This document contains binding rate sheets and key personnel rates for a potential federal contract to provide environmental services at the Callahan Mine Superfund Site.
The rate sheets provide fully burdened hourly rates by labor category for five potential years of the contract. Rates are included for personnel in home office, field office, and remote office locations, and for regular and overtime hours. However, all rates for all years and locations are listed as $1.00/hour with 0% markup, indicating this is a template or example document rather than rates specific to any offeror. No other cost or pricing information is included.
The related federal contract opportunity notice is for in-situ thermal remediation services at the Former Nike Battery and Disaster Training Village Area in North Kingstown, Rhode Island. It is a small business set-aside solicited as a best value IDIQ contract with a $25 million ceiling and seed task order. The effort includes pre-remediation design and execution of thermal remediation to address CVOCs contributing to a groundwater plume. The period of performance is five years.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Markups
| Binding Rates for Prime Contractor | |
| Prime Contractor Name: | |
| Document: | Appendix I-1/Mark-up Development |
| HOME OFFICE LABOR | |
| Markup Type (Provide Description) | % |
| Fringe | |
| Overhead | |
| G&A | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| Combined Markup for home office | 0.00% |
| FIELD OFFICE LABOR | |
| Markup Type (Provide Description) | % |
| Fringe | |
| Overhead | |
| G&A | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| 0.00% | |
| Combined Markup for field office/site work | 0.00% |
| REMOTE OFFICE LABOR | |
| Markup Type | |
| Fringe | |
| Overhead | |
| G&A | |
| Combined Markup for Remote | 0.00% |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Solicitation Number: W912WJ-17-R-0005 &D
Base Year 1
| Binding Rates for Key Personnel | Base Year 1 |
| Prime Contractor Name: | |
| Document: |
| Home Office | Home Office OT | Field Office | Field Office OT | |||||||||
| Government Job Title | Contractor Job Title | Unit | DIRECT RATE $ | DIRECT RATE (OT) $ | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE |
| Program Manager | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | ||||
| Project Manager | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Chemist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Chemist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Technical Expert - Thermal | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Civil/Environmental Engineer | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Civil/Environmental Engineer | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Geologist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Geologist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Geophysicist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Geophysicist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Hydrgeologist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Hydrogeologist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Scientist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Scientist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Safety Specialist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Senior Computer/CADD Operator | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Computer/CADD Operator | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Data Base Manager | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Administrative Assistant | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| QA/QC Specialist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Contract Administrator | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| GIS Specialist | Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | |||
| Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | ||||
| Hour | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | 0.00% | $ - | ||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour | ||||||||||||
| Hour |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Year 2
| Binding Rates for Key Personnel | Year 2 |
| Prime Contractor Name: | |
| Document: |
| Home Office | Home Office OT | Field Office | Field Office OT | |||||||||
| Government Job Title | Contractor Job Title | Unit | DIRECT RATE $ | DIRECT RATE (OT) $ | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE |
| Program Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Project Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Technical Expert - Thermal | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Hydrgeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hydrogeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Safety Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Data Base Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Administrative Assistant | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| QA/QC Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Contract Administrator | Hour | |||||||||||
| GIS Specialist | Hour |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Year 3
| Binding Rates for Key Personnel | Year 3 |
| Prime Contractor Name: | |
| Document: |
| Home Office | Home Office OT | Field Office | Field Office OT | |||||||||
| Government Job Title | Contractor Job Title | Unit | DIRECT RATE $ | DIRECT RATE (OT) $ | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE |
| Program Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Project Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Technical Expert - Thermal | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Hydrgeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hydrogeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Safety Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Data Base Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Administrative Assistant | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| QA/QC Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Contract Administrator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| GIS Specialist | Hour |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Year 4
| Binding Rates for Key Personnel | Year 4 |
| Prime Contractor Name: | |
| Document: |
| Home Office | Home Office OT | Field Office | Field Office OT | |||||||||
| Government Job Title | Contractor Job Title | Unit | DIRECT RATE $ | DIRECT RATE (OT) $ | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE |
| Program Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Project Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Technical Expert - Thermal | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Hydrgeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hydrogeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Safety Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Data Base Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Administrative Assistant | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| QA/QC Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Contract Administrator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| GIS Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Year 5
| Binding Rates for Key Personnel | Year 5 |
| Prime Contractor Name: | |
| Document: |
| Home Office | Home Office OT | Field Office | Field Office OT | |||||||||
| Government Job Title | Contractor Job Title | Unit | DIRECT RATE $ | DIRECT RATE (OT) $ | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE | Combined Markup % | TOTAL BURDENED RATE |
| Program Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Project Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Chemist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Technical Expert - Thermal | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Civil/Environmental Engineer | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Geophysicist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Hydrgeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hydrogeologist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Scientist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Safety Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Senior Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Computer/CADD Operator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Data Base Manager | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Administrative Assistant | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| QA/QC Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Contract Administrator | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| GIS Specialist | Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | |
| Hour | $ 1.00 | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 | 0.00% | $ 1.00 |
&G &"Arial,Italic"Callahan Mine Superfund Site IDIQ/RAC, Pick List
| Task 1 |
| Task 2 |
| Task 3a |
| Task 4 |
| Task 3b Initial |
| Task 3b Final |