This document is an amendment to a solicitation for the Muddy River Flood Damage Reduction - Phase 2 project in Boston and Brookline, Massachusetts. The amendment extends the proposal due date from August 23, 2019 to August 30, 2019 at 2:00 PM local time and provides responses to 18 contractor questions. Key details include that the U.S. Army Corps of Engineers Engineering District New England is the issuing agency; the work involves flood control channel excavation, culvert excavation, and sheet pile installation; disposal requirements are specified for excavated sediments and phragmites; and the contractor will be responsible for ensuring fish passage during construction.

Amendment

View the file

Other files

File Type Posted
Amendment_0005_of_Solicitation.pdf PDF
AMENDMENT_0004_OF_SOLICITATION.pdf PDF
W912WJ19R0014_0004.pdf PDF
MUD-2_B-SI.dgn —
W912WJ19R0014_0003.pdf PDF
AMENDMENT_0003_OF_SOLICITATION.pdf PDF
MUD-2_G-KP.dgn —
215042-200-FIRE-ALARM.dgn —
MUD-2_C-SP.dgn —
MUD-2_V-SP-BOS_GIS.dgn —
MUD-2_V-SP_CDM.dgn —
MUD-2_V-SP_BRYANT_2016.dgn —
W912WJ19R0014_0002.pdf PDF
W912WJ19R0014_0001.pdf PDF
Site_Visit_Attendance_List.pdf PDF
Site_Visit_Attendance_List.pdf PDF
Muddy River 2 Reference Drawings Complete Set.pdf PDF
Sediment_Data_Appendix_Phase_2_Specifications.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
W912WJ19R0014.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to answ er Contractor Requests for Information, incorporate the Specifications Amendment Document titled "Amendment 0005 of Solicitation" and extend the Proposal due date. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19R0014

X 9B. DATED (SEE ITEM 11)

20-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ19R0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 23-Aug-2019 02:00 PM to 30-Aug-2019 02:00 PM.

The following have been added by full text:

RFI - AMENDMENT 0005

Muddy River Phase II Construction Amendment 0005

REQUESTS FOR INFORMATION AND GOVERNMENT RESPONSES

1. Will USACE provide a tax exempt certification for materials incorporated into the project?

RESPONSE: Please see response to Amendment 0003, #62.

2. The contract drawings appear to have switched the Northing and Eastings in all of the coordinate boxes. Can you please check and confirm?

RESPONSE: See revised C-101 to C-110 drawings under Amendment 0005.

3. G-101 and the GC contract drawings have scales which appear to be incorrect. Can you please check the scaling and revise drawings accordingly?

RESPONSE: See revised G-101 and GC101 to GC105 drawings under Amendment 0005.

4. Can you make the CAD files available to the bidders?

RESPONSE: CADD files were made available under Amendment 0003.

5. The prevailing wage rates appear to be a year old. Please revise to the present rates.

RESPONSE: An updated Wage Determination was included under Amendment 0004.

6. Union contractors will be subject to annual rate inflation, will non-union contractors be subject to increases to prevailing wage?

RESPONSE: All contractors, whether they are union or non-union, are required to pay their workers prevailing Construction Wage rates for the duration of the contract.

7. Due to the size and complexity of this proposal response, we respectfully request a two-week extension.

RESPONSE: Proposal due date is extended to August 30, 2019 at 2pm local time.

8. Has the USACE or their consultant prepared a Cultural Landscape Report per the Secretary of Interior’s standard for the treatment of cultural landscapes? If so, will USACE provide the report to contractors? If not, will this be a requirement of the selected contractor?

RESPONSE: The contractor is not required to prepare a Cultural Landscape Report per the Secretary of Interior’s Standard for the treatment of cultural landscapes.

9. In drawings C-101 thru C-110, the phragmities excavation areas are 1) hatched to indicate MA Lined landfill, 2) hatched to indicate out of state non-RCRA, or 3) not classified by a hatching. Is the disposal for the all phragmities excavated materials MA Lined Landfill? If not, please provide guidance for all excavation areas without a disposal hatching.

