This is a Request for Proposals (RFP) issued by the Department of the Army for Enhanced Use Lease (EUL) opportunities to develop commercial power generation facilities with an optional data center component at nine Army installations: Blue Grass Army Depot (Kentucky), Pine Bluff Arsenal (Arkansas), Tooele Army Depot (Utah), Sierra Army Depot (California), Fort McCoy (Wisconsin), Fort Bragg (North Carolina), Fort Hood (Texas), Fort Rucker (Alabama), and Joint Base Lewis-McChord (Washington). The RFP was issued November 19, 2026, with a proposal deadline of 5:00 P.M. EST on January 18, 2027. Questions must be submitted by 5:00 P.M. EST on January 6, 2027.

Offerors may propose power generation facilities only or integrated power generation and data center projects; data center-only proposals are not acceptable. Power generation technologies may include advanced natural gas turbines, reciprocating internal combustion engines, fuel cells, hydrogen systems, Small Modular Reactors (maximum 500 MW per unit), advanced nuclear systems, battery energy storage systems, and dispatchable generation with solar arrays. Data center proposals should align with two preferred profiles: hardened, physically isolated campuses built to ICD 705 standards for classified workloads (Profile 1) or large-scale hyperscale and AI/HPC facilities targeting PUE ≤ 1.15 (Profile 2). All projects must provide energy resilience capabilities delivering power within one hour of grid outage for a minimum of 14 continuous days, with preference for 90 days of independent operation. Projects must avoid aquifer draws, prioritize industrial greywater and closed-loop cooling, and achieve net-neutral or better water usage. The initial EUL term is 25 years with potential for renewal options. Consideration to DA must be in-kind, cash, or combination form, valued at fair market rent as determined by appraisal; in-kind consideration should prioritize resilient power provision and utility infrastructure improvements. The selected Offeror will be responsible for all financing, design, permitting, construction, operation, and decommissioning of the Project at no cost to DA. Proposals are evaluated on five equally weighted factors: Project Description (5 pages), Project Plan (10 pages), Financial Capability (5 pages), Organizational Structure/Experience/Past Performance (10 pages), and EUL Consideration/Rent (5 pages), with supporting materials limited to 10 additional pages. The RFP requires compliance with extensive environmental regulations including NEPA, CERCLA, ESA, MBTA, BGEPA, CWA, CAA, NHPA, NAGPRA, and nuclear waste requirements. Offerors must fund independent environmental contractors, an Environmental Condition of Property Report, NEPA compliance, and all permitting. Administrative expenses such as appraisals, surveys, and environmental documentation costs may be collected by DA per 10 U.S.C. § 2695. Property tours are scheduled at each installation in late November through mid-December 2026 with RSVPs required by specified dates. Only entities organized under U.S. law with majority domestic ownership, domestic control, and U.S. physical presence are eligible; foreign entity of concern and foreign adversary restrictions apply. No set-aside is identified in this RFP.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

REQUEST FOR PROPOSALS No. DACA27-1-27-0015900

ENHANCED USE LEASE (“EUL”) OPPORTUNITIES

COMMERCIAL POWER GENERATION FACILITY

WITH THE OPTION FOR

COMMERCIAL DATA CENTER

Blue Grass Army Depot, Kentucky

Pine Bluff Arsenal, Arkansas

Tooele Army Depot, Utah

Sierra Army Depot, California

Fort McCoy, Wisconsin

Fort Bragg, North Carolina

Fort Hood, Texas

Fort Rucker, Alabama

Joint Base Lewis-McChord, Washington

DATE OF ISSUANCE: November 19, 2026

To be considered for award, proposals conforming to the requirements of this RFP must be received no later than 5:00 P.M. (EST), January 18, 2027.

Questions regarding this RFP may not be considered after 5:00 P.M. (EST), January 6, 2027.

DISCLAIMER

The information presented in this Request for Proposals and all supplements, revisions, modifications, updates, and addenda thereto (collectively, the “RFP”), including (without limitation) narrative descriptions and information, is not represented to be all of the information that may be material to an Offeror’s decision to submit a proposal in response to this RFP or to develop, construct, manage, and maintain the Project(s) (as defined below) on the Installations.

Neither the Department of the Army (“DA”), nor any of its contractors, subcontractors, officers, employees, counsel, advisors, or agents make any representation or warranty, whether expressly implied or created by operation of law, as to the accuracy or completeness of this RFP or any of its contents or materials referred to or provided pursuant to or in connection with this RFP, and no legal liability with respect thereto is assumed or may be implied. Any information or site description is merely provided to assist Offerors in their independent analysis of the decision to submit a proposal. The transaction contemplated by this RFP involves significant risks. Offerors and their advisors should review carefully all the information set forth in the RFP and any additional information available to them to evaluate such risks.

Except as expressly provided in a Terms Sheet, or Enhanced Use Lease executed by DA, no additional representation or warranty, whether expressly implied or created by operation of law, will be made by DA. No person has been authorized to make or give on behalf of DA any other written or oral representation, warranty, or assurance with respect to the Project(s) or the accuracy or completeness of the information provided in this RFP or otherwise and, if any such representation, warranty, or assurance is made or given, it may not be relied upon by any Offeror as having been made by or on behalf of DA, and DA shall not have any liability for or with respect to such statements.

