Amendment_W912WJ22B0007_0005_Raymark PS 01A-602 Rev-1.pdf

PDF 67 KB Posted

Attached to
Construction of a Raymark Stormwater Pumping Station
Solicitation number
W912WJ22B0007
Issued by

About this file

This document contains construction drawings and specifications for a stormwater pumping station project. The drawings depict precast concrete wall panel types, door and louver schedules, a room finish schedule, and hatch schedules. Precast concrete walls will utilize split-faced block and concrete block form liners. The project involves construction of a stormwater pumping station in Stratford, Connecticut for the U.S. Army Corps of Engineers, New England District. AECOM Technical Services is providing consulting services.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION

PARTITION TYPE B1

CONCRETE INSULATED PRECAST PANEL

REMARKS

WALL REINFORCING SHALL BE DESIGNED AND

DETAILED BY THE PRECAST WALL PANEL

MANUFACTURER AND SIGNED AND SEALED BY

THE DESIGN PROFESSIONAL WHO PREPARED

THE DESIGN PER SPECIFICATION SECTION 03

45 33-2.1.1.2 AND THE REINFORCING SHALL BE

DETAILED BY THE PRECAST WALL

MANUFACTURER AS SPECIFIED IN

SPECIFICATION SECTION 03 45 33-2.1.1.2b(3).

FROM INTERIOR TO

EXTERIOR

- 5 1/2" CONCRETE PANEL

- 2 1/2" RIGID INSULATION

- 6" CONCRETE PANEL

FORM LINERS : SPLIT-FACE

BLOCK AND CONCRETE

BLOCK PER SPEC 03 45

33 -2.3.10.2 FORMED

SURFACES

DESCRIPTION

BASE

PLAN

HEAD

VIEW

STRUCTURE

PARTITION TYPE B2

CONCRETE WALL

FROM TOP TO BOTTOM

- FIRE PROOFING AT TOP OF WALL

- 8" PRECAST CONCRETE PANEL

IN

TE

R

IO

R

REMARKS

WALL REINFORCING SHALL BE DESIGNED AND

DETAILED BY THE PRECAST WALL PANEL

MANUFACTURER AND SIGNED AND SEALED BY

THE DESIGN PROFESSIONAL WHO PREPARED

THE DESIGN PER SPECIFICATION SECTION 03

45 33-2.1.1.2 AND THE REINFORCING SHALL BE

DETAILED BY THE PRECAST WALL

MANUFACTURER AS SPECIFIED IN

SPECIFICATION SECTION 03 45 33-2.1.1.2b(3).

1 1

LA

ST

U

PD

AT

E:

PA

TH

/F

IL

EN

AM

E:

PL

O

T D

AT

E

Designed By:

SHEET TITLE

SHEET NUMBER

Drawn By:

Dept. Check:

ISSUE/REVISION

CLIENT

AECOM TECHNICAL SERVICES, INC.

250 APOLLO DRIVE

CHELMFORD, MA 01824

PHONE: (987) 905-2100

www.aecom.com

PROJECT

PROJECT NUMBER

CONSULTANT

New England District

REGISTRATION

DISCIPLINE

Proj. Check:

Date:

Scale:

BI

M

-R ay m ar k

St or m w at er

D es ig n/

R ay m ar k St or m w at er P um p

St at io n

AR

C H

.rv t

2/

/2

2:

:0

PM

2/

/2

2:

:0

PM

1" = 1'-0"

A.QUINN

A.QUINN

WALL TYPES &

SCHEDULES

01 A-602

US Army Corps of Engineers

60610884

RAYMARK STORMWATER

PUMPING STATION

STRATFORD, CONNECTICUT

G.OTTERSON

June 2021

M.MESERVE

KEY VALUE KEYNOTE TEXT

LOUVER SCHEDULE

TYPE COUNT WIDTH HEIGHT MATERIAL FINISH

HEAD

DETAIL

JAMB

DETAIL

SILL

DETAIL NOTES

L1 1 8' - 0" 8' - 8" ALUM ANOD LH LJ LS

L2 1 6' - 4" 2' - 0" ALUM ANOD LH LJ LS

L3 1 2' - 0" 4' - 0" ALUM ANOD LH LJ LS

DOOR SCHEDULE

DOOR

NUMBER COUNT

ROOM INFORMATION SIZE DOOR FRAME DETAIL

FIRE RATING HDW GROUP NOTESFROM ROOM NUMBER TO ROOM NUMBER WIDTH WIDTH R.O. HEIGHT HEIGHT R.O. TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

101A 1 ELECTRIC ROOM 101 EXTERIOR 6' - 0" 6' - 4 1/2" 8' - 4" 8' - 8 1/2" C HM PT 1 HM PT DH-1 DJ-1 DS-1 NO 90 101B 1 ELECTRIC ROOM 101 PUMP ROOM 102 3' - 0" 3' - 4 1/2" 7' - 0" 7' - 4 1/2" B HM PT 1 HM PT DH-2 DJ-2 DS-2 90 MIN 170 NO GLASS 101C 1 PUMP ROOM 102 EXTERIOR 6' - 0" 6' - 4 1/2" 8' - 4" 8' - 8 1/2" C HM PT 1 HM PT DH-1 DJ-1 DS-1 NO 90 102A 1 PUMP ROOM 102 EXTERIOR 3' - 0" 3' - 4 1/2" 7' - 0" 7' - 4 1/2" A HM PT 1 HM PT DH-1 DJ-1 DS-1 NO 30

ROOM FINISH SCHEDULE

NUMBER NAME

FLOOR

FINISH BASE

WALL FINISH

CEILING FINISH NOTESNORTH SOUTH EAST WEST

101 ELECTRIC ROOM LQH CON P2 P2 P2 P2 P1

102 PUMP ROOM LQH CON P P P P P1

01 A-602 Scale: 1" = 1'-0"

1 WALL TYPES

ROOF HATCH SCHEDULE

HATCH TYPE HATCH MATERIAL LENGTH WIDTH COMMENTS

PERSONAL ROOF HATCH GALVANIZED STEEL 4' - 0" 4' - 0"

ROOF HATCH GALVANIZED STEEL 8' - 2" 5' - 10"

ROOF HATCH GALVANIZED STEEL 8' - 2" 5' - 10"

ROOF HATCH GALVANIZED STEEL 8' - 2" 5' - 10"

ROOF HATCH GALVANIZED STEEL 8' - 2" 5' - 10"

FLOOR HATCH SCHEDULE

TYPE NOTES

ALUMINUM FLOOR HATCH

Grand total: 4

SEE STRUCTURAL FOR SIZES & LOCATIONS

I/R DATE DESCRIPTION

1 FEB 2022 CLARIFY CONCRETE NOTES

File details come from the government source that posted it. Updated .