l f ace di mensi ons of t he ent r ance door s as i ndi cat ed on t he dr awi ngs.
Pr ovi de maj or por t i ons of t he door member s at 0. 125 i nches nomi nal i n t hi ckness and gl azi ng mol di ng at 0. 050 i nches t hi ck.
2. 1. 1. 2 Recycl ed Cont ent
Pr ovi de al umi num f r amed ent r ances and st or ef r ont s t hat have a mi ni mum of 20 per cent r ecycl ed cont ent based upon t he al umi num bi l l et used i n t he or i gi nal mat er i al . Pr ovi de dat a i ndi cat i ng per cent age of r ecycl ed cont ent of al umi num mat er i al .
2. 1. 1. 3 Seal ant s
Pr ovi de ei t her et hyl ene pr opyl ene di ene monomer ( EPDM) el ast omer i c ext r usi ons or t her mopl ast i c el ast omer gl azi ng gasket s. St r uct ur al s i l i cone seal ant i s r equi r ed.
I nt er nal Seal ant s: Pr ovi de seal ant s t hat accor di ng t o t he manuf act ur er wi l l r emai n per manent l y el ast i c, t acky, non- dr yi ng, non- mi gr at i ng, and weat her t i ght .
2. 1. 1. 4 Ther mal Bar r i er
Use a r i gi d, st r uct ur al t her mal bar r i er t o separ at e al l ext er i or al umi num f r om i nt er i or al umi num. For pur poses of t hi s speci f i cat i on, a st r uct ur al t her mal bar r i er i s def i ned as a syst em t hat t r ansf er s shear dur i ng bendi ng and, t her ef or e, pr omot es composi t e act i on bet ween t he ext er i or and i nt er i or ext r usi ons. Do not use a nonst r uct ur al t her mal bar r i er . Ensur e t hat t he t her mal bar r i er pr ovi des a st r uct ur al connect i on bet ween t he t wo si des of t he door .
2. 2 FABRI CATI ON
Pr ovi de t he f ol l owi ng i nf or mat i on when submi t t i ng f abr i cat i on dr awi ngs f or cust om f abr i cat i ons:
a. I ndi cat e el evat i ons, det ai l ed desi gn, di mensi ons, member pr of i l es, j oi nt l ocat i ons, ar r angement of uni t s, and member connect i ons.
b. Show t he f ol l owi ng i t ems:
( 1) Det ai l s of speci al shapes.
( 2) Rei nf or ci ng.
( 3) Anchor age syst em.
SECTI ON 08 41 13 Page 9
( 4) I nt er f aci ng wi t h bui l di ng const r uct i on.
( 5) Pr ovi s i ons f or expansi on and cont r act i on.
( 6) Ther mal br eaks.
( 7) Oper abl e uni t s
c. I ndi cat e t ypi cal gl azi ng det ai l s, l ocat i ons of var i ous t ypes and t hi ckness of gl ass, and i nt er nal seal ant r equi r ement s as r ecommended by t he seal ant manuf act ur er .
d. Cl ear l y i ndi cat e l ocat i ons of exposed f ast ener s and j oi nt s.
e. Cl ear l y show wher e and how t he manuf act ur er ' s syst em devi at es f r om Cont r act dr awi ngs and t hese speci f i cat i ons.
2. 2. 1 Ent r ance Syst em Fabr i cat i on
Pr ovi de door cor ner const r uct i on consi st i ng of mechani cal c l i p f ast eni ng, SI GMA deep penet r at i on pl ug wel ds and 1 1/ 8 i nch l ong f i l l et wel ds i nsi de and out si de al l f our cor ner s. Pr ovi de a hook- i n t ype ext er i or gl azi ng st op wi t h EPDM gl azi ng gasket s r ei nf or ced wi t h non- st r et chabl e cor d.
Pr ovi de an i nt er i or gl azi ng st op t hat i s mechani cal l y f ast ened t o t he door member and t hat i ncor por at es a s i l i cone- compat i bl e spacer used wi t h s i l i cone seal ant .
Accur at el y f i t and secur e j oi nt s and cor ner s. Make j oi nt s hai r l i ne i n appear ance. Remove bur r s and smoot h edges. Pr epar e component s wi t h i nt er nal r ei nf or cement f or door har dwar e. Ar r ange f ast ener s and at t achment s so t hat t hey ar e conceal ed f r om vi ew.
