This document provides an amendment to a solicitation for environmental services at a former defense site in Rhode Island. The U.S. Army Corps of Engineers, New England District is issuing a request for proposal for an in-situ thermal remediation effort at the Former Nike Battery and Disaster Training Village Area. This is a small business set-aside with a NAICS code of 562910 and size standard of 750 employees. The solicitation is for a best value, firm-fixed price single award task order contract with a ceiling of $25 million over five years. The amendment extends the proposal acceptance period to November 15th, provides responses to request for information questions on regulatory review timelines, project management costs, and the power supply, and clarifies that offerors are responsible for determining power requirements.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to provide responses to RFIs. Additionally, the requirement for acceptance of proposal is changed from 105 days to 15 November 2022. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22R0011
X 9B. DATED (SEE ITEM 11)
28-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2022
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ22R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIS AMENDMENT 0006
1. Can you please provide insight on the duration that should be anticipated for regulatory review of documents such as the RAWP by RIDEM and USEPA Region 1 based on prior project experience to inform the refinement of the project schedule?
Response: For planning purposes proposals should assume 45-days for stakeholder review and comments.
2. Please advise how project management, regular meetings, monthly status reporting, and other similar tasks associated with the period of work for Option Task 6 – ISTR Implementation should be carried. Should these costs be carried in tasks 001A – 001C or should these costs be carried in option task 005B?
Response: Pricing for project management, regular meetings, monthly status reporting and other similar related tasks should be carried in the appropriate option sub-task; Option Task 6.1 or Option Task 6.2.
3. We would like to request a 10-day extension for the proposal due date in response to the duration associated with obtaining responses to questions.
Response: Please see Amendment 0005.
4. Given the response to Amendment 0004 - RFI 8 to questions about electrical service and assumptions which reads: “Response: Preliminary results of the power study are not available. Due to the stated uncertainties about the power supply available from National Grid, Offeror’s should develop methods and prices for producing electric power for the thermal remedy using portable generators”, we respectfully request an additional 4 days be added to the response date (27 June to 1 July 2022) so that we have adequate time to properly scope and price this item and incorporate it into our offer. This item includes significant fuel use and potential storage requirements as well as additional permitting considerations that are well beyond those of the scoped backup power generator.
Response: Please see Amendment 0005.
5. USACE issued questions and answers in Amendment 004, including the following: 8. Based on
Appendix G of the DAR, it is suggested by National Grid that there is enough service for a 2.5MW load without any negative effects on the local grid service. Are preliminary results from the power study available to provide additional insight into the available power supply at Babcock Road? If no preliminary results are available and a supplemental power supply by portable generators could be required (as specified in the PWS), please specify the supplemental load requirement that would be required by the government as contractors cannot speculate on the actual service load provided to Babcock Road.
Response: Preliminary results of the power study are not available. Due to the stated uncertainties about the power supply available from National Grid, Offeror’s should develop methods and prices for producing electric power for the thermal remedy using portable generators.
However, the Revised Performance Work Statement, also issued as part of Amendment 004 states the following:
1) Power availability
a) Based on discussions with the utility company, National Grid, it is assumed that the thermal treatment zone can be treated using available power and a nominal sized supplemental generator if needed. However, it is the Contractors responsibility to determine the power requirements for the ISTR TCH system and identify the most economically responsible manner to bring power to the Site if required.
Use of the word “should” in the Q&A response indicates that bidders must provide pricing for power supply by generators to be considered compliant, following Instructions to Offerors and Evaluation criteria (Page 68 of the RFP; Section M - Evaluation Factors for Award; C. Evaluation Factors). However, the use of generators to power the site will not result in the most economically responsible approach to providing power. Please clarify whether bidders must include a bid based on the use of generators or if bidders may determine power requirements and select the most economically responsible manner to bring power to the site.
Response: Power on the site is not provided. It is the Offeror’s responsibility to determine if power is needed, how to provide it, and how to price it. A revised response to Amendment 0004 RFI 8 is provided below.
Revised response to Amendment 0004 RFI 8:
Question: Based on Appendix G of the DAR, it is suggested by National Grid that there is enough service for a 2.5MW load without any negative effects on the local grid service. Are preliminary results from the power study available to provide additional insight into the available power supply at Babcock Road? If no preliminary results are available and a supplemental power supply by portable generators could be required (as specified in the PWS), please specify the supplemental load requirement that would be required by the government as contractors cannot speculate on the actual service load provided to Babcock Road.
Revised Response: The availability of power at Babcock Road is unknown and will not be known until the power study referenced in the Seed T.O. and in the responses to RFI questions. The correspondence between AECOM and National Grid presented in Appendix G of the DAR does not indicate that there is enough service for a 2.5 MW load, but rather it describes some requirements for permanent services (as opposed to temporary services such as that being inquired about) larger than 2.5 MW.
The language cited in the Revised Performance Work Statement from Section 6.6.2, the 1st Task Scope Element on “Power Availability”, is legacy text that was written when more information from the power study was expected to be available. Since the power study has not yet been performed, and USACE does not know what power service is currently available, nor what the price would be to bring sufficient power to the site for electrical thermal remediation, Offeror’s may develop methods and prices for producing electric power for the thermal remedy using portable generators.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
GENERAL INFORMATION
This contract is a Single Award Indefinte Delivery Indefinite Quantity (IDIQ) Service Contract. The contract shall have a 5 year ordering period and the total amount of the contract shall not exceed $25,000,000.00.
After award of the base contract, work will be issued through negotiated task orders on a firm fixed price basis.
Specific task and pricing information for work to be performed under this contract shall be included in each negotiated Task Order.
Certain pricing data and information will be required with your proposal. Pricing shall be provided in accordance with the applicable wage rates. Binding Rates shall become part of the contract and used in developing task orders under this contract.
The Government is obligated to satisfy a minimum guaranteed amount of not less than $20,000.00 over the life of the contract. The Seed Task Order will be awarded after the base IDIQ contract award.
Contractors are to complete and submit a Certificate of Corporate Authority of the signing representative with their proposal.
**NOTE** In accordance with FAR 4.1102(a), all Offerors must have an ACTIVE SAM.gov registration prior to proposal submission. Joint Ventures must be registered and active as the Joint Venture in SAM prior to proposal submission. Offerors not registered at the time of submission will be rejected and will not be reviewed.
***NOTE*** Offerors must provide at least until November 15, 2022 days for acceptance of the proposal.
Please note the proposal submission requirements on page 62.
***NOTE*** Requests for Information (RFIs) should be received no later than close of business on Friday, 27 May 2022.