Table of Contents

1. EXECUTIVE SUMMARY

2. DEVELOPMENT OF THE PROPERTIES

2.1 Available Properties

2.2 Development Considerations

2.2.1 Environmental Regulatory Requirements

2.2.2 National Environmental Policy Act (NEPA)

2.2.3 Environmental Condition of Property Report

2.2.4 Infrastructure

2.2.5 Police and Fire Protection

2.2.6 Legal Considerations

2.2.7 Prevailing Wages

2.2.8 Handicap Accessibility

2.2.9 Buy American Act

2.2.10 Limitation on Procurement of Certain Batteries.

2.2.11 Cyber Security and Data Protection

2.2.12 Energy Resilience

2.2.13 Testing Requirements

2.2.14 Airfield Obstruction

2.2.15 Glint Glare

2.2.16 Army Determinations and Congressional Notification

2.2.17 EUL Consideration

2.2.18 Period Prior to EUL Execution

2.2.19 Execution of an EUL

2.2.20 Decommissioning Plan and Financial Assurance

2.2.21 Other Considerations

3. GENERAL INSTRUCTIONS FOR OFFERORS

4. SUBMISSION OF PROPOSALS

5. RESTRICTIONS ON DISCLOSURE AND USE OF DATA

6. PROPOSAL COMPONENTS AND FACTORS FOR EVALUATION

6.1 Project Description

6.2 Project Plan

6.3 Financial Capability

6.4 Organizational Structure, Experience, and Past Performance

6.5 EUL Consideration (Rent)

7. EVALUATION OF PROPOSALS

7.1 Overview of Evaluations

7.2 Evaluation Criteria

7.2.1 Project Description

7.2.2 Project Plan

7.2.3 Financial Capability

7.2.4 Organizational Structure, Experience, and Past Performance

7.2.5 EUL Consideration (Rent)

7.3 Exchanges with Offerors After Receipt of Proposals

8. NOTICE TO AWARD

9. MISCELLANEOUS TERMS AND CONDITIONS APPLICABLE TO THIS RFP

9.1 Questions and Information

9.2 Authorizations by Submission of Proposal

9.3 Teaming Arrangements and Special Purpose Entities

9.4 DA Mandatory Requirements

9.5 Relationship between DA and Offeror(s)

ATTACHMENTS

ATTACHMENT A: 10 U.S.C. § 2667

ATTACHMENT B: Term Sheet (Sample)

ATTACHMENT C: Enhanced Use Lease Agreement (Sample)

ATTACHMENT D: Blue Grass Army Depot Site Specific Information

ATTACHMENT E: Pine Bluff Arsenal Site Specific Information

ATTACHMENT F: Tooele Army Depot Site Specific Information

ATTACHMENT G: Sierra Army Depot Site Specific Information

ATTACHMENT H: Fort McCoy Site Specific Information

ATTACHMENT I: Fort Bragg Site Specific Information

ATTACHMENT J: Fort Hood Site Specific Information

ATTACHMENT K: Fort Rucker Site Specific Information

ATTACHMENT L: Joint Base Lewis-McChord Site Specific Information

ATTACHMENT M: Department of War National Environmental Policy Act Implementing Procedures, April 2026

Request for Proposals No. DACA27-1-27-0015900

REQUEST FOR PROPOSALS NO. DACA27-1-27-0015900

ENHANCED USE LEASE(S)

1. EXECUTIVE SUMMARY

a. The Department of the Army (“DA”) is issuing this Request for Proposals (“RFP” or “Solicitation”) to solicit competitive proposals from private, public and/or not-for-profit entities interested in leasing non-excess DA land (“Properties”) for development of commercial power generation facilities and data centers under a long-term lease agreement(s) (“Enhanced Use Lease” or “EUL”) at Blue Grass Army Depot, Pine Bluff Arsenal, Tooele Army Depot, Sierra Army Depot, Fort McCoy, Fort Bragg, Fort Hood, Fort Rucker, and Joint Base Lewis-McChord (“Installations”). The EUL(s) that would result from this RFP would be for the purpose of the selected Offeror(s) designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, securing, and decommissioning a commercial power generation facility and a data center (“Project”). DA’s preference is for integrated power generation facility and commercial data center Projects, but an Offeror can elect to propose power generation only. DA may elect to award one or more EULs pursuant to this RFP. Prior to expiration of the EUL(s), Lessee(s) will be required to restore the Property to the condition it was in prior to execution of the EUL(s).

Offerors may submit proposals for a power generation facility only, or for a power generation facility and a data center as further described below. Proposals for a data center-only will not be considered.

(1) Power Generation Facility without a Data Center Project. Offerors may submit proposals that do not include a Data Center. The proposals should include combinations of power generation, energy storage systems, and microgrids to serve power markets. Projects will require the provision of resilient energy capabilities to DA as part of the consideration to be paid to DA. The Project may include a single technology or a hybrid generation portfolio, including but not limited to:

• Advanced low-emission natural gas turbines

• High-efficiency reciprocating internal combustion engines (RICE)

• Stationary fuel cells and hydrogen generation/combustion systems

• Small Modular Reactors (SMRs)

• Advanced nuclear systems

• Utility-scale Battery Energy Storage Systems (BESS)

• Dispatchable generation combined with utility-scale solar photovoltaic (PV) arrays and energy storage

(2) Power Generation Facility and Data Center Project. Offerors may submit proposals for both power generation and a data center. Proposals are not restricted to any particular data center size or capacity. However, DA’s preference is for the following data center frameworks in order of preference:

Profile 1: Hardened, physically isolated campuses built to ICD 705 standards for Top Secret/IL6 workloads.

Profile 2: Large-scale hyperscale and AI/HPC facilities targeting PUE ≤ 1.15.

