This document is a Questions and Answers (Q&A) clarification for a federal contract opportunity. The contract is a Part 12 action with an estimated project cost between $1,000,000.00 and $5,000,000.00. The scope involves installation of power infrastructure systems including an inverter system with -48V DC input with Maintenance Bypass Panel, 208V 3-Phase AC input, and 208/120V 3-Phase AC output, along with a new DC power plant with 208V 3-Phase AC input. Bidders should bid the work as shown on site plans, which indicate reuse of existing panels and only one DC Plant despite drawings showing two new rectifier cabinets. No bonding is required for this project. The deadline for submitting questions was Monday, April 20, 2026, and the bidding date and time remain April 24, 2026 at 1:00 PM.
Acceptable bid submissions require only a completed Representations and Certifications (Reps and Certs) page and a price breakout schedule; no Division 1 submittals such as quality control plans or schedules are required. Site visit attendee and planholders lists are posted to SAM, and Amendment 001 is the only amendment currently issued. Escorts will be provided from 7:30 AM to 4:30 PM Monday through Friday; weekend work requires prior coordination with the Naming Entity Coordinator (NEC). The 30-day submittal process timeline and specific requirements for a full-time Site Safety and Health Officer remain unaddressed in the provided Q&A response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR26RA017 Amendment 0003.pdf | ||
| W912QR26RA017 Amendment 0002.pdf | ||
| Site Visit Sheet.pdf | ||
| Solicitation Amendment W912QR26RA0170001 SF 30.pdf | ||
| Solicitation - W912QR26RA017 3.17.26.pdf | ||
| 2025.6.18 - FTC Rectifier PWS.pdf | ||
| Facility Plans .pdf | ||
| Wage Rates 12.25.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer To proceed, we require detailed power specifications for the equipment. Please provide the requirements for the following:
a.Inverter System:
i.DC Input: -48V DC with Maintenance Bypass Panel
(MBP)
ii.AC Input: 208V, 3-Phase iii.AC Output: 208/120V, 3-Phase b.DC Power Plant:
i.AC Input: 208V, 3-Phase The system is 3 phase 208/120V in and out
New DC Plant, does the new DC plant connect to the MDP?
Or is a distribution cabinet required.
Site drawing shows New Rectifier Cabinet 1 and 2 but only calls for 1 DC Plant – Bid as Shown, Plans show panels being reused What is the bonding requirement? No bonding is reqquired for this projhect Is the 30-day submittal process apart of the period of performance?
Is this contract a part 12, 36 or Hybrid. This is a Part 12 action.
The site visit was yesterday, when is the deadline for RFIs/questions?
The deadline for questions is today Monday 4/20/2026
Minimal information was provided for what is expected to be provided with the bid package -please confirm that a completed Reps and Certs and price breakout schedule are the only requirements for an acceptable bid submission.
Yes only the Reps and Certs page and the Prrice break out schedule are the only items required to be submitted
Is the bidding date & time remains the same? Apr.
24, 1PM Yes
• Can I ask for a copy of the site visit attendees / planholders list? Posted to SAM
• Is there any addendum aside from addendum1 posted on sam?
as of right now the only Amendment is the Amendment 001
How much will be the project estimated cost? If not available, can you provide me a rough range? $1,000,000.00- $5,000,000.00
Will escort availability be guaranteed during all allowable work hours? If not, will delays caused by lack of escort support justify time extensions?
Escorts will be provided from 0730-1630 Monday- Friday. If weekend work is needed prior coordination will need to take place with the NEC.
No division 1 submittals were provided - please confirm there are no division 1 requirements required (i.e. QC, Schedule, etc.)
Will there be a requirement for a full-time site safety & health officer (SSHO)? There is a reference to EM 385-1-1 but no specific requirements in regard to key personnel.