Site_Visit_Attendance_List.pdf

PDF 635 KB Posted

Attached to
Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Solicitation number
W912WJ19R0014
Issued by

About this file

This document contains sign-in sheets from a site visit related to solicitation number W912WJ19R0014 for flood damage reduction services for the Muddy River in Boston and Brookline, Massachusetts. The site visit was held on June 11, 2019 and pertained to Phase 2 of the Muddy River Flood Damage Reduction Project. The solicitation was issued by the Department of the Army Corps of Engineers New England District on August 15, 2019. The sign-in sheets include the names and contact information of various individuals from companies such as Kleinfelder, CDM Smith, and Middlesex Corporation who attended the site visit to inform their responses to the solicitation.

Site Visit Attendance List

View the file

Other files

File Type Posted
W912WJ19R0014_0005.pdf PDF
Amendment_0005_of_Solicitation.pdf PDF
AMENDMENT_0004_OF_SOLICITATION.pdf PDF
W912WJ19R0014_0004.pdf PDF
MUD-2_B-SI.dgn —
W912WJ19R0014_0003.pdf PDF
AMENDMENT_0003_OF_SOLICITATION.pdf PDF
MUD-2_G-KP.dgn —
215042-200-FIRE-ALARM.dgn —
MUD-2_C-SP.dgn —
MUD-2_V-SP-BOS_GIS.dgn —
MUD-2_V-SP_CDM.dgn —
MUD-2_V-SP_BRYANT_2016.dgn —
W912WJ19R0014_0002.pdf PDF
W912WJ19R0014_0001.pdf PDF
Site_Visit_Attendance_List.pdf PDF
Muddy River 2 Reference Drawings Complete Set.pdf PDF
Sediment_Data_Appendix_Phase_2_Specifications.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
W912WJ19R0014.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT SIGN IN SHEET

Date: 11 June 2019

RFP No. W912WJ19R0014

Title: Muddy River Flood Damage Reduction Project — Phase 2, Boston and

Brookline, Massachusetts

Name (First and Last)

Please print legibly

COMPANY

(Please Print legibly)

Phone Number

**f DeAis s k valig co4 q4l 7P-q, Ci% ri9 (fAir,/ -j,e1440os T I iLe 30 .s.--6(3V6,6 arAll fatvwi o‹,0

(v 7 7/7 '''2 7, 1 3' 7,

- 7 ) 6 - 2E -4 - b4 1 .k--V.66.- ._., AA

- licrl

)1

-cr-lc- )

--Tvoc_ lot NIGInert l-Lsfitilifi6

6 / 7 era- C(60 t\ locatic6 C/tefry-Al il

?t_fe"/ SpaS k

A id dle Sex

Ts -7et? - 4-fn

SITE VISIT SIGN IN SHEET

Date: 11 June 2019

RFP No. W912WJ19R0014

Title: Muddy River Flood Damage Reduction Project — Phase 2, Boston and

Brookline, Massachusetts

Name (First and Last)

Please print legibly

COMPANY

(Please Print legibly)

Phone Number

Cj4t: t fil(l'A Lt(PlYm* (1 i-LA-u--6-1, fli) 3 -3-) 6Wv6 litl-e-t-e 6 , (cpw,,,,At 6,4, teip-cri's 3 -54)

7zAte --a,-si - t3 6 oczAs iz_r_aucrri ci--ptit-roit f vorAtiK Ciwitr, ei(5'.7-- Tr3- .5Pc

&Ali POOttvAik N.-AA:ma... 9)5-1 - 2 ai t?,- 44

Ikffith7V.t. ctdi \;11) II{ 1*- \‘'.7kC

Page 1
Page 2

File details come from the government source that posted it. Updated .