This appears to be a construction specification document associated with an Army Corps of Engineers Louisville District solicitation for a design/build/build project at Joint Base McGuire-Dix-Lakehurst (JBMDL). The project involves constructing a new 9,500 SF Vertical Skills (Material Handling) and General Instruction Classroom facility for Army Reserves, with permanent construction including HVAC, plumbing, mechanical, security, and electrical systems.

The facility requirements include site development, utilities, lighting, paving, walks, curbs and gutters, storm drainage, and information systems. The design must incorporate force protection measures, sustainability features, and accessibility compliance, with a minimum 40-year facility life expectancy. Optional components include resurfaced parking areas, HVLS fans, HVAC enclosure, and collateral equipment. The contract period is set at 630 calendar days from award.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR25R0014 for the construction of a Vertical Skills Instructional Facility at Joint Base McGuire-Dix-Lakehurst, New Jersey is hereby amended as follow s:

*See Continuation Page*

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0014

X 9B. DATED (SEE ITEM 11)

10-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

U0003

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE

DATE

12-Feb-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR25R0014_Specs-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

CONTINUATION PAGE

Solicitation W912QR25R0014 for the Construction of a Vertical Skills Instructional Facility at Joint Base McGuire- Dix-Lakehurst, New Jersey is hereby amended as follows:

a) The following Specifications have been replaced in their entirety:

00 80 00.01 SUBMITTAL REGISTER

01 33 29.00 06 SUSTAINABLE REPORTING

10 28 13 TOILET ACCESSORIES

b) The following Plans have been added in their entirety:

P-501 PLUMBING DETAILS

M-715 MECHANICAL CONTROLS AND SEQUENCE

M-716 MECHANICAL CONTROLS AND SEQUENCE

TS101 TELECOMMUNICATIONS - SITE PLAN

c) Wage Decision NJ20250001, dated 03 January 2025, is hereby revised and replaced in its entirety by Wage Decision NJ20250001, dated 07 February 2025.

d) Wage Decision NJ20250027, dated 03 January 2025, is hereby revised and replaced in its entirety by Wage Decision NJ20250027, dated 07 February 2025.

e) The response due date has been extended from 2:00 PM EST, 13 February 2025 to 2:00 PM EST, 19 February 2025.

e) All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 13-Feb-2025 02:00 PM to 19-Feb-2025 02:00 PM.

(End of Summary of Changes)

2/10/25, 11 :38 AM SAM.gov

"General Decision Number: NJ20250001 02/07/2025

Superseded General Decision Number: NJ20240001

State: New Jersey

Construction Type: Highway

Counties: Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Mercer, Monmouth, Ocean and Salem Counties in New Jersey.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(l).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:

Executive Order 14026 generally applies to the contract.

The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

Executive Order 13658 generally applies to the contract.

The contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2025.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date https://sam.gov/wage-determination/NJ20250001/1 1/18

2/10/25, 11 :39 AM SAM.gov

"General Decision Number: NJ20250027 02/07/2025

Superseded General Decision Number: NJ20240027

State: New Jersey

Construction Type: Building

County: Burlington County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(l).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:

Executive Order 14026 generally applies to the contract.

The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

Executive Order 13658 generally applies to the contract.

The contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2025.

The applicable Executive Order m1n1mum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number

Publication Date 01/03/2025

02/07/2025 https://sam.gov/wage-determination/NJ20250027/1 1/13

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 77 PAGES

00 80 00.00 06 SD-01 Preconstruction Submittals

1.14Local Agency Check

1.12SF1413 Statement and

Acknowledgement

1.32 GRadioactive Material/Equipment

SD-02 Shop Drawings

1.34 GMechanical/Electrical Room

Layout

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.37Progress Photographs

SD-07 Certificates

1.16Warranty of Construction

1.15 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.15.2 GCertification for each individual

product installed and identified to contain mineral fibers that no asbestos-containing materials were installed

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

479787 JBMDL VERTICAL SKILLS INSTRUCTION FACILITY

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 77 PAGES

00 80 00.00 06 1.15.2 GDocumentation to show that the products containing mineral fiber materials have been microscopically examined by an

AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos

1.29Insurance

1.27Sales and Use Tax

SD-11 Closeout Submittals

1.7.4 GPreliminary (Working) As-Built

Drawings

1.7.1 GFinal As-Built Drawings

1.7.1.2 GCAD Working As-Built Drawings

1.9.1Equipment-in-Place List

1.9.1Maintenance and Parts Data

1.16 GWarranty Management Plan

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1List of Contact Personnel

01 32 01.00 06 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

479787 JBMDL VERTICAL SKILLS INSTRUCTION FACILITY

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 77 PAGES

01 33 00 1.8 GSubmittal Register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.4.1.1 GSustainability Action Plan

1.4.1.4 GSustainability Progress Report

SD-11 Closeout Submittals

1.4.1.2 GFinal Sustainability eNotebook

1.4.1.2 GAmended Final Sustainability

eNotebook

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Access/Haul Road Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

1.7Process Safety Management

Plan

1.7Lead Compliance Plan &

Specifications

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 77 PAGES

01 35 26.00 06 1.7Asbestos Abatement Plan &

Specifications

1.7Radiation Safety Program

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Chromium (VI) Exposure

Evaluation

1.7Crystalline Silica Assessment

1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Wild Land Fire Management Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

1.7Critical Lift Plan - LHE

1.7Naval Architectural Analysis-LHE

(Floating)

1.7Floating Plant Inspection and

Certification

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 77 PAGES

01 35 26.00 06 1.7Severe Weather Plan for Marine

Activities

1.7Emergency Plan for Marine

Activities

1.7Man Overboard/Abandon Ship

Procedures

1.7Float Plan for Launches, Motorboats, Skiffs

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

1.7Fire Prevention & Protection Plan for Underground Construction

1.7Compressed Air Plan for

Underground Construction

1.7Erection and Removal Plan for

Formwork and Shoring

1.7PreCast Concrete Plan

1.7Lift-Slab Plans

1.7Masonry Bracing Plan

1.7Steel Erection Plan

1.7Explosives Safety Site Plan

(ESSP)

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 77 PAGES

01 35 26.00 06 1.7Blasting Plan

1.7Dive Operations Plan

1.7Safe Practices Manual for Diving

Activities

1.7Emergency Management Plan for

Diving

1.7Tree Felling/Maintenance

Program

1.7Aircraft/Airfield Construction

Safety & Phasing Plan (CSPP)

1.7Aircraft/Airfield Safety Plan

Compliance Document (SPCD)

1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO)

1.3 G ROCertified Safety

Professional/Certified Industrial

Hygienist Qualifications

1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 77 PAGES

01 35 26.00 06 SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.3 G ROConstruction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1AC472 Accreditation

2.1Certificate of Compliance

1.5 G GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 77 PAGES

01 46 00.00 06 SD-01 Preconstruction Submittals

1.4 G DOCommissioning Specialists

1.4.2 G DOCommissioning Specialists

1.9 G DOProject Schedule

SD-05 Design Data

3.1.4 G DODesign Review Report

SD-06 Test Reports

3.1.3 G DOConstruction Phase

Commissioning Plan

3.1.6.2 G DOPre-Functional Checklists

1.7Issues Log

3.7.1Post-Construction Trend Log

Report

3.6 G DOCommissioning Report

3.7 G DOPost-Construction

Commissioning Report

SD-07 Certificates

1.8 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2 G DOSystems Training

3.3 G ROTraining Plan

3.3 G ROTraining Attendance Rosters

3.4 G DOSystems Manual

3.7 G DOPost-Construction Systems

Manual

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 77 PAGES

01 46 00.00 06 3.5 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

1.6 S DOFinal Commissioning Report

1.6 SFinal Construction Phase

Commissioning Plan

01 50 00 SD-01 Preconstruction Submittals

1.3Construction Site Plan

3.3.1Traffic Control Plan

1.6.1.4Contractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

3.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.10Solid Waste Management Permit

1.5.2Regulatory Notifications

1.6Environmental Protection Plan

1.6.9.1Dirt and Dust Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 77 PAGES

01 57 19.00 06 1.5.5Employee Training Records

1.5.4Environmental Manager

Qualifications

3.15Notice Of Soil Treatment

SD-06 Test Reports

3.5.2.1Solid Waste Management Report

SD-07 Certificates

1.5.5Employee Training Records

SD-11 Closeout Submittals

3.5.1Waste Determination

Documentation

3.5.4.6Disposal Documentation for

Hazardous and Regulated Waste

1.5.5Assembled Employee Training

Records

1.10Solid Waste Management Permit

3.5.2.1Solid Waste Management Report

3.5.4.1Hazardous Waste/Debris

Management

1.5.2Regulatory Notifications

3.5.2.1Sales Documentation

3.5.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 77 PAGES

01 74 19 1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.2Receipts

02 82 00 SD-01 Preconstruction Submittals

1.3.4 GPermits And Licenses

1.5.3Worker's License

1.5.4Contractor's License

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 77 PAGES

02 82 00 1.5.8Protective Clothing

Decontamination Facility

Notification

3.1.9Glovebags

SD-03 Product Data

1.2.2 GAmended Water

1.3.8 GSafety Data Sheets (SDS) for All

Materials

3.1.2.1 GRespirators

3.1.7 GVacuums

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.3 GEmployee Training

1.3.4 GNotifications

1.3.6 GRespiratory Protection Program

1.3.9 GAsbestos Hazard Abatement Plan

1.3.10 GTesting Laboratory

1.3.11 GLandfill Approval

1.3.11 GDelivery Tickets

1.3.11 GWaste Shipment Records

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 77 PAGES

02 82 00 1.3.12Transporter Certification

1.3.13 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.7 GVacuums

3.1.7 GVentilation Systems

SD-11 Closeout Submittals

1.3.4 GPermits and Licenses

1.3.4 GNotifications

1.3.6.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

1.7.1 GRental Equipment

03 30 00 SD-01 Preconstruction Submittals

1.6.5 GQuality Control Program

1.6.6 GQuality Control Personnel

Certifications

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 77 PAGES

03 30 00 1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5 SJoint Sealants

2.4.4 SJoint Filler

2.1Formwork Materials

2.3.3.2 SRecycled Aggregate Materials

2.3.1 SCementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6 SReinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.2.2Waterstops

1.8.1 SLocal/Regional Materials

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 77 PAGES

03 30 00 1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Slag Cement

1.6.3.3Aggregates

3.14.3.3 GCompressive Strength Tests

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5 SJoint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 77 PAGES

04 20 00 2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.7 GInsulation

SD-04 Samples

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.2.3 GPrecast Concrete Units

2.6.7 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.5 GBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 77 PAGES

04 20 00 2.6.3Joint Reinforcement

2.6.7Insulation

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.4 GBollards/Pipe Guards

2.6 GAngles and Plates

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 77 PAGES

05 50 13 2.5 GDownspout Terminations

2.1 SRecycled Content

SD-07 Certificates

2.1 GCertificates of Compliance

06 10 00 SD-03 Product Data

2.4Underlayment

1.8Fire-retardant Treatment

1.4.3Structural-use and OSB Panels

2.3.2.2Structural-use and OSB Panels

2.3Oriented Strand Board

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Virgin Lumber

2.2.1 SCertified Sustainably Harvested

Framing Lumber

2.3.1.1 SCertified Sustainably Harvested

Plywood Subflooring

2.3.1.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Subfloor Sheathing

2.3.2.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 77 PAGES

06 10 00 2.3.2.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Wall Sheathing

2.3.3.1 SCertified Sustainably Harvested

Plywood for Other Uses

2.3.3.2 SCertified Sustainably Harvested

Structural-use and OSB Panels for

Other Uses

2.4.1 SCertified Sustainably Harvested

Plywood Underlayment

1.7Preservative Treatment

06 41 16.00 10 SD-02 Shop Drawings

2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9.7.3Finish Schedule

1.5.2Certification

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3LEED Documentation

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 77 PAGES

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Fabrication Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

06 73 01 SD-02 Shop Drawings

1.3 GInstallation Drawings, Templates, and Directions

SD-03 Product Data

1.3 GFRP Grating

1.3 GClips and Anchorage

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 77 PAGES

06 73 01 2.1.1Bearing Strength Testing

2.1.1Flexural Properties

2.1.1Ultraviolet Testing

2.1.1Shear Strength

2.1.1Tensile Properties

2.1.1Toxicity Testing

2.1.1Coefficient of Lineal Thermal

Expansion

2.1.1Flame Spread Testing

SD-07 Certificates

1.3Manufacturer's Sample Warranty

1.3Certification of Anchorage

System compliance with ASCE

7-16

SD-08 Manufacturer’s Instructions

1.4Shipping, Handling, and Erection

Procedures

1.4Care and Maintenance

Instructions

SD-09 Manufacturer’s Field

Reports

3.1Manufacturer's Certification of

Installation

SD-11 Closeout Submittals

3.2.1Manufacturer's Warranty

07 11 13 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 77 PAGES

07 11 13 1.3Materials

07 21 13 SD-02 Shop Drawings

1.3 GManufacturer's Standard Details

SD-03 Product Data

1.4 GEnvironmental Data for Materials

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.3 GPressure Sensitive Tape

2.4 GProtection Board or Coating

2.5 GAccessories

1.5.2 SEnergy Star Label For Insulation

Product

2.1.5 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1.6 SIndoor Air Quality For Block Or

Board Insulation

1.5.3 SAcceptable Foam Blowing Agents

SD-08 Manufacturer’s Instructions

3.3.1Insulation Installation and

Handling

3.4.5Protection Board or Coating

Installation

2.5.1Adhesive

SD-11 Closeout Submittals

1.8.1 GDraft Guarantee

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 77 PAGES

07 21 13 1.8.1 GFinal Guarantee

1.8.2 GDraft Warranty

1.8.2 GFinal Warranty

07 27 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

2.1 GMaterial Samples For Air Barrier

System

SD-06 Test Reports

3.1.2 GTesting and Inspection

07 27 19.01 SD-01 Preconstruction Submittals

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-02 Shop Drawings

1.4.1 GSelf-adhering Air Barrier Shop

Drawings

SD-03 Product Data

2.1 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4.3 GSelf-adhering Air Barrier System

Mockup

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 77 PAGES

07 27 19.01 SD-06 Test Reports

1.7.3 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

3.4.1 GSite Inspections and Testing

SD-08 Manufacturer’s Instructions

1.4.2 GSelf-adhering Air Barrier

Manufacturer's Printed Instructions

2.2 GPrimers, Adhesives, and Mastics

07 41 14.00 48 SD-02 Shop Drawings

2.1 GRoof Panel

SD-03 Product Data

2.1 GRoof panel

2.4 GROOF PANEL FACTORY

COLOR FINISH

2.2.2 GPanel Clips

2.3 GFasteners

2.5 GSealant

2.8.1 GSnow Retention System

SD-04 Samples

2.1 GRoof panel

2.4 GROOF PANEL FACTORY

COLOR FINISH

SD-05 Design Data

1.3.4 GWind Uplift Calculations

1.3.4.2 GPoint Line of Fixity Calculations

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 77 PAGES

07 41 14.00 48 2.8.1 GSnow Retention System

SD-07 Certificates

2.1Roof Panel

3.1Installation

2.2Accessories

1.7.4Qualification of Installer

SD-08 Manufacturer’s Instructions

2.1Roof Panel

SD-11 Closeout Submittals

1.9WARRANTIES

3.6INFORMATION CARD

07 62 00.00 48 SD-11 Closeout Submittals

3.12Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00.00 48 SD-03 Product Data

2.1 SSealants

2.2 SPrimers

2.3Bond breakers

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 77 PAGES

07 92 00.00 48 2.4Backstops

2.6 SSpray Foam Filler/Sealant

2.1.1VOC Content

SD-07 Certificates

1.7Installer Certificates

1.8Manufacturer Certificates

SD-08 Manufacturer’s Instructions

2.1Sealants

2.2Primers

2.3Bond breakers

2.4Backstops

2.6Spray Foam Filler/Sealant

SD-11 Closeout Submittals

1.9Warranties

2.1 SSealants

2.2 SPrimers

2.6 SSpray Foam Filler/Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.5 GFrames

2.5 GFrames

2.3Accessories

SD-03 Product Data

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 77 PAGES

08 11 13 2.1 SRecycled Content for Steel Door

Product

2.5 GFrames

2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.8 GAccessories

2.1 SRecycled Content

SD-04 Samples

2.5 GFinishes

SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

2.2.1.3 GBottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.2.2 GHood

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 77 PAGES

08 33 23 2.1.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

2.2.1.1 SRecycled content for steel curtain

slats

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.5 GElectric Door Operators

SD-10 Operation and Maintenance

Data

1.3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1 GWarranty

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 77 PAGES

08 41 13 2.2 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

3.4.4Condensation Resistance and

Thermal Transmittance

3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.7Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.7.1 GHardware

2.2.2 GFasteners

1.8 GWindow Performance

2.3 GThermal-Barrier Windows

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 77 PAGES

08 51 13 2.2.9 GScreens

2.1.5 GWeatherstripping

2.2.7 GAccessories

2.2.3Adhesives

1.8.5 GThermal Performance

SD-04 Samples

1.3.4.1Finish Sample

1.3.4.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.5 GDesign Analysis

SD-06 Test Reports

1.3.6Minimum Condensation

Resistance Factor

SD-07 Certificates

1.3.3Engineer's Qualifications

SD-10 Operation and Maintenance

Data

2.1 GWindows

1.5Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.6 GKeying System

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 77 PAGES

08 71 00 SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3Insulating Glass

1.3Glazing Accessories

2.4.3.1Sealants

SD-04 Samples

2.3Insulating Glass

2.4.2Glazing Compound

2.4.5Tape

2.4.5Sealing Tapes

SD-07 Certificates

2.3Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 77 PAGES

08 91 00 1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.5 GWall Louver Samples

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Board

2.1.6Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.1.4 SVOC Content of Joint Compound

SD-06 Test Reports

3.6 GASTM E90 Factory Test Report

SD-07 Certificates

2.1 GAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

TITLE AND LOCATION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 77 PAGES

09 29 00 2.1.1 SIndoor Air Quality for Gypsum

Board

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

2.5.1 GCementitious Backer Units

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.6.1 GTransition Strips

2.4.3 GGrout

SD-07 Certificates

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.7Manufacturer's Approved

Cleaning Instructions

09 51 00 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

2.2.1.1 GAcoustical Ceiling Tiles

SUBMITTAL REGISTER

CONTR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .