This is an attachment to a Request for Proposals (RFP) issued by the Department of the Army for a lease opportunity at Fort McCoy, Monroe County, Wisconsin (RFP No. DACA27-1-27-0015900). The solicitation concerns approximately 1,000 acres of undeveloped, mostly wooded land located off Wisconsin State Highway 16, currently utilized for land navigation and heavy maneuver training.

The property presents significant environmental constraints that prospective offerors must address. Four federally listed fauna species are present: the Karner blue butterfly (with an estimated 64.6 acres of lupine host plant habitat), gray wolf, northern long-eared bat (NLEB habitat covering much of the area), and rusty patched bumble bee (with approximately 871.3 acres of overwintering habitat and 135.6 acres of nesting habitat). Fort McCoy is authorized specific cumulative take limits for each species, and offerors must obtain permitting and fund required mitigation and surveys. The property contains approximately 38.6 acres of wetlands and 3,506 linear feet of intermittent/permanent streams regulated under the Clean Water Act, as well as 5.5 acres of floodplains subject to Executive Order 11988. Seven cultural resource sites exist on the property, including five eligible for the National Register of Historic Places and one known Property of Traditional Religious and Cultural Importance requiring tribal consultation. The property contains standing merchantable timber that must be appraised, with the offeror required to pay fair market value to the Army. No existing utilities serve the property—electricity, natural gas, water, wastewater, and government-owned fiber are absent, though non-government fiber availability along Highway 16 is unknown. Soil composition varies significantly across the 1,000 acres, with Tarr sand, Gosil loamy sand, and Council-Elevasil-Norden complex comprising over 40 percent of the total acreage. The property is subject to concurrent federal legislative jurisdiction where both state and federal laws apply.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment H Request for Proposals No. DACA27-1-27-0015900

FORT MCCOY, MONROE COUNTY, WISCONSIN

Installation Summary:

Established in 1909, Fort McCoy is an Army Reserve-funded Installation comprised of 60,000 acres situated in west-central Wisconsin. It serves as a Training Center, Mobilization Force Generation Installation, and Strategic Support Area that enables Warfighter lethality to deploy, fight, and win our Nation’s wars. Home to the 88th Readiness Division, 86th Training Division, 181st Multi-Functional Training Brigade, 98th Army Reserve Readiness Training Center, Non-Commissioned Officer’s Academy, 426th Regional Training Institute, Wisconsin Military Academy, and Wisconsin State Patrol Academy, Fort McCoy trained over 109,000 members of the Joint Force in Fiscal Year 2025.

Available Property:

The property available for lease is comprised of approximately 1,000 acres of land and is referred to as Parcel 1.

Parcel Identifier Acreage

Parcel 1 1,000

Total 1,000

Map Identifying the Property:

Land Usage of the Property:

The Property is undeveloped land, mostly wooded with steep terrain in the southern portion near the Installation boundary. It is currently utilized for a land navigation course and heavy maneuver training. It is located off Wisconsin State Highway 16 in Monroe County. The Property has direct access off the state highway without requiring access through the Installation.

Utilities at Fort McCoy:

Electricity: Fort McCoy supplied power is from Xcel Energy. The Installation is served by two separate 69kV transmission feeds, where the Installation is primary metered at each substation. One transmission line enters from the south and the other from the west. The Installation electrical distribution infrastructure is owned and operated by Xcel Energy. There is no electrical power from the Xcel Energy for Fort McCoy that serves the Property.

Natural Gas: Natural Gas provided to the Installation is from Xcel Energy natural gas transmission pipelines. There are no natural gas lines from Xcel Energy for Fort McCoy that serve the Property.

Pine Bluff Arsenal

Water: Fort McCoy owns and operates its own well field and water treatment plant. There is no water infrastructure serving the Property.

Wastewater: Fort McCoy owns and operates its own wastewater treatment plant.

There is no wastewater infrastructure on the Property.

Fiber: There is no government-owned fiber serving the Property. It is unknown if non-government owned fiber infrastructure exists along Wisconsin State Highway 16 or Interstate 90.

Environmental Considerations of the Property:

a. There are four (4) federally listed fauna species currently associated with this area.

The Karner blue butterfly (KBB) (host plant is lupine), the gray wolf, the northern long-eared bat (NLEB) and the rusty patched bumble bee (RPBB).

1. There is an estimated 64.6 acres of lupine (KBB host plant) present within the area.

Projects must be designed to avoid KBB habitat areas to the maximum extent possible.

Fort McCoy is authorized 20 acres of incidental take for permanent construction activities (cumulatively in a year) and no more than 2 acres KBB habitat (lupine) or 1/3 of a KBB site will be taken per project without further coordination and approval of the United States Fish and Wildlife Service (USFWS). The cumulative effects of past projects, currently proposed projects, and expected future projects cannot jeopardize the ability of Fort McCoy to meet its conservation goals. The Fort McCoy Endangered Species biologist will make this determination. The determinations above will be based on but not limited to the following: Project impacts to KBB movement or dispersal corridors, impacts to major nectar sources, impacts to known high-quality KBB population areas, impacts to KBB management areas, and fragmentation of existing KBB habitat. The selected Offeror(s) will be required to apply for and receive permitting for take or other impacts to the KBB as well as fund any required mitigation or additional surveys needed.

2. Fort McCoy is committed to protecting known active den and rendezvous sites of gray wolves from specific activities to include permanent construction. In short, construction will be prohibited within 100 meters of active den sites (utilized within the last two years) or within 100 meters of active rendezvous sites. If a den is found while completing construction activities that could possibly be a wolf den (opening a minimum of 15-18 inches wide by 18-24 inches tall), all activities must halt and the Endangered Species Biologist contacted (2-4793) to determine if the den is an active wolf den. There are currently no known den or rendezvous sites in this area. The selected Offeror(s) will be required to apply for and receive permitting for take or other impacts to the gray wolf as well as fund any required mitigation or additional surveys needed.

3. The NLEB habitat is located in much of this area. Fort McCoy is authorized up to 50 acres of take that results from construction activities within NLEB habitat. Fort McCoy must consult with the USFWS on any future additional construction projects that exceed this 50-acre estimate. Tree removal between April 15-October 31 is to be avoided to limit impacts to maternity roosts and foraging bats; removal of trees from June 1-15 August is to be avoided to avoid mortality of flightless pups (young); removal of greater 50 percent of a single woodlot is to be avoided; and the removal of more than 30 acres of suitable NLEB habitat for any single project/federal action will be avoided; and contacting the Service prior to removal of any future known NLEB roost tree is required.

Exceedance of any thresholds above will require additional consultation with the USFWS. There are currently no known roost trees in this area, but additional surveys may be required to validate the presence of roost trees, especially dependent upon the time of year trees are to be removed. The selected Offeror(s) will be required to apply for and receive permitting for take or other impacts to the NLEB as well as fund any required mitigation or additional surveys needed.

4. There are an estimated 871.3 acres of over-wintering habitat and 135.6 acres of nesting habitat for the RPBB in this area. Impacts to over-wintering habitat will be avoided October 15 to March 15 and to nesting habitat from March 16 to October 14.

Fort McCoy has been permitted for take of nesting and overwintering habitat of 452.1 acres and 441.2 acres respectively; however, this take is cumulative take for all the annual Fort McCoy federal undertakings and training actions. The selected Offeror(s) will be required to apply for and receive permitting for take or other impacts to the RPBB as well as fund any required mitigation or additional surveys needed.

b. All reasonable attempts should be made to complete all major work prior to May 1 or after August 30 to remain in compliance with the Migratory Bird Treaty Act.

c. The Property has wetlands and waters regulated under Section 404/401 of the Clean Water Act or falling under the purview of Executive Order 11990, “Protection of Wetlands”. These are located along the southwestern corner of the area in A05 Training Area. Wetland/waterway delineation, approvals to impact, permitting, and associated costs will be the responsibility of the selected Offeror(s). An estimated 38.6 acres of wetland and 3,506 linear feet of intermittent/permanent streams are present.

d. The Property does include floodplains under the purview of Executive Order 11988, “Floodplain Management”. Wisconsin storm water management or other regulatory permitting will be the responsibility of the selected Offeror(s). An estimated 5.5 acres of floodplains are present.

e. There are cultural resources sites in the area. Five of these are eligible for National Register of Historic Places (NRHP) and two are ineligible for the NRHP. NRHP eligible sites (Tier 3 Properties) would require consultation/mitigation if impacts are expected.

The presence of non-eligible sites may increase the potential for inadvertent discovery of artifacts/cultural resource materials. The area has a known Property of Traditional Religious and Cultural Important (Tier 2 Property) in the area associated with Federally recognized Tribe(s). Impacts to the Tier 2 and 3 properties to include transfer, sale or lease of these properties out of Federal Ownership would require consultation and mitigation per the Program for Army Comment for Army Warfighting Readiness and

Associated Infrastructure dated 26 March 2026. Tribal consultation will be coordinated with/conducted by the Fort McCoy Native American Coordinator. The five eligible sites cover 75.73 acres, the non-eligible covers 2.2 acres and the known PTRCI is less than 1 acre in size. Any inadvertent discovery of artifacts/cultural resource materials or potential human remains during construction will require all work to immediately cease in the area of impact and require notification of the Fort McCoy Cultural Resources Manager (or delegate). The selected Offeror(s) will be required to fund any required mitigation, additional surveys, and curation of material as needed in association with an inadvertent discovery.

f. Fort McCoy is in an Air Attainment area of Wisconsin. Any new air emission sources or air quality impacts would need to be captured and permitted separately from the existing Fort McCoy Air Permit and this would be the responsibility of the selected Offeror(s).

g. Large portions of the area have standing merchantable timber on site. If the Property requires clearing forest areas, any merchantable standing timber must be appraised by the Army to establish its fair market value. The selected Offeror(s) will be required to pay the appraised timber value to the Army, with proceeds deposited into the DoW Forestry Account or the special Treasury account under Title 10 U.S.C.

Section 2665.

h. The soil composition of the Property is varied as follows (source https://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx):

Monroe County, Wisconsin (WI081)

Map Unit Symbol

Map Unit Name Acres in

AOI

Percent of AOI

25A Dawsil mucky peat, 0 to 1 percent slopes 37.0 3.6%

224D2 Elevasil sandy loam, 12 to 20 percent slopes, moderately eroded

13.7 1.3%

254C2 Norden silt loam, 6 to 12 percent slopes, moderately eroded

39.0 3.8%

255D2 Urne fine sandy loam, 12 to 20 percent slopes, moderately eroded

125.9 12.1%

255E2 Urne fine sandy loam, 20 to 30 percent slopes, moderately eroded

80.9 7.8%

434B Bilson sandy loam, 1 to 6 percent slopes 20.6 2.0%

551A Impact sand, 0 to 3 percent slopes 9.1 0.9%

551B Impact sand, 2 to 6 percent slopes 37.7 3.6% https://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx

Monroe County, Wisconsin (WI081)

Map Unit Symbol

Map Unit Name Acres in

AOI

Percent of AOI

556A Mindoro sand, 0 to 3 percent slopes 18.2 1.8%

561B Tarr sand, 1 to 6 percent slopes 168.2 16.2%

561C Tarr sand, 6 to 15 percent slopes 140.2 13.5%

562C Gosil loamy sand, 6 to 12 percent slopes 188.7 18.2%

569A Newlang muck, 0 to 2 percent slopes, frequently flooded 12.3 1.2%

676A Kickapoo fine sandy loam, 0 to 3 percent slopes, occasionally flooded

5.3 0.5%

743C2 Council fine sandy loam, 6 to 12 percent slopes, moderately eroded

0.6 0.1%

743D2 Council fine sandy loam, 12 to 20 percent slopes, moderately eroded

4.4 0.4%

1125F Dorerton, very stony-Elbaville complex, 30 to 60 percent slopes

6.7 0.6%

1145F Gaphill-Rockbluff complex, 30 to 60 percent slopes 14.1 1.4%

1743F Council-Elevasil-Norden complex, 20 to 45 percent slopes, rocky

113.9 11.0%

W Water 2.6 0.2%

Totals for Area of Interest 1,039.1 100.0%

Legislative Jurisdiction of Pine Bluff Arsenal:

The Property is subject to concurrent federal legislative jurisdiction. Both state and federal laws are applicable in a concurrent legislative jurisdiction area. Both federal and state governments may enforce their respective laws and punish an offender for an offense committed in the area. The state, subject to the exemption of the federal government, retains its right to tax. The regulatory powers of the state may be exercised in the area, but not in such a manner as to interfere with federal functions.