W912WJ19R0014_0004.pdf
PDF 297 KB Posted
- Solicitation number
- W912WJ19R0014
About this file
This document provides an amendment to a solicitation for the Muddy River Flood Damage Reduction - Phase 2 project in Boston and Brookline, Massachusetts. The amendment responds to contractor questions, updates specifications and wage determinations, and incorporates changes to the solicitation document. The U.S. Army Corps of Engineers Engineering District New England issued the solicitation under number W912WJ19R0014 and proposals are due by August 23, 2019. The work includes flood protection improvements across multiple areas and specifications cover items such as metal sheet piling, landscaping, and prevailing wages.
Amendment 0004
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to answ er Contractor Requests for Information, correct Amendment 0003 Requests for Information that had been published w ith clerical errors, update the Wage Determination, and to incorporate the Amendment Document titled “AMENDMENT 0004 OF SOLICITATION.” All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ19R0014
X 9B. DATED (SEE ITEM 11)
20-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2019
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ19R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0004
SPECIFICATIONS CHANGE
This Amendment Incorporates the Specifications Amendment Document titled “AMENDMENT 0004 OF
SOLICITATION”
RFI - AMENDMENT 0004
Muddy River Phase II Construction Amendment 0004
REQUESTS FOR INFORMATION AND GOVERNMENT RESPONSES
1. We respectfully request a bid extension of two (2) weeks. This is a unique project with numerous environmental and logistical restraints that need to be considered. This extra time would allow for better alignment between our technical proposal and pricing while also providing a more accurate and competitive proposal overall.
RESPONSE: Please see Amendment 0002 to the Solicitation. Proposal due date is August 23 at 2pm.
2. Regarding the contaminated soils and groundwater, most of the supplemental data from the “Compilation of Sediment Quality Information” is over four (4) years old. Are there any soil classifications/analysis from the Phase 1 project that can be provided pre-bid?
RESPONSE: No. All available sediment data is provided as part of the contract documents under “Sediment Data Appendix Phase 2 Specifications – 100%”
3. Due to the time required to process information once answers from earlier requests for information are received, please provide a 4 week extension of the due date to allow adjustments to be made in our Technical Approach and Pricing.
RESPONSE: Please see Amendment 0002 to the Solicitation. Proposal due date is August 23 at 2pm.
4. Please confirm that the 1-year construction warranty, the 12-month Seed Establishment
Period and the 24-month Guarantee Period will extend beyond the Period of Performance indicated.
RESPONSE: See Changes to specifications and contract clauses under Amendment 0004.
5. Reference Specification Section 31 41 16 Metal Sheet Piling to be used for temporary diversion structures, Paragraph 1.6 Delivery, Storage and Handling indicates that "Materials delivered to the site shall be new and undamaged and shall be accompanied by certified test reports." Please confirm that previously used sheet piles can be used, removed and reused for temporary diversion structures.
RESPONSE: Yes, previously used sheets can be used. See changes to specification under Amendment 0004.
6. Please clarify whether sediment staging and dewatering areas are required to have a geomembrane liner to separate stockpiled sediment from underlying materials and that collected water and treated prior to discharge.
RESPONSE: Sediment staging and dewatering areas shall follow all conditions in the DEP Order of Conditions (One for City of Boston and one for Town of Brookline) as well as the Water Quality Certification and all pertinent MADEP regulations.
7. Specification Section 01 57 20 Section 1.7.2.q; States that the river must be free flowing during September 15 - November 1 for juvenile out migration and April 1 to June 15 for adult upstream and downstream migration. Please confirm that inwater work may continue during these periods provided free flowing conditions are maintained.
RESPONSE: Yes, in-water work may continue during these periods provided free flowing conditions of the river are maintained.
8. Reference Sheet CD103 Existing Conditions & Demolition Plan and C-103 Site Plan -
There is a 24-inch diameter drain line and a Storm Drain that pass under The Riverway and Brookline Avenue, respectively, before discharging into the Muddy River in Work Area 3. Please provide flow data for these outlets.
