Plans_Colebrook_Final.pdf
PDF 28 MB Posted
- Solicitation number
- W912WJ19B0008
About this file
Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_Crane_Report_0001.pdf | ||
| Amendment_0001.pdf | ||
| Specifications.pdf | ||
| W912WJ_19_B_0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
F
C
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
COLEBROOK, CONNECTICUT
COLEBROOK RIVER LAKE
A N
S I
D
G-001
:1
C O
V E
R S
H E
E T
NOT TO SCALE
LOCATION PLAN
NOT TO SCALE
VICINITY MAP
MASSACHUSETTS
CONNECTICUT
MASSACHUSETTS
N E
W Y
O R
K
CONNECTICUT
SPRINGFIELD
COLEBROOK
WINSTED
THOMASTON
WATERBURY
HARTFORD
C O
N N E C T
IC
U T R
SANDISFIELD
TO NEW BOSTON
TOLLAND
BERKSHIRE COUNTY
LITCHFIELD COUNTY
COLEBROOK
HAMPDEN COUNTY
HARTLAND COUNTY
HARTLAND
GOODWIN DAM
TO WINSTED
PROJECT
LOCATION
PROJECT
LOCATION
L
IT
C H
F
IE
L D C
O U
N T
Y H
A R
T L
A N
D C
O U
N T
Y
RIVER LAKE
COLEBROOK
CHANNEL
APPROACH
WEIR
SPILLWAY
C H
A N
N E L
D
IS
C H
A R
G E
O U
T L E
T C
H A
N N
E L
DOWNSTREAM
EMBANKMENT
DAM
CHANNEL
APPROACH
NOT TO SCALE
SITE PLAN
PROJECT
LOCATION
A P
R
IL
APRIL 2019
of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District
OUTLET STRUCTURE
INLET STRUCTURE
INTAKE TOWER
W912WJ19B0008
E
C H
IR
IA
C
E
C H
IR
IA
C
J S
W A
L L E
Y
J
H A
C H
IG
IA
N
REPAIR HYDRAULIC CYLINDERS AND POSITION INDICATORS
UPSTREAM
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
DESIGN FILESHEET NO.
G-001
SHEET TITLE
CON-CL-464_G-001.DGN
M-101
M-501
M-502
CON-CL-464_M-101.DGN
CON-CL-464_M-501.DGN
CON-CL-464_M-502.DGN
CON-CL-464_M-503.DGNM-503
OVERALL ELEVATION AND PLAN
CON-CL-464_G-002.DGNG-002
COVER SHEET
M-301 CON-CL-464_M-301.DGN
8 CON-CL-464_M-504.DGNM-504
SECTION AT E-GATES
POSITION INDICATOR DETAILS 1
POSITION INDICATOR DETAILS 2
ADDITIONAL PHOTOS
HYDRAULIC CYLINDER REPAIRS
SHEET 41
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
OUTLET WORKS - INTAKE TOWER, EMERGENCY STOP GATE STRUCTURAL DETAILS NO. 2
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 47
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 48
OUTLET WORKS - INTAKE TOWER, ELECTRICAL - POWER AND LIGHTING - FLOOR AND ROOF PLANS
OUTLET WORKS - INTAKE TOWER, ELECTRICAL - ONE LINE DIAGRAM AND SECTION
SHEET 1
COLEBROOK RIVER LAKE
REPAIR HYDRAULIC LINES - PLAN AND INDEX
SHEET 2
COLEBROOK RIVER LAKE
REPAIR HYDRAULIC LINES - NOTES AND PIPING SCHEMATIC
DRAWING TITLE
SHEET 1
SHEET 8
OUTLET WORKS AND SPILLWAY PLAN
LOCATION MAP AND INDEX
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 11
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 14
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 15 CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 16 CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 17
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 40
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
OUTLET WORKS PROFILE AND SECTIONS
OUTLET WORKS - INTAKE TOWER, SECTIONAL PLANS AT ELEVATION 575.0 & GATE CHAMBER
OUTLET WORKS - INTAKE TOWER, PLAN - ELEVATION 631.0 SECTIONS AND DETAILS
OUTLET WORKS - INTAKE TOWER, SECTIONS TO EL. 657.0
OUTLET WORKS - INTAKE TOWER, FLOOR PLANS ABOVE ELEVATION 657.0
OUTLET WORKS - INTAKE TOWER, EMERGENCY STOP GATE STRUCTURAL DETAILS NO. 1
SHEET 42
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 43
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 44
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 45
OUTLET WORKS - INTAKE TOWER, MECHANICAL-ARRANGEMENT OF EQUIPMENT - SECTIONS AND DETAILS
OUTLET WORKS - INTAKE TOWER, MECHANICAL-ARRANGEMENT OF EQUIPMENT - PLANS AND DETAILS
OUTLET WORKS - INTAKE TOWER, MECHANICAL - GATE ASSEMBLY - SECTIONS AND DETAILS
OUTLET WORKS - INTAKE TOWER, MECHANICAL - HYDRAULIC CONTROL SYSTEM - PIPING AND DETAILS
CONNECTICUT RIVER FLOOD CONTROL COLEBROOK RIVER DAM
SHEET 49
OUTLET WORKS - TRANSITION AND TUNNEL CONCRETE SECTIONS
SHEET NO.
JAN. 1965
JAN. 1965
JAN. 1965
MAR. 1991
MAR. 1991
DATE
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
JAN. 1965
CON-316
CON-316
CON-16
NUMBER
DRAWING
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
CON-16
6 - 4' X 8' GATES - COLEBROOK DAM
GATE ASSEMBLY
6 - 4' X 8' GATES - COLEBROOK DAM
GATE ASSEMBLY - CONT.
DETAILS OF CYLINDER
DETS. BONNET COVER & CYLINDER HD.
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
DETAILS OF BONNET
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
DETAILS OF UPSTREAM FRAME
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
DETAILS OF DOWNSTREAM FRAME
6 - 4' X 8' GATES - COLEBROOK RIVER DAM
SLIDE GATE INDICATOR DETAILS
DOWNSTREAM FRAME
6 - 4' X 8' GATES - COLEBROOK DAM
6 - 4' X 8' GATES - COLEBROOK DAM
DETAILS OF GATE LEAF
COLEBROOK RIVER DAM
DETAILS OF FRAME, BONNET, & LEAF SEATS
6 - 4' X 8' GATES - COLEBROOK DAM
HYDRAULIC PIPING CONTROL SYSTEM
6 - 4' X 8' GATES - COLEBROOK DAM
HYDRAULIC PIPING CONTROL SYSTEM (CONT)
6 - 4' X 8' GATES - COLEBROOK DAM
HYDRAULIC PIPING CONTROL SYSTEM (CONT)
6 - 4'-0" X 8'-0" GATES - COLEBROOK RIVER DAM
DETAILS SEMI-AUTOMATIC GATE HANGER
COLEBROOK RIVER DAM
HYD. UNIT
DRAWING TITLE
APR. 1965
APR. 1965
JUN. 1965
JUN. 1965
DATE
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
APR. 1965
JUN. 1965
22514
22512
22511
22510
22509
22507
22506
22505
INDEX TO INFORMATION DRAWINGS: SHOP DRAWINGS
DRAWING NUMBER
22505-A
22508 R/1
COLEBROOK RIVER DAM
HYDRAULIC CYLINDER DETS.
COLEBROOK RIVER DAM
HYDRAULIC CYLINDER DETS.
22508-A
22511 A
22513 R/1 MAY 1965
MAY 1965
22517 R/1
22518 R/2
22518-A R/4
22518-B R/2
MAY 196565-182
INDEX TO INFORMATION DRAWINGS: DESIGN DRAWINGS
A N
S I
D
G-002
:1
INDEX TO DESIGN DRAWINGS
A P
R
IL
D R
A W
IN
G I
N D
E X
LIMIT SWITCH MOUNTING AT GATE CYLINDERS
COLEBROOK HYDROELECTRIC PROJECT
COLEBROOK HYDROELECTRIC PROJECT
CONDUIT LAYOUT GATE CHAMBER
COLEBROOK HYDROELECTRIC PROJECT
CONDUIT LAYOUT GATE CHAMBER
COLEBROOK HYDROELECTRIC PROJECT
COLEBROOK - HYDRO ELECTRIC
HYDRAULIC SCHEMATIC - GATE CONTROL
PIPING ARRANGEMENT - HYDRAULIC GATE CONTROL
COLEBROOK HYDROELECTRIC
LIGHTNING/GROUND PROTECTION AT CRANE AND SERVICE PLATFORM
DRAWING TITLE
NOV. 1989
DATE
MAR. 1987
MAR. 1987
MAR. 1987
FEB. 1989
MAR. 1987
FEB. 1989E-1022
M-1016
DRAWING NUMBER
E-1009 1/2
E-1009 2/2
05-1002-86-RF
M-1031 2/2
A26-A01 MAY 1989
TURBINE BANK GENERAL ASSY. (SH.1)
COLEBROOK HYDROELECTRIC
TURBINE BANK GENERAL ASSY. (SH.2)
COLEBROOK HYDROELECTRIC
A26-A02
INDEX TO INFORMATION DRAWINGS: HYDROELECTRIC PROJECT
S-2 MAY 1987
COLEBROOK RIVER DAM HYDROELECTRIC PROJECT
CONCRETE SLAB MODIFICATION SECTION
DRAWING INDEX
E
C H
IR
IA
C
E
C H
IR
IA
C
J S
W A
L L E
Y
J
H A
C H
IG
IA
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
A1
NOT ALL COMPONENTS SHOWN FOR CLARITY
SCALE: 1/16" = 1' 0 8' 32'16'
EL 575.0 (CONDUIT INVERT)
SERVICE BRIDGE (NOT SHOWN)
OVERALL ELEVATION/SECTION VIEW
INSIDE CONDUIT
WORK AREA
GATE CHAMBER
WORK AREA IN
ROOM
OPERATING
FLOW
A5
0 4' 8'2'SCALE: 1/4" = 1'
CYLINDER
S-1 HYDRAULIC
CYLINDER
S-2 HYDRAULIC
CYLINDER
S-3 HYDRAULIC
VENT
VENT
VENT
CYLINDER
E-3 HYDRAULIC
CYLINDER
E-2 HYDRAULIC
CYLINDER
E-1 HYDRAULIC
STAIRS
OUTLINE OF UPPER TOWER (ABOVE)
MDC ACCUMULATORS (TYP 5)
POWER UNIT
MDC HYDRAULIC
TO E-1 AND E-2
MDC ACCUMULATOR LINES
PLAN VIEW GATE CHAMBER EL 591.5
SUMP PUMPS
CONDUIT 1 BELOW
CONDUIT 2 BELOW
CONDUIT 3 BELOW
EL. 575.0 (CONDUIT INVERT)
DISCONNECTED
TO E-2, CURRENTLY
USACE HYDRAULIC LINES
CONDUIT 3
CONDUIT 2
CONDUIT 1
SUMP PUMPS
CHECK VALVE ON SUMP DISCHARGE LINE
E4 NOT TO SCALE
ILLUSTRATION VIEW OF LOWER TOWER USACE COMPONENTS
FLOW
NOT ALL COMPONENTS SHOWN FOR CLARITY
NOT ALL COMPONENTS SHOWN FOR CLARITY
VIEW NOTES:
GENERAL NOTES:
3. GATES ARE ALL SHOWN IN THE FULLY CLOSED POSITION.
2. MDC EQUIPMENT IS NOT SHOWN.
DETAILS AND FIELD VERIFY ACTUAL CONDITIONS AND DIMENSIONS.
OF MAJOR COMPONENTS. REFER TO FOR INFORMATION ONLY AS-BUILT DRAWINGS FOR COMPONENT
1. NOT ALL ITEMS SHOWN FOR CLARITY. PURPOSE OF THIS DETAIL IS TO SHOW APPROXIMATE LAYOUT
5. REFER TO FOR INFORMATION ONLY DRAWINGS FOR ADDITIONAL EQUIPMENT INFORMATION.
4. FIELD VERIFY ACTUAL CONDITIONS AND DIMENSIONS.
3. GATES ARE SHOWN IN THE FULLY CLOSED POSITION.
2. HYDRAULIC PIPING AND COMPONENTS ARE NOT SHOWN FOR CLARITY.
WORK SEQUENCES.
CONDITIONS AND SHALL COORDINATE WITH USACE AND MDC TO DETERMINE SAFE AND APPROPRIATE
1. NOT ALL ITEMS SHOWN FOR CLARITY. CONTRACTOR SHALL BECOME FAMILIARIZED WITH ACTUAL SITE
SHEET NOTES:
TO E-1 AND E-2
MDC HYDRAULIC LINES
DISCONNECTED
TO E-1, CURRENTLY
USACE HYDRAULIC LINES
DISCONNECTED
TO E-2, CURRENTLY
USACE HYDRAULIC LINES
EMERGENCY GATES
OF USACE HYDRAULIC LINES TO THE
GATE CHAMBER ROOF PENETRATIONS
SUMP DISCHARGE LINE
CHECK VALVE ON
MDC NITROGEN BOTTLE
SERVICE GATES
OF USACE HYDRAULIC LINES TO THE
GATE CHAMBER ROOF PENETRATIONS
CONTINUE UP TOWER TO OPERATING ROOM
USACE HYDRAULIC LINES TO/FROM E-GATES
DISCONNECTED
TO E-1, CURRENTLY
USACE HYDRAULIC LINES
CENTER, GATE E-3 BEHIND)
EMERGENCY GATE E-1 (GATE E-2 IN
GATE S-3 BEHIND)
SERVICE GATE S-1 (GATE S-2 IN CENTER,
CONTINUE UP TOWER TO OPERATING ROOM
USACE HYDRAULIC LINES TO/FROM S-GATES
(TYP 6)
HYDRAULI\CYLINDER
GATE OPERATING
A N
S I
D
M-101
:1
A P
R
IL
O V
E R
A L L E
L E
V A
T
IO
N A
N D P
L
IN THE OPERATING ROOM
HYDRAULIC POWER UNITS
FROM CYLINDERS TO
USACE HYDRAULIC PIPING
SHAFT
ACCESS
EQUIPMENT
EL. 591.5
EL. 627.0
EL. 777.0
EL. 790.5
EL. 804.5
EL. 818.0
EL. 591.5
SPACE. REFER TO EM-385-1-1 FOR CONFINED SPACE ENTRY REQUIREMENTS.
3. THE INTAKE TOWER GATE CHAMBER IS A PERMIT REQUIRED CONFINED
ON OR AROUND THIS SYSTEM.
APPROPRIATE TECHNICAL POINT OF CONTACT AT MDC PRIOR TO WORKING
PERFORMING WORK ON E-1 AND E-2. CONSULT AND COORDINATE WITH THE
MUST BE DEPRESSURIZED AND THE ACCUMULATORS ISOLATED BEFORE
NITROGEN PRESSURIZED PISTON ACCUMULATORS, AND THE SYSTEM
BY THE CORPS OF ENGINEERS. THE MDC HYDRAULIC SYSTEM CONTAINS
SEPARATE HYDRAULIC POWER SYSTEM FROM THE ONE THAT IS OPERATED
OPERATES EMERGENCY GATES 1 AND 2 (E-1 AND E-2). MDC UTILIZES A
SERVICE GATES 1, 2, AND 3, AND EMERGENCY GATE 3, WHILE MDC
2. NOTE THAT THE CORPS OF ENGINEERS CURRENTLY OPERATES
COMMISSION (MDC).
ENGINEERS AND WITH THE HARTFORD METROPOLITAN DISTRICT
THIS WILL REQUIRE ADDITIONAL COORDINATION WITH THE CORPS OF
OF THE CONDUITS WILL BE NECESSARY FOR SOME OF THE WORK, AND
PROPER WORK SEQUENCING AND REQUIREMENTS. FULL DEWATERING
1. OPERATIONAL RESTRICTIONS SHALL REQUIRE COORDINATION FOR
E
C H
IR
IA
C
J
H A
C H
IG
IA
N
E
C H
IR
IA
C
J S
W A
L L E
Y
A1
M-101
A1
M-101
E4
M-101
E4
M-101
A2
M-301
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
OPEN
CLOSED
OPEN
CLOSED
OPEN
CLOSED
A2
NOT ALL COMPONENTS SHOWN FOR CLARITY
4'0 2' 8'
SCALE: 3/8" = 1'
EL. 575.0 CONDUIT INVERT
EL. 591.5 GATE CHAMBER FLOOR
GATE LEAF (TYP)
INTERIOR OF BONNET
SPECIFICATIONS FOR ADDITIONAL DETAILS.
WORK ITEMS ARE LISTED HERE IN GENERAL TERMS ONLY. REFER TO
NUMBER OF THE COMPONENT SHOWN OR LISTED ON THAT SHEET.
CORRESPOND TO THE AS-BUILT SHEET FOLLOWED BY THE PART
COMPONENTS. THE COMPONENT MARKS LISTED BELOW
REFER TO FOR INFORMATION ONLY DRAWINGS FOR DETAILS OF
SECTION AT EMERGENCY GATES E-1, E-2, AND E-3
622506-1HYDRAULIC CYLINDER
622507-1BONNET COVER
322507-2CYLINDER HEAD
322507-3CYLINDER HEAD, OPPOSITE
622508-1GATE LEAF STEM
622508-3STEM EXTENSION
1222508-5CYLINDER GASKET
3022508-6PISTON RING
622508-92" DIAMETER OIL PACKING
622508-135.5" DIAMETER WATER PACKING
622508-145.5" DIAMETER OIL PACKING
1222508-17O-RING 5.5" ID
622508-18O-RING 4.75" ID
322510-1UPSTREAM FRAME, E-GATE
322510-2UPSTREAM FRAME, S-GATE
322511-1DOWNSTREAM FRAME, S-GATE
322511-2DOWNSTREAM FRAME, E-GATE
622512-1GATE LEAF
622514-22WATER PACKING
622514-6PACKING GLAND
ACTIVITY THIS PROJECTQUANTITYMARKCOMPONENT
REFURBISH
REFURBISH
REFURBISH
REFURBISH
REFURBISH
REFURBISH
REFURBISH
REMOVE, REPLACE WITH PLUG
REMOVE6 (5 INTACT)22514-2INDICATOR ROD
REMOVE
N/A
N/A
N/A
N/A
REPLACE WITH NEW
REPLACE WITH NEW
REPLACE WITH NEW
REPLACE WITH NEW
REPLACE WITH NEW
REPLACE WITH NEW
REPLACE WITH NEW
WORK ITEMS
REFURBISH622508-4LEAF NUT
A N
S I
D
M-301
S E
C T
IO
N A
T E -G
A T
E S
:1
A P
R
IL
EL. 620.5
5. REFER TO FOR INFORMATION ONLY DRAWINGS FOR ADDITIONAL EQUIPMENT INFORMATION.
4. FIELD VERIFY ACTUAL CONDITIONS AND DIMENSIONS.
3. GATES ARE SHOWN IN THE FULLY CLOSED POSITION.
2. HYDRAULIC PIPING AND COMPONENTS ARE NOT SHOWN FOR CLARITY.
WORK SEQUENCES.
CONDITIONS AND SHALL COORDINATE WITH USACE AND MDC TO DETERMINE SAFE AND APPROPRIATE
1. NOT ALL ITEMS SHOWN FOR CLARITY. CONTRACTOR SHALL BECOME FAMILIARIZED WITH ACTUAL SITE
SHEET NOTES:
METHODS THAT ARE DETERIORATED OR OTHERWISE MALFUNCTIONING.
-PROCEDURES TO DEAL WITH FASTENERS OR OTHER ASSEMBLY
IN THE SAME ALIGNMENTS AS THEY ARE PRESENTLY ASSEMBLED.
-PROCEDURES TO ENSURE COMPONENTS ARE RE-INSTALLED
MAINTAIN AND/OR ENSURE LEAK-FREE SEAL.
(OR ADDITION OF GASKET, IF NO GASKET IS PRESENT) TO
-BONNET COVER OVER BONNET GASKET REPLACEMENT
STRUCTURES IS MAINTAINED.
ENSURE ACCURATE ALIGNMENT OF MACHINERY AND
-METHOD OF REMOVAL AND REINSTALLATION TO
LIMITED TO:
DESIGN CONSIDERATIONS INCLUDE, BUT ARE NOT
RE-INSTALLATION ONCE THE WORK IS COMPLETE.
AND SHALL PROPOSE METHODS AND MATERIALS FOR
CONDITIONS OF EACH HYDRAULIC CYLINDER ASSEMBLY
CONTRACTOR SHALL FIELD VERIFY ACTUAL
COMPONENTS FOR EXECUTION OF THIS WORK,
DURING DISASSEMBLY OF HYDRAULIC CYLINDER
E-3 E-2 E-1
FASTENERS)
IN PLACE AT THE PACKING GLAND WITH MODIFIED
IN 2003, AND REMAINING SECTION IS HELD STATIONARY
AFTER FAILURE OF THE ROD TO GATE CONNECTION
ROD AT E-1 (MOST OF ROD LENGTH WAS REMOVED
REMAINING PORTION OF POSITION INDICATOR
AND IT WAS CONNECTED TO THE STEM EXTENSION ROD.
LEAF FAILED, THE INDICATOR ROD ASSEMBLY WAS MODIFIED
2003, AFTER THE CONNECTION BETWEEN THE ROD AND GATE
AFTER THE FAILURE OF THE ROD TO GATE CONNECTION IN
EXISTING MODIFIED INDICATOR ROD SYSTEM, ONLY AT E-1.
PART # 22508-18 (1 PER LEAF NUT - 6 TOTAL)
PART # 22508-17 (1 PER LEAF NUT, AND 1 PER PISTON - 12 TOTAL) AND
REPLACE O-RINGS:
LEAF NUT, PART # 22508-4.
PART # 22508-1
GATE LEAF STEM (TYP)
BONNET COVER (TYP)
ASSEMBLY (TYP)
GATE HANGER
PART # 22508-3
STEM EXTENSION ROD
TO CYLINDER)
FROM CYLINDER
MINOR MODIFICATIONS
LOCATIONS, WITH
(TYPICAL OF 6
INDICATING GAUGE
GATE POSITION
CONNECTION AT GATE)
S-3 (WITH FAILED
S-2
S-1
E-3
E-2
LOCATIONS:
TYPICAL OF FIVE
ROD, PART # 22514-2.
POSITION INDICATOR
ROD TO GATE LEAF (TYP)
OF POSITION INDICATOR
THREADED CONNECTION
PART # 22517-11
SAFTEY STUD WITH NUT
PART # 22517-10
SAFTEY STUD CAP
GENERAL NOTES:
LINE.
REPLACE THE 3" CHECK VALVE ON THE TOWER SUMP PUMPS DISCHARGE 3.
AND/OR SHIMS.
NOTE: EXCESSIVE HONING WILL REQUIRE PACKING MODIFICATIONS BUSHING
THOROUGH ANALYSIS OF THE CONDITION OF THE FLUID.
GASKETS, AND STEM O-RINGS. TEST HYDRAULIC FLUID TO PERFORM A
STEM EXTENSION OIL PACKING. REPLACE PISTON RINGS, CYLINDER
DIAMETER GATE STEM WATER PACKING. REPLACE 2" DIAMETER UPPER GATE
RODS. REPLACE 5-1/2" DIAMETER GATE STEM OIL PACKING AND 5-1/2"
CHAMBER. HONE AND POLISH GATE LEAF STEM RODS AND STEM EXTENSION
REFURBISH ALL SIX HYDRAULIC CYLINDERS LOCATED IN THE GATE 2.
EXTENSION POSITION TRANSDUCERS AND LIMIT SWITCHES.
INDICATOR ROD AT THAT GATE FAILED IN 2003. RECALIBRATE CABLE
EXISTING POSITION INDICATION SYSTEM AT E-1 WAS MODIFIED AFTER THE
TO THE STEM EXTENSION ROD, IN A SIMILAR MANNER TO THE WAY THAT THE
E-3, S-1, S-2, AND S-3) THAT INDICATE GATE POSITION BY BEING CONNECTED
PROVIDE NEW POSITION INDICATION ASSEMBLIES AT FIVE LOCATIONS (E-2,
WITH A WELDED PLUG.
SEAL THE INDICATOR ROD PACKING GLAND HOLE IN THE BONNET COVER
REMOVE INDICATOR RODS AND THEIR PACKING GLANDS AND PERMANENTLY
CYLINDERS LOCATED IN THE GATE CHAMBER.
REPAIR AND MODIFY POSITION INDICATOR SYSTEMS AT ALL SIX HYDRAULIC 1.
SPACE. REFER TO EM-385-1-1 FOR CONFINED SPACE ENTRY REQUIREMENTS.
3. THE INTAKE TOWER GATE CHAMBER IS A PERMIT REQUIRED CONFINED
ON OR AROUND THIS SYSTEM.
APPROPRIATE TECHNICAL POINT OF CONTACT AT MDC PRIOR TO WORKING
PERFORMING WORK ON E-1 AND E-2. CONSULT AND COORDINATE WITH THE
MUST BE DEPRESSURIZED AND THE ACCUMULATORS ISOLATED BEFORE
NITROGEN PRESSURIZED PISTON ACCUMULATORS, AND THE SYSTEM
BY THE CORPS OF ENGINEERS. THE MDC HYDRAULIC SYSTEM CONTAINS
SEPARATE HYDRAULIC POWER SYSTEM FROM THE ONE THAT IS OPERATED
OPERATES EMERGENCY GATES 1 AND 2 (E-1 AND E-2). MDC UTILIZES A
SERVICE GATES 1, 2, AND 3, AND EMERGENCY GATE 3, WHILE MDC
2. NOTE THAT THE CORPS OF ENGINEERS CURRENTLY OPERATES
COMMISSION (MDC).
ENGINEERS AND WITH THE HARTFORD METROPOLITAN DISTRICT
THIS WILL REQUIRE ADDITIONAL COORDINATION WITH THE CORPS OF
OF THE CONDUITS WILL BE NECESSARY FOR SOME OF THE WORK, AND
PROPER WORK SEQUENCING AND REQUIREMENTS. FULL DEWATERING
1. OPERATIONAL RESTRICTIONS SHALL REQUIRE COORDINATION FOR
E
C H
IR
IA
C
J
H A
C H
IG
IA
N
E
C H
IR
IA
C
J S
W A
L L E
Y
D7
M-501
A1
M-502
A1
M-503
A1
M-501
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
D7 SCALE: 3" = 1'
A1 SCALE: 3" = 1'
FINISH OF 62 μIN.
PACKING TO SURFACE
CONTACT WITH ROD AND
POLISH SURFACES IN
# 22508-12. CLEAN, AND
PACKING SEAT, PART
HD. CAP SCREW
3/4" X 1.5" H.SOC.
NOT ALL COMPONENTS SHOWN FOR CLARITY. SEE PHOTOS ON M-502 FOR VISIBLE EXISTING CONDITIONS.
NOT ALL COMPONENTS SHOWN FOR CLARITY. SEE PHOTOS ON M-502 FOR VISIBLE EXISTING CONDITIONS.
LOWER HYDRAULIC CYLINDER REPAIRS
UPPER HYDRAULIC CYLINDER REPAIRS
DETAIL D7 THIS SHEET.
STEM EXTENSION ROD, SEE
A8 SCALE: 3" = 1'
WELD PLUG AT POSITION INDICATOR ROD HOLE
NOT ALL COMPONENTS SHOWN FOR CLARITY. TYPICAL OF 6 LOCATIONS.
MATERIAL AND SPACE CONDITIONS/CONSTRAINTS.
WILL BE COMPATIBLE WITH THE BONNET COVER
AND FOR THE WELD METAL AND WELD TYPE THAT
MATERIAL SPECIFICATIONS FOR THE STEEL ROD
CONTRACTOR SHALL SUBMIT PROPOSALS FOR THE
PERFORMED ON CLEAN AND SMOOTH BARE METAL.
THE PACKING USED TO BE. WELDING SHALL BE
ALL THE WAY DOWN IN THE EXISTING HOLE WHERE
WELDING IN PLACE. ROD SEGMENT SHALL BE SET
PLUGGING WITH NEW STEEL ROD SEGMENT AND
COVERS SHALL BE MADE WATERTIGHT BY
POSITION INDICATOR ROD HOLES AT THE BONNET
AT ALL SIX HYDRAULIC CYLINDERS:
PISTON, PART # 22508-2
PART # 22508-27
2" HEAVY HEX NUT,
1/4
E
C H
IR
IA
C
A N
S I
D
M-501
:1
A P
R
IL
E
C H
IR
IA
C
J S
W A
L L E
Y
H Y
D R
A U
L
IC
C
Y L
IN
D E
R R
E P
A
IR
/2 i n
2" DIA. STEEL ROD
PART # 22508-23
SEAT FASTENERS
INSTALL PER PACKING MANUFACTURER'S INSTRUCTIONS.
TO 250°F, AND A MAXIMUM PRESSURE OF AT LEAST 2000 PSI.
WITH WATER, WITH AN OPERATING TEMPERATURE RANGE OF -40°F
WITH SBR RUBBER BINDER CHEVRON V-RINGS, SUITABLE FOR USE
MATCH EXISTING DIMENSIONS. MATERIAL SHALL BE COTTON FABRIC
WATER PACKING (ORIGINAL SPEC PART # 22508-13. NEW PACKING SHALL
TO SURFACE FINISH OF 62 μIN.
CONTACT WITH ROD AND PACKING
CLEAN, AND POLISH SURFACES IN
PACKING GLAND, PART # 22508-10.
3/4" X 4.75" STUD WITH HEX NUT
GLAND FASTENERS PART # 22508-20
TO SURFACE FINISH OF 62 μIN.
CONTACT WITH ROD AND PACKING
CLEAN, AND POLISH SURFACES IN
PACKING GLAND, PART # 22508-10.
OF CYLINDER BODY
LOCATIONS: AT TOP AND BOTTOM
(12 TOTAL)
QUANTITY = 2 PER CYLINDER
PART # 22508-5.
REPLACE ALL CYLINDER GASKETS
TO SURFACE FINISH OF 62 μIN.
IN CONTACT WITH PACKINGS
CLEAN, AND POLISH SURFACES
BONNET COVER, PART # 22507-1.
HD. CAP SCREW
3/4" X 1.5" H.SOC.
PART # 22508-23
SEAT FASTENERS
PER LEAF NUT - NOT SHOWN (12 TOTAL)
QUANTITY = 1 PER PISTON, AND 1
REPLACE O-RING, PART # 22508-17
(30 TOTAL)
QUANTITY = 5 PER CYLINDER
PART # 22508-6.
REPLACE ALL PISTON RINGS
PART # 22506-1
HYDRAULIC CYLINDER
EXCEED 1.0.
DEPTH TO WIDTH RATIO NOT TO
IN DEPTH THAN 1/32", AND SCORING
AND WITH SCORING NOT GREATER
ACHIEVE SURFACE FINISH 16 μIN, CLEAN, HONE, AND POLISH TO
GATE LEAF STEM, PART # 22508-1.
WATER PACKING
REMOVE EXISTING
FINISH OF 62 μIN.
PACKING TO SURFACE
CONTACT WITH ROD AND
POLISH SURFACES IN
# 22508-11. CLEAN, AND
PACKING SEAT, PART
FOR WELDING THE NEW PLUG
SMOOTH TO BARE METAL TO PREPARE
GRIND SURFACE OF BONNET COVER
INDICATED
PREVENT COMPLETION OF REPAIRS AS
COR OF ANY DISCREPANCIES THAT WOULD
IN THE FIELD AND SHALL IMMEDIATELY NOTIFY
SHALL VERIFY DIMENSIONS AND CONDITIONS
ASSEMBLY ARE UNVERIFIED. CONTRACTOR
NOTE: COMPLETE DIMENSIONS FOR THIS
DUE TO PREVIOUS MODIFICATIONS.
A UNIQUE FASTENER ARRANGEMENT
FASTENER ASSEMBLY AT E-1 HAS
AT ALL 6 CYLINDERS. NOTE THAT
(PART # 22514-6) AND FASTENERS
REMOVE EXISTING PACKING GLAND
CONNECTING TO THE GATE.
OF PASSING THROUGH THE BONNET COVER AND
THE TOP OF THE HYDRAULIC CYLINDER INSTEAD
CONNECTED TO THE STEM EXTENSION ROD ABOVE
INDICATOR ROD SHALL BE RE-USED BUT SHALL BE
AT GATES E-2, E-3, S-1, S-2, AND S-3.
REMOVE AND KEEP INDICATOR ROD (PART # 22514-2)
PART # 22506-1
HYDRAULIC CYLINDER
OF CYLINDER BODY
LOCATIONS: AT TOP AND BOTTOM
(12 TOTAL)
QUANTITY = 2 PER CYLINDER
PART # 22508-5.
REPLACE ALL CYLINDER GASKETS
TO SURFACE FINISH OF 62 μIN.
SURFACES IN CONTACT WITH PACKING
AND 22507-3 (TYP 3). CLEAN, AND POLISH
CYLINDER HEAD, PART # 22507-2 (TYP 3)
INSTALL PER PACKING MANUFACTURER'S INSTRUCTIONS.
RANGE OF -40
WITH THE HYDRAULIC FLUID, WITH AN OPERATING TEMPERATURE
WITH NITRILE ELASTOMER CHEVRON V-RINGS, SUITABLE FOR USE
MATCH EXISTING DIMENSIONS. MATERIAL SHALL BE COTTON FABRIC
OIL PACKING (ORIGINAL SPEC PART # 22508-9). NEW PACKING SHALL
2000 PSI.
°F TO 250°F, AND A MAXIMUM PRESSURE OF AT LEAST
GLAND FASTENERS PART # 22508-19
DEPTH TO WIDTH RATIO NOT TO EXCEED 1.0.
GREATER IN DEPTH THAN 1/32", AND SCORING
FINISH 16 μIN, AND WITH SCORING NOT
CLEAN, HONE, AND POLISH TO ACHIEVE SURFACE
STEM EXTENSION ROD, PART # 22508-3.
ILLUSTRATIVE PURPOSES.
THIS VIEW IS SHOWN FOR
VIEW FROM WHAT IS SHOWN HERE-
ROTATED 90 DEGREES IN THE PLAN
THE ACTUAL PACKING GLAND IS
NOTE THAT THE ORIENTATION OF
TO SURFACE FINISH OF 62 μIN.
CONTACT WITH ROD AND PACKING
CLEAN, AND POLISH SURFACES IN
PACKING GLAND, PART # 22508-7.
FINISH OF 62 μIN.
PACKING TO SURFACE
CONTACT WITH ROD AND
POLISH SURFACES IN
# 22508-8. CLEAN, AND
PACKING SEAT, PART
PART # 22508-22
SEAT FASTENERS
CAP SCREW
1/2" X 1.5" H.SOC. HD.
MANUFACTURER'S INSTRUCTIONS.
2000 PSI. INSTALL PER PACKING
A MAXIMUM PRESSURE OF AT LEAST
RANGE OF -40°F TO 250°F, AND
WITH AN OPERATING TEMPERATURE
SUITABLE FOR USE WITH THE HYDRAULIC FLUID,
ELASTOMER CHEVRON V-RINGS,
MATERIAL SHALL BE COTTON FABRIC WITH NITRILE
NEW PACKING SHALL MATCH EXISTING DIMENSIONS.
OIL PACKING (ORIGINAL SPEC PART # 22508-14).
CL
CL
6"0 3" 1' 6"0 3" 1'
6"0 3" 1'
J
H A
C H
IG
IA
N
A8
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
OPEN
CLOSED
A1 SCALE: 1" = 1'
D5
A5 A6
D8
STEM EXTENSION ROD AT E-3
POSITION TRANSDUCER (USACE CYLINDERS)
POSITION INDICATION (USACE CYLINDERS)
VISIBLE PORTION OF GATE LEAF STEM
NOT TO SCALE. S-1 SHOWN, BUT TYPICAL OF 6 LOCATIONS. DATE OF PHOTO: FEBRUARY 2017
DETAIL TYPICAL CYLINDER (OTHER THAN E-1)
M-502
P O
S
IT
IO
N I
N D
IC
A T
O R D
E T
A
IL
0 1' 2'6"
SYSTEMS AND LIMIT SWITCHES.
ELECTRONIC POSITION INDICATOR
AND RECALIBRATE MECHANICAL AND
REASSEMBLE UPON COMPLETION OF WORK,
TO ACCOMPLISH SCOPE OF WORK.
DISASSEMBLE COMPONENTS AS REQUIRED
POSITION TRANSDUCERS & LIMIT SWITCHES
-MAINTAINS ACCURATE OPERATION OF
WITH STEM EXTENSION ROD OPERATION)
EXISTING SYSTEMS (DOES NOT INTERFERE
-FITS WITHIN SPACE CONSTRAINTS OF
-MAINTENANCE FREE DESIGN
THE STEM EXTENSION ROD
TO AVOID PLACING EXCESSIVE LOAD ON
-LIGHT WEIGHT AND SMOOTH OPERATION
-DURABILITY AND RELIABILITY
ARE NOT LIMITED TO:
DESIGN CONSIDERATIONS INCLUDE BUT
ASSEMBIES FOR THESE FIVE LOCATIONS.
THE NEW POSITION INDICATOR ROD
MATERIALS AND METHODS TO CONSTRUCT
CONTRACTOR SHALL PROPOSE THE
HYDRAULIC CYLINDER.
STEM EXTENSION ROD ABOVE THE
COVER, BUT INSTEAD IS ATTACHED TO THE
NO LONGER PASSES THROUGH THE BONNET
DONE AT E-1, SO THAT THE INDICATOR ROD
IN A SIMILAR MANNER AS WAS PREVIOUSLY
MODIFY THE INDICATOR ROD ASSEMBLY
REQUIREMENTS SPECIFIC TO E-3, S-1, S-2, S-3:
BUT CONDITIONS VARY. DATE OF PHOTO: FEBRUARY 2017
NOT TO SCALE. TYPICAL OF USACE OPERATED CYLINDERS AT E-3, S-1, S-2, AND S-3,
BUT CONDITIONS VARY. DATE OF PHOTO: FEBRUARY 2017
NOT TO SCALE. TYPICAL OF USACE OPERATED CYLINDERS AT E-3, S-1, S-2, AND S-3,
BUT CONDITIONS VARY. DATE OF PHOTO: FEBRUARY 2017
NOT TO SCALE. TYPICAL OF USACE OPERATED CYLINDERS AT E-3, S-1, S-2, AND S-3,
NOTE THAT SOME COMPONENTS ARE UNIQUE AT E-2. NOT ALL COMPONENTS SHOWN FOR CLARITY.
MEASURING WIRE.
OF CABLE EXTENSION TRANSDUCER
ASSEMBLY TO MAINTAIN VERTICAL ALIGNMENT
EXTENSION BRACKET ADDED TO POINTER
ROD ASSEMBLY
POINTER ATTACHED TO POSITION INDICATOR
INDICATION GAUGE
VISUAL POSITION
TRANSDUCER
EXTENSION POSITION
WIRE FROM CABLE
HYDRAULIC CYLINDER (TYP)
CL
PIPING VARIES BY CYLINDER)
THAT ARRANGEMENT OF
TO TOP OF CYLINDER (NOTE
HYDRAULIC PIPE CONNECTION
CYLINDER HEAD
STEM EXTENSION ROD
PACKING GLAND
THEY SHALL BE REMOVED)
OF REMAINING COMPONENTS,
AFFECTING FUNCTIONALITY
IS ACHIEVABLE WITHOUT
FUNCTIONAL TRANSDUCERS
BRACKETS AND NON-
IF REMOVAL OF UNUSED
ATTACHED (FIELD VERIFY-
STILL HAVE TRANSDUCERS
THAT SOME CYLINDERS
MOUNTING BRACKET - NOTE
ORIGINAL TRANSDUCER
AT USACE CYLINDERS)
TRANSDUCER (TYPICAL KIND
CABLE EXTENSION POSITION
(VARIES BY CYLINDER)
TRANSDUCER MOUNTING PLATE
LOCATION)
VARIES CONSIDERABLY BY
SURFACE CONDITION
BONNET COVER (NOTE THAT
LOCATION)
VARIES CONSIDERABLY BY
AMOUNT OF WATER LEAKAGE
CONDITION OF GLAND AND
PACKING GLAND (NOTE THAT
INDICATOR ROD
INDICATION GAUGE
VISUAL POSITION
WATER PACKING
PACKING GLAND, OVER THE
GATE LEAF STEM
BONNET COVER
THE OIL PACKING
PACKING GLAND, UNDER
A P
R
IL
E
C H
IR
IA
C
E
C H
IR
IA
C
J S
W A
L L E
Y
A N
S I
D :1
SHEET NOTES:
2. CONTRACTOR TO TURN OVER ALL OLD PARTS TO CORPS OF ENGINEERS.
CONDITIONS OF TYPICAL COMPONENTS. FIELD VERIFY ACTUAL CURRENT CONDITIONS AND DIMENSIONS.
1. PHOTOS ARE PROVIDED TO ILLUSTRATE EQUIPMENT LAYOUT AND TO SHOW APPROXIMATE EXISTING
PART # 22508-3
STEM EXTENSION ROD
PART # 22517-10 (FOR REFERENCE)
SAFTEY STUD CAP
PART # 22517-11 (FOR REFERENCE)
SAFTEY STUD WITH NUT
POSITION INDICATOR ROD
TRANSDUCER AT E-2 IS SIMILAR TO THE ONE AT E-1)
(TYPICAL OF TRANSDUCERS AT E-3, S-1, S-2, S-3.
CELESCO PT9101-0100-111-1110
CABLE EXTENSION POSITION TRANSDUCER:
TO POINTER AT E-1.
E-3, S-1, S-2, S-3. THE POINTER AT E-2 IS SIMILAR
ROD ASSEMBLY, TYPICAL OF POINTERS AT
POINTER ATTACHED TO POSITION INDICATOR
GAUGE AT E-2 CONTAINS MDC LIMIT SWITCHES)
(TYPICAL OF GAUGES AT E-3, S-1, S-2, S-3.
GATE POSITION INDICATING GAUGE
J
H A
C H
IG
IA
N
A1
M-501
D7
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
OPEN
CLOSED
0 1' 2'6"A1
NOT ALL COMPONENTS SHOWN FOR CLARITY
SCALE: 1" = 1'
E8
A4
CYLINDER E-1 WITH MODIFIED POSITION INDICATOR
NOT TO SCALE. UNIQUE CONDITIONS AT E-1 DUE TO PREVIOUS INDICATOR ROD MODS. DATE OF PHOTO: FEBRUARY 2017
A8
POSITION TRANSDUCER AT E-1
NOT TO SCALE. UNIQUE CONDITIONS AT E-1 DUE TO PREVIOUS INDICATOR ROD MODS. DATE OF PHOTO: FEBRUARY 2017
NOT TO SCALE. UNIQUE CONDITIONS AT E-1 DUE TO PREVIOUS INDICATOR ROD MODS. DATE OF PHOTO: FEBRUARY 2017
DETAIL: HYDRAULIC CYLINDER E-1
3/4" STAINLESS STEEL THREADED ROD (E-1 ONLY)
2"x2" ALUMINUM ANGLE SECTIONS (E-1 ONLY)
PACKING GLAND AT E-1
MOVED BY THE STEM EXTENSION ROD.
ASSEMBLY IS CONNECTED TO AND
CONNECTION IN 2003. INDICATOR ROD
THE FAILURE OF THE ROD-TO-GATE
(AT E-1 ONLY). CONSTRUCTED AFTER
MODIFIED INDICATOR ROD ASSEMBLY
TO ANGLE SECTIONS.
L-BRACKETS CONNECT COLLARS
STEM EXTENSION ROD (E-1 ONLY).
4 LOCKING COLLARS FASTENED TO
PART # 22517-11 (FOR REFERENCE)
SAFTEY STUD WITH NUT
PART # 22517-10 (FOR REFERENCE)
SAFTEY STUD CAP
PART # 22508-3
STEM EXTENSION ROD
E-1 AND E-2 - SEE PHOTOS)
FOR POSITION LIMIT SWITCHES AT
CYLINDERS, BUT HAS MODIFICATIONS
(SIMILAR AMONG ALL SIX HYDRAULIC
GATE POSITION INDICATING GAUGE
MAINTAIN A WATERTIGHT SEAL)
GLAND WITH MODIFIED FASTENERS TO
STATIONARY IN PLACE AT THE PACKING
2003, AND REMAINING SECTION IS HELD
OF THE ROD TO GATE CONNECTION IN
LENGTH WAS REMOVED AFTER FAILURE
INDICATOR ROD AT E-1 (MOST OF ROD
REMAINING PORTION OF POSITION
AND LIMIT SWITCHES.
POSITION INDICATOR SYSTEMS
MECHANICAL AND ELECTRONIC
OF WORK, AND RECALIBRATE
REASSEMBLE UPON COMPLETION
ACCOMPLISH SCOPE OF WORK.
ASSEMBLY AS REQUIRED TO
DISASSEMBLE INDICATOR ROD
E-1 SHALL BE RE-USED.
INDICATOR ROD ASSEMBLY AT
THE EXISTING MODIFIED
REQUIREMENTS SPECIFIC TO E-1:
SWITCHES LOCATED ALONG THE TRAVEL PATH.
ORIGINAL, AND NOW ALSO ACTIVATE MDC'S LIMIT
POINTERS AT E-1 AND E-2 WERE MODIFIED FROM
INDICATOR ROD ASSEMBLY. NOTE THAT THE
POINTER COMPONENTS ATTACHED TO POSITION
(TYPICAL AT E-1 AND E-2)
CELESCO PT 101-0100-111-1110
CABLE EXTENSION POSITION TRANSDUCER:
(TYP OF E-1 AND E-2)
POWER CONNECTION
MDC UPPER HYDRAULIC
HYDRAULIC CYLINDER E-1 (TYP)
(TYP OF E-1 AND E-2)
POWER CONNECTION
MDC LOWER HYDRAULIC
BONNET COVER
ACTUATORS (SIMILAR AT E-1 AND E-2)
THREE UPPER LIMIT SWITCH
INDICATION GAUGE
VISUAL POSITION
IN THIS PHOTO)
ABOVE - NOT FULLY VISIBLE
(WITH CLAMPS TO INDICATOR ROD
MODIFIED FASTENER ASSEMBLIES
ROD AT E-1
POSITION INDICATOR
REMAINING PORTION OF
PACKING GLAND
BONNET COVER
BONNET COVER
TYPES AT E-1 AND E-2)
TRANSDUCER (TYPICAL OF
CABLE EXTENSION POSITION
INDICATION GAUGE
VISUAL POSITION
M-503
P O
S
IT
IO
N I
N D
IC
A T
O R D
E T
A
IL
P
R
IL
A N
S I
D :1
SHEET NOTES:
CONDITIONS OF TYPICAL COMPONENTS. FIELD VERIFY ACTUAL CURRENT CONDITIONS AND DIMENSIONS.
1. PHOTOS ARE PROVIDED TO ILLUSTRATE EQUIPMENT LAYOUT AND TO SHOW APPROXIMATE EXISTING
SIMILAR AT E-1 AND E-2 ONLY)
DESIGN AND LIMIT SWITCH COMPONENTS ARE
LIMIT SWITCH ACTUATOR BEHIND. (POINTER
POSITION INDICATION POINTER, WITH LOWER
ROD ASSEMBLY
MODIFIED INDICATOR
SEE VIEW E8 THIS SHEET.
MODIFIED PACKING GLAND,
E
C H
IR
IA
C
E
C H
IR
IA
C
J
H A
C H
IG
IA
N
J S
W A
L L E
Y
A1
M-502
E1
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
N -C
L -4
C O
L E
B R
O O
K
C O
N N
E C
T
IC
U T
C O
L E
B R
O O
K R
IV
E R L
A K
E
SHEET ID
®of Engineers
US Army Corps
W
W J
B
R E
P A
IR
H
Y D
R A
U L
IC
C
Y L
IN
D E
R S A
N D P
O S
IT
IO
N I
N D
IC
A T
O R
S
C1
PHOTO OF CYLINDERS E-1 AND E-2
NOT TO SCALE. DATE OF PHOTO: FEBRUARY 2017 C6 NOT TO SCALE. DATE OF PHOTO: FEBRUARY 2017
PHOTO OF CYLINDERS S-1 AND S-2 AND SUMP PUMPS
E
C H
IR
IA
C
A N
S I
D
M-504
:1
A P
R
IL
E
C H
IR
IA
C
J S
W A
L L E
Y
A D
D
IT
IO
N A
L P
H O
T
INDICATOR ROD - ONLY AT THIS CYLINDER)
CONNECTING TO MODIFIED POSITION
(GATE CLOSED- AND NOTE BRACKETS
E-1 UPPER GATE STEM EXTENSION ROD
MDC HYDRAULIC OPERATING UNIT
CONDUIT 2 AIR VENT
CONDUIT 1 AIR VENT
SUMP PUMPS
MDC HYDRAULIC LINES TO E-1
ROD (GATE OPEN)
STEM EXTENSION
E-2 UPPER GATE
DISCONNECTED
TO E-1, CURRENTLY
USACE HYDRAULIC LINES
MDC HYDRAULIC LINES TO E-2
DISCONNECTED
TO E-2, CURRENTLY
USACE HYDRAULIC LINES
HYDRAULIC CYLINDER
E-2 GATE OPERATING
EXTENSION ROD OIL PACKING (TYP)
E-2 COVER FOR UPPER STEM
HYDRAULIC CYLINDER
E-1 GATE OPERATING
FROM ACCUMULATORS
MDC LINES TO E-1 AND E-2
HYDRAULIC CYLINDER
S-1 GATE OPERATING
HYDRAULIC CYLINDER
S-2 GATE OPERATING
DOWN TO CONDUIT 1 BELOW
SUMP DISCHARGE LINE
CONDITIONS OF TYPICAL COMPONENTS. FIELD VERIFY ACTUAL CURRENT CONDITIONS AND DIMENSIONS.
1. PHOTOS ARE PROVIDED TO ILLUSTRATE EQUIPMENT LAYOUT AND TO SHOW APPROXIMATE EXISTING
SHEET NOTES:
J
H A
C H
IG
IA
E6EPDDSH
Typewritten Text
SHEET 45
| CON-CL-464_3-27-2019 |
| G-001 |
| G-002 |
| M-101 |
| M-301 |
| M-501 |
| M-502 |
| M-503 |
| M-504 |
| CON-CL-464_INFO_DRWGS |
| SHOP Drawings - Colebrook Dam.pdf |
| 22505 |
| 22505-A |
| 22506 |
| 22507 |
| 22508 R1 |
| 22508-A |
| 22509 |
| 22510 |
| 22511 |
| 22511-A |
| 22512 |
| 22513 R1 |
| 22514 |
| 22517 R1 |
| 22518 R2 |
| 22518-A R4 |
| 22518-B R2 |
| 65-182 |
| historical COLEBROOK GATES.pdf |
| CON-16-16 |
| CON-16-40 |
| CON-16-44 |
| CON-16-45 |
| CON-113-1 |
File details come from the government source that posted it.