W912WJ-16-R-0001.pdf
PDF 428 KB Posted
- Solicitation number
- W912WJ16R0001
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0008(1).pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Appendix_D-1.pdf | ||
| Amendment_0001.pdf | ||
| Solicitation_Attachment_1.pdf | ||
| Solicitation_Attachment_2.pdf | ||
| Solicitation_Attachment_3.xlsx | XLSX spreadsheet | |
| Wage_Determination_20160401.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPRESENTATIONS AND CERTIFICATIONS, SECTION 00600; CONTRACT CLAUSES, SECTION 00700
THIS SOLICITATION IS 100% SET-ASIDE for the FOLLOWING SMALL BUSINESS FIRMS ONLY:
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB); HUBZONE and 8(A) FIRMS
NOTE TO 8(a) FIRMS: 8(a) f irms must have an off ice in the follow ing geographical locations or a bon-a-f ide off ice that has been approved by the U.S. Small Business Administration (ME, VT, NH, MA, RI, CT, NY, NJ)
NAICS: 236220
Size Standard: $36,500,000
NOTE TO BIDDERS: Please pay special attention to Section 00600, Contract Clause 52.204-7(System for Aw ard Management Registration All Offerors must complete the annual representations and certif ications electronically via the System for Aw ard Management (SAM) w ebsite at https://w w w .sam.gov/portal/public/SAM/ or by telephone at 1-866-606-8220. Please ensure your f irm is registered in the SAM Database
Offers sent by fascimile or email w ill not be accepted.
JESSICA R LOC 978-318-8678
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
08-Jun-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________25 Jul 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
978-318-8207FAX:TEL: TEL: FAX:
W912WJ-16-R-0001 122
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912WJ-16-R-0001
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job
Construction MATOC
FFP
This Multiple Award Task Order Contract MATOC is to establish a pool of contracts for construction services for the US Army Corps of Engineers. The total estimated value of the MATOC POOL is $35,000,000 with an ordering period of 5 years. This is a five year IDIQ with no option years.
The scope of this MATOC includes construction, renovation and repair projects to military and other federal facilities. Each contract resulting from this solicitation will be subject to a minimum guarantee of $33,333. This minimum is to be met within the life of the contract.
All work shall be performed in accordance with the attached Scope of Work (SOW) and individual requirements will be provided on a task order basis. For evaluation purposes on this MATOC a sample task order is included in this solicitation. The sample Task Order is provided for bidding purposes. The government may choose to award the sample task order.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
Contractor Manpower Reporting (CMR)
FFP
CMR for fulfilling the CMR requirement if included or if not included in your overhead for initial CMR database set up and for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs). Refer to Clause 52.204-9002.
CMR will be priced separately on each task order, when required.
FOB: Destination
NET AMT
SOW
SCOPE OF WORK
1.1 Multiple Award Task Order Contract (MATOC) for General Construction
This MATOC will comprise of a pool of contractors for construction, renovation and repair projects at Military and other Federal Facilities throughout the six New England States.
Primarily the work will be located within the New England District’s (NAE) geographical boundaries (VT, ME, NH, MA, RI, CT) but task orders issued under this contract may extend to within the USACE North Atlantic Division Region (NY, NJ, PA, MD, DE, VA and Washington DC). The primary use of this MATOC will be for the Military Installations served by NAE to include: Natick Soldier Systems Center, Natick, MA; Fort Devens Reserve Forces Training Area, Ayer, MA; and the US Army Corps of Engineers Cold Regions Research Engineering Laboratory, Hanover, NH; Hanscom AFB, Bedford, MA; Westover ARB, Springfield, MA.
Task Orders to be issued under this MATOC are not limited to these installations. The information is provided in order to identify the primary locations of work to be completed under the contract. NAE serves other Military Customers/Installations and Federal Agencies, and also controls and maintains numerous flood control facilities throughout the region. Task Orders may also be issued to support those locations.
