Questions and Answers 17 June 2011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol Amendment 6.pdf | ||
| Sol Amendment 5.pdf | ||
| QandA 13 July 2011.pdf | ||
| Sol Amendment 4.pdf | ||
| JFHQ Phase II Amend 3 | — | |
| Pre-Proposal Slides.pdf | ||
| Site Visit Sign In Sheet.PDF | ||
| Sol Amendment 2 20110617.pdf | ||
| QandA 14 June 2011.pdf | ||
| Sol Amendment 1 20110607.doc | DOC document | |
| Exhibit D-E-F Jul 10.doc | DOC document | |
| QandA 25 May 2011.pdf | ||
| Exhibit D-E-F Jul 10.doc | DOC document | |
| Exhibit C SSS JUL10.doc | DOC document | |
| EXHIBIT A SSS Jul 10.doc | DOC document | |
| Exhibit B SSS Jul 10.doc | DOC document | |
| Instructions for Accessing Plans and Specifications.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL GUARD BUREAU
OFFICE OF THE U.S. PROPERTY AND FISCAL OFFICER, MASSACHUSETTS
50 MAPLE STREET, MILFORD, MASSACHUSETTS 01757-3604
NGMA-PFO-PC 17 June 2011
JOINT FORCES HEADQUARTERS PHASE II, HANSCOM AFB
SOLICITATION #W912SV-11-R-0001, PROJECT #250136
QUESTIONS & ANSWERS
Q# Date
Asked
Date
Posted
Date
Answered
Question Answer
1 Various 25 May
25 May
Where do I send the DD2345?
How long does the process take?
How will I receive the approval back?
If you go to the Defense Logistics
Information Service (DLIS) link provided in the Instructions for
Accessing Plans and Specifications you will find the address and other contact information to include frequently asked questions.
2 Various 25 May
25 May
Do I need to update our account information on CCR once we receive the certification (assuming that we do receive it)?
Your JCP information will be linked to your CCR account so you won't need to update anything.
3 Various 25 May
25 May
Will consideration be given with regards to the proposal due date because of the DD2345 process time?
The Government will evaluate whether or not the proposal due date will be extended due to the DD2345 process.
25 May
25 May
25 May
Section 00010 Notes, #4 states: "Funds IAW FAR Provision
52.232-18, Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."
Please confirm if this project remains un-funded. Can you comment on the likelihood of receiving funding in the near future?
Currently the project remains unfunded.
There is a very strong likelihood that this project will be funded.
5 Various 25 May
25 May
Is the pre-bid conference/site visit still scheduled for 9 June
2011?
Yes
25 May
14 June
14 June
The Massachusetts Department of Revenue has advised us that this project would qualify for a sales tax exemption if the Government provides the successful prime contractor with a completed and authorized Form ST-5C (Contractor’s
Yes the ST-5C and ST-2 will be provided to the successful contractor after award.
Sales Tax Exempt Purchase Certificate) and a copy of its
ST-2 or letter. Will the Government provide these two items to the successful prime contractor after award?
25 May
17 June
17 June
Subpart 1.3A and Part 3 of Specification Section 01270
(Unit Prices) states that bidders should provide various unit prices “on the bid forms”; however, the schedule of prices provided with the solicitation documents makes no provision for the unit prices mentioned.
a. How should bidders proceed with regard to this requirement?
b. If the unit prices are required, shouldn’t the soil units of measure be cubic yards (CY) instead of tons to facilitate quantifying the material?
a. ANSWER: We have updated the schedule of prices in the solicitation to account for the unit prices.
b. ANSWER: We use Tons because when a load of soil is shipped off-site to a receiving facility, the load is weighed upon arrival and that unit is measured in
Tons. The weight slips are proof for which payment would be rendered. For estimation purposes, the conversion factor for Tons to CY for this site is 120 lbs/cubic foot (assuming dense soil – our boring logs support this assumption for density). So the ultimate factor is 1.62
Tons/CY.
25 May
17 June
17 June
Subpart 1.05A of Specification Section 01515 (Construction
Indoor Air Quality (IAQ) Management) seems to indicate that bidders should submit a preliminary Construction IAQ
Management Plan with their proposal. Is that correct? If so, where should it be located within the proposal (which volume, what section)?
No, this is not a requirement for the solicitation. There will be an addendum issued to address when the IAQ plan will need to be submitted.
9 Various 14 June
14 June
I have received my DD2345 approval, what do I do next? Once you have received your approval log in to www.fbo.gov, you should be prompted for your CCR MPIN when you try to download the plans/specs.
If you are not prompted you will need to contact either the DLIS Helpdesk or the
FedBizOpps Helpdesk.
31 May
17 June
17 June
Is there currently furniture included amongst the specifications for this project Solicitation, or is it strictly confined to the construction and building phases of the project, at present?
Furniture will be purchased under a separate contract. Items Identified as
“BIF” built-in furniture are part of the contract work. Refer to note 26 on sheet
A-404.
2 June
17 June
17 June
Rooms G07 and G08 are “locker rooms”; however, there are no lockers shown in those locations. Please confirm that the contractor is not required to provide any lockers in Rooms
G07 Equipment Lockers and G08 Physical Fitness/Lockers.
There are no lockers in these spaces to be provided and installed by the contractor.
http://www.fbo.gov/
2 June
17 June
17 June
Does Section 11/A-505 apply to Classrooms 225 and 338 in addition to Copy 120?
Yes
2 June
17 June
17 June
Does Elevation 7/A-511 apply to Copy 217, Mail/Files 234, Copy 318, and Sec Copy 326?
Yes
2 June
17 June
17 June
What the required finish (wood or plastic laminate) for the:
a. Base cabinet (drawers) at Reception Desk (Detail 10 on
Sheet A-505)?
b. Wall cabinet with undershelves (Detail 3 on Sheet A-
505)?
c. Base cabinet (drawers) (Detail 2 on Sheet A-505)?
a. ANSWER: Plastic Laminate
b. ANSWER: Plastic Laminate
c. ANSWER: Plastic Laminate
2 June
17 June
17 June
Are all acoustical wall panels to be 8’ high x 8’ wide as indicated by Note 22 on Sheet A-404?
Yes
2 June
17 June
17 June
Are 2 each 8’ x 8’ acoustical wall panels required in
Classrooms 225, 338, 309, and 331 as indicated by Note 22 on Sheet A-404? If so, where?
Yes. Locate opposite the door, except at room 338 and 225 locate opposite the curved wall.
2 June
17 June
17 June
Where does the PT-1 porcelain wall tile (indicated by the
Finish Schedule on Sheet A-404) go in the Corridors? Please provide elevations.
At the drinking fountain wall, floor to ceiling, 5'-0" wide.
2 June
17 June
17 June
At the Coffee Rooms, are we correct that the only porcelain wall tile is as shown on Elevation 5 (Sheet A-509)? Which wall tile is to be used (PT-1, PT-2 per the Room Finish
Schedule on A-404 or 6x8 backsplash tile per Note 1 on the lower right corner of Sheet A-404)?
Wall tile at the coffee rooms to be
Daltile, Matt, Desert Gray, x714, 6"x8" as per A-404.
2 June
17 June
17 June
Floor Plans A-100, A-102, and A-103 seem to indicate porcelain tile in Rooms G26, 243, 244, 343, and 344;
however, the Room Finish Schedule on A-404 states that these rooms receive Rubber Flooring RBB-1 and RBB-3.
Which is correct?
Provide RBB-1 at rooms G26, 133, 244 and 344. Provide PT-1 at 343.
2 June
17 June
17 June
Note 3 on Sheet A-404 states that the treads, risers, and landings at Stairs 3 and 4 are to be sealed concrete; however the Finish Schedule, the stair sections, and Note 29 on Sheet
A-404 indicated that they are to be rubber. Which is correct?
The construction of the stair is steel and sealed concrete, the finish is rubber as per A-404.
2 June
17 June
17 June
Note 12 on Sheet A-404 states that the transition from tile to other flooring is a marble threshold; however, Note 28 on
Sheet A-404 states that the transition from carpet to tile is stainless steel. What is the required transition from
Marble as per note 12 at doorways, stainless steel at all other carpet to tile transitions.
porcelain tile to another material?
2 June
17 June
Please provide a size (diameter and depth) for the new oil/water separator manhole as indicated by the Oil / Water
Separator Detail on Sheet P0.00 of the drawings.
ANSWER PENDING
3 June
Are Contractors allowed to post the plans on their Website and Plan Room websites?
ANSWER PENDING
9 June
17 June
17 June
Are bid bonds required with the bids? No
9 June
17 June
17 June
Are performance and payment bonds required for the project?
Please refer to box 12A of the solicitation.
13 June
17 June
17 June
Amendment #1 Exhibit E references compliance with
Sections 00100,00110, and 00120. These sections are not in the specifications and I could not find them on the
FBO website.
These sections are found in the solicitation not the specifications.
13 June
17 June
17 June
Amendment #1 Exhibit E references compliance with
Sections 00600. This section is not in the specifications and I could not find them on the FBO website
This section is found in the solicitation not the specifications.
13 June
Specifications Table of contents specifies that the
“conditions of the contract” will be issued by MAARNG.
When will the conditions of contract be issued?
ANSWER PENDING