RESPONSE: No flow data is available for these outlets. The Offeror shall make reasonable assumptions of flow based on the size of the pipes that may need to be controlled and diverted for the work in this area and other similar areas.
9. Reference Specification Section 31 62 19 - There is not much information regarding what is needed, if anything, for pile load tests. Section 3.2.1 does not give us any information regarding how many test piles there are, what type of testing is required (static or dynamic), or what the required pile capacity is. It does make reference to a test pile being driven to determine vibration levels during installation. Please clarify pile load testing requirements?
RESPONSE: Per Specification Section 31 62 19, subpart 3.2.1, “One test pile shall be installed for baseline vibration monitoring 80 feet away from the 59 Fenway historic Fire Signal Building.” No additional test piles or dynamic or static pile load tests are required.
10. Referenced Specification Section 31 62 19 - What is the required treatment (CCA, etc.)
for the timber piles? The specification references AWPA U1, but it doesn’t indicate what the treatment level needs to be or what the actual use category is.
RESPONSE: Treated Douglas Fir or Southern Pine piles shall be used. Use category is 4C. See changes to specifications under Amendment 0004.
11. Reference Specification Section 01 57 20 - Page 12 Paragraph 3.1 states... "Obtaining other permits and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility. Among these other permits, the Contractor shall note that an NPDES Construction General Permit is required and has not been obtained by the Government. Who is responsible for obtaining the NPDES Construction General Permit?
RESPONSE: The contractor is responsible to obtain the NPDES Construction General Permit as part of this contract on behalf of the Government and the project Sponsors.
12. The Wage Determination issued with the Solicitation (General Decision Number:
MA190008 2/22/2019) was updated 5/17/2019. Please clarify which wage determination will be applicable for the duration of this contract.
RESPONSE: The Wage Determination is updated with this Amendment.
13. Reference Wage Determination related to survey crew members - US Department of Labor Field Operations Handbook (FOH) Chapter 15e20 Survey Crews identifies which members of survey crews are subject to prevailing wage requirements. Please confirm that this is applicable to this project. Please confirm which Worker Classification (Laborer or Mechanic) and wage Group that survey crew members that are subject to prevailing wage requirements would be classified so that the correct wage can be applied for this project.
RESPONSE: Survey crew members are not classified as laborers or mechanics unless they are doing manual work such as clearing brush, in which case they are considered common laborers.
14. Reference 01 11 00 – Summary of Work – 1.9.12 Storm Preparation and Removal of Equipment states … "All equipment and unconsolidated materials shall be removed from areas subject to the one percent annual chance flood (100-year flood, Zone A) in advance of significant rainfall that will exceed the volume of a ten year, 24-hour storm event."
Can unconsolidated soil stockpiles remain within the 100-year floodplain so long as they are confined by a non-erodible barrier with a top at or above the 100-year flood elevation?
RESPONSE: Yes, unconsolidated soil stockpiles may remain within the 100-year floodplain as long as they are confined by a non-erodible barrier with a top at or above the 100-year flood elevation.
15. Is there an official deadline for questions?
RESPONSE: We request that all pre-bid questions be submitted by 9 August 2019.
16. The project drawings do not indicate a tip elevation for the new timber piles that are supporting the flood wall at the BFD Fire Alarm Building. The specifications indicate that the contractor shall perform geotechnical borings to assess drivability and depth. For the purpose of bidding, will USACE provide a tip elevation and general statement regarding driving conditions to allow contractors to properly price the work.
RESPONSE: Per Sheet S-501 Note #5, "LENGTH OF TIMBER PILES SHALL BE
25 FT OR UNTIL REFUSAL."
17. Specification section 32 93 00(3.11) Extension states: Following completion of the Guarantee Period, the Landscape Architect and the Contracting Officer shall inspect the site. If the plant material and workmanship are acceptable, written notice will be given by the Contracting Officer. If remedial action is required to meet performance standards, the Contracting Officer will extend the Guarantee Period until performance standards are met. Maintenance during the extended Guarantee period shall continue and will be the responsibility of the Contractor. Please clarify the following: Will maintenance during the extended Guarantee period apply only to the replacement plantings or to the entire site?
18. Specification section 32 93 00, 3.6.1.1 Performance standards: Each plant shall show at least 80 percent healthy growth and shall have the natural character of a plant of its species in accordance with the American Nurserymens Association Standards. Dead or unsatisfactory plants shall be replaced during the normal planting season. The contracting officer shall make a final inspection for acceptance after the replacement plants have been maintained in satisfactory condition for one year. Please confirm this final acceptance will be relevant to replacement plants only.
19. Please refer to section 3.6.1 of specification 32 93 00. Please clarify if provisional acceptance and guarantee period will begin after all installation of all plant material on the project or all plant material by “Area” as shown on the plans.
20. The Maintenance and Guarantee Period will commence following Provisional
Acceptance of plantings. The Guarantee Period shall extend until October 15 in the second calendar year following the year in which Provisional Acceptance was granted per
3.6.1. Please confirm Provision Acceptance of plantings will be provided on a Work Area level following substantial completion within each individual work area.
RESPONSE: See changes to specifications under Amendment 0004.
21. Please provide the electronic version of the CAD files for the Landscape Plans L‐100 through L‐ 118; and S‐101 for Work Area 13 for the project. They were not included in Amendment 0003.
RESPONSE: All information to submit a proposal is shown on the contract drawings. The Offeror shall bid the project as shown and amended.
22. Reference Specification 32 93 00 Exterior Planting and Habitat Restoration ‐ paragraph 3.6.1 Guarantee Period ‐ please confirm that Provisional Acceptance of plantings within each Work Area will be provided by USACE by Work Area once successfully restored and does not require completion of all 13 Work Areas.
RESPONSE: See changes in specification under Amendment 0004.
23. Reference Solicitation Section 00800 ‐ Special Contract Requirements ‐ Clause 52.211‐10 Commencement, Project and Completion of Work, paragraph (c) states... "complete the entire work ready for use not later than 1095 Days from Notice to proceed issuance. The time stated for completion shall include final cleanup of the premises." Please confirm that Guarantee Periods for plantings are not included in this 1095 day limit.
RESPONSE: See changes to specification under Amendment 0004.
24. Reference "Amendment_ 0003_ of_ Solicitation" dated July 26, 2019, page 3, section 1.2.1 Revised and reissued Drawings ‐ please revise. The text of the section is not readable behind the list of revised drawings.
RESPONSE: See Changes to Issued Amendments under Amendment 0004.
25. Responses to questions in Amendment 0003 did not reference other responses correctly. Please clarify.
RESPONSE: See Amendment 0004 for corrections to Amendment 0003 Requests for Information that had been published with clerical errors.
AMENDMENT 0003 RFI RESTATED
The following Requests for Information were originally published as part of Amendment 0003. The Government response contained clerical errors. These RFI’s are reposted with corrected responses below:
17. The actual physical and contaminant characteristics of the existing soils are unknown.
For bidding purposes, how much loam should the Contractor include as imported and how much should be included as re-use of existing?
RESPONSE: See response to question #07 of Amendment 0003. See changes to specifications under Amendment 0003.
21. No quantities for payment are provided - what quantities of dredge/excavation and backfill is our estimate to be based on?
RESPONSE: See response to question #20 of Amendment 0003.
24. How is Transportation and Disposal of Unsuitable Material that is dredged/excavated to be paid? Please provide a unit price and estimated quantity in the bid form to allow payment per ton for each disposal option being considered.
RESPONSE: See response to question #23 of Amendment 0003.
25. How are backfill materials that are required to fill excavations of unsuitable material to be paid? Please provide a unit price in the bid form to allow payment per cubic yard.
RESPONSE: See response to question #23 of Amendment 0003.