The Government reserves the right to issue additional solicitations and award additional contracts within the region covered by this solicitation. The scope of work will consist of a broad range of construction tasks to include but not limited to minor new construction, renovation, repairs, upgrades, alterations, and preventive maintenance for vertical construction-type projects. Work could also include horizontal construction incidental to a vertical construction project or as the primary task under a task order.
1.2. Vertical Construction
1.2.1. Buildings Construction & Renovation
The scope of work for construction of buildings may include but is not limited to: new construction; rehabilitation; renovation and repair; building additions; pre-engineered buildings and other structures (e.g. open bay pre-engineered, storage facilities, training ranges, etc.).
Renovations may include but are not limited to: flooring; ceilings; walls; windows; doors;
electrical & mechanical systems; furniture incidental to construction (e.g. workstations); lead, asbestos, mold and other hazardous substances; interior and/or exterior painting of new and existing facilities; and work incidental to surface deterioration (e.g. patching drywall, replacing siding, trim work, etc). Structural repairs include but are not limited to foundations, settlement, and masonry/brick cracking.
1.2.2. Mechanical/HVAC
Mechanical and HVAC work will be completed under this contract as either the primary work under a task order or incidental to the overall work. Work may include: new construction, rehabilitation, or repair of HVAC systems; plumbing systems; waste water drainage systems; fire alarm systems; fire protection sprinkler systems; fire suppression systems; back flow preventers;
and all devices, equipment and components associated with constructing and installing mechanical/HVAC systems.
1.2.3. Roofing & Building Envelope Repair
Roofing and Building Envelope Repair activities may be completed under this contract as either the primary work under a task order or incidental to the overall work. Roofing may include but is not limited to replacement and repair of roof and roofing systems. Work may also include gutters, downspouts, flashing, fascia and soffits, repair of incidental damage (e.g. ceiling replacement, painting and carpet cleaning) as a result of roof leaks. Building envelope repairs/replacement will include but not be limited to exterior windows, sealants, brick veneer, mortar repointing, metal ties, mortars, expansion/control joints.
1.2.4. Anti-Terrorism Force Protection (ATFP) and Anti-Terrorism Operational Security (AT-
OPSEC)
ATFP activities may be completed under this contract as either the primary work under a task order or incidental to the overall work. ATFP construction work will include building and site security for both new and retrofit construction. AT/OPSEC requirements will be specified at a Task Order level, if applicable.
1.3. Horizontal Construction
1.3.1. General Horizontal Construction
Horizontal construction activities will be primarily performed as incidental work under a task order but may on occasion be the primary type of work. Horizontal construction may include but is not limited to: new construction, rehabilitation and repairs of highways, roads, streets, airport runways, concrete aprons and sidewalks; firing ranges; trails; obstacle courses; storm drainage;
erosion repairs,(i.e. sinkholes, washouts); soft/hard landscaping; sodding; detection loops;
bridges; parking lots; traffic lines; traffic markings; repair/replacement of storm water, sewer, lines, and utility supply lines.
1.3.2. Electrical Utilities
Electrical utility work may include new construction, rehabilitation, maintenance or repair of interior and exterior utility systems and lines (main lines and lateral feeders). Work may also include but not be limited to the following: interior and exterior high and low voltage electrical lines; communication lines (telephone & data lines); communication systems; security & security camera systems and cabling; and emergency generator systems.
1.4. Incidental Work
1.4.1. Incidental work to the tasks performed in any of the above paragraphs may also be required. Incidental work includes associated work similar to that described above that may be required to provide a complete, safe and usable facility during and after the course of the primary project services.
1.4.2. Testing, Reports, Studies & Surveys
Completion of testing, reports, studies and surveys may be required as incidental work under a task order. Requirements for testing, reports, studies and surveys will be clearly identified in task order scopes of works.
