Solicitation Amendment W91QV126RA0560003 SF 30.pdf

PDF 4 MB Posted

Attached to
Arlington National Cemetery Boundary Wall Repairs Phase 6
Solicitation number
W912QV1-26-R-A056
Issued by

About this file

This is Amendment 0003 to a Request for Information (RFI) solicitation for Arlington National Cemetery Boundary Wall Repairs Phase VI, issued by the U.S. Army Corps of Engineers (W91QV126RA056). The amendment is effective August 20, 2026, and was issued by W91QV1 (Fort Belvoir). The document contains answers to 16 RFI questions submitted by prospective contractors regarding the project scope and requirements.

Key clarifications provided include: bid bonds should be included in Volume I (Administrative section); page limitations for both Volume I (Administrative) and Volume II (Technical Execution Plan) will be increased to accommodate full SAM.gov registration with representations and certifications, as well as sufficient key personnel qualifications and relevant project experience; Seneca sandstone attic stock is confirmed available from previous phases for contractor evaluation; bluestone capstones must be labeled, documented, and reinstalled in their original locations in the same order as removed, stored unstacked on pallets; salvaged stone should be reinstalled to match the historic character of the stonework as closely as possible within the same panel and general location; onsite storage is available between the boundary wall and Joint Base fence, with laydown areas along the rubble wall and between wall sections; stone cleaning requires only warm water and soft nylon brushes per the Statement of Work; wall heights must match existing elevations; previously approved mortar by the Contracting Officer's Representative must be used; a continuous steel-reinforced concrete footing is required; the wage scale is available under solicitation notice DBAVA20260013 05.18.26.pdf; and undamaged stone can be reused.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

I I I

I I

I

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 30 00 - Available Information

Miscellaneous text in this section has been added to:

Arlington National Cemetery Boundary Wall Repairs Phase VI W912QV126RA056-RFI Answers

1. The SF1442 shows that an offer guarantee is required. Can you please advise which volume the bid bond should be included? Answer: Please include the bid bond within Volume I Administrative section.

2. The requirements for Volume I (Administrative) state, "A complete, current copy of the offeror's System for Award Management (SAM.gov) registration, including all Representations and Certifications." The Administrative proposal has a page limit of 13 pages. Providing a complete copy of the SAM.gov registration, including all reps & certs will far exceed that limit. Can you increase the page limitation to allow for the requirement of the full SAM.gov registration/reps & certs? Answer: The page limitation will be increased to allow for the full SAM.gov registration reps and certs.

3. Volume II (Technical Execution Plan) has a 15-page limit. To allow for sufficient key personnel qualifications and 3 relevant projects as well as the other required information, will you consider increasing the page limit? Answer: The page limitation will be increased to allow for sufficient key personnel qualifications, relevant experience, and other required information.

4. Please confirm ANC has Seneca sandstone attic stock for use. The quarry is closed. Answer:

Confirmed. Based on the amount of Seneca stone that has been salvaged from previous Boundary Wall Phase projects and the similar amount that could be salvaged from this Phase (VI) the Contractor will be able to evaluate the material in Section 77 for use in Phase VI.

5. Please confirm bluestone capstones should be labeled, documented and reinstalled in their original location. Answer: Per SOW 5.1.14, the Contractor shall reset the capstones in the same order as removed from the wall. Per SOW 1.4, the bluestone capstones shall be removed, numbered, and mapped in order to ensure replacement in their existing order and position in the wall upon reconstruction. Capstones shall be removed and stored on pallets in an unstacked manner for reuse.

W91QV126RA0560003

6. How many bluestone capstones require replacement? Per SOW 5.1.14, Answer: Contractor shall provide replacement capstones of a matching material and dimensional profile for location at which re-use of existing capstones is not feasible due to condition.

7. Please confirm the Seneca sandstone individual pieces do not require reinstallation in their original location. Please confirm matching look/pattern of the existing wall and adjacent walls is sufficient. Reinstalling each piece in it's original location greatly increases the cost. Answer: Please refer to language of SOW 5.1.12, and of particular note, "following the historic character of the stonework as closely as possible". Please also refer to last sentence of SOW 5.1.9, "A protruding stone will be reset within the same panel as it was removed from and at the same general location within the panel"

8. Please confirm all salvaged stone can be stored onsite. Answer: There is space between the boundary wall to be reconstructed and the Joint Base fence. Sequencing of the work to utilize this potential laydown zone could be entertained by an eligible Contractor. Please also note that the drive aisle between the two 17 sections (see SOW Technical Exhibit B) could be utilized for laydown area.

9. Please confirm there is room along the rubble wall for a laydown area of materials and equipment. Answer: Please refer to response to RFI 8.

10. Please confirm if the stone requires general cleaning with water and detergents? Answer: Per SOW 5.1.15, The Contractor shall, upon completion of each portion of wall to be reconstructed, lightly scrub stone identified by ANC in order to remove superficial dirt, soil residue, or other matter. The Contractor shall only utilize warm water and an approved soft nylon brush during such activity.

11. Please confirm stone should be reinstalled at elevations that match existing. Answer: Per SOW 5.1.9, Contractor shall establish, document, and mark the existing alignment of the wall for use in resetting the wall. Contractor shall establish and document the existing wall heights and variations in heights for use resetting the wall to the existing heights.

12. Are there any drawings available for use? Answer: Refer to SOW Technical Exhibits D and E for Wall Survey Drawing. Boundary Wall Phase VI is generally between wall sections 2 and 30

13. Is the approved mortar mix/color info available? This wall butts against a newly pointed section. Same mortar should be used. Answer: Per SOW 5.1.13, the contractor shall use the previously approved mortar by the COR.

14. Is a concrete foundation required? Answer: Per SOW 5.1.11, the contractor shall excavate a trench and fully compact the base (to 95%) in preparation for the placement of formwork required to place a continuous steel-reinforced concrete footing.

15. Please provide the wage scale. Answer: It is listed under the Solicitation Notice ID W912QV1- 26-R-A056 Arlington National Cemetery Boundary Wall Repairs Phase 6, Attachment Title DBAVA20260013 05.18.26.pdf

16. Please confirm the stone that is not damaged, can it be reused? Answer: Confirmed.

IDCode: J
Page: 1
Pages: 4
AmendNo: 0003
EffDate: 20 AUG 2026
ReqNo:
ProjNo: PANMCC-26-P-0000 046276
IssCode: W91QV1
AdmCode:
IssuedBy: W6QM MICC-FT BELVOIR

9410 JACKSON LOOP SUITE 101, FORT BELVOIR VA 22060-5116

FORT BELVOIR, VA 22060-5116

UNITED STATES

AMBER PEEPLES, EMAIL: AMBER.K.PEEPLES.CIV@ARMY.MIL TELEPHONE: (520) 671-5013

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W91QV126RA056
SolDate: 13 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this Amendment is to provide the answers to the RFI questions.