W912QR25R0014_Plans-0003.pdf

PDF 5 MB Posted

Attached to
Vertical Skills Instructional Facility - Joint Base McGuire-Dix-Lakehurst, NJ
Solicitation number
W912QR25R0014
Issued by

About this file

These drawings show detailed mechanical, plumbing and telecommunications plans for the Vertical Skills Instruction Facility at Joint Base McGuire-Dix-Lakehurst. The drawings include specifications for water service entrance, pipe penetrations, gas meter connections, and wall penetration details. Key mechanical components include a 2" water meter with integral strainer, 2" reduced pressure zone backflow preventer, and 2" natural gas houseline rated at 10" WC (495.5 CFH).

The plans detail control and monitoring requirements for electric, gas and water meters that must be integrated with the building's Direct Digital Control (DDC) system. The meters must comply with Advanced Meter Reading System (AMRS) requirements and obtain approval from the Contracting Officer before ordering/installation. Telecommunications infrastructure includes new conduit crossings under Texas Road via horizontal directional drill, with (2) 4" conduits extending to the telecom entrance facility and connecting to existing manholes. The drawings specify that wall outlets must comply with ADA standards and all exposed cabling in open ceiling areas must be installed in conduit.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

2" WATER METER

WITH INTEGRAL STRAINER

2" REDUCED PRESSURE

ZONE BACKFLOW

PREVENTER (W/ GATE OR

BALL VALVES)

2" DISCHARGE, EXTEND TO

NEAREST FLOOR DRAIN

T O

D O

M E

S T

IC

W

A T

E R

S Y

S T

E M

FIN FLOOR

PROVIDE THRUST BLOCKING

SLEEVE AND SEAL

FLOOR PENETRATIONS

PROVIDE PIPE SUPPORTS,

AS REQUIRED

2" DOMESTIC

WATER MAIN

PROVIDE FIXED AIRGAP

2" DOMESTIC WATER MAIN.

REFER TO CIVIL DRAWINGS FOR

CONT.

2"E E

E

CONNECT WATER METER TO BUILDING

DDC SYSTEM. THE CONTRACTOR TO

ENSURE THE COMPATIBILITY OF THE

METER WITH THE PROTOCOLS OF THE

DDC SYSTEM, AND SHALL PROVIDE

COMMUNICATION CABLING FROM THE

METER TO THE NEAREST DDC PANEL.

SEE DRAWING M-716 MECHANICAL

CONTROLS AND SEQUENCE FOR METER

INTEGRATION CONTROL DIAGRAM AND

ADDITIONAL REQUIREMENTS.

NOTE:

WATER ENTRANCE ASSEMBLY SHALL BE A MINIMUM OF 12" FROM WALL. CAST IN PLACE

CORE DRILL

STEEL SLEEVE CAST IN

PLACE;

EXTEND SLEEVE MINIMUM 1"

ABOVE FLOOR

STEEL SLEEVE; EXTEND SLEEVE

MINIMUM 1" HIGHER THAN

FLOOR

PIPE WITH OR WITHOUT INSULATION

FILL GAP COMPLETELY

AROUND PIPE WITH FIRE

CAULK AS REQUIRED; USE

FILLER ROD PER

MANUFACTURER AND FILL

FLUSH TO TOP OF PIPE SLEEVE

FILL GAP COMPLETELY

AROUND PIPE WITH FIRE

CAULK AS REQUIRED; USE

FILLER ROD PER

MANUFACTURER AND FILL

FLUSH TO TOP OF PIPE SLEEVE

UNION

GAS-FIRED EQUIPMENT

PROVIDED BY MC

REFER TO MECH

DRAWINGS FOR INPUT

CFH

G

GAS PRESSURE REGULATOR

FURNISHED WITH GAS-FIRED

EQUIPMENT, WHERE APPLICABLE

6" LONG DIRT LEG

/ SEDIMENT TRAP

INSTALL PLUG-TYPE GAS

SHUTOFF VALVE IN

ACCESSIBLE LOCATION

REFER TO

PLANS FOR SIZE

STANDARD INSTALLATION

1/2" STAINLESS STEEL

FLEXIBLE LINE

FINAL CONNECTION

PROVIDED BY PC

GAS PIPING

PROVIDED BY PC

7"

M A

X

ENTRY ABOVE METER

MAINTAIN 8" CLEARANCE

BETWEEN INLET AND OUTLET

RISERS AND WALL

WALL BRACKET

(ATTACH TRACER

WIRE)

FINISHED GRADE

TOP OF RISER

TAMPER PROOF LOCK

STOP

APPROVED RISER SHALL REST

ON UNDISTURBED SOIL OR

WELL COMPACTED BACKFILL

GAS METER

BY GAS COMPANY

PRIME AND PAINT EXPOSED GAS

PIPING, AS APPROVED BY ARCHITECT

TRANSITION COUPLING

PE UNDERGROUND NATURAL GAS SERVICE LINE.

