This amendment modifies a solicitation for a multiple award task order contract for design-build services. The U.S. Army Corps of Engineers, New England District intends to award four small business set-aside contracts totaling $90 million over five years for new construction, rehabilitation, renovation, repair, modification, and maintenance projects across New England and the North Atlantic Division. Task orders will range from $500,000 to $10 million on a firm-fixed-price basis. The amendment provides responses to requests for information, clarifying that past performance questionnaires and contractor performance assessment reports will not count against the page limit and should be included in the past performance factor documentation.

View the file

Other files

File Type Posted
W912WJ20R0002_Amendment_0002.pdf PDF
MFR.pdf PDF
W912WJ20R0002_Amendment_0001_.pdf PDF
Seed_Task_Order_Scope.pdf PDF
W912WJ20R0002.pdf PDF
Appendix_D_-_Prime_Binding_Rates_Excel_Sheet.xlsx XLSX spreadsheet
WD.pdf PDF
Appendix_E_-_Seed_Task_Order_Rates_Excel_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is being issued to provide responsed to Requests for Information. All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Nov-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20R0002

X 9B. DATED (SEE ITEM 11)

11-Oct-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Nov-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUESTS FOR INFORMATION (0003

1. Under Section L, Page 8 of 78 of the Solicitation, Note directly below the graph, appears to exempt PPQs from the proposal 35 page limit, please confirm. Our questions is, since CPARS and PPQs appear to be interchangeable depending on availability, are CPARS also exempt from the 35 page limit?

RESPONSE: Correct. CPARS and PPQs will NOT be counted agains the page limits.

2. Under Section L, Content Requirement, Page 12 of 78, h. Phase 1, Volume 1, Factor 3: Past Performance, the first paragraph appears to require PPQs and CPARS to be filed in Phase 1, Volume 1, Factor 1: Experience. However, item 2 appears to require the submission of any PPQs, in lieu of unavailable CPARS, as part of this item, Phase 1, Volume 1, Factor 3. Please advise exactly where the PPQs and the CPARS should appear in the Proposal package.

RESPONSE: PPQs/CPARS documentation should be submitted as part of Phase I, Factor 3 documentation.

(End of Summary of Changes)