Solicitation Amendment W912QR26QA0710001 SF 30.pdf
PDF 4 MB Posted
- Solicitation number
- W912QR26QA071
About this file
This is Standard Form 30 (SF 30), an Amendment of Solicitation/Modification of Contract document issued by the U.S. Army Corps of Engineers, Louisville District.
Amendment Details: Amendment 0001 to solicitation W912QR26QA071 was issued on August 5, 2026, with an effective date of August 5, 2026. The amendment does not extend the deadline for receipt of offers. Offerors must acknowledge receipt of this amendment prior to the solicitation closing date by completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in offer rejection.
Scope of Changes: The amendment modifies Section 00 01 15 (List of Drawing Sheets) by replacing the attachment table. The key change involves updating the Tailwater Volunteer Village Campground Statement of Work document from "SOW FINAL" dated July 24, 2026 to "SOW Revised" dated August 5, 2026. All other contract documents remain unchanged, including Special Instructions, PIEE Directions, PROJNET Instructions, Clauses, Representations & Certifications, and Wage Determination documents. The amendment addresses campsile entrance dimensions under TP-3.1 General Specifications. The contracting officer is Richard Van De Linde, III, and the amendment was signed on August 5, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SPECIAL INST
RUCTIONS
Statement of Work 23 Jul 2026 Attach ment
No
0002 PIEE Directions PIEE DIRECTIONS 23 Jul 2026 Attach ment
No
0003 PROJNET
Instructions
PROJNET Instructions 23 Jul 2026 Attach ment
No
0004 Tailwater Volunteer Village Campground
SOW FINAL
Statement of Work 24 Jul 2026 Attach ment
No
0005 Clauses Statement of Work 24 Jul 2026 Attach ment
No
0006 REPS AND
CERTS
REPRESENTATIONS &
CERTIFICATIONS
24 Jul 2026 Attach ment
No
0007 Wage Determination
Wage Determination 23 Jul 2026 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 SPECIAL INST
RUCTIONS
Statement of Work 23 Jul 2026 Attach ment
No
W912QR26QA0710001
0002 PIEE Directions PIEE DIRECTIONS 23 Jul 2026 Attach ment
No
0003 PROJNET
Instructions
PROJNET Instructions 23 Jul 2026 Attach ment
No
0004 Tailwater Volunteer Village Campground SOW Revised
Statement of Work 05 Aug
Attach ment
No
0005 Clauses Statement of Work 24 Jul 2026 Attach ment
No
0006 REPS AND
CERTS
REPRESENTATIONS &
CERTIFICATIONS
24 Jul 2026 Attach ment
No
0007 Wage Determination
Wage Determination 23 Jul 2026 Attach ment
No
The following contract documents were added:
Tailwater Volunteer Village Campground SOW Revised
The following contract documents were deleted:
Tailwater Volunteer Village Campground SOW FINAL
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Tailwater Volunteer Village Campground SOW Revised none
W912QR26QA0710001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 05 AUG 2026 |
| ReqNo: |
| ProjNo: 0001 |
| IssCode: W912QR |
| AdmCode: |
| IssuedBy: W072 ENDIST LOUISVILLE |
KO CONTRACTING DIVISION, 220 W MAIN STREET 3RD FLOOR
LOUISVILLE, KY 40202-2230
UNITED STATES
JOEL HUBERMAN, EMAIL: JOEL.HUBERMAN@USACE.ARMY.MIL TELEPHONE: (502) 315-7409
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912QR26QA071 |
| SolDate: 24 JUL 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment 0001 is to address the campsite entrance dimensions under TP-3.1 GENERAL SPECIFICATIONS. |
| ContNameTitle: |
| CoNameTitle: RICHARD VAN DE LINDE, III |
| ContDate: |
| CODate: 05 AUG 2026 |
File details come from the government source that posted it. Updated .