Separ at e di ssi mi l ar met al s wi t h pr ot ect i ve coat i ng or pr e- f or med separ at or s t o pr event cont act and cor r osi on.
2. 2. 2 Shop Assembl y
Fabr i cat e and assembl e uni t s wi t h j oi nt s onl y at t he i nt er sect i on of al umi num member s wi t h hai r l i ne j oi nt s; r i gi dl y secur e t hese uni t s, and seal t hem i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons.
2. 2. 2. 1 Wel di ng
Conceal wel ds on al umi num member s i n accor dance wi t h AWS r ecommendat i ons or met hods r ecommended by t he manuf act ur er . Member s showi ng wel di ng bl oom or di scol or at i on on f i ni sh or mat er i al di st or t i on wi l l be r ej ect ed by t he Cont act i ng Of f i cer .
2. 2. 3 Fi ni sh
Bef or e f abr i cat i on, c l ean t he uni t s and gi ve t hem a cl ear anodi zed f i ni sh i n accor dance wi t h t he r equi r ement s of t he AA DAF45. The f i ni sh t hi ckness i s A42, 0. 7 mi l or gr eat er .
a. Cl ear Anodi zed: Conf or mi ng t o AAMA 611.
( 1) Ar chi t ect ur al Cl ass I
SECTI ON 08 41 13 Page 10
2. 2. 4 Fabr i cat i on Tol er ance
Fabr i cat e and assembl e uni t s wi t h j oi nt s onl y at i nt er sect i on of al umi num member s wi t h hai r l i ne j oi nt s; r i gi dl y secur e t hese uni t s, and seal t hem i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons.
Fabr i cat e al umi num ent r ances i n accor dance wi t h t he ent r ance manuf act ur er ' s pr escr i bed t ol er ances.
2. 2. 4. 1 Mat er i al Cut s
Squar e t o 1/ 32 i nch of f squar e, over l ar gest di mensi on; pr opor t i onat e amount of 1/ 32 i nch on t he t wo di mensi ons.
2. 2. 4. 2 Maxi mum Of f set at Consecut i ve Member s
1/ 64 i nch i n al i gnment bet ween t wo consecut i ve member s i n l i ne, end t o end.
2. 2. 4. 3 Maxi mum Of f set at Gl azi ng Pocket Cor ner s
1/ 64 i nch bet ween f r ami ng member s at gl azi ng pocket cor ner s.
2. 2. 4. 4 Joi nt s
Bet ween adj acent member s i n same assembl y: Joi nt s ar e hai r l i ne and squar e t o t he adj acent member .
2. 2. 4. 5 Var i at i on
I n squar i ng di agonal s f or door s and f abr i cat ed assembl i es: 1/ 16 i nch.
2. 2. 4. 6 Fl at ness
For door s and f abr i cat ed assembl i es: pl us/ mi nus 1/ 16 i nch of neut r al pl ane.
2. 3 MATERI ALS
2. 3. 1 Seal ant s
Ref er t o Sect i on 07 92 00 JOI NT SEALANTS. Ensur e t hat al l seal ant s conf or m t o AAMA 800.
2. 3. 2 Gl ass
Ref er t o Sect i on 08 81 00 GLAZI NG.
2. 4 ACCESSORI ES
2. 4. 1 Fast ener s
Pr ovi de st ai nl ess st eel f ast ener s i n ar eas wher e t he f ast ener s ar e exposed.
Use non- cor r osi ve and compat i bl e f ast ener s wi t h component s bei ng f ast ened. Do not use exposed f ast ener s, except wher e unavoi dabl e f or appl i cat i on of har dwar e.
I n ar eas wher e f ast ener s ar e not exposed, use al umi num, non- magnet i c st ai nl ess st eel , or ot her mat er i al s war r ant ed by t he manuf act ur er .
SECTI ON 08 41 13 Page 11
For exposed l ocat i ons, pr ovi de count er sunk Phi l l i ps head scr ews when i t ems wi t h a mat chi ng f i ni sh ar e f ast ened. For conceal ed l ocat i ons, pr ovi de t he manuf act ur er ' s st andar d f ast ener s.
Pr ovi de nut s or washer s t hat have been desi gned wi t h a means t o pr event di sengagement ; do not def or m f ast ener t hr eads.
2. 4. 2 Per i met er Anchor s
When st eel anchor s ar e used, pr ovi de i nsul at i on bet ween st eel mat er i al and al umi num mat er i al t o pr event gal vani c act i on.
