This amendment modifies the solicitation for the Construction of a Raymark Stormwater Pumping Station project. The amendment provides responses to five questions from potential offerors. It confirms that a water treatment plant is required to treat suspended solids and have flexibility to treat impacted water if needed. It also confirms that pump requirements can be found in the specifications and drawings but manufacturer names will not be specified. Additionally, it clarifies that price escalation will not be allowed and that the bid opening date and call-in information remain the same as the original solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to Requests for Information (RFIs). All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22B0007
X 9B. DATED (SEE ITEM 11)
25-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Mar-2022
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ22B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 0006
QUESTIONS AND ANSWERS:
Question #1: Amendment #5, Question #28 asked for confirmation that a water treatment plant is required for this project. The Government Response states that a water treatment plans shall be provided per Section 02 24
50. Section 02 24 50, Paragraph 1.1 states: “This specification is intended to address construction water treatment during Contract related work activities. This work is not expected to generate impacted water during work activities with the exception of suspended solid (SS), but the Contractor shall have equipment and personnel prepared to manage and treat impacted construction water as needed.” Providing an onsite water treatment plant will add cost and scope to the project that most likely will be unnecessary. Can this scope be addressed as a change of condition during construction, in the event it is required, similar to how potential impacted soils are to be handled?
Government Response 1: This work is not expected to generate impacted water during work activities except for suspended solids. The Water Treatment Plant shall treat suspended solids at a minimum and have the flexibility to be upgraded to treat potentially impacted water collected during construction activities.
Question #2: Amendment #5, Question #16 requested information on the basis of design for each pump type. Can you please confirm the following?
a. Basis of design for pumps specified in Section 22 13 29
b. Basis of design for pumps specified in Section 35 45 01
Government Response 2: Requirements for the pumps can be found on Sheet D-003, Section 22 13 29, and Section 35 45 01. Manufacturer names will not be specified by the Government.
Question #3: In consideration of current volatile market conditions and that these conditions may deteriorate further in the 60+ days following bid submission, would the Government include an escalation clause in this solicitation?
Government Response 3: The Government will not include a price escalation clause for this project.
Question #4: Can you please clarify the date and time of the bid opening?
Government Response 4: Offers are due by 01:00 PM EST on 11-Mar-2022. The bid opening will begin at 02:00 PM EST on 11-Mar-2022.
Question# 5: Is the call-in information provided in the original RFP for the bid opening still correct?
Government Response 5: The original call-in number is the same.
1-844-800-2712 US Toll Free; 1-669-234-1177 US Toll; Access Code: 2764 738 0716
(End of Summary of Changes)
W912WJ22B0007