REFER TO CIVIL DRAWINGS FOR CONT

CONNECT GAS METER TO BUILDING DDC SYSTEM.

CONTRACTOR SHALL PROVIDE COMMUNICATION

CABLING FROM METER TO NEAREST DDC PANEL.

SEE DRAWING M-716 MECHANICAL CONTROLS AND

SEQUENCE FOR METER INTEGRATION CONTROL

DIAGRAM AND ADDITIONAL REQUIREMENTS.

EE

E

NOTE:

1. PSE&G IS THE LOCAL NATURAL GAS SUPPLIER. THEY ARE RESPONSIBLE TO INSTALL THE NATURAL GAS PIPING FROM THEIR MAIN, UP TO, AND INCLUDING THE NATURAL GAS METER. PSE&G MUST BE SUB-

CONTRACTED BY THE CONTRUCTION CONTRACTOR TO PERFORM THIS WORK. THE CONSTRUCTION

CONTRACTOR WILL BE RESPONSIBLE TO COORDINATE WITH, AND PAY PSE&G.

2. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL GAS UTILITY TO ENSURE THAT THE GAS METER THAT IS PROVIDED IS COMPATIBLE WITH THE BUILDING DDC SYSTEM. IF THE GAS COMPANY CANNOT PROVIDE AN APPROPRIATE GAS METER, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE A FLOW METER THAT CAN BE CONNECTED TO THE DDC SYSTEM TO MEASURE NATURAL GAS CONSUMPTION.

SEE DRAWING M-716 MECHANICAL CONTROLS AND SEQUENCE FOR METER INTEGRATION CONTROL

DIAGRAM AND ADDITIONAL REQUIREMENTS.

3. THE CONTRACTOR SHALL COORDINATE INLET PRESSURE AND FURNISHING OF AN APPROVED PSE&G

GAS REGULATOR.

2" NATURAL GAS HOUSELINE @

10" WC (495.5 CFH)

1 1/4" G TO

AHU UNIT

SLEEVE AND SEAL WALL

PENETRATION

GAS PRESSURE REGULATOR

INLET PRESSURE DETERMINED BY CONTRACTOR

7"-10" W.C. OUTLET PRESSURE

616 CFH

(SEE NOTE 3)

CONCRETE BLOCK WALL

MINERAL WOOL OR

BACKER ROD (BOTH SIDES)

SILICONE SEALANT

AROUND PIPE SLEEVE

PIPE

SILICONE SEALANT AROUND

PIPE (BOTH SIDES)

SHC 40 PIPE SLEEVE

EXTERIOR INTERIOR

1/4" GAP ALL AROUND PIPE - MINIMUM

PAINT EXTERIOR EXPOSED

PIPE W/ 1 COAT PRIMER AND

2 COATS OF FINISH COLOR

SELECTED BY ARCH

MINERAL WOOL OR

BACKER ROD

MORTAR JOINT

NOTES:

1. FOR GYB BOARD WALLS PROVIDE MIN. 16 GUAGE GALV. STEEL SLEEVE WITH LOCK-TYPE

LONGITUDINAL SEAM.

1/4" GAP ALL AROUND PIPE - MINIMUM

PROVIDE ESCUTCHEON FOR

EXPOSED PIPING.

INSULATION

(WHERE

REQUIRED)

PROVIDE SEALANT TO ACHIEVE

FIRE RESISTANCE RATING IN

ACCORDANCE WITH UL 1479 AND

PROJECT FIRESTOPPING

SPECIFICATIONS (BOTH SIDES)

ALUMINUM JACKET WITH FACTORY

APPLIED MOISTURE BARRIER.