1.5. Restrictions: Task orders for design only or demolition only shall not be placed against the contract.
1.6 General Task Order Requirements
All work under this contract shall comply with General Requirements and the scope of work for each task order will include Division 01 - General Requirements Specifications. These sections provide project management and oversight requirements, including project specific requirements.
Quality control, safety, sustainability, and environmental documentation, standards, and processes are also included.
Typical Specification Sections include the sections listed below. This list is not comprehensive and additional sections may be added for specific task orders. The General Requirements Specifications Sections include the following:
01 33 00 Submittal Procedures 01 33 29 Sustainability Reporting 01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 01 Quality Control System (QCS) 01 50 00 Temporary Construction Facilities and Controls 01 57 20 Environmental Protection
01 57 23 Temporary Storm Water Pollution Control 01 74 19 Construction and Demolition Waste Management The above listed Specification Sections are provided in their entirety as an attachment to this Solicitation. The requirements identified in these specifications shall apply to all task orders issued under this contract. The Specification Sections provided are the most recent, available versions. Each task order scope of work will include the most up to date version of the Specification Sections. The Specifications provided with a task order take precedence over the version provided in this Solicitation.
1.7 Contractor Personnel and Qualifications
Personnel assigned to individual task orders shall have the required qualifications pertaining to the specific work at the site. The requirements for on-site and off-site personnel will differ for each project and shall be specifically identified in individual task orders. The following list of qualifications generally reflects the personnel requirements associated with these types of activities. The following personnel shall be employees of the Prime Contractor. After contract award any substitution of Contractor personnel identified in the Contractor’s proposal shall be submitted to the Contracting Officer for concurrence.
1.7.1 PROJECT MANAGER. For each task order, the Contractor shall designate a Project Manager (PM). The Contractor shall identify the PM before work begins on the task order and the PM qualifications, experience and performance history shall be satisfactory to the Contracting Officer or ACO. The PM shall be responsible for the management and execution of the task order in accordance with the approved Scope of Work, approved work plans, and all federal, state, and local laws and regulations. The PM shall ensure coordination with the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner. The PM shall also maintain close communication and coordination with USACE for the duration of the task order, including weekly and/or monthly progress and detailed cost reporting.
The PM shall have, as a minimum, the following qualifications: a. A college degree from an accredited school in architecture, engineering, or construction management, b. A minimum of five (5) years Project Management experience, with a minimum of three (3) years’ experience on vertical construction and renovations c. Working knowledge of applicable federal, state, and local laws, regulations, and guidance as they apply to the region specified in this solicitation.
1.7.2 SITE SUPERINTENDENT. For each task order issued to the Contractor, the Contractor shall designate a Site Superintendent. The Site Superintendent shall oversee all work on site and be able to perform the functions identified in Specification Sections 01 45 00 and 01 35 26. The Site Superintendent shall have, as a minimum, the following qualifications: b. A minimum of two (2) years experience as a Site Superintendent on vertical construction and renovations c. A minimum of five (5) years experience on construction projects in any capacity d. Working knowledge of applicable federal, state, and local laws, regulations, and guidance as they apply to the region specified in this solicitation.
1.7.3 CONTRACTOR QUALITY CONTROL (CQC) SYSTEM MANAGER. For each task order issued to the Contractor, the Contractor shall designate a CQC System Manager qualified in accordance with Specification Section 01 45 00. The CQC System Manager shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor.
1.7.4 SITE SAFETY AND HEALTH OFFICER (SSHO). For each task order issued to the Contractor, the Contractor shall designate a SSHO qualified in accordance with Specification Section 01 35 26. The SSHO shall be responsible for overall safety at the project site and have the authority to act in all safety matters for the Contractor.
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION L
D. PROPOSAL SUBMISSION
1. INTRODUCTION
This solicitation includes a Scope of Work for all work contemplated under the MATOC IDIQs. The solicitation also includes the plans and specifications for a Sample Task Order project, along with a Department of Labor Construction Wage Determination applicable to the Sample Task Order. Price proposals for the Sample Task Order are to be submitted as part of the response to this solicitation. The Sample Task Order price proposal will be used to evaluate price for the purposes of making a best value trade-off decision.
The offeror’s proposal shall be submitted in hard copy, with an accompanying digital copy, as set forth below. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
The offeror’s proposal shall consist of two (2) volumes. The first volume shall be titled Technical Information and should address experience, management approach and past performance. The second volume shall be titled Price and should address price, solicitation, offer and award documents and certifications/representations.
Offerors are cautioned that “parroting” of the technical requirements or the SOW with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of their proposal. Proprietary information shall be clearly marked.
Failure to submit any of the proposal submissions may result in rejection of the offer.
2. PROPOSAL SUBMISSION REQUIREMENTS
a. Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).
b. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New
Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
c. The following volumes of material shall be submitted:
PRINTED DIGITAL MAXIMUM
VOLUME TITLE COPIES COPIES PAGES
I – Technical Information Original + 3 1 100
II – Price Original + 3 1 N/A
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will not be read and will not be evaluated by the Government. Past performance questionnaires will not count against the page limit.
The past performance narrative will count against the page limit.
3. PROPOSAL FILES
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be consecutively numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
NOTE: 11x17 folded pages are acceptable for tables/graphic representations; however, each 11x17 page counts as two pages.
The following additional restrictions apply:
b. File Packaging. All of the proposal electronic files shall be in their native format, i.e. docx, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. In addition, files in read-only format (PDF files) shall also be submitted. All price breakdown information to aid in the price reasonableness evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. ** If the hard-copy proposal differs from the electronic version, the hard copy will govern.
c. Content Requirement. All information shall be confined to the appropriate file.
The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:
VOLUME I – Technical. The volume shall be organized into the following sections:
(1) Factor 1 – Experience
A. Subfactor 1a. The offeror’s Prime Contractor/JV Experience. The subfactor portion of the proposal shall address the following as a minimum:
(i) Description of a minimum of two recent and relevant projects, but no more than five projects.
(ii) Descriptions shall include project name, project location, project dollar value, a general description of the project, a description of the work performed as the prime contractor, name and contact information of the project owner. Photos to supplement the description are acceptable, however there still needs to be a narrative description.
B. Subfactor 1b. The experience of the offeror’s proposed Subcontractors. The subfactor portion of the proposal shall address the following at a minimum:
(i) Descriptions for all proposed subcontractors. Provide no more than two projects per subcontractor. An appropriate number of subcontractors should be proposed to show experience in the entire breadth of work in the Scope of Work. Indicate the work to be self-performed and the work to be performed by subcontractors submitted in their proposal.
(ii) Descriptions shall include project name, project location, project dollar value, and a general description of the project, a description of the work performed by the subcontractor, name and contact information of the project owner.
(2) Factor 2 - Management Approach
The Offeror’s proposal must, at a minimum:
A. Include an organizational chart and narrative description of the Offeror’s overall structure and management of the project team from the Offeror’s Headquarters to the Offeror’s site office(s). The chart and narrative must:
- identify all offices involved in this contract.
- identify all positions by title, organization, and physical location and how they are related, to include all proposed subcontractors and consultants, including lines of reporting and technical areas of responsibility under the contract.
- clearly show the lines of authority of the Offeror’s Project Manager, Quality Control and Safety Organization, including all JV Partners and proposed subcontractors, when applicable.
B. Identify key personnel who will perform the following functions on task orders issued under the IDIQ contract: Project Manager, Site Superintendent, Contractor Quality Control (CQC) System Manager, and Site Safety and Health Officer (SSHO). All key personnel must be employed directly by the prime contractor.
Provide resumes showing the qualifications for the key personnel identified and using the titles matching the above referenced key personnel functions. Personnel provided on a task order basis under awarded contracts must be consistent with key personnel proposed under this paragraph (B) unless otherwise approved by the Contracting Officer. Multiple key personnel may be proposed for each function to maintain sufficient staff to respond flexibly to task orders.
C. Discuss proposed approach to subcontracting. Describe the process by which subcontractors will be identified and selected for projects. Include any established relationships with organizations qualified for work within the scope of this solicitation, including number of projects that have been completed together and/or number of years of partnering. The Offeror shall also submit one letter of commitment for each proposed subcontractor.
D. Discuss how the Offeror will ensure quality consistently across the team.
Discuss quality control lines of authority between Subcontractors and prime.
Discuss quality control lines of authority between task order execution and contract management.
E. Discuss how the Offeror will provide labor, materials, equipment, subcontractors, and project management to multiple sites simultaneously at various geographically dispersed locations, including response times resulting from fluctuating workloads.
F. Discuss the Offeror's experience and description of their Management
Information System (MIS) (or equivalent) capabilities regarding tracking, planning and scheduling, cost estimating, budgeting and accounting reports, technical and regulatory reports, submittals and other relevant data for both individual and multiple task orders.
G. Identify personnel who will perform the following functions for the Sample
Task Order (Attachment 2): Project Manager, Site Superintendent, Contractor Quality Control (CQC) System Manager, and Site Safety and Health Officer (SSHO). Sample task order personnel provided under this paragraph must be consistent with key personnel proposed under paragraph (B), above.
H. For the Sample Task Order (Attachment 2), identify the work that will be self- performed and the work to be performed by subcontractors.
(3) Factor 3 – Past Performance
This section shall contain past performance information regarding the projects submitted under Factor 1a and 1b. In addition, offerors shall submit information regarding all Government and/or commercial contracts, as identified below, for the prime offeror and each proposed subcontractor awarded during the past 5 years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation.
Relevancy will be determined by projects that address the Scope of Work required by this solicitation, i.e., projects that show tasks completed encompassing the requirements under 1.2, 1.3. and 1.4 of the Scope of Work. Data concerning the offeror shall be provided first, followed by each proposed subcontractor, in alphabetical order. This section shall be organized into the following subsections:
A. Subsection 1 – Contract Descriptions. This sub-section shall include the following information in the following format.
(i) For offerors who have worked on Federal Government contracts, provide the contract number.
(ii) For work that was not performed on Government contracts, provide
Past Performance Questionnaires. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) [But see C. below] within the prime contractor organization (name, and current address, email address, and telephone number).
B. Subsection 2- Letters of Commitment shall be included in the proposal for proposed subcontractors in order to be considered for award. If a JV, submit fully signed Joint Venture Agreement.
C. Subsection 3 – Past Performance Questionnaire. For all contracts identified in sub-section 1, Contract Descriptions, a Past Performance Questionnaire must be completed and submitted or a Contractor Performance Assessment Reporting System (CPARS) report must be available. If CPARS data is available for a project, the Corps will access and evaluate CPARS data. If no CPARS report is available for a listed project, the offeror shall complete Part I of the Past Performance Questionnaire, send it to the customer to complete Part II of the Past Performance Questionnaire, request the completed form in a sealed envelope from the customer and submit it in the sealed envelope with the proposal. The Past Performance Questionnaire can be found in Appendix D-1.
VOLUME II – Price. This volume shall consist of all pricing for the Sample Task Order.
Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. There are no page limitations for this volume.
The offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF1442 and price proposal breakdown spreadsheet for the Sample Task Order.
For proposal preparation purposes, the expected or approximate date for initiation of contract performance is October 2016.
Each offeror shall submit binding hourly rates for the following positions: project manager, superintendent, site safety personnel, and quality control representative. Binding rates must be submitted for each of the five years of contract duration. These rates are to become a part of the contract and are to be used in pricing all task orders for the life of the contract.
