Revised_Bid_Schedule.pdf

PDF 120 KB Posted

Attached to
Emergency Gate Slot Repairs, at Tully Lake Project Royalston, Massachusetts
Solicitation number
W912WJ19Q0036
Issued by

About this file

Revised Bid Schedule

View the file

Other files

File Type Posted
Amendment_W912WJ19Q0036_0002.pdf PDF
W912WJ19Q00360002.pdf PDF
RFI_1.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Specification_Change_Summary.pdf PDF
W912WJ19Q00360001.pdf PDF
Revised_Drawings.pdf PDF
Specs_Tully_Gate_Slot_II_RTA_4Apr19.pdf PDF
Solicitation_W912WJ19Q0036.pdf PDF
Drawings_Tully_Lake_3-12-19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emergency Gate Slot Repair, Phase II, Tully Dam, Royalston, MA Amendment 0001

Document 00 41 00 Page 1

BIDDING SCHEDULE

Item Unit No. Description Quantity Unit Price Amount

Base Bid Item

0001 Repairs to the Emergency Gate Slot Except as included in Bid Item 0002

1 Job $_____________

TOTAL AMOUNT, BASE BID ITEM $_____________

Optional Item

0002 Repair of Spalled or Delaminated Concrete present on the Conduit wall within the Conduit. One Job = 10 Square Feet

This Optional item can be exercised up to 4 times.

1 Job $___________

TOTAL AMOUNT, All OPTIONAL ITEMS (1 Job x 4) $____________

TOTAL EVALUATED AMOUNT = BASE BID ITEM + OPTIONAL ITEMS $____________

Note 1: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers shall be evaluated by the Base Item and All Optional Items. The minimum work awarded will be the Base Bid work. Some or all optional Items may not be exercised.

Note 2: All work shall be completed within the time period specified in Section H SPECIAL CONTRACT REQUIREMENTS, Subpart "COMMENCEMENT, PROSECUTION

AND COMPLETION OF WORK (APR 1984) FAR 52.211-10."

Note 3: Item Number 0002 above is an Optional Bid Item. Item Number 0002 may, at the option of the Government, be exercised up to 4 times once the conduit is dewatered and the extent of damaged concrete, if any, can be determined. This Item may be exercised up to 100 calendar days from NTP.

If Item 0002 is exercised, 30 additional calendar days will be added one time to the project duration.

-- End of Document --