Virtual SIte Visit_no video.pptx

PPTX presentation 5 MB Posted

Attached to
Fairhaven Sector Gate Allision Repairs at the New Bedford Hurricane Barrier
Solicitation number
W912WJ21B0004
Issued by

About this file

This solicitation requests bids for repair work at the New Bedford Hurricane Barrier in Massachusetts. The U.S. Army Corps of Engineers, New England District is seeking to replace damaged fenders and gate guides, install new composite fenders, and demonstrate repairs on stop gates. The work includes inspecting and clearing debris from the navigation channel sill and gate guides. The small business set-aside contract has an estimated value between $500,000 and $1,000,000 and a 125-day period of performance. Interested certified small businesses may submit bids through the System for Award Management website until the closing date to be considered for award of this repair work at the New Bedford Hurricane Barrier damaged in an allision event in May 2020.

View the file

Other files

File Type Posted
BidAbstract.pdf PDF
Snap Sheet.pdf PDF
W912WJ21B0004-0002.pdf PDF
Allision Repairs_Virtual Site Visit.mp4 MP4 file
Amendment W912WJ21B0004-0001.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
W912WJ21B0004-Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Allision repairs NEW BEDFORD HURRICANE Barrier New Bedford, MA Adam Stewart Technical Lead Engineer New England District, Structural Section 5 January 2021 1/5/2021

Contracting Introduction

Project Overview Primary Items of Work:

Fabricate and Replace Gate Guide 4 (G4) Fabricate and Replace Strut at Horizontal Truss 2 Fabricate and Replace Timbers at G4 and South Abutment Perform Test Fit of Stop Gate Between G3-G4 and G4-G5

Site Access - Overview

West Entry

Staging Area

Hurricane Barrier

East Entry

Site Access – West ENTRY

See “1. Access Road.avi”

Site Access – EAST ENTRY

Staging Area

Must maintain right of way for canal staff

Staging Area Stop Gates

Fairhaven Sector Gate

Fairhaven Sector Gate

Gate guide g4

Horizontal strut image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image1.png image2.png image3.png

File details come from the government source that posted it. Updated .