Binding rates should be burdened with taxes, insurance, and home office overhead but shall not include job site overhead or profit. Offerors shall use the table in the “Binding Rates” tab of the Excel spreadsheet titled “Price Proposal Breakdown” to submit their binding rates. Upon contract award the binding rate table will be incorporated into the contract.
Each offeror shall also submit a price for the work outlined in the Sample Task Order.
Each offeror is required to complete (in entirety) the “Sample Task Order” tab of the Excel spreadsheet titled “Price Proposal Breakdown,” which is attached to the solicitation (Attachment 3). Additional supporting information shall be provided showing the rates and labor hours performed by the Project Manager, Site Superintendent, Contractor Quality Control (CQC) System Manager, and Site Safety and Health Officer (SSHO).
Rates used for these personnel must be consistent with the binding rates proposed in the “Binding Rates” tab of the “Price Proposal Breakdown”. If the rates are not consistent, the binding rates in the “Price Proposal Breakdown” shall control and the Government will substitute binding rates for inconsistent rates proposed in the sample task order for the purposes of price evaluation. The offeror may provide additional information supporting price reasonableness.
Solicitations, Offer and Award Documents and Certification/Representations Certifications and Representations – Each offeror shall complete the solicitation sections indicated below using the file provided with the RFP. An authorized official of the firm shall sign the SF 1442 and all certifications requiring an original signature. Each offeror shall submit a Certificate of Corporate Authority documenting the authority of the signatory authority to sign on behalf of the offeror.
Section A – Standard Form 1442 (SF 1442), Solicitation, Offer and Award Section G – Contract Administration Data Section K – Representations, Certification and Other Statements of Offerors
Solicitations, Offer and Award Documents and Certifications/Representations shall not be addressed separately from that submitted in VOLUME II.
Joint Venture Offerors must submit a copy of their executed Joint Venture Agreement that is fully compliant, as applicable, with the Service-Disabled Veteran-Owned Small Business (SDVOSB), 8(a) and HUBZone regulations.
SECTION M
A. BASIS FOR AWARD
Three separate contract awards will be made using the best value trade-off process in accordance with FAR Part 15.101, based on the best overall (i.e., best value) proposals that are determined to be the most beneficial to the Government, with appropriate consideration given to three (3) technical evaluation factors: Experience, Management Approach, and Past Performance; and a Price factor. All three technical factors are equal in importance.
Subfactor 1a is significantly more important than subfactor 1b. Price is more important than any individual technical factor. ALL EVALUATION FACTORS OTHER THAN PRICE, WHEN COMBINED, ARE APPROXIMATELY EQUAL TO PRICE. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the technical factors (to include all subfactors). Offerors are cautioned that the award(s) may not necessarily be made to the lowest price offered.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
Award will be made to the three (3) offerors whose proposals are most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government will assign each subfactor an adjectival rating and then an overall rating for each factor with a written narrative evaluation reflecting the identified findings. The following evaluation factors and subfactors will be used to evaluate each proposal:
Factor 1 - Experience:
Subfactor 1a – Prime Contractor/Joint Venture Experience Subfactor 1b – Subcontractor Experience
Subfactor 1a is significantly more important than Subfactor 1b.
Factor 2 - Management Approach:
This technical factor evaluates the offeror’s proposal for reasonableness, risk, and the extent to which the proposal illustrates a basic understanding of managing the work set forth in the Scope of Work and Sample Task Order.
Factor 3 - Past Performance:
Each offeror’s past performance will be reviewed to determine relevancy and confidence assessment.
Factor 4 - Price:
The resulting awards will be firm-fixed price Multiple Award Task Order Contracts. Price evaluation will be based on prices submitted in the Binding Rates and the Sample Task Order shown in the Price Proposal Breakdown.
C. EVALUATION APPROACH
All proposals shall be subject to evaluation by the Source Selection Team (SST).