EXTEND 2" BOTH SIDES AND SECURE

BOTH ENDS WITH A WORM DRIVE

STAINLESS STEEL BAND

REFER TO ARCHITECTURAL PLANS

FOR SPECIFIC CONSTRUCTION OF

WALL

SCHEDULE 40 STEEL PIPE

SLEEVE CUT FLUSH WITH WALL

BACKUP MATERIAL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

L O

U

IS

V

IL

L E

K

Y

D B

A R

K E

R

A u to d e s k D o c s

/2

J B

M D

L V e rt ic a l S k il ls

/4 -V

S T

F -P

.r v t

/3

/2

:3

:0

A

M

P-501

P L U

M B

IN

G

D E

T A

IL

S

J O

IN

T

B A

S E

M C

G U

IR

E

-D

IX

-L A

K E

H U

R S

T

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

A

IR

S

ID

E

D R

IV

E

M O

O N

T O

W N

S H

IP

P

A

R P

A F

F

J W

Y L

IE

D H

U R

D

O

C T

O B

E R

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V E

R T

IC

A

L S

K

IL

L S

I N

S T

R U

C T

IO

N

F A

C

IL

IT

Y

B U

IL

D

IN

G

P

SCALE: NTS

WATER SERVICE ENTRANCE DETAIL

J1

SCALE: NTS

PIPE PENETRATION THROUGH CONCRETE DETAIL

J9

SCALE: NTS

NATURAL GAS CONNECTION DETAIL

A15

SCALE: NTS

GAS METER DETAIL

A8

SCALE: NTS

PIPE SLEEVE IN CONCRETE BLOCK WALL

J15

SCALE: NTS

WALL PENETRATON DETAIL

A1

A

M D

T

F E

B

W

2Q R

R

_P la ns -0

ELECTRIC METER SEQUENCE OF OPERATION:

THE CONTROLLER SHALL MONITOR THE ELECTRIC METER FOR ELECTRIC CONSUMPTION ON A CONTINUAL

BASIS. THESE VALUES SHALL BE MADE AVAILABLE TO THE SYSTEM AT ALL TIMES.

METER FAILURE ALARM SHALL BE GENERATED IF SENSOR READING INDICATES A LOSS OF PULSE OUTPUT

FROM THE ELECTRIC METER.

PEAK DEMAND HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE ELECTRIC METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

USAGE HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD ELECTRIC METER READINGS SO AS TO PROVIDE A POWER CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-

TO-DATE, AND YEAR-TO-DATE BASIS.

NOTE: THIS METER IS SEPARATE AND DISTINCT FROM THE METER INDICATED ON THE ELECTRICAL

DRAWINGS. ATC SUB-CONTRACTOR TO PROVIDE.

KW PULSE (01) CT-DMD-LVL (02)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

L O

U

IS

V

IL

L E

K

Y

A u to d e s k D o c s

/2

J B

M D

L V e rt ic a l S k il ls

/4 -V

S T

F -M

.r v t

/3

/2

:3

:2

A

M

M-715

M E

C H

A N

IC

A

L C

O N

T R

O L S

A N

D S

E Q

U E

N C

E

J O

IN

T

B A

S E

M C

G U

IR

E

-D

IX

-L A

K E

H U

R S

T

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

A

IR

S

ID

E

D R

IV

E

M O

O N

T O

W N

S H

IP

P

A

A H

O S

K O

A K

O K

A L

D B

A R

K E

R

D H

U R

D

O

C T

O B

E R

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V E

R T

IC

A

L S

K

IL

L S

I N

S T

R U

C T

IO

N

F A

C

IL

IT

Y

B U

IL

D

IN

G

P

SCALE: NTS

ELECTRIC METER INTEGRATION CONTROL DIAGRAM

G1

NOTE: CONTRACTOR TO PROVIDE DDC CONTROLS SUBMITTAL PER DRAWINGS AND UFC 3-410-02 DIRECT

DIGITAL CONTROLS FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE 2. CONTROL

POINTS SCHEDULES TO FOLLOW CONTROL DRAWINGS (DEVELOPED USING MICROSOFT EXCEL FILE

TEMPLATES LOCATED AS PART OF UFC RELATED MATERIALS, TITLED, “POINTS SCHEDULE EXAMPLES FOR

LONWORKS BACNET NIAGARA”). PROVIDE POINTS SCHEDULES AS PART OF DDC CONTROLS SUBMITTAL FOR

GOVERNMENT REVIEW AND APPROVAL.

SEE THE FOLLOWING LINK FOR LOCATION OF POINTS SCHEDULE MICROSOFT EXCEL TEMPLATE:

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-02

A

M D

T

F E

B

NOTE: METER SHALL COMPLY WITH ALL AMRS (ADVANCE METER READING SYSTEM)

REQUIREMENTS. OBTAIN APPROVAL FOR METER FROM CONTRACTING OFFICER OF

RECORD PRIOR TO ORDERING. OBTAIN APPROVAL FROM AND COORDINATE WITH

CONTRACTING OFFICER OF RECORD FOR METER INSTALLATION. ELECTRIC METER

TO REPORT TO DDC SYSTEM AND AMRS.

W

2Q R

R

_P la ns -0

GAS METER SEQUENCE OF OPERATION:

THE CONTROLLER SHALL MONITOR THE GAS METER FOR GAS CONSUMPTION ON A CONTINUAL BASIS. THESE VALUES SHALL BE MADE

AVAILABLE TO THE SYSTEM AT ALL TIMES.

METER FAILURE ALARM SHALL BE GENERATED IF SENSOR READING INDICATES A LOSS OF PULSE OUTPUT FROM THE GAS METER.

PEAK DEMAND HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE GAS METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

USAGE HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD GAS METER READINGS SO AS TO PROVIDE A GAS CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

GAS-F-TOT (02)

GAS-F (01)

GAS-R-CNG (03)

WATER FLOW METER SEQUENCE OF OPERATION:

THE CONTROLLER SHALL MONITOR THE WATER METER FOR WATER CONSUMPTION ON A CONTINUAL BASIS. THESE VALUES

SHALL BE MADE AVAILABLE TO THE SYSTEM AT ALL TIMES.

METER FAILURE ALARM SHALL BE GENERATED IF SENSOR READING INDICATES A LOSS OF PULSE OUTPUT FROM THE

WATER METER.

PEAK DEMAND HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD THE PEAK (HIGH AND LOW) DEMAND READINGS FROM THE WATER METER. PEAK READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

USAGE HISTORY: THE CONTROLLER SHALL MONITOR AND RECORD WATER METER READINGS SO AS TO PROVIDE A WATER CONSUMPTION HISTORY. USAGE READINGS SHALL BE RECORDED ON A DAILY, MONTH-TO-DATE, AND YEAR-TO-DATE BASIS.

WATER-F-TOT (02)

WATER-F (01)

WATER-F-CP (03)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

L O

U

IS

V

IL

L E

K

Y

A u to d e s k D o c s

/2

J B

M D

L V e rt ic a l S k il ls

/4 -V

S T

F -M

.r v t

/3

/2

:3

:2

A

M

M-716

M E

C H

A N

IC

A

L C

O N

T R

O L S

A N

D S

E Q

U E

N C

E

J O

IN

T

B A

S E

M C

G U

IR

E

-D

IX

-L A

K E

H U

R S

T

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

A

IR

S

ID

E

D R

IV

E

M O

O N

T O

W N

S H

IP

P

A

A H

O S

K O

A K

O K

A L

D B

A R

K E

R

D H

U R

D

O

C T

O B

E R

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V E

R T

IC

A

L S

K

IL

L S

I N

S T

R U

C T

IO

N

F A

C

IL

IT

Y

B U

IL

D

IN

G

P

SCALE: NTS

GAS METER INTEGRATION CONTROL DIAGRAM

J1

SCALE: NTS

WATER METER INTEGRATION CONTROL DIAGRAM

C1

NOTE: CONTRACTOR TO PROVIDE DDC CONTROLS SUBMITTAL PER DRAWINGS AND UFC 3-410-02 DIRECT DIGITAL CONTROLS FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS, WITH CHANGE 2. CONTROL POINTS SCHEDULES TO FOLLOW CONTROL DRAWINGS (DEVELOPED USING MICROSOFT EXCEL FILE

TEMPLATES LOCATED AS PART OF UFC RELATED MATERIALS, TITLED, “POINTS SCHEDULE EXAMPLES FOR LONWORKS BACNET NIAGARA”). PROVIDE POINTS

SCHEDULES AS PART OF DDC CONTROLS SUBMITTAL FOR GOVERNMENT REVIEW AND APPROVAL.

SEE THE FOLLOWING LINK FOR LOCATION OF POINTS SCHEDULE MICROSOFT EXCEL TEMPLATE:

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-02

A

M D

T

F E

B

NOTE: METER SHALL COMPLY WITH ALL AMRS (ADVANCE METER READING SYSTEM)

REQUIREMENTS. OBTAIN APPROVAL FOR METER FROM CONTRACTING OFFICER OF

RECORD PRIOR TO ORDERING. OBTAIN APPROVAL FROM AND COORDINATE WITH

CONTRACTING OFFICER OF RECORD FOR METER INSTALLATION. GAS METER TO

REPORT TO DDC SYSTEM AND ELECTRIC METER (ELECTRIC METER TO AMRS).

NOTE: METER SHALL COMPLY WITH ALL AMRS (ADVANCE METER READING SYSTEM)

REQUIREMENTS. OBTAIN APPROVAL FOR METER FROM CONTRACTING OFFICER OF

RECORD PRIOR TO ORDERING. OBTAIN APPROVAL FROM AND COORDINATE WITH

CONTRACTING OFFICER OF RECORD FOR METER INSTALLATION. WATER METER TO

REPORT TO DDC SYSTEM AND ELECTRIC METER (ELECTRIC METER TO AMRS).

W

2Q R

R

_P la ns -0

VAN

C U

C U

C U

C U

C U

C U

C U

C U

C U

C U

GATE

GATE

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

SU

N

R

IS

E R

O

AD

TEXAS AVENUE

SHEDS

C U

CU

C

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

L O

U

IS

V

IL

L E

K

Y

A u to d e s k D o c s

/2

J B

M D

L V e rt ic a l S k il ls

/4 -V

S T

F -E

.r v t

/2

/2

:0

:5

P

M

TS101

T E

L E

C O

M M

U N

IC

A

T

IO

N S

S

IT

E

P L A

N

J O

IN

T

B A

S E

M C

G U

IR

E

-D

IX

-L A

K E

H U

R S

T

M

IC

H A

E L B

A K

E R

I N

T E

R N

A T

IO

N

A L

A

IR

S

ID

E

D R

IV

E

M O

O N

T O

W N

S H

IP

P

A

D T

R

IZ

Z

IN

O

D T

R

IZ

Z

IN

O

D B

A R

K E

R

J G

O L D

C A

M P

O

C T

O B

E R

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V E

R T

IC

A

L S

K

IL

L S

I N

S T

R U

C T

IO

N

F A

C

IL

IT

Y

B U

IL

D

IN

G

P

SCALE: 1" = 20'-0"

TELECOMMUNICATIONS- SITE UTILITY PLAN

KEYNOTES

GENERAL NOTES

1. SEE SHEET T-001 FOR TELECOMMUNICATIONS

NOTES, SYMBOLS, AND ABBREVIATIONS.

2. ALL WAP CABLING SHALL UTILIZE CABLE TRAY IN

OFFICE AREA. WAP’S IN THE WORK BAY AREAS

SHALL BE IN 3/4” EMT FROM TRAY TO DEVICE

LOCATION.

3. WALL OUTLETS AND WALL PHONE OUTLETS FOR

SAFETY, COURTEST, AND CONVENIENCE WILL BE

MOUNTED AT A HEIGHT IN COMPLIANCE WITH THE

ARCHITECTURAL BARRIERS ACT STANDARDS

(ADA/ABA).

4. FOR OUTSIDE PLANT BACKBONE CONNECTIONS

AND ROUTING SEE DRAWING TS101.

5. ALL CABLING EXSPOSED IN OPEN CEILING AREAS

MUST BE INSTALLED IN CONDUIT.

6. ALL CABLING SHALL BE ROUTED IN EMT CONDUIT

TO NEAREST CABLE TRAY LOCATION.

1. PROPOSED TELECOM TEXAS ROAD CROSSING

VIA HORIZONTAL DIRECTION DRILL (HDD).

2. EXTEND (2) 4" CONDUIT INTO TELECOM

ENTRANCE FACILITY.

3. PROPOSED TELECOMMUNICATIONS HANDHOLE

(5/T-601).

4. EXTEND (2) 4" CONDUITS FROM NEW HANDHOLE

TO EXISTING COMMS HANDHOLE.

5. CONNECT TO EXISTING TELECOMMUNICATIONS

MANHOLE.

A

M D

T

F E

B

W

2Q R

R

_P la ns -0

P-501 - Amend2.pdf
P-501 - PLUMBING DETAILS
M-715 - Amend2.pdf
M-715 - MECHANICAL CONTROLS AND SEQUENCE
M-716 - Amend2.pdf
M-716 - MECHANICAL CONTROLS AND SEQUENCE
TS101 - AMEND2.pdf
TS101 - TELECOMMUNICATIONS - SITE PLAN

File details come from the government source that posted it. Updated .