2. 4. 2. 1 I nser t s and Anchor age Devi ces
Pr ovi de manuf act ur er ' s st andar d f or med or f abr i cat ed assembl i es, st eel or al umi num, of shapes, pl at es, bar s, or t ubes. Shop- coat st eel assembl i es af t er f abr i cat i on wi t h an al kyd zi nc chr omat e pr i mer compl yi ng wi t h
FS TT- P- 645.
2. 4. 3 St andar d Ent r ance Har dwar e
2. 4. 3. 1 Weat her st r i ppi ng
Equi p meet i ng st i l es on pai r s of door s wi t h an adj ust abl e ast r agal usi ng wool pi l e wi t h a pol ymer i c f i n.
Pr ovi de door weat her st r i ppi ng on a s i ngl e- act i ng of f set pi vot or but t - hung door and f r ame ( s i ngl e or pai r s) consi st i ng of a t her mopl ast i c el ast omer weat her st r i ppi ng on a t ubul ar shape wi t h a semi - r i gi d pol ymer i c backi ng.
Pr ovi de si l l - sweep st r i ps: Pr ovi de an EPDM bl ade gasket sweep st r i p i n an al umi num ext r usi on appl i ed t o t he i nt er i or exposed sur f ace of t he bot t om r ai l wi t h conceal ed f ast ener s. ( Pr ovi de as necessar y t o meet speci f i ed per f or mance t est s. )
2. 4. 3. 2 Thr eshol d
Pr ovi de an ext r uded al umi num t hr eshol d, one pi ece per door openi ng, wi t h r i bbed sur f ace.
2. 4. 3. 3 Of f set Pi vot s
Pr ovi de t he manuf act ur er ' s st andar d t op and bot t om pi vot s wi t h one i nt er medi at e of f set pi vot .
2. 4. 3. 4 Pani c Devi ce
Pr ovi de t he manuf act ur er ' s r ecommended st andar d pani c har dwar e.
2. 4. 3. 5 Cl oser
Pr ovi de a sur f ace cl oser i n accor dance wi t h ANSI / BHMA A156. 4.
SECTI ON 08 41 13 Page 12
PART 3 EXECUTI ON
3. 1 EXAMI NATI ON
3. 1. 1 Si t e Ver i f i cat i on of Condi t i ons
Ver i f y t hat t he condi t i on of subst r at e pr evi ousl y i nst al l ed under ot her sect i ons i s accept abl e f or pr oduct i nst al l at i on i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons.
Ver i f y t hat openi ngs ar e s i zed t o r ecei ve t he st or ef r ont syst em and t hat t he s i l l pl at e i s l evel i n accor dance wi t h t he manuf act ur er ' s accept abl e t ol er ances.
3. 2 PREPARATI ON
Fi el d- ver i f y di mensi ons bef or e f abr i cat i ng component s f or t he door por t al assembl y.
Coor di nat e r equi r ement s f or l ocat i ons of bl ockout s f or anchor age of door por t al col umns and ot her embedded component s wi t h Sect i on 03 30 00
CAST- I N- PLACE CONCRETE.
Coor di nat e t he er ect i on of door por t al wi t h i nst al l at i on of sur r oundi ng gl ass wal l and door assembl i es. Ensur e t hat t he door por t al s can pr ovi de suppor t and anchor age f or assembl y component s.
Coor di nat e el ect r i cal r equi r ement s f or el ect r i f i ed door har dwar e t o ensur e pr oper power sour ce, condui t , wi r i ng, and boxes.
3. 2. 1 Adj acent Sur f aces Pr ot ect i on
Pr ot ect adj acent wor k ar eas and f i ni sh sur f aces f r om damage dur i ng pr oduct i nst al l at i on.
3. 2. 2 Al umi num Sur f ace Pr ot ect i on
Pr ot ect al umi num sur f aces f r om cont act wi t h l i me, mor t ar , cement , aci ds, and ot her har mf ul cont ami nant s.
3. 3 I NSTALLATI ON
Submi t i nst al l at i on dr awi ngs f or r evi ew and appr oval . I ncl ude i nst al l at i on det ai l s showi ng i nt er f ace wi t h t he adj acent wal l assembl y and al l r equi r ed l ocat i ons of seal s.