28. Current dredge/excavation quantities have not been provided. Please provide quantities and electronic CAD files for all work areas to allow dredge/excavation and backfill take-offs to be performed.
RESPONSE: See response to question #20 of Amendment 0003.
29. Please provide Split Spoon Soil Borings and Plan Locations for the 122 soil borings referenced in Section 3.0 Geotechnical and Geologic Considerations found in Appendix F (USACE Basis of Design Report) of Volume I of the CDM Smith Notice Of Project Change dated November 2018
RESPONSE: See response to question #22 of Amendment 0003. All available sediment data is provided as part of the contract documents under “Sediment Data Appendix Phase 2 Specifications – 100%.”
31. Please provide Bench Scale Analysis of Sediment Samples referenced in Section 3.0 Geotechnical and Geologic Considerations found in Appendix F (USACE Basis of Design Report) Of Volume I of the CDM Smith Notice of Project Change dated November 2018.
RESPONSE: See response to question #22 of Amendment 0003. All available sediment data is provided as part of the contract documents under “Sediment Data Appendix Phase 2 Specifications – 100%.”
35. Please reference Temporary Fill Volumes and Areas shown on Tables 5-1 thru 5-18 in CDM Smith Notice of Project Change dated November 2018.
a) The total volume of Temporary Fill for all areas is 311,000 CY; where is the material placed?
b) Please identify what Material Specification this material must meet.
c) Will this temporary fill have to be removed and disposed of upon completion of the work?
d) If yes, will it need to be disposed of as a Regulated Material?
RESPONSE: See response to question #22 of Amendment 0003.
51. Please refer to Specification Section 31 11 00 Par. 3.1.1 which directs the bidders to a Website showing Heritage Trees to be protected. Please note that this Website does not show any Heritage Trees in Area 3. During the site walk, there was a discussion about tree protection for site access into Area 3, yet we find no Heritage Trees in Area 3. Please advise which trees, if any, need to be protected. After initial access to the website, the link Blockedhttps://kzla.maps.arcgis.com/apps/Shortlist/index.html?appid=0071cf3a1d0147c2b8155 63a1bb is no longer active. Please confirm the link.
RESPONSE: See response to question #41 of Amendment 0003. The Offeror shall note that during the 11 June pre-bid site walk, protection of existing trees and their root system was stressed and specifically identified in Work Area 3 due to the existing trees to remain in close proximity to the work and access routes. In general, any trees not to be removed within all work areas must be protected. This is not limited to only Heritage Trees.
58. Due to the complexity of this project and the in-depth technical nature of this proposal, please grant a 3-week deadline extension.
RESPONSE: Amendment 0002 extended the Proposal due date to 2:00PM on 23 August 2019.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1095 Days from Notice to proceed issuance. The entire work is defined as all work associated with the plans & specifications, excluding the Seed establishment and plant Guarantee periods. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a)If the Contractor fails to complete the entire work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,900.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Contractor fails to complete the work that is part of the Seed establishment and plant Guarantee periods established by the Contract, within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $842.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
The following have been modified:
WAGE DETERMINATION
"General Decision Number: MA20190008 05/17/2019
Superseded General Decision Number: MA20180013
State: Massachusetts
Construction Types: Heavy (Heavy and Marine)
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth and Suffolk Counties in Massachusetts.
HEAVY AND MARINE CONTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/22/2019 3 05/17/2019
BOIL0029-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 42.42 24.92
BRMA0001-011 02/01/2019
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton);
NORFOLK, (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham); and PLYMOUTH (Lakeville)
Rates Fringes
Bricklayer/Cement Mason..........$ 51.41 31.09
BRMA0001-012 02/01/2019
LOWELL CHAPTER
MIDDLESEX (Acton, Ashby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstabale, Ft Devens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)
BRICKLAYER.......................$ 51.41 31.09
BRMA0001-013 02/01/2019
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway, Millis)
BRICKLAYER.......................$ 51.41 31.09
BRMA0003-001 08/01/2018
Rates Fringes
Marble & Tile Finisher...........$ 40.40 31.52 Marble, Tile & Terrazzo Workers..........................$ 52.95 33.55
TERRAZZO FINISHER................$ 51.85 33.39
BRMA0003-003 02/01/2019
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
BRICKLAYER.......................$ 53.55 31.88
BRMA0003-011 08/01/2018
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield, Wakefield, Wenham, West Newbury); and MIDDLESEX (North Reading, Reading, Wakefield)
Bricklayer/Cement Mason..........$ 52.91 33.60
BRMA0003-012 08/01/2018
Rates Fringes
BRICKLAYER
WALTHAM CHAPTER -
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn).........$ 52.91 33.60
BRMA0003-014 02/01/2019
QUINCY CHAPTER
PLYMOUTH COUNTY (Abington, Bridgewater, Brockton, Carver, Duxbury, East Bridgewater, Halifax, Hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Middleboro, Norwell, Pembroke, Plymouth, Rockland, Scituate, West Bridgewater, Whitman)
Bricklayer/Cement Mason..........$ 53.55 31.88
BRMA0003-025 02/01/2019
NEW BEDFORD CHAPTER
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Fairhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES;
NANTUCKET; PLYMOUTH (Marion, Mattapoisett, Rochester, Wareham)
Bricklayer/Cement Mason..........$ 53.55 31.88
BRMA0003-033 08/01/2018
NEWTON CHAPTER
MIDDLESEX (Newton); NORFOLK (Dover, Needham, Wellesley)
Bricklayer, Plasterer............$ 52.91 33.60
CARP0026-003 09/01/2017
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Braintree, Canton, Cohassett, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham) COUNTIES
CARPENTER........................$ 39.28 27.90
CARP0033-003 09/01/2017
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); AND SUFFOLK
COUNTIES
CARPENTER........................$ 46.43 28.35
CARP0056-001 08/01/2015
All of SUFFOLK COUNTY; and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, and PLYMOUTH COUNTIES situated INSIDE Boston Beltway (I-495) and North of Cape Cod Canal. ALL of DUKES and NANTUCKET COUNTIES
PILEDRIVERMAN....................$ 42.04 29.73
CARP0056-002 08/01/2015
The areas of BARNSTABLE, BRISTOL, PLYMOUTH, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal
CARP0056-003 08/01/2015
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)
CARP0056-004 08/01/2015
Rates Fringes
DIVER TENDER.....................$ 42.04 29.73
DIVER............................$ 58.86 29.73
CARP0424-001 09/01/2017
NORFOLK (Braintree, Quincy, Cohasset, Weymouth, etc.) PLYMOUTH (Duxbury, Hanover, Hull, Hingham, Marshfield, Norwell, Pembroke Rockland, Scituate)
CARP0624-002 09/01/2017
DUKES; NANTUCKET
Rates Fringes
CARPENTER........................$ 46.43 28.35
CARP0624-006 09/01/2017
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro);
NORFOLK (Avon, Holbrook, Randolph, Stoughton); PLYMOUTH (Bridgewater, Kingston, Lakeville, Middleboro, Plymouth, S.