Offerors electing to integrate commercial data centers alongside generation assets may do so within a unified campus master plan.

b. Proposed Projects must provide energy resilience capabilities to the DA that will be part of the lease consideration to be provided to DA by the Lessee. These capabilities must include the provision of resilient power within one (1) hour of a grid outage and for a minimum of fourteen (14) continuous days, and providing any required improvements to DA’s utility infrastructure that may be required to enable the Installation to accept delivery of the resilient power. For purposes of this RFP, a grid outage is defined as any loss of power from the grid serving the Installation. Preference will be given to Offerors whose Proposal is for the provision of contingency power in excess of fourteen (14) continuous days.

c. DA expects that all power generated and data center capacity (where applicable) will be sold to third-party off-taker(s). The selected Offeror will be responsible for identifying and securing off-taker(s).

d. The Installations included in this solicitation are located in both competitive and vertically integrated utility markets. All Projects must comply with the utility regulations, such as retail sale of electricity and interconnection requirements, that are applicable to the service territory.

e. Projects must avoid draws on water aquifers and must prioritize industrial greywater, treated municipal effluent, or closed-loop cooling towers. Water usage must be net-neutral or better. Offeror shall, at its sole expense, source all industrial process water from non-potable alternative sources, which may include brackish groundwater, reclaimed municipal wastewater (graywater), or treated industrial/agricultural runoff, subject to DA approval and regulatory compliance.

f. Pursuant to its leasing authority codified at 10 U.S.C. § 2667 and provided as Attachment A, DA intends to execute an EUL(s) with a selected Offeror(s) (“Lessee”) for an initial term of twenty-five (25) years. DA may consider including one or more options to renew the EUL for an additional period of time following expiration of the initial term if proposed by the Offeror in its Proposal and as further described in Section 6.1.a.

Consideration to be provided by the Lessee for the EUL will be in-kind, cash, or a combination thereof in an amount not less than the fair market value of the lease interest as determined by an appraisal to be completed by DA.

g. The Lessee(s) under the EUL(s) will, among other things and subject to the terms and conditions of the EUL, be authorized and responsible for financing, designing, developing, operating, and maintaining the Project and shall be responsible for complying with all applicable Federal, state and local laws, codes, ordinances and regulations, including building codes, as they may be amended from time to time. The Project(s) shall be viable without any commitment or contribution, monetary or otherwise, from DA. DA envisions that development of the Project(s) will utilize the Properties in a manner that will not conflict with adjacent Installation ongoing mission-related activities or the surrounding community.

h. Offerors may propose a Project(s) on all or a portion of the Properties at any one or more of the Installations. DA may also elect to select more than one Offeror for award and may consider multiple Projects at the same Installation if more than one Project can be accommodated without conflict. Offerors may submit proposals to develop a single tract or multiple tracts. Proposals must clearly identify the portion(s) and associated acreage(s) of the Properties proposed for lease by the Offeror.

i. By submitting a proposal, each Offeror acknowledges terms and conditions set forth in this RFP and its Attachments, including but not limited to, the Term Sheet and the EUL, samples of which are provided as Attachments B and C. Offerors are advised that substantive lease terms and clauses are not subject to further negotiation.

j. This RFP may be amended or supplemented and all such amendments and supplements shall be considered part of this RFP (and references to the RFP shall include all amendments and supplements, unless otherwise specified). To receive any amendments or supplements to this RFP, Offerors will be required to refer to the RFP posting on sam.gov.

k. DA reserves the right, at any time, without notice, at its sole and absolute discretion, to (a) modify, update, supplement, revise, suspend, or waive any terms and conditions of this RFP; (b) independently waive any deficiency or irregularity in any proposal submitted where it is in the Government’s best interest to do so; (c) reject any or all proposals at any time prior to award; (d) extend any deadline set forth in this RFP; (e) cancel the RFP process, in whole or in part; (f) make an award or awards as a result of initial proposals submitted; (g) discuss any submission with the Offeror that submitted it and require the submission of additional information regarding any aspect of the Offeror’s proposal; (h) make award to an Offeror who submits a proposal that is not the proposal that would provide DA with the highest value in terms of consideration to be paid under the EUL; (i) make an award to more than one Offeror if the Properties proposed for lease by said Offerors do not conflict; and (j) initiate further discussions or negotiations directly with the Offeror(s) (after DA selects it for award), if DA believes that the amount of consideration offered for the EUL in the Offeror’s proposal warrants further refinement or enhancement.

l. DA’s objective for this RFP and the Project(s) is to maximize the financial return to DA through the lease of non-excess available land on the Installations. In leasing the Properties, DA will capitalize their value.

2. PROPERTY AND PROJECT DEVELOPMENT

2.1 Available Properties. Site specific information for the Properties available for lease at each of the nine (9) Installations is provided as attachments to this RFP. Site specific information includes location of the Properties, former and current use of the Properties, environmental considerations as currently known, utilities, and jurisdictional status. Site specific information can be found in the Attachments as identified below:

Blue Grass Army Depot Attachment D

Pine Bluff Arsenal Attachment E

Tooele Army Depot Attachment F

Sierra Army Depot Attachment G

Fort McCoy Attachment H

Fort Bragg Attachment I

Fort Hood Attachment J

Fort Rucker Attachment K

Joint Base Lewis-McChord Attachment L

2.2 Development Considerations. In considering whether to submit a proposal to develop the Properties or any portion(s) thereof, Offerors should consider the following factors:

2.2.1 Environmental Regulatory Requirements. The EUL and the Project will be subject to all applicable federal, state, local, Department of War and Department of the Army environmental laws, codes, ordinances and regulations, including but not limited to: National Environmental Policy Act (NEPA), 42 U.S.C.