I nst al l t he ent r ance syst em i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons and t he AAMA st or ef r ont and ent r ance gui de speci f i cat i ons manual . At t ach t he ent r ance syst em t o t he st r uct ur e, al l owi ng i t t o be adj ust ed t o accommodat e const r uct i on t ol er ances and ot her i r r egul ar i t i es.
Pr ovi de al i gnment at t achment s and shi ms t o per manent l y f ast en t he syst em t o t he bui l di ng st r uct ur e. Al i gn t he assembl y so t hat i t i s pl umb and l evel , and f r ee of war p and t wi st . Mai nt ai n assembl y di mensi onal t ol er ances al i gni ng wi t h adj acent wor k.
Set t hr eshol ds i n a bed of mast i c and secur e t he t hr eshol ds. Pr ot ect al umi num member s i n cont act wi t h masonr y, st eel , concr et e, or di ssi mi l ar mat er i al s usi ng nyl on pads or a bi t umi nous coat i ng. Shi m and br ace t he al umi num syst em bef or e anchor i ng t he syst em t o t he st r uct ur e. Ver i f y t hat
SECTI ON 08 41 13 Page 13 weep hol es ar e open, and t he met al j oi nt s ar e seal ed i n accor dance wi t h t he manuf act ur er ' s i nst al l at i on i nst r uct i ons. Seal met al - t o- met al j oi nt s usi ng a seal ant r ecommended by t he syst em manuf act ur er .
3. 3. 1 Tol er ances
Ensur e t hat t ol er ances f or wal l t hi ckness and ot her cr oss- sect i onal di mensi ons of ent r ance member s ar e nomi nal and i n compl i ance wi t h Al umi num St andar ds and Dat a, publ i shed by t he Al umi num Associ at i on.
3. 3. 2 Adj ust i ng
Adj ust oper at i ng har dwar e f or smoot h oper at i on, and as r ecommended by t he manuf act ur er .
3. 3. 3 Rel at ed Pr oduct s I nst al l at i on Requi r ement s
3. 3. 3. 1 Seal ant s ( Per i met er )
Ref er t o Sect i on 07 92 00 JOI NT SEALANTS.
3. 3. 3. 2 Gl ass
Ref er t o Sect i on 08 81 00 GLAZI NG.
3. 4 FI ELD QUALI TY CONTROL
3. 4. 1 Ai r I nf i l t r at i on
Test ai r i nf i l t r at i on i n accor dance wi t h ASTM E783
Submi t cer t i f i ed t est r epor t s showi ng compl i ance wi t h speci f i ed per f or mance char act er i st i cs as f ol l ows:
a. For s i ngl e- act i ng of f set pi vot , but t hung, or cont i nuous gear ed hi nge ent r ances i n t he c l osed and l ocked posi t i on, t est t he speci men i n accor dance wi t h ANSI / BHMA A156. 10, and ASTM E283 at a pr essur e di f f er ent i al of 1. 57 psf f or pai r s of door s; ensur e t hat maxi mum i nf i l t r at i on f or a pai r of 7 f oot by 8 f oot ent r ance door s and f r ame i s
1. 2 cf m/ squar e f oot .
b. Ensur e t he maxi mum al l owabl e i nf i l t r at i on f or a compl et ed st or ef r ont syst em does not exceed 0. 06 cf m/ squar e f oot when t est ed i n accor dance wi t h ASTM E1424 at a di f f er ent i al st at i c pr essur e of 6. 24 psf .
3. 4. 2 Wi nd Loads
Pr ovi de a compl et ed st or ef r ont syst em capabl e of wi t hst andi ng wi nd pr essur e l oads, nor mal t o t he wal l pl ane i ndi cat ed, as f ol l ows:
a. Ext er i or Wal l s
( 1) Posi t i ve Pr essur e: As i ndi cat ed on St r uct ur al Dr awi ngs.
( 2) Negat i ve Pr essur e: As i ndi cat ed on St r uct ur al Dr awi ngs.
b. I nt er i or Wal l s: ( pr essur e act i ng i n ei t her di r ect i on) 5 psf
SECTI ON 08 41 13 Page 14
3. 4. 3 Def l ect i on
Submi t cer t i f i ed t est r epor t s showi ng t hat t he maxi mum al l owabl e def l ect i on i n a member when t est ed i n accor dance wi t h ASTM E330/ E330M wi t h al l owabl e st r ess i s L/ 175 or 3/ 4 i nches maxi mum.
3. 4. 4 Condensat i on Resi st ance and Ther mal Tr ansmi t t ance
Submi t cer t i f i ed t est r epor t s showi ng compl i ance wi t h speci f i ed per f or mance char act er i st i cs as f ol l ows:
a. U- Val ue Requi r ement s:
( 1) Per f or m t est i n accor dance wi t h t he AAMA 1503 pr ocedur e and on t he conf i gur at i on speci f i ed t her ei n.
( 2) Ther mal Tr ansmi t t ance ( " U" Val ue) maxi mum 0. 65 ( 6250) BTU/ hr / sf / deg F at 15 mph ext er i or wi nd.
b. CRF Cl ass Requi r ement s:
( 1) Per f or m a t est i n accor dance wi t h AAMA 1503.
( 2) Condensat i on Resi st ance Fact or Requi r ement s ( CRF) mi ni mum 85.
3. 4. 5 Wat er I nf i l t r at i on
Submi t cer t i f i ed t est r epor t s showi ng t hat t he syst em i s desi gned t o pr ovi de no uncont r ol l ed wat er when t est ed i n accor dance wi t h ASTM E1105 at a st at i c pr essur e of 8 psf .
3. 5 ADJUSTI NG AND CLEANI NG
3. 5. 1 Pr ot ect i on
Pr ot ect t he i nst al l ed pr oduct ' s f i ni sh sur f aces f r om damage dur i ng const r uct i on. Pr ot ect t he al umi num st or ef r ont syst em f r om damage f r om gr i ndi ng and pol i shi ng compounds, pl ast er , l i me, aci d, cement , or ot her har mf ul cont ami nant s.
3. 5. 2 Cl eani ng
Repai r or r epl ace damaged i nst al l ed pr oduct s. Cl ean i nst al l ed pr oduct s i n accor dance wi t h manuf act ur er ' s i nst r uct i ons bef or e accept ance r emove excess mast i c, mast i c smear s, and ot her f or ei gn mat er i al s. Remove const r uct i on debr i s f r om t he pr oj ect s i t e and l egal l y di spose of t hi s debr i s.
3. 6 WARRANTY
Submi t t hr ee si gned copi es of t he manuf act ur er ' s pr oduct war r ant y f or t he ent r ance syst em as f ol l ows:
a. War r ant y Per i od: Fi ve year s f r om Dat e of Subst ant i al Compl et i on of t he pr oj ect , pr ovi ded t hat t he Li mi t ed War r ant y begi ns no l at er t han si x mont hs f r om t he dat e of shi pment by t he manuf act ur er . I n addi t i on, suppor t wel ded door cor ner const r uct i on wi t h a l i mi t ed l i f et i me war r ant y f or t he l i f e of t he door under nor mal use.
SECTI ON 08 41 13 Page 15
Ensur e t hat t he War r ant y ' s l anguage i s i dent i cal t o t he " As Appr oved" ver si on of t he sampl e war r ant y submi t t ed t o and r et ur ned f r om t he Cont r act i ng Of f i cer .
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 0002
- - End of Sect i on - -
SECTI ON 08 41 13 Page 16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 99 PAGES
Building 15 South Wing, Natick SSC
01 11 00 SD-01 Preconstruction Submittals
1.10.3.3Three-Week Schedule of Work
Activities
1.10.3.2 G ROFinal Phasing Plan
1.13.1 G ROUtility Outage Requests
1.13.1 G ROUtility Connection Requests
1.3.2.1 G ROLicenses and Certificates
1.15.5.4 G ROEgress Plan
SD-07 Certificates
G ROPeriodic Schedule Updates
1.10.2 G RORequest Application
SD-11 Closeout Submittals
G ROAs-Built Drawings
G RORecord Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
3.5.2 G RONarrative Report
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.4.2 G SPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G SSustainability Action Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 99 PAGES
01 33 29 1.5.4.2 G SPreliminary Sustainability eNotebook
SD-06 Test Reports
1.5.3 G SSustainability Progress Reports
SD-11 Closeout Submittals
1.5.4.2 G SFinal High Performance and
Sustainable Building Checklist
1.5.4.2 G SFinal Sustainability eNotebook
1.5.4.2 G SAmended Final Sustainability
eNotebook
1.5.4.2 G SAmended Final High
Performance and Sustainable
Building Checklist
3.2 G SThird Party Certification
Certificate, Assessment, or
Validation and Compliance Report
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.4.2 G ROStandard Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 99 PAGES
01 35 26 1.7.4.3 G ROCritical Lift Plan
1.8 G ROActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
3.10 G ROQCR Report
01 45 20.00 18 SD-01 Preconstruction Submittals
1.3 G ROTest Plan List
01 45 35 SD-01 Preconstruction Submittals
3.1.1 G ROSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
Steel Truss Plant Quality
Assurance Program
Wood Truss Plant Quality
Assurance Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 99 PAGES
01 45 35 AC472 Accreditation
Steel Joist Institute Membership
Certified Plant
2.1Certificate of Compliance
G ROSpecial Inspector of Record
1.5 G ROSpecial Inspector
3.1.1Qualification Records
SD-11 Closeout Submittals
3.1.1 G ROInterim Report
3.1.1 G ROComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.6 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
1.9.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.9.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-07 Certificates
1.7.1Backflow Tester
1.7Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 G ROSolid Waste Management Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 99 PAGES
01 57 19 1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
3.2.1.1 G ROStormwater Pollution Prevention
Plan
3.2.1.2 G ROStormwater Notice of Intent
1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications
SD-06 Test Reports
3.2.1.3Inspection Reports
1.10.1 F ROMonthly Solid Waste Disposal
Report
SD-07 Certificates
1.5.5 G ROEmployee Training Records
1.5.5.1Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 F ROStormwater Notice of Termination
3.6.1 F ROWaste Determination
Documentation
3.6.3.6 F RODisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 99 PAGES
01 57 19 1.5.5 F ROAssembled Employee Training
Records
1.10 G ROSolid Waste Management Permit
3.6.2.1 F ROProject Solid Waste Disposal
Documentation Report
3.6.3.1 G ROHazardous Waste/Debris
Management
1.5.2 F RORegulatory Notifications
3.6.2.1 F ROSales Documentation
3.6.2.1Contractor Certification
3.2.1.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.3.1 G ROSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.3.3 G ROC&D Waste Management Plan
01 78 23 SD-10 Operation and Maintenance
Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 F ROTraining Outline
3.1.2 F ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 F ROValidation of Training Completion
01 91 00.15 SD-06 Test Reports
3.1 G RODesign Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 99 PAGES
01 91 00.15 3.5 G ROInterim Construction Phase
Commissioning Plan
3.5 G ROFinal Construction Phase
Commissioning Plan
1.12Issues Log
G ROTemplate Building Envelope
Inspection Checklists
G ROBuilding Envelop Inspection
Checklists
G ROPre-Functional Checklists
G ROCommissioning Report
G ROPost-Construction Trend Log
Report
SD-10 Operation and Maintenance
Data
3.10 G ROMaintenance and Service Life
Plan
3.9 G ROSystems Manual
G ROContractor Training Plan
F ROTraining Attendance Rosters
SD-11 Closeout Submittals
3.11 G ROFinal Commissioning Report
01 91 19 SD-01 Preconstruction Submittals
1.11.2.1 G ROBuilding Enclosure
Commissioning Specialist
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 99 PAGES
01 91 19 1.8 G ROBuilding Enclosure Testing Work
Plan
SD-03 Product Data
2.3 F ROThermal Imaging Camera
2.1 G ROTest Equipment
SD-05 Design Data
3.9.2 G ROEnvelope Surface Area
Calculations
SD-06 Test Reports
3.8 F ROCompleted Building Envelope
Inspection Checklists
3.9.5 G ROPressure Test Procedures
1.11.3 G ROAir Leakage Test Report
3.9.5.7 G ROAir Leakage Test Report
1.11.3 G RODiagnostic Test Report
3.9.6.6 G RODiagnostic Test Report
SD-07 Certificates
1.11.2.2Pressure Test Agency
1.11.2.3Thermographer Qualifications
1.13Certificate of Readiness
SD-10 Operation and Maintenance
Data
3.10 G ROTraining
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RODemolition Plan
1.9Existing Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 99 PAGES
02 41 00 SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals
3.3.3Receipts
02 84 16 SD-07 Certificates
1.8.1 G ROQualifications of CIH
1.8.1 G ROTraining Certification
1.8.2 G ROPCB and Lamp Removal Work
Plan
1.8.3 G ROPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 G ROTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.1DD Form 1348-1
3.3.1Testing Results
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1 G ROConcrete Curing Plan
1.6.6 G ROQuality Control Plan
1.6.7 G ROQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 G ROLaboratory Accreditation
3.3.10Maturity Method Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .