W912WJ19Q00360001.pdf

PDF 490 KB Posted

Attached to
Emergency Gate Slot Repairs, at Tully Lake Project Royalston, Massachusetts
Solicitation number
W912WJ19Q0036
Issued by

View the file

Other files

File Type Posted
Amendment_W912WJ19Q0036_0002.pdf PDF
W912WJ19Q00360002.pdf PDF
Revised_Bid_Schedule.pdf PDF
RFI_1.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Specification_Change_Summary.pdf PDF
Revised_Drawings.pdf PDF
Specs_Tully_Gate_Slot_II_RTA_4Apr19.pdf PDF
Solicitation_W912WJ19Q0036.pdf PDF
Drawings_Tully_Lake_3-12-19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment necessary to include the follow ing:

-Site Visit Attendance List -Responses to Requests For Information -Issue revised Bid Schedule -Issue revised draw ings -Issue Specif ication Change Summary

All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19Q0036

X 9B. DATED (SEE ITEM 11)

11-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-May-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

ROBERT.C.GARRAHAN@USACE.ARMY.MILEMAIL:978-318-8814TEL:

ROBERT C GARRAHAN / ADDED BY UPASS

W912WJ19Q0036

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

BID SCHEDULE

BIDDING SCHEDULE

Item Unit No. Description Quantity Unit Price Amount

Base Bid Item

0001 Repairs to the Emergency Gate Slot Except as included in Bid Item 0002

1 Job $_____________

TOTAL AMOUNT, BASE BID ITEM $_____________

Optional Item

0002 Repair of Spalled or Delaminated Concrete present on the Conduit wall within the Conduit. One Job = 10 Square Feet

This Optional item can be exercised up to 4 times.

1 Job $___________

TOTAL AMOUNT, All OPTIONAL ITEMS (1 Job x 4) $____________

TOTAL EVALUATED AMOUNT = BASE BID ITEM + OPTIONAL ITEMS $____________

Note 1: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers shall be evaluated by the Base Item and All Optional Items. The minimum work awarded will be the Base Bid work. Some or all optional Items may not be exercised.

Note 2: All work shall be completed within the time period specified in Section H SPECIAL CONTRACT REQUIREMENTS, Subpart "COMMENCEMENT, PROSECUTION

AND COMPLETION OF WORK (APR 1984) FAR 52.211-10."

Note 3: Item Number 0002 above is an Optional Bid Item. Item Number 0002 may, at the option of the Government, be exercised up to 4 times once the

W912WJ19Q0036

conduit is dewatered and the extent of damaged concrete, if any, can be determined. This Item may be exercised up to 100 calendar days from NTP.

If Item 0002 is exercised, 30 additional calendar days will be added one time to the project duration.

-- End of Document -- Document 00 41 00

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

SPECIFICATION CHANGE SHEET

AMENDMENT 0001 OF SOLICITATION

1.1 CHANGE TO SPECIFICATION

1.1.1 Narrative Change

Paragraph A, General Description of the Work to be Performed

Change the eighth sentence in the third paragraph. This sentence currently reads: “This component of the project is treated as an Option on the Bid Schedule, and may be exercised up to ten times, depending upon the quantity of repair needed.”

Change it to read “This component of the project is treated as an Option on the Bid Schedule, and may be exercised up to four times, depending upon the quantity of repair needed.”

(End of Summary of Changes)

File details come from the government source that posted it.