1. The evaluation approach for all factors and subfactors is as follows:
a. Adequacy of Response. Each proposal will be evaluated to determine whether the offeror’s methods and approach have satisfied the requirements specified in the RFP. The tasks listed in the Scope of Work are in descending order of importance. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.
b. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is feasible and the end results achievable. The proposal will be evaluated to determine the extent to which the offeror has demonstrated ability to successfully complete the proposed tasks and technical requirements.
2. Factor 1 - Experience. This technical factor evaluates the Offeror’s proposed company and team experience in successfully completing projects recent and relevant to the Scope of Work in section 000100. The Scope of Work indicates tasks required under the solicitation in descending order of importance. The ratings for Subfactor 1a and Subfactor 1b will be combined into a single Factor 1 rating.
a. Subfactor 1a - Prime Contractor/Joint Venture Experience. The Offeror will be evaluated on whether the past projects are recent and relevant to the work set forth in the Scope of Work. Recency will be determined by projects completed within the last five years that are similar to the work under 1.2, 1.3 and 1.4 of the solicitation Scope of Work. Relevancy will be determined by projects shown that demonstrate experience in performing the tasks required by the Scope of Work. Projects should demonstrate successful completion of the types of work encompassed by all of the requirements under 1.2, 1.3 and
1.4 of the Scope of Work. The role the Offeror played in past projects will be considered when determining relevancy. Offerors that demonstrate prior successful experience working together with their proposed JV partners and/or subcontractors on projects that are recent and relevant may receive higher consideration for this subfactor. Offerors submitting more projects than the minimum (but no more than five projects total) may receive higher consideration for this subfactor. Marginal levels of proposed experience could indicate a lack of understanding concerning mission requirements and may result in the entire factor receiving an unacceptable rating or being eliminated from the competitive range.
b. Subfactor 1b – Subcontractor Experience. This sub factor evaluates the subcontractor’s experience in successfully completing projects similar to the requirements of the Scope of Work in this contract. Roles and responsibilities of subcontractor team members in conducting the work required under this scope shall be presented. Experience must be demonstrated in the presented role (i.e. plumber presented in a plumbing role in proposal). The Offeror’s proposed subcontractors shall also be evaluated on whether the past projects are recent and relevant to the work under the RFP. Recency will be determined by similarity of projects completed within the last five years. Subcontractors with a history of successfully working together with the Offeror may be rated higher than those with no prior working relationships.
3. Factor 2 - Management Approach. This factor will evaluate the extent to which the proposal illustrates a basic understanding of managing the work set forth in the overall contract Scope of Work and Sample Task Order, and risk presented by the contractor’s management approach. This factor will be evaluated for consistency between the management approach for the overall contract Scope of Work and the management approach for the Sample Task Order. In performing the evaluation, the Government will consider the following:
a. Whether the proposal clearly delineates lines of authority, and communication both within the offeror’s organization and with the Government on an organizational chart (graph) organized in a precise and logical manner, including all offices involved with the performance of the contract, including subcontractors and JV partners.
b. Whether the proposal contains comprehensive descriptions of duties, roles, major responsibilities, and authorities for the Project Manager, Site Superintendent, CQC System Manager, Site Safety and Health Officer, and other personnel, for all prime offerors and all proposed subcontractors identified in Subfactor 1b. This factor will be evaluated on whether the offeror submits a logical approach to perform the work throughout the contract, proposes qualified and experienced personnel sufficient to manage multiple sites simultaneously at geographically dispersed locations, provides one subcontractor letter of commitment for each subcontractor proposed, and if the offeror comprises a Joint Venture, provides a fully executed Joint Venture Agreement.
Factors 1 and 2 will be rated using Table 1.
