Specification_Change_Summary.pdf

PDF 330 KB Posted

Attached to
Emergency Gate Slot Repairs, at Tully Lake Project Royalston, Massachusetts
Solicitation number
W912WJ19Q0036
Issued by

About this file

Specification Change Summary

View the file

Other files

File Type Posted
Amendment_W912WJ19Q0036_0002.pdf PDF
W912WJ19Q00360002.pdf PDF
Revised_Bid_Schedule.pdf PDF
RFI_1.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
W912WJ19Q00360001.pdf PDF
Revised_Drawings.pdf PDF
Specs_Tully_Gate_Slot_II_RTA_4Apr19.pdf PDF
Solicitation_W912WJ19Q0036.pdf PDF
Drawings_Tully_Lake_3-12-19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emergency Gate Slot Repairs, Phase II, Tully Dam, Royalston, MA

AM 0001

AMENDMENT 0001 OF SOLICITATION

1.1 CHANGE TO SPECIFICATION

1.1.1 Narrative Change

Paragraph A, General Description of the Work to be Performed

Change the eighth sentence in the third paragraph. This sentence currently reads: “This component of the project is treated as an Option on the Bid Schedule, and may be exercised up to ten times, depending upon the quantity of repair needed.”

Change it to read “This component of the project is treated as an Option on the Bid Schedule, and may be exercised up to four times, depending upon the quantity of repair needed.”