§§ 4321, et seq.; Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. §§ 9601, et seq.; Resource Conservation and Recovery Act (RCRA), 42 U.S.C. §§ 6901, et seq.; National Historic Preservation Act (NHPA), 54 U.S.C. § 300101, et seq.; Native American Graves Protection and Repatriation Act (NAGPRA), 25 U.S.C. §§ 3001, et seq.; Endangered Species Act (ESA), 16 U.S.C. §§ 1531, et seq.; Migratory Bird Treaty Act (MBTA), 16 USC §§ 703, et seq.; the Bald and Golden Eagle Protection Act (BGEPA), 16 USC §§ 668, et seq.; Clean Air Act, 42 U.S.C. §§ 7401, et. seq.;

Clean Water Act, 33 U.S.C. §§ 1251, et seq.; and the Nuclear Waste Policy Act, 42 U.S.C. §§ 10101 et seq.

2.2.2 National Environmental Policy Act (NEPA). NEPA requires federal agencies to consider the potential environmental impacts of a proposed major federal action (i.e., the Project) prior to making a decision or implementing such action. Prior to execution of the EUL, all necessary environmental studies and analyses under NEPA must be completed. The review of the environmental effects of the Project, as described in any proposal(s) provided in response to this RFP, must ensure compliance with NEPA, 42 U.S.C 4321 et seq., under the Department of War NEPA Implementing Procedures, April 2026, provided as Attachment M, and other Army applicable implementing guidance. These NEPA Procedures integrate NEPA into the decision-making process of DA by describing what actions are subject to NEPA’s procedural requirements and the applicable level of NEPA review; ensuring that relevant environmental information is identified and considered early in the process in order to ensure informed decision making; enabling DA to conduct coordinated, consistent, predictable, and timely environmental reviews; reducing unnecessary burdens and delays; and by implementing NEPA’s mandates regarding lead and cooperating agency roles, page and time limits, and sponsor preparation of environmental documents. While NEPA compliance is a federal agency responsibility and the ultimate decision remains with the federal agency, the Offeror(s) selected for award will be required to:

(1) Ensure their proposed action undergoes the appropriate level of environmental review and public engagement, as determined by DA, and that final NEPA documents are signed by an appropriate government DA official, as agreed to in the scope of work provided by DA.

(2) Program and allocate funds to accomplish NEPA compliance. NEPA must begin early in the decision-making process (i.e., as soon as practicable after the proposal for action is sufficiently developed for consideration) and be completed prior to implementing a proposed action (i.e., no later than prior to issuing a contractual notice to proceed for construction). Included are funds required to:

i. Prepare studies, surveys, etc., necessary to enable the environmental review.

ii. Execute the NEPA review process and complete NEPA documents.

iii. Conduct any mitigation specified in the applicable signed FONSI, or ROD, or required under any non-NEPA compliance document such as a Biological Opinion or Programmatic Agreement under other laws identified in 2.2.1.; inclusive of mitigation monitoring. Mitigation implementation timing, inclusive of funds obligation, is dependent on the specific mitigation measure and project, and depending upon compliance processes under the laws identified at 2.2.1., may be required to be implemented before, during, and/or after the execution of the action (e.g., pre-, during-, or post-construction).

(3) Ensure appropriate synchronization, contracting, and funding of other environmental requirements identified in 2.2.1, as appropriate. At a minimum, those additional supporting studies would include any surveys and documentation necessary to comply with NHPA, ESA, MBTA, BGEPA, and CWA, with any and all permit requirements under CWA, CAA, and RCRA, and with any other applicable statutory and regulatory requirements identified at 2.2.1.

i. All correspondence with regulatory agencies required for regulatory consultations will be transmitted by the Installation Commander, Garrison Manager, or their Deputy.

ii. Must ensure a NEPA scope planning document is prepared as part of the NEPA planning activities for the Offeror(s)’s action early on initial scope to facilitate communications with appropriate Army stakeholders, support budgeting requirements, and enabling NEPA execution preparation.

(4) Use an independent environmental contractor, subject to DA approval, selected in a manner that avoids any conflict of interest with respect to the Project, and the environmental contractor must execute disclosure statements specifying that the environmental contractor, its employees, subcontractors, or any other parties participating in performing the required environmental analyses for the Project have no financial or other conflict of interest in the outcome of the Project.

(5) Ensure any mitigation measures specified in the applicable FONSI or ROD or under any other law identified in 2.2.1. are implemented, monitored for success, and accomplished.

(i) If any required mitigation actions significantly adversely affect the viability of the Project, DA and the selected Offeror(s) will enter into discussions to resolve any disputes regarding the implementation of any such mitigation actions. If DA and the selected Offeror(s) cannot resolve the disputes, DA reserves the right to terminate negotiations. Upon such termination, DA shall neither owe nor pay any fees, costs, expenses or monetary penalties to the selected Offeror for any reason(s) regarding or stemming from this Solicitation, and DA shall, at its discretion, be free to select another Offeror to further pursue the EUL and the Project, or to cancel this entire Solicitation.

(6) Fund the completion of the NEPA analysis and documentation, as agreed to in the scope of work provided by DA. DA will determine the appropriate level of NEPA analysis for the Project. DA will ultimately remain responsible for the accuracy, scope, contents, and adequacy of the environmental analyses and documentation, which shall be subject to review and approval by DA. DA will independently evaluate NEPA documents and remain the ultimate decision-maker for NEPA and all other environmental requirements.

2.2.3 Environmental Condition of Property Report. The selected Offeror will be required to fund completion of an Environmental Condition of Property (ECP) Report prepared in conformance with 42 U.S.C. § 9620 (h)(4) and Army Regulation 200-1 (15 April 2026) and in general conformance with American Society for Testing and Materials (ASTM) Designation D6008-96 (2014), Standard Practice for Conducting Environmental Baseline Surveys prior to execution of an EUL. All correspondence with regulatory agencies will be transmitted by the Installation Commander or their Deputy. In addition, the selected Offeror must use an independent environmental contractor, subject to DA approval and selected in a manner that avoids any conflict of interest with respect to the Project, and the environmental contractor must execute disclosure statements specifying that the environmental contractor, its employees, subcontractors, or any other parties participating in performing the required ECP have no financial or other conflict of interest in the outcome of the Project. DA will ultimately remain responsible for the accuracy and adequacy of the ECP, which shall be subject to review and approval by DA.

2.2.4 Infrastructure. Access to the Properties, as well as the provision of all utilities, will be at the sole cost and responsibility of the selected Offeror/Lessee.

The following infrastructure elements must be considered:

a. Utilities. The Offeror’s Proposal must include a plan for providing utilities and infrastructure needs to the Properties as further discussed in Section 6.2 below, without disrupting current operations at the Installation. Additional information regarding utilities at each of the nine Installations is contained in Attachments D through L.

b. Access Considerations. Access to the Properties will be coordinated with the Installation and appropriate municipal governments, as appropriate. The selected Offeror will be responsible for constructing and maintaining any roads on the Installation that will serve the Properties and any associated costs. Maintenance will include routine maintenance and other services necessary to maintain its roads within the Properties.

c. Parking on the Property. The selected Offeror must provide an adequate number of parking spaces on the Property appropriate for the Project.

d. Physical Security. The selected Offeror, at its sole cost and expense, will be required to erect and maintain a fence and manually or electronically controlled gate(s) in accordance with United Facilities Criteria (UFC) 4-022-03 around the perimeter of the Property or portion thereof leased. Such fence shall not prevent DA from entering the Property in an emergency situation without prior notification to the selected Offeror(s).

2.2.5 Police and Fire Protection. In the event police, fire, or EMS services are required by the Lessee or any of its contractors or invitees on the Property, the Installation will provide such services on a reimbursable basis pursuant to separate agreements entered into between the Installation and the Lessee prior to execution of an EUL.

2.2.6 Legal Considerations.

a. Due Diligence. The Properties will be leased “as-is/where-is” without any warranties, representations or guarantees, either expressed or implied, of any kind, nature or type whatsoever, from or on behalf of the Government. The description of existing conditions set forth in this Section 2 and Attachments D through L is intended to be a general description based on information currently available to DA. All Offerors will be responsible for performing all due diligence investigations necessary to ascertain a more complete and accurate determination of existing conditions.

The Offeror is responsible for conducting its own due diligence and determining to its satisfaction that:

(1) The development of the Properties, as contemplated by the Offeror, can be accomplished in compliance with applicable Federal, state, and local laws, regulations, and requirements (including fire, life safety, accessibility, zoning, state and local building codes, and all other local land use restrictions);

(2) The condition of the Properties is suitable for the Offeror’s contemplated use;

(3) The necessary permits, variances, special exceptions and other governmental actions or approvals required for the contemplated development can be obtained at no cost or expense to DA; and

(4) The contemplated use is otherwise practical and economically feasible.

b. Taxes. The selected Offeror, during the term of the EUL, is solely responsible for any and all applicable state and local taxes, fees, assessments, including special assessments, utility rents, any charges imposed in lieu of ad valorem taxes, and all other taxes or charges levied against the Project or Lessee (including the costs of contesting such taxes), or assessments levied against the Lessee’s interest in the use of the Properties or against its activities or operations on the Properties. Offeror acknowledges that DA shall not be required to sponsor, consent to, endorse, cooperate with, or assist the selected Offeror with obtaining or negotiating any Payment in Lieu of Taxes (PILOT) or other tax incentives or abatements in connection with the Project, and any such pursuit shall be at the selected Offeror’s sole risk and expense. However, in accordance with 10 U.S.C. § 2667 (f), the EUL shall provide that if and to the extent the Properties (i.e., the underlying land) are later made taxable by state or local governments under an Act of Congress, the EUL shall be renegotiated.

c. Limited Title Search. The Properties may be subject to certain reservations, easements, restrictions and rights. A list of such known reservations, easements, restrictions and rights, upon current information and belief of the Government, will be provided to the selected Offeror(s) prior to execution of an EUL(s).

However, the Government provides no representations or warranties regarding the accuracy or completeness of such information. As provided in Section 2.2.6(a) above, each Offeror is solely responsible for conducting its own due diligence regarding the Properties, including title review.

d. Liability. The selected Offeror shall be responsible for all damages to persons or property that arise from or are incident to the selected Offeror’s use of, or activities on, the Properties. The selected Offeror shall also be responsible for all materials delivered and work performed.

2.2.7 Prevailing Wages. So long as DA's interest in this Project is solely that of lessor of DA-owned land and: (i) DA is not a party to the contracts for construction of the Project, and (ii) there is no public funding for the Project's construction or DA ownership or operation of the completed Project, the selected Offeror will be exempt from complying with the requirements of the Davis-Bacon Act, as amended, 40 U.S.C. § 3141, et seq. and the relevant rules, regulations, and orders of the Secretary of Labor. The selected Offeror/Lessee will be required to comply with the requirements of the Davis-Bacon Act, as amended, 40 U.S.C. § 3141, et seq. and the relevant rules, regulations, and orders of the Secretary of Labor for any covered contract(s) for the Project, including any work performed by the selected Offeror or its subcontractor(s) as in-kind consideration to be provided to DA.

2.2.8 Handicap Accessibility. The selected Offeror will be required to ensure that its design, development, construction, operation, and maintenance plans and activities on the Properties comply in all respects with the Americans with Disabilities Act of 1990, 42 U.S.C. § 12101, et seq., and the Architectural Barriers Act of 1968, 42 U.S.C. § 4151, et seq., as amended.

2.2.9 Buy American Act. The selected Offeror/Lessee shall be required to comply with the requirements of the Buy American Act, 41 U.S.C. §§ 10a - 10d, in the case of projects undertaken by the selected Offeror or any subcontractor for the construction of a public building or public work to be delivered by the selected Offeror to DA as in-kind consideration. “Public building or public work” means a building or work, the construction of which is carried on directly or indirectly by authority of, or with funds of, a federal agency, to serve the interest of the general public regardless of whether the title thereof is in a federal agency.

2.2.10 Limitation on Procurement of Certain Batteries. The selected Offeror/Lessee (including its contractors, operators, suppliers, and sublessees at all tiers) shall be required to comply with any applicable battery procurement restrictions, for example under Section 154 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2024 (Pub. L. 118-31) and Section 842 of the NDAA for FY 2026 (Pub. L. 119-60; 10 U.S.C. § 4865), and any applicable implementing regulations.

2.2.11 Cyber Security and Data Protection. Any assets connected to a DA information network shall comply with applicable Unified Facilities Criteria for cybersecurity of facility-related control systems. The EUL will include comprehensive cybersecurity and data protection requirements commensurate with the strategic nature of energy resilience on a Federal installation, to include the following concepts, and as further detailed in the Cyber & Data Security of the Term Sheet: Cybersecurity Maturity Model Certification (CMMC), Protection of Covered Defense Information (CDI), Industrial Control Systems (ICS) and SCADA Security, and Federal Information Security Modernization Act (FISMA).

2.2.12 Energy Resilience. The EUL(s) will require the Lessee to provide energy resilience capabilities to DA in the event of a grid outage as part of the lease consideration to be provided to DA as further discussed in this RFP. The on-site power generation facility must ensure the Installation can maintain mission-critical operations through islanded operation, automated switching, and the ability to route electricity directly to loads while shedding non-critical loads as necessary.

2.2.13 Testing Requirements. Lessee will be required to demonstrate the ability to deliver energy resilience capabilities to DA through initial and periodic testing, such periodic testing to be conducted no less than annually. Energy resilience capabilities shall be provided no later than at Commercial Operation of the Project. Prior to execution of the EUL, the Offeror and DA will negotiate testing procedures specific to the capabilities proposed by the selected Offeror. Testing procedures will be made a part of the EUL. The selected Offeror and DA will negotiate Standard Operating Procedures (SOP) for operations and testing during grid outage and restoration of normal operations within twelve (12) months of execution of the EUL.

2.2.14 Airfield Obstructions. Offerors are advised that in some cases, available Properties are near to or adjacent to active military airfields. All proposals that may affect airfield operations, as identified in the site-specific information contained in Attachments D through L, must consider any height restrictions or other land use limitations within airfield designated zones, such as clear zones and imaginary surfaces. Proposals must address compliance with relevant siting and DA safety requirements including appropriate mitigations. DA requirements for airfield compatibility and siting guidelines are contained in Unified Facilities Criteria (UFC 3-260-01) and Federal Aviation Administration regulations at Part 77 of Title 14 of the Code of Federal Regulations.

2.2.15 Glint Glare. Solar reflections from solar photovoltaic systems can significantly impact the safety of pilots, air traffic controllers, road users, and others. Accordingly, selected Offeror(s)/Lessee(s) proposing the use of solar photovoltaic equipment in their Project may be required, as identified in the site-specific information contained in Attachments D through L, to conduct glint glare analyses and incorporate appropriate mitigation measures to address any impacts on Installation operations and activities. Such analyses and mitigation measures shall be at the selected Offeror(s)/Lessee(s) sole cost and expense.

2.2.16 Army Determinations and Congressional Notification. Under 10 U.S.C. § 2667 (a)(1-3), the Secretary of the Army must make certain determinations before entering into an EUL, including that (a) the Property is not excess property as defined by the Federal Property and Administration Services Act of 1949, as amended (40 U.S.C. § 102(3)), and is not at this time needed for other public use; (b) a lease of the Property is advantageous to the United States; and (c) a lease of such Property on the terms set forth in the Lease is in the public interest. In addition, 10 U.S.C. § 2667 (b) requires the Secretary of the Army to make certain findings with respect to the fair market rental value of the lease interest and any deviation of required lease terms. Pursuant to 10 U.S.C. § 2662 (b)(3), not less than 30 days prior to entering into an EUL whose annual payment will exceed $750,000, the Secretary of the Army must provide formal written notice to the Congressional Defense Committees advising of their intent to enter into the EUL. The Secretary of the Army may not enter into the EUL until the required notification process under 10 U.S.C. § 2662 is complete. The initial notification required by 10 U.S.C. § 2662 (b)(1)(A) prior to release of this Solicitation was completed by DA.

2.2.17 EUL Consideration. In exchange for DA entering into the contemplated EUL(s) and in accordance with 10 U.S.C. § 2667, the selected Offeror(s) will be required to provide consideration in the form of in-kind, cash, or a combination thereof, not less than the fair market rental value of the lease interest as determined by DA (i.e., rent). DA’s preference is receipt of in-kind consideration.

Such in-kind consideration must include the provision of contingency power in the event of a grid outage, such contingency power to be provided within one (1) hour of a grid outage and provided for a minimum of fourteen (14) continuous days, and providing any required improvements to DA’s utility infrastructure that may be required to enable the Installation to accept delivery of the resilient power. In-kind consideration may also include improvements to Installation infrastructure to improve resilience and reliability, such as dedicated emergency feeders, black-start generators, microgrid control centers, automated transfer switchgear, and dedicated standby reserve allocations. In-kind consideration could also include other DA needs such as data center computing power and storage, restoration, modernization, or construction of facilities either on the Installation or other DA properties.

2.2.18 Period Prior to EUL Execution. To accommodate the period for the selected Offeror to complete regulatory and permitting requirements such as NEPA, NHPA, an ECP, and other applicable requirements; secure Project financing; complete Project design; order long lead-time items; and complete any other tasks required to begin construction of the Project, DA and the selected

Offeror will enter into a Term Sheet, a sample of which is provided as Attachment B. The Term Sheet serves to protect both DA and the selected Offeror to ensure an EUL is executed in a timely manner and in accordance with milestones as agreed by both parties. Attachment B is the standard Term Sheet utilized by DA with selected Offerors prior to execution of an EUL. The Term Sheet will include milestones from its execution until execution of the EUL specific to the Project as submitted in the selected Offeror’s Proposal and as may be further refined or negotiated with DA. The selected Offeror may request DA also issue a Right of Entry to the selected Offeror to provide access to the Property to conduct any necessary studies or tests. Before engaging an Installation for project due diligence or development activities, however, the selected Offeror(s) may be required to execute an agreement ensuring compliance with Government information sharing requirements and restrictions, such as those at EO 13556 "Controlled Unclassified Information," 32 C.F.R. Part 2002 "Controlled Unclassified Information (CUI)," DODI 5200.48 "Controlled Unclassified Information (CUI), AR 380-5 "Army Information Security Program," and DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

2.2.19 Execution of an EUL. Upon completion of the milestones as identified in the executed Term Sheet(s), an EUL(s) will be executed between DA and the selected Offeror(s). DA’s model EUL is provided as Attachment C. Offerors are advised to thoroughly review Attachment C as substantive lease terms and clauses are rooted in statutory requirements unique to the Federal government and are not subject to further negotiation.

2.2.20 Decommissioning Plan and Financial Assurance.

a. Decommissioning Plan. The selected Offeror shall be required, as a condition precedent to EUL execution and land disturbance activities, to submit a Decommissioning and Site Restoration Plan ("Decommissioning Plan") that meets DA approval, which shall become part of the EUL. The plan must detail the procedures, timelines, and costs for the complete decommissioning, removal of all Lessee-constructed improvements (including, but not limited to data halls, electrical substations, backup diesel generators, fuel storage tanks, battery energy storage systems, underground conduits, and foundations to a minimum depth of four (4) feet below grade), hazardous materials abatement, and environmental remediation to restore the Properties to a safe, baseline condition acceptable to DA.

b. Delivery of Financial Assurance. Prior to commencing land disturbance activities and/or construction activities, Lessee shall obtain and deliver to DA a

Decommissioning Bond (issued by an approved surety listed on Treasury Circular 570), an Irrevocable Standby Letter of Credit (issued by an federally insured financial institution acceptable to the Government), or other DA approved financial security instrument (collectively, the “Decommissioning Security”) in an amount calculated by an independent, licensed professional engineer, at Lessee’s sole expense, and approved by DA to cover the full estimated costs of decommissioning the Project and restoring the Property in accordance with the Decommissioning Plan. The Decommissioning Security shall be maintained in full force and effect until the decommissioning and site restoration obligations have been inspected and approved by the DA. In the Event of Default, as later defined in the EUL, DA shall have the right to draw upon the Decommissioning Security to complete the work.

c. Periodic Adjustment. The Decommissioning Security amount shall be re-evaluated and adjusted every five (5) years, or upon a triggering event including, but not limited to, site modifications, environmental changes, market inflation, and option periods, whichever occurs first. Estimated scrap, salvage, or equipment resale value shall not be deducted or credited against the required Decommissioning Security amount.

2.2.21 Other Considerations. When preparing Proposals in response to this RFP, Offerors should be cognizant of the following:

a. DA will not participate in or allow its or the United States’ interest in the land comprising the Properties to be used as security for financing for the Project or otherwise, including without limitation, providing any kind of guaranty or act in any way as a beneficiary for a financing vehicle.

b. In regard to any proposed Project-related financing to be obtained by the selected Offeror, DA as a general rule, will not approve any financing that includes requirements that operate to deny, restrict, or subordinate DA’s right to terminate the EUL upon the selected Offeror’s failure to cure an outstanding event of default thereunder. Any proposed Project financing that does not comply with this restriction must be explicitly identified in the RFP proposal for DA’s unilateral review and evaluation.

c. The selected Offeror shall not cross-collateralize or cross-default the EUL, or the assets or revenues of the Project, without prior written approval of DA. The selected Offeror(s) shall not assign, pledge, provide as collateral, or otherwise transfer its interest in the EUL, in the net cash flows, or in the ownership of the Project, in whole or in part, without prior written approval of DA. Where the selected Offeror(s) will be arranging financing for the Project, it shall seek prior written approval of DA for any planned future changes in the Project ownership or cash flows.

d. The selected Offeror must establish and maintain positive relations and communications with state and local governmental authorities and the local communities during negotiations with DA and any of its representatives.

e. The selected Offeror will be responsible for any required coordination of its work schedule with DA to minimize disruption to Installation activities and operations. This coordination includes the work of any contractor or subcontractor that the selected Offeror retains in connection with the Project.

f. To the extent that may be required, the selected Offeror, its officers, agents, or employees or others who may be on the Properties at their invitation or the invitation of any one of them will comply with all Installation access requirements, including such requirements to obtain identification passes from Installation military police before admission to the Installation. Vehicles of such personnel will also be required to be registered with and issued temporary passes by the Installation military police before they may be driven onto the Installation. Such vehicles are subject to inspection by Installation military police, and, before temporary passes will be issued, drivers must present evidence that they comply with the minimum insurance requirements of the state in which their vehicle is registered.

3. GENERAL INSTRUCTIONS FOR OFFERORS

a. This RFP is not for an acquisition of goods, services, or facilities for DA’s consumption or use and as such, is not governed by the Federal Acquisition Regulation (FAR). This RFP supports a real estate transaction granting the use of DA controlled real property pursuant to 10 U.S.C. § 2667. DA is soliciting proposals to this RFP to form a decision on awarding one or more EULs on the Properties or portion(s) thereof.

DA retains its right to authorize use of the Properties in any manner it deems appropriate, consistent with applicable laws and regulations.

b. In no event shall this RFP or any EUL executed as a result of this RFP require or otherwise obligate DA to purchase any service or product from the Project. DA makes no representations regarding the Offeror(s)’ ability to secure an agreement(s) for sale and purchase of the services or products arising directly or indirectly from the Project, EUL, or the Properties.

c. All information concerning this RFP, including generalized responses to questions from prospective Offeror(s), will be made available to all other prospective Offeror(s). If the information is necessary in submitting proposals, or if the lack of it would be prejudicial to any other prospective Offeror(s), the information will be provided in response to comments or may be furnished as an amendment to the RFP.

d. Offeror’s Proposal should comprehensively address each of the requirements set forth in this RFP and contain the Offeror’s best terms. DA may, at its sole discretion, elect to make an award and enter into negotiations with a selected Offeror on the basis of initial proposals received without discussions, or DA may elect to conduct discussions with one or all Offeror(s), at any time, and for any reason, to clarify information in the Proposal, typically through negotiations after date proposals are due and prior to selection of an Offeror(s). Any discussions held will become part of the Offeror‘s Proposal, which shall be non-binding, and will be considered by DA in making its selection(s).

e. Proposals that fail to furnish required information or that fail to meet any terms and conditions of this RFP may be rejected by DA. An Offeror whose Proposal is rejected for being incomplete will not be notified by DA of the specific deficiencies in its Proposal.

Rejected Proposals will not be evaluated further. Offeror(s) will not be allowed the opportunity to amend their Proposals, and DA will only notify an Offeror that its Proposal has been rejected without further explanation.

f. By participating in this RFP process, Offeror(s) agree to indemnify and hold harmless the DA and the United States and each of its respective officers, employees, contractors, and consultants from and against any and all claims, liabilities, and costs related to this RFP, and under no circumstances will DA be liable for any real estate brokerage commissions, finder’s fees, or other forms of compensation related in any way to activities undertaken by any person as a result of this RFP.

g. Offeror shall be responsible, at their own expense, for all costs associated with its Proposal, including but not limited to, preparation costs, legal consulting, engineering, permitting, and compliance with applicable laws and regulations, and DA is not responsible for any costs associated with Offeror’s Proposal.

h. Entities eligible to submit a proposal are limited to those entities that are organized under the laws of the United States, its states, territories, or possessions; have majority domestic ownership and control; and have a physical place of business in the United States. All Offerors submitting a proposal will be reviewed for risks of undue foreign influence prior to decision making by DA. As part of its review, DA may require that an Offeror provides additional disclosures and information to inform the review. DA will not review proposals made by foreign persons or organizations. Determinations by DA that an entity is ineligible due to risk evaluations are subject to DA’s sole discretion.

i. The following parties, which shall mean persons and/or entities, are ineligible to be an Offeror or a team member of an Offeror or otherwise participate in the Project (including as a contractor, subcontractor, or professional):

(1) Non-Qualifying Party: any person that has been debarred or suspended from doing business with DA; (b) any person that is listed on the most current “Excluded Parties List System” published at https://www.sam.gov/, as updated from time to time; (c) any person who poses a security or safety risk, as determined by the Secretary of State, including but not limited to any person who either represents a country, or is a member of or provides political, financial, or military support to a group, that is listed in the most current “Patterns of Global Terrorism” report issued by the Secretary of State in compliance with 22 U.S.C. § 2656f, available from the Superintendent of Documents, U.S. Government Printing Office, Washington D.C. 20402 and also available at http://www.state.gov/j/ct/rls/crt/index.htm; (d) governments of a terrorist country; and (e) any person who is subject to a criminal indictment or information for a felony in any U.S.

court; and

(2) Restricted Party: (a) any person that is, or is owned or controlled, directly or indirectly, by: a person that is debarred, suspended, or proposed for debarment from doing business with DA or any other federal agency; (b) a person then appearing upon the “Denied Persons List,” the “Entity List,” or the “Unverified List,” as maintained by the U.S. Department of Commerce; (c) a person on the U.S. Office of Foreign Assets Control “Specially Designated Nationals and Blocked Persons List,” the “Sectoral Sanctions Identifications List,” the “Non-SDN Chinese Military-Industrial Complex Companies List,” the “Foreign Sanctions Evaders List,” or any similar list maintained by a governmental authority of the United States, including Persons resident in embargoed countries, territories, or regions; (d) a “foreign entity of concern” as defined by 15 U.S.C.

§ 4651(8) or 42 U.S.C. § 18741(a)(5) or a “foreign adversary” as defined by 15 CFR § 791.4; (e) the government, including any political subdivision, agency, or instrumentality thereof, or any national, of any country, territory, or region against which the United States maintains comprehensive economic sanctions or embargos; (f) the People’s Republic of China or a country determined to…