TABLE 1 – COMBINED TECHNICAL/RISK RATINGS
Color Rating Description
Blue Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Purple Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
4. Factor 3 - Past Performance. The Government will evaluate the Offeror’s record of past and current performance to ascertain the probability of successfully performing the requirements under this solicitation.
a. Evaluation of past performance will utilize past performance information available in the Contractor Performance Assessment Reporting Systems (CPARS) for each project listed by the offeror. If no CPARS evaluation exists for projects submitted under Factor 1, evaluation shall utilize the Past Performance Questionnaire form in Appendix D.
b. The Government will focus its inquiries on the Offeror’s and each proposed subcontractor’s (identified in Factor 1b) record of performance as it relates to all solicitation requirements, including cost, schedule, and management of subcontractors. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the Offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the Offeror in its proposal and data obtained from other sources, including data in Government files.
c. The past performance factor considers each Offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements. There are two aspects to the past performance evaluation:
relevancy and performance confidence assessment.
RELEVANCY: The first aspect of the past performance evaluation is to assess the Offeror’s past performance to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired through the source selection. The following criteria will be used to establish what is relevant which shall include similarity of service, complexity, contract type, and degree of subcontract/teaming.
Table 2a Past Performance Relevancy Ratings Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
QUALITY ASSESSMENT: The quality of the Offeror’s past performance will be assessed on those recent efforts that were determined relevant by determining how well the contractor performed on the contracts. Documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment.
PERFORMANCE CONFIDENCE ASSESSMENT: The evaluation will arrive at a single consensus performance confidence assessment for the Offeror, selecting the most appropriate rating from the chart below. This rating considers the assessed quality of the relevant/recent efforts gathered.
Table 2b Performance Confidence Assessments Rating Definition
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
5. Factor 4 - Price. The Government will analyze the price reasonableness of the binding hourly rates submitted for the project manager, superintendent, site safety personnel, and quality control representative for all five years of the contract duration.
The Government will also analyze the price reasonableness of the price submitted for the Sample Task Order, using the data in the “Sample Task Order” tab of the Excel spreadsheet titled “Price Proposal Breakdown” and all supporting data provided by the contractor.
The Government will examine price proposals for artificially low prices. Offers found to be unreasonably high, unrealistically low (an indication of “buy-in”), or unbalanced may be considered a performance risk.
The Government will evaluate price for the purposes of best value trade-off analysis using the total price submitted for the Sample Task Order, as indicated in the “Grand Total” cell of the “Sample Task Order” tab of the Excel spreadsheet titled “Price Proposal Breakdown”. The labor rates presented for the Sample Task Order will be compared to the binding rates in the “Price Proposal Breakdown” for consistency. In the event these are not consistent with one another, the “Binding Rates” in the “Price Proposal Breakdown” govern. The total evaluated price shall be the total price proposed for the Sample Task Order.
The resulting contracts will be Multiple Award Task Order Contracts (MATOCs). The government will award one contract to each of the top three offerors selected, based on the proposals that present the best value to the Government. The Sample Task Order may be awarded to the firm with the lowest price of the three successful offerors.
After contracts are awarded, task orders will be competed among the awardees in accordance with procedures intended to ensure that each contractor is given a fair opportunity to be considered for each order, unless an exception to this process applies.
Each contractor will receive a Request for Proposal (RFP) for each task order. Each task order RFP will contain a Scope of Work and instructions to the contractors for responding to the task order RFP. Contractors choosing to respond are to furnish a technical proposal and a price proposal, with backup documentation showing how the cost proposal rates for the task order were derived. The price information furnished in response to a task order RFP will be compared to the binding rates submitted in response to this solicitation and are to be consistent with the rates proposed in this solicitation.
Task order proposals will be awarded to the contractor whose task order proposal, conforming to the RFP, is the lowest price.
CLAUSES INCORPORATED BY REFERENCE
52.216-27 Single or Multiple Awards OCT 1995
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (JULY 2013)
(a) Definitions. As used in this provision--
Data Universal Numbering System (DUNS) number means the 9-digit number assigned by Dun and Bradstreet, Inc.
(D&B) to identify unique business entities.
Data Universal Numbering System +4 (DUNS+4) number means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)
This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic…