W912WJ21B0004-0002.pdf
PDF 549 KB Posted
- Solicitation number
- W912WJ21B0004
About this file
This document provides an amendment to a federal solicitation for repair work on the Fairhaven Sector Gate at the New Bedford Hurricane Barrier. The U.S. Army Corps of Engineers, New England District is seeking bids for repairs to damage caused by an allision in May 2020. The scope of work includes removing existing fenders and debris, replacing a damaged gate guide and support strut, installing new composite fenders, and demonstrating functionality of the gate. The period of performance is 125 days with an estimated budget between $500,000 and $1,000,000. The solicitation is set aside for certified small businesses and provides responses to contractor questions on permitting requirements, specification clarifications, inspection and testing needs, disposal responsibilities, and whether confined space or lead paint work is involved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| Snap Sheet.pdf | ||
| Virtual SIte Visit_no video.pptx | PPTX presentation | |
| Allision Repairs_Virtual Site Visit.mp4 | MP4 file | |
| Amendment W912WJ21B0004-0001.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| W912WJ21B0004-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to provide responses to Requests for Information. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0004
X 9B. DATED (SEE ITEM 11)
16-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jan-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ21B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION
1. I have a question on permits, environmental, as it relates to removing marine growth, please provide what applies.
Response: Divers would be removing any marine growth, algae, mussels, etc. These are not protected species and are incidental to removal of the debris. Any impact is anticipated to be negligible to minor and do not require further permitting under NEPA.
2. Specification section 01 35 26 states that an SSHO cannot be the CQC Manager. Specification section 01 45 00 states that the CQC Manager can be the SSHO. Please clarify this difference.
Response: Specification section 01 45 00 is incorrect. SSHO cannot be the CQC Manager.
3. Please clarify whether the NDT of welds is for shop welds, field welds or both.
Response: It is for both. Refer to SECTION 05 50 14, STRUCTURAL METAL FABRICATIONS, para. 2.4.2.2 which states: "Perform as designated or described in the sections of these specifications, the nondestructive testing of shop and field welds covering the particular items of work."
4. Please clarify whether the coating thickness testing applies to shop coating, field coating or both.
Response: The coating thickness testing applies to both shop and field coating, so as to determine the total coat system thickness required by the specs.
5. Please clarify touch up requirements for field touch up of coating with respect to field drilled bolt holes, welds, and damaged coating. Specifically, will field touch up of coating need to meet the same specifications as shop coating with respect to preparation, number of coats and/or immersion time?
Response: Yes, touch up painting shall be the same preparation, types of paint, number of coats, thickness of coat, immersion time, etc.
6. What will the required spacing be for the galvanized threaded rods to be drilled into the concrete abutment? For the 2 pcs. of composite fenders to be attached to the abutments.
Response: There are four pairs of existing anchors currently supporting the fenders on the abutments. The current sets of anchors appear to be spaced about 4.5' to 5.0' apart, however, the contractor shall field verify all dimensions prior to work. New anchors shall be installed offset from the existing anchors, as described in the current set of contract documents.
W912WJ21B0004
7. The specification section 01 11 00 /1.1 reads “All steel and fenders that are removed shall be stored at the project site”. Is this correct?
Response: Yes.
8. Is the GC not responsible for disposal, transportation, tipping fees, loading, and unloading of the items removed for replacement?
Response: Correct. Contractor is only responsible for removing and placing them at a location on site as directed by the COR.
9. Is confined space work expected?
Response: No.
10. Is lead paint removal work expected?
Response: These are new members to be painted in the shop; so no lead work is expected.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .