This document is an amendment to a solicitation for Gatehouse Electrical Upgrades at East Brimfield Lake in Fiskdale, Massachusetts, contract number W912WJ24B0006. The amendment provides details on the site visit attendees, responses to requests for information (RFIs), and an update to the wage determination.

The key details are as follows: The project involves upgrading the existing 100A, 120/208V switchboard and lighting panel in the gatehouse, replacing the gatehouse feeder, and replacing branch circuit conductors within the existing conduit system. Optional items include removing and replacing existing floodlights, interior lighting fixtures, and the electric unit heater. The project is set aside for small businesses, with an estimated value between $250,000 and $500,000, and a period of performance of approximately 180 days. The U.S. Army Corps of Engineers, New England District is the issuing agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to inform of site visit attendees, address requests for information (RFIs), and update the w age determination. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Apr-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24B0006

X 9B. DATED (SEE ITEM 11)

14-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Apr-2024

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ24B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

AMENDMENT 0001

Site visit attendees were as follows:

Name Company Ketal Vendant Construction Gary Eaton Lion Heart Electric Corp Al Seranno Serrano Construction Michael Evangelous Patriot Light and Power Graig Gooley Lyle Electric Inc.

Brian Pidgeon BCP Electric LLC Stephen Stachura BCP Electric LLC Brian Genera Premier Plus Electric Terrence Alden Alden Electric Javier Guzman Ray Services Jessie Cabral Ray Services Terrance Ryan TRUEDGE Solutions Corey Moccio Collins Electric Michael Sanborn Sanborn and Son Inc.

Mike Dodd Giroux Electrical Contractors

RESPONSES TO REQUEST FOR INFORMATION (RFIs)

Q1 Can EMT be used rather than rigid conduit in the gatehouse?

A1 No, the project intent is to utilize rigid metallic conduit within the gatehouse as specified.

Q2 What is the process for if the existing conductors can't be pulled out of the conduit?

A2 The conduit and manhole system along the dam was scoped/inspected in October 2022.

No issues were found with the existing conduit condition and no complications are anticipated with removal of the existing conductors. If conductors are unable to be removed from the embedded conduit(s) within and around the gatehouse, the conflicts shall be brought to the attention of the Contracting Officer.

Q3 Will the existing conduit be used?

A3 It is the intent of this project to reuse existing conduit for routing of all new conductors, both within the gatehouse and exterior (dam conduit/manhole system), to the fullest possible extent.

Q4 Will the contractor need to ball and brush following conductor removal?

A4 Refer to Specification Section 33 71 02, Subpart 3.4 "UNDERGROUND CONDUIT AND DUCT

SYSTEMS" for conduit cleaning requirements.

Q5 How long can the electrical be offline?

A5 East Brimfield Dam personnel confirmed the maximum outage duration at the gatehouse will be 24-hours. 72-Hour advanced notice shall be provided for all service interruptions as noted in the contract documents.

Q6 Can the contractor setup a temporary generator at the gatehouse to maintain operations?

A6 The contractor may utilize a temporary generator as a means for backup power to maintain operations when utility power is unavailable for the periods exceeding the 24-hour maximum outage.

Q7 Is the depth of the handholes known?

A7 Refer to Informational Drawing, Sheet 45 for handhole dimensions.

Q8 Are there requirements for the specific type wiring, i.e., THHN or XHHW?

A8 Yes, requirements for wiring type are outlined in Specification Section 26 20 00, Paragraph 2.5.3.

Q9 300 gauge wiring will not fit a 100 amp breaker. Please confirm the wiring size.

A9 Conductors along the dam have been upsized to limit voltage drop in accordance with the UFCs. Splices down to the maximum conductor size accepted by the circuit breaker lugs can be made in accessible locations near the 100A breakers within the utility building panelboard/GHDP to allow the conductors to land at either end of the run.

Q10 Please confirm a full coordination and arc flash study including the utility building and project office needs to be performed for this project.

A10 Confirmed, provide in accordance with UFGS 26 05 73 Power System Studies.

Q11 Please confirm every breaker in GHDP panel needs to have a 100 amp frame regardless of trip size.

A11 Confirmed, that is the intent in distribution panel GHDP.

Q12 Please confirm a fall-of-potential test is needed for the grounding system, if so at what buildings will it need to be performed for?

A12 Intent is for the grounding system test to be performed on the gatehouse system in accordance with Paragraph 3.5.4 of UFGS 26 20 00.

Q13 To install the new panelboards in place of the existing would necessitate a shut down longer than 24 hours. Will a temp generator need to be provided?

A13 See responses to Q5/Q6 for additional information.

Q14 Please confirm the Buy American requirement.

A14 Confirmed, project will utilize domestic materials and products. See FAR 52.225-9 and FAR

52.225-10.

Q15 Please confirm SD-04 Sample Submittals will not be required for this project.

A15 No sample submittals are expected as part of this project.

Q16 Can you please provide specifications & drawings for the switchboard, lighting panel, and any other equipment involved in the upgrade?

A16 Refer to attached excerpt from the Specifications for the Construction of Dam and

Appurtenant Structures for additional information. Document includes Section No. 13 Interior Electrical Work and Section No. 14 Exterior Electrical Work.

Q17 Can you please provide the existing site pictures of the current switchboard, lighting panel, conduit routes, and any other relevant features? Any additional documentation or specifications pertinent to the project scope.

A17 Refer to attached photo pages for additional information.

Q18 Clarify the QTY of removal and replacement of existing floodlights, Interior Lighting Fixtures, and unit heater.

A18 The quantity of removals under this project's optional bid items are as follows:

Gatehouse Roof:

Two (2) Floodlights Gatehouse Operating Floor Four (4) Pendant Mounted Fixtures One (1) Wall Mounted Jelly-Jar Fixture One (1) 7.5kW Electric Unit Heater Gatehouse EL.655.00 Two (2) Pendant Mounted Fixtures

The proposed replacement fixtures/equipment are as follows:

Gatehouse Roof:

Two (2) LED Floodlight Fixtures Gatehouse Operating Floor Four (4) Surface Mounted LED Striplight Fixtures One (1) Wall Mounted LED Vaportight Jelly Jar Fixture One (1) 10kW Electric Unit Heater Gatehouse EL.655.00 Four (4) Surface Mounted LED Striplight Fixtures

The following have been modified:

WAGE DETERMINATIONS

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/MA20240013/3 Wage Determination No.: MA20240013 Modification No.: 3 Date: 22 March 2024

(End of Summary of Changes)