RESPONSE: The disposal of phragmites excavated from within flood control channel shall be disposed in accordance with the adjacent excavated sediment hatching. Disposal of phragmites beyond the flood control channel shall be MA lined landfill.

10. Drawing C-108 and C-109. The Agassiz Road Culverts are to be excavated. The areas north of the culverts is designated MA Lined Landfill and the areas south are Out of State Non-RCRA, but the culvert excavation is not hatched. Please indicate the disposal classification for the culvert excavation.

RESPONSE: See response to RFI question #48 under Amendment 0003.

11. Specification 01 74 19 Part 1.1 states that contractors “Divert a minimum of 60 percent by weight of total project solid waste from the landfill.” Does this statement apply to excavated sediments, which are identified for disposal at landfills per the contract drawings? Can you please clarify this specification requirement?

RESPONSE: This statement does not apply to excavated sediments. It applies to general construction waste.

12. Are Blueback Herrings being transported around the flood control structure (installed during Phase I between Area 6 and 7) by the USACE or other entity during the spring and fall windows? If not, does the existing structure presently in place allow for safe passage? If yes, can you provide the name and contact information for the company/agency presently performing this work?

RESPONSE: The contractor will be responsible to ensure that blueback herring can reach areas upstream and downstream of the project either by allowing free passage in the river or by truck transport. The Corps will not be transporting the fish. The current flow restriction control structure does allow fish to pass.

13. Specification section 31 01 00 3.2 E. 9. States: Sheet piles installed within 25 feet of the 59 Fenway Fire Signal Station buildings shall remain in-place and the locations shall be surveyed and marked on the As-Built Drawings. During backfilling and compaction, bracing shall be removed once backfill is within 2 ft of the bracing.

Sheet piles to remain in-place shall have the top 5 feet cut and removed, unless located within 5 feet of a building. Does this only pertain to temporary shoring to be used between Dredge Area 11 and 12? Please indicate where permanent sheeting is to be installed at 59 Fenway Fire Signal Station, if any.

RESPONSE: This requirement only pertains to temporary sheet piles. There is no permanent sheet pile requirement.

14. The site plan drawings (C101 – C111) classify excavated material disposal classifications outside the shaded limit of excavation. Does any of this material require removal and disposal?

RESPONSE: The only requirement for excavation and disposal of material is within the shaded limit of excavation.

15. In response to Amendment 0003 Question 62, it states in part that "... After award, the contractor may submit an applicable tax exempt form for materials for Government review and signature. However, the Government will not provide a blanket exemption form." Please clarify whether bidders shall carry sales tax in their bid for permanent materials incorporated into the work.

RESPONSE: Please see FAR clause 52.229-3 included in the solicitation.

16. In response to Amendment 0003 Question 11, it states in part that "Arrangement for the payment of Police Details shall be made directly with the police department providing services." Please clarify whether the cost for police details that are paid by the contractor are to be included within Bid Items 1-25, or whether they are separate from Bid Items 1-25 and shall be invoiced/reimbursed separately by USACE in addition to Bid Items 1-25 as performed on other projects.

RESPONSE: See subpart 1.5 of Specification Section 01 22 00. The costs for police details per the Offeror’s means and method of work shall be included in the listed item most closely associated with the work involved within the bid items 0001-0025.

17. Based on questions that have still have not been answered, please consider extending the bid due date an additional week. If no extension, please consider a delivery/due date of Monday 8/26 at 2pm due to the need to ship the bid package? Or consider an electronic submittal?

RESPONSE: Proposal due date is extended to August 30, 2019 to 2pm.

18. Regarding the disposal of contaminated and/or hazardous soils and other materials we cannot find within the bid documents that anyone is specifically listed as the waste generator.

Can you please clarify who the contaminated and/or hazardous waste generator(s) will be and if there are any other MassDEP ownership requirements?

RESPONSE: The generator of the contaminated sediment is the owner of the property where the contaminated sediment and/or hazardous soils are found, either in Boston or Brookline, as determined by the boundary lines shown on drawings C-101 through C-110.