Hanover, Whitman)
CARP1121-001 10/01/2017
MILLWRIGHT.......................$ 39.52 30.85
ELEC0096-001 12/01/2018
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
ELECTRICIAN......................$ 42.57 11%+21.92
Teledata System Installer........$ 29.04 24.67
ELEC0099-001 06/01/2017
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN......................$ 38.08 57.24%
Teledata System Installer........$ 28.56 13.1%+13.76
* ELEC0103-002 03/01/2019
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)
ELECTRICIAN......................$ 51.10 32.65
* ELEC0103-004 03/01/2019
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)
* ELEC0103-005 03/01/2019
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
ELEC0104-001 09/03/2017
Rates Fringes
Line Construction:
Cableman....................$ 38.45 18.42+A Equipment Operator..........$ 38.45 22.50+A Groundman...................$ 24.88 10.24+A Lineman.....................$ 45.23 25.71+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
* ELEC0223-002 03/01/2019
BARNSTABLE, BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET; PLYMOUTH (Except Hingham and Hull Twps); NORFOLK (Avon, Halbrook, Randolph, Sloughton)
ELECTRICIAN......................$ 41.64 30.14%+11.65
ENGI0004-009 12/01/2018
Rates Fringes
Power equipment operators:
Group 1.....................$ 47.58 28.10 Group 2.....................$ 47.10 28.10 Group 3.....................$ 32.03 28.10 Group 4.....................$ 39.13 28.10 Group 5.....................$ 23.06 28.10 Group 6.....................$ 27.42 28.10
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.13 Over 185 ft. +3.75 Over 210 ft. +5.27 Over 250 ft. +7.98
Over 295 ft. +11.05 Over 350 ft. +12.85
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. PAID HOLIDAYS: New Year's Day, Washington,s Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
POWER EQUIPMENT OPERATORS CLASSIFICATIONS [HEAVY
CONSTRUCTION]
GROUP 1: Power shovel; crane; truck crane; derrick; pile driver; trenching machine; mechanical hoist pavement breaker; cement concrete paver; dragline; hoisting engine;
three drum machine; pumpcrete machine; loaders; shovel dozer; front end loader; mucking machine; shaft hoist;
steam engine; backhoe; gradall; cable way; fork lift;
cherry picker; boring machine; rotary drill; post hole hammer; post hole digger; asphalt plant on job site;
concrete batching and/or mixing plant on job site; crusher plant on job site; paving concrete mixer; timber jack GROUP 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; bulldozer; tractor; mechanic - maintenance; York rake; mulching machine; paving screed machine;stationary steam boiler; paving concrete finishing machine; grout pump; portable steam boiler; portable steam generator;
roller; spreader; asphalt paver; locomotives or machines used in place thereof; tamper (self propelled or tractor-draw); cal tracks; ballast regulator;rail anchor machine; switch tamper; tire truck GROUP 3: Pumps (1-3 grouped); compressor; welding machines (1-3 grouped); generator; sighting plant; heaters (power driven, 1- 5); syphon-pulsometer; concrete mixer; valves controlling permanent plant air steam, conveyor, wellpoint system (operating) GROUP 4: Assitant engineer (fireman) GROUP 5: Oiler (other than truck cranes and gradalls) GROUP 6: Oiler (on truck cranes and gradalls)
IRON0007-001 09/16/2017
AREA 1: BRISTOL (Easton); ESSEX (Beverly,Gloucester,Lynn, Lynnfield, Manchester,Marblehead, Nahant, Rockport, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Carlisle, Concord, Dunstable, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); PLYMOUTH (Abington, Bridgewater, Brocton, Duxbury, East Bridgewater, Halifax, Hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Norwell, Pembroke, Plymouth, Plympton, Rockland, Scituate, West Bridgewater, Whitman); SUFFOLK
AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action,Billerica, Chelmsford, Dracut, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilminton)
IRONWORKER
AREA 1......................$ 44.71 30.56
AREA 2......................$ 40.30 30.56
IRON0007-010 09/16/2017
MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)
IRONWORKER.......................$ 44.41 30.56
IRON0037-002 09/16/2017
BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;
NORFOLK (Billingham, Franklin, Plainville, Wrentham); PLYMOUTH (Lakeville, Marion, Mattapoisett, Middleboro, Rochester, Wareham)
IRONWORKER.......................$ 34.89 26.87
LABO0022-006 06/01/2018
SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)
Laborers:
GROUP 1.....................$ 38.00 24.10
GROUP 2.....................$ 38.25 24.10
GROUP 3.....................$ 38.75 24.10
GROUP 4.....................$ 39.00 24.10
GROUP 5.....................$ 21.50 24.10
GROUP 6.....................$ 39.00 24.10
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operator
GROUP 3: Air track operator; block paver; rammer; curb setter
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers
LABO0022-012 06/01/2018
Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
PLYMOUTH; MIDDLESEX (With the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (With the exception of Brookline, Dedham, and Milton)
Laborers:
GROUP 1.....................$ 33.25 22.92
GROUP 2.....................$ 33.50 22.92
GROUP 3.....................$ 34.00 22.92
GROUP 4.....................$ 34.25 22.92
GROUP 5.....................$ 21.50 22.92
GROUP 6.....................$ 34.25 22.92
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drillperator
GROUP 3: Air track operator; block paver; rammer; curb setter; hydraulic & similar self powere drills
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers
LABO0022-013 06/01/2018
Rates Fringes
Laborers:
(FREE AIR OPERATION):
SHIELD DRIVEN AND LINER
PLATE IN FREE AIR)
GROUP 1....................$ 39.40 21.80+a GROUP 2....................$ 39.40 21.80+a
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
TEST BORING & WELL DRILLING
Driller....................$ 39.35 24.30+A Laborer....................$ 37.95 24.30+A
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
OPEN AIR CASSON,
UNDERPINNING WORK & BORING
CREW
Bottom man.................$ 39.10 24.30+A Laborers; Top man..........$ 37.95 24.30+A
(TUNNELS, CAISSON &
CYLINDER WORK IN
COMPRESSED AIR)
GROUP 1....................$ 39.75 24.70+a GROUP 2....................$ 42.30 24.70+a GROUP 3....................$ 42.30 24.70+a GROUP 4....................$ 42.30 24.70+a GROUP 5....................$ 42.30 24.70+a GROUP 6....................$ 44.30 24.70+a
CLEANING CONCRETE AND
CAULKING TUNNEL (Both New & Existing) GROUP 1....................$ 39.40 21.80+a GROUP 2....................$ 39.40 21.80+a
ROCK SHAFT, CONCRETE
LINING OF SAME AND TUNNEL
IN FREE AIR
GROUP 1....................$ 36.85 21.80+a GROUP 2....................$ 39.40 21.80+a GROUP 3....................$ 39.40 21.80+a GROUP 4....................$ 39.40 21.80+a GROUP 5....................$ 41.40 21.80+a
LABORERS CLASSIFICATIONS for TUNNELS, CAISSON & CYLINDER WORK
IN COMPRESSED AIR
GROUP 1: Powder watchman; Top man on iron bolt; change house attendant
GROUP 2: Brakeman; trackman; groutman; tunnel laborer;
outside lock tender; lock tender; guage tender
GROUP 3: Motorman, miner
GROUP 4: Blaster
GROUP 5: Mucking machine operator
GROUP 6: Hazardous Waste work within the ""HOT"" zone. (A premium of two dollars $2.00 per hour over the basic wage rate.
LABORERS CLASSIFICATIONS for (FREE AIR OPERATION): SHIELD
DRIVEN AND LINER PLATE IN FREE AIR
GROUP 1: Miner; miner welder; conveyor operator; motorman;
mucking machine operator; nozzle man; grout man-; pumps, shaft and tunnel steel and rodman; shield and erector arm operators, mole nipper, outside motorman, burner, TBM operator, safety miner; laborer topside; heading motormen;
erecting operators; top signal men
GROUP 2: Brakeman; trackman
LABORERS CLASSIFICATIONS FOR CLEANING CONCRETE AND CAULKING
TUNNEL (Both New & Existing)
GROUP 1: Concrete workers; strippers and form movers (wood & steel), cement finisher
GROUP 2: Form erector (wood & steel and all accessories)
LABORERS CLASSIFICATIONS for ROCK SHAFT, CONCRETE LINING OF
SAME AND TUNNE IN FREE AIR
GROUP 1: Change house attendants
GROUP 2: Laborers, topside, bottom men (when heading is 50
ft. from shaft) and all other laborers
GROUP 3: Brakeman; trackman; tunnel laborers; shaft laborers
GROUP 4: Miner; cage tender; bellman
GROUP 5: Hazardous Waste work within the ""HOT"" zone. (A premium of two dollars $2.00 per hour over the basic wage rate)
FOOTNOTE FOR LABORERS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Patriot's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day
LABO1421-001 06/01/2018
WRECKING LABORERS:
Rates Fringes
Laborers: (Wrecking) Group 1.....................$ 38.15 24.10 Group 2.....................$ 38.90 24.10 Group 3.....................$ 39.15 24.10 Group 4.....................$ 34.15 24.10 Group 5.....................$ 37.25 24.10 Group 6.....................$ 38.15 24.10
Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic ""Brock"" Type Hammer Operators, Concrete Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.
PAIN0035-001 01/01/2019
BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH
(Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES)
PAINTER
NEW CONSTRUCTION:
Bridge.....................$ 50.36 30.25 Brush, Taper...............$ 39.86 30.25 Spray, Sandblast...........$ 41.26 30.25
REPAINT:
Bridge.....................$ 50.36 30.25 Brush, Taper...............$ 37.92 30.25 Spray, Sandblast...........$ 39.32 30.25
PAIN0035-015 01/01/2019
MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline)
PAINTER
NEW CONSTRUCTION:
Brush, Taper...............$ 45.65 30.25 Spray, Sandblast...........$ 47.05 30.25
REPAINT:
Bridge.....................$ 50.36 30.25 Brush, Taper...............$ 43.71 30.25 Spray, Sandblast...........$ 45.11 30.25
* PLAS0534-001 01/01/2019
ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 42.00 36.21
* PLUM0004-001 03/01/2019
MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)
Plumbers and Pipefitters.........$ 44.81 26.36
* PLUM0012-001 03/01/2019
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfieild, Wenham, West Newbury)
PLUMBER..........................$ 52.61 29.93
* PLUM0012-003 03/01/2019
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Manchester, Marblehead, Merrimac, Methuen, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfield, Wenham, West Newbury)
Plumber, Pipefitter, Steamfitter......................$ 52.61 29.93
* PLUM0012-006 03/01/2019
ESSEX (Lynn, Lynnfield, Nahant, Saugus, and Swampscott);
MIDDLESEX (Acton, Arlington, Ashland, Ayer - except W. of Greenville Branch of Boston & Maine RR, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlisle, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover,Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK
PLUMBER..........................$ 56.69 29.93
PLUM0051-005 09/01/2018
BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK (Avon, Holbrook, Randolph, Stoughton) PLYMOUTH(Remainder of County)
Plumbers and Pipefitters.........$ 42.04 29.91
PLUM0537-001 09/01/2018
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Wakefield, Winchester and Woburn); NORFOLK
(Bellingham, Braintree, Brookline, Canton Cashasset, Dedham, Foxboro, Franklin, Millis, Milton, Sharon, Walpole, Westwood, and Wrenthan); PLYMOUTH (Hingham, Hull, Scituate); ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott, Topsfieild, Wenham, West Newbury)
PIPEFITTER.......................$ 52.44 32.11
TEAM0379-001 06/01/2018
Rates Fringes
Truck drivers:
Group 1.....................$ 33.08 24.6125+A+B Group 2.....................$ 33.25 24.6125+A+B Group 3.....................$ 33.32 24.6125+A+B Group 4.....................$ 33.44 24.6125+A+B Group 5.....................$ 33.54 24.6125+A+B Group 6.....................$ 33.83 24.6125+A+B Group 7.....................$ 34.12 24.6125+A+B
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks
Group 2: Two axle equipment; & forklift operator
Group 3: Three axle equipment and tireman
Group 4: Four and Five Axle equipment
Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment
Group 6: Specialized earth moving equipment over 35 tons
Group 7: Trailers for earth moving equipment (double hookup)
FOOTNOTES:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day
B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .