Colebrook Lake Dam Hydraulic Cylinders and Position Indicator Rods Repairs
Solicitation number
W912WJ19B0008
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Attachment_Crane_Report_0001.pdf PDF
Specifications.pdf PDF
W912WJ_19_B_0008.pdf PDF
Plans_Colebrook_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above solicitation is hereby amended to answ er Request for Information (RFI’s) and upload the Site Visit list of Attendees. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ19B0008

X 9B. DATED (SEE ITEM 11)

29-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-May-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ19B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUESTS FOR INFORMATION

REQUESTS FOR INFORMATION – Amendment 0001

1. Can the crane extend out? Is it cantilevered?

RESPONSE: The boom reach is variable, so yes, the length can change. Yes, it is cantilevered. The crane could be termed a small hammerhead boom crane. It extends in and out, and circles to the left and right, but does not rotate fully around.

2. Is there a range diagram for the crane?

RESPONSE: The Corps will provide a range diagram to the Contract Awardee. The crane is fully capable of lifting and placing the bulkhead as needed for this project.

3. When was the last inspection of the Gantry Crane?

RESPONSE: Kone Cranes does the crane inspections for the Corps. The latest inspection for the Gantry Crane inside of the Colebrook Gate Tower was in August 2016. The report is attached, below.

4. How long will it take to dewater the Goodwin Pool?

RESPONSE: As per Specification Section No. 01 11 00 SUMMARY OF WORK, Paragraph 1.6 WORK SEQUENCE AND SCHEDULING, Subparagraph 1.6.1 Work Requiring Lowered Pool Levels, “Thirty calendar days are required to fully lower the pool after initiation.” It should be noted that the Colebrook pool is not going to be lowered.

5. What is the capacity of the Service Bridge?

RESPONSE: The capacity of the Service Bridge is 34.2 Tons Inventory (ie everyday loads) and 56.9 Tons Operating (largest load allowed on the bridge). The maximum axle loads (for each individual axle) is 30.5 kips for Inventory and 50.5 kips for Operating.

6. How will the bulkhead be moved into place?

RESPONSE: The New England District will be responsible to move the bulkhead from its current location to a location closer to the Gate Tower and to a location from where the crane can easily pick it up. However, installation of the bulkhead using the gate will be by the Contractor.

7. Did the Corps mean to have the internal surface of the hydraulic cylinders (shells) honed as part of the re-conditioning of the hydraulic cylinders?

RESPONSE: No. This work element is not part of the scope. Only the stem extension rods/gate leaf stems were to be removed and polished.

8. Is there mud and debris on the sills?

RESPONSE: No. The Corps conducted Remotely Operated Vehicle (ROV) inspections of all three slots on 3 April 2019, and no mud or debris were observed on the sills.

9. Could the Contractor use an ROV instead of a diver to confirm the seating of the bulkhead against the intake structure?

RESPONSE: Yes, the Contractor could use an ROV instead of divers. The Corps does not tell the Contractor means and methods. The Dive Specification is included in case the Contractor elects to use divers.

10. Will there be current flowing at the intake structure when the Contractor puts the bulkhead in place?

RESPONSE: No. The Corps will have one of or both the emergency gate and the service gates closed on the conduit section that the bulkhead is to be placed in front of, in order to balance the head for the seating of the bulkhead.

11. Who built the gates and hydraulic cylinders currently in place in the gate chamber? Was it Rodney Hunt?

RESPONSE: As per the shop drawings submitted for approval, and included in the Information Drawings that are a part of this contract, the manufacturer of the gates and hydraulic cylinders was the Goslin-Birmingham Manufacturing Co., Inc. from Birmingham, AL in 1965.

12. What is the depth of the water in front of the intake structures?

RESPONSE: As per Specification Section35 25 00 UNDERWATER DIVING WORK, Paragraph 1.1.4 Depths of Diving Operations and Visibility, “Depths of diving operations will range between 100 and 125 feet below the water surface at the upstream end of the three conduits, and may include both clear and limited visibility conditions.”

13. Does the Contractor have to use Divers?

RESPONSE: No. The Corps does not tell the Contractor means and methods. The Dive Specification is included in case the Contractor elects to use divers.

14. Does the crane operator have to be licensed?

RESPONSE: Yes. As per Spec Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, Subparagraph

1.6.1.5 Crane Operators/Riggers, “Provide Operators, Signal Persons, and Riggers meeting the requirements in EM 385-1-1, Section 15.B for Riggers and Section 16.B for Crane Operators and Signal Persons. Provide proof of current qualification.”

15. What voltage does the MDC Crane run on?

RESPONSE: The MDC Crane, located at the top of the Gate Tower, runs on 480 volts.

16. Where will the bulkhead be located during the time of this project?

RESPONSE: The New England District will be responsible to move the bulkhead from its current location to a location closer to the Gate Tower and to a location from where the crane can easily pick it up. The bulkhead is expected to be in continual use in one of the three gate slots to dewater the passage of the conduit where the cylinders are being worked on.

17. Will Contractors be allowed to witness the bulkhead test currently scheduled for 29 May 2019?

RESPONSE: No. The Government will conduct the test, and record the conditions using their ROV. The Contract awardee will be provided with the results of the test.

18. Will the replacement of the P-seal on the bulkhead be a part of this project?

RESPONSE: No. Leakage is an inherent component of this project. Replacing the Pseal on the bulkhead is not to be considered part of the scope. Leakage is not expected to approach a magnitude that would pressurize the conduit.

19. Have the welds on the bulkhead been tested by Mag particle?

RESPONSE: The welds were tested in 1969 as part of the original construction of the bulkhead. The following comes from the original specifications: “Radiographic Inspection. – The Contracting Officer will require radiographic inspection of shop and field welds as designated on the drawings. Welds designated for radiographic inspection which are found inaccessible to a radiation source or whose geometry is such that radiographic examination is not feasible may be examined, upon written approval of the Contracting Officer, by other non-destructive methods, such as dye penetrant, magnetic particle, or ultrasonic tests.” The welds have not been tested since the original tests. A visual inspection was conducted during the spring of 2019, and no degradation was observed. The bulkhead has seen very little service since construction. Therefore, issues associated with weld fatigue are not anticipated.

20. Does the Contractor have to have the CQC class in order to submit a bid?

RESPONSE: No. However, as per Spec Section 01 45 00 QUALITY CONTROL, Subparagraph 3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN, “Construction will be permitted to begin only after acceptance of the Contractor Quality Control (CQC) Plan or acceptance of an interim plan applicable to the particular features of work to be started.” Additionally, as per Subparagraph 3.4.3 Additional Requirement, “…the Contractor Quality Control (CQC) System Manager and Alternate CQC System Manager are required to have completed the “Construction Quality Management (CQM) for Contractors” course.”

Important Note: Crane Report Attached Separately. (pages 1-12)

SITE VISIT ATTENDEES

Project Location: Colebrook Lake and Dam located in Colebrook, CT.

Solicitation: W912WJ19B0008-Repair Hydraulic Cylinders and Position Indicator Rods Site Visit Date: 10 May 2019 Time: 0900 AM

(End of Summary of Changes)

Site Visit Attendees (Contractors) Company

1. David Krupp Chas G Allan Inc.

2. Chuck Surgent Chas G Allan Inc.

3. Gary Bontrenn Chas G Allan Inc.

4. Bill Foontoin Gardner CIS

5. David Allen Kovacs Construction Corp.

6. David Tenney Baltimore Hydraulics Inc.

7. Jason Kauhman Baltimore Hydraulics Inc.

8. Mike Sondag Alltech Engineering Corp.

9. Jrame for Ricksimon Shoreline Line Diving

10. Trevor Rich Marino Diving Solutions

11. Rob Barba Atlantic Diving Welding

12. Jan Judson Gardner CIS

13. Tim Stellewerlf Gardner CIS

14. Keith Lundgren Terry Contracting

Site Visit Attendees (Government)

1. Sara J. Torres Contract Specialist

2. Janet Patev Tech Lead

3. John Haluchak Natural Resource Specialist/Park Ranger

4. Richard Doughty Project Engineer