This appears to be a design and construction specification document for a Vertical Skills Instructional Facility project at Joint Base McGuire-Dix-Lakehurst (JBMDL) in New Jersey. The project is being managed by the U.S. Army Corps of Engineers Louisville District as a design/bid/build contract to construct a 9,500 SF facility for Army Reserves training. The building requires permanent construction with complete HVAC, plumbing, mechanical, security and electrical systems. Project scope includes site development, utilities, lighting, paving, walks, curbs, gutters, storm drainage, and information systems.
The contract includes specific requirements for sustainability, energy efficiency, cybersecurity measures, force protection, and ADA accessibility. The facility must be designed for a 40-year minimum lifespan. Optional project elements include resurfaced parking areas, HVLS fans, HVAC enclosure, and collateral equipment. The contract period of performance is 630 calendar days from award. The project emphasizes force protection through physical security measures like maximum standoff distances from roads, parking and unloading zones.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR25R0014 for the construction of a Vertical Skills Instructional Facility at Joint Base McGuire-Dix-Lakehurst, New Jersey is hereby amended as follow s:
*See Continuation Page*
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0014
X 9B. DATED (SEE ITEM 11)
10-Dec-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2025
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR25R0014_Specs-0001
W912QR25R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE
Solicitation W912QR25R0014 for the Construction of a Vertical Skills Instructional Facility at Joint Base McGuire- Dix-Lakehurst, New Jersey is hereby amended as follows:
a) The following Specifications have been replaced in their entirety:
00 02 00 TABLE OF CONTENTS
00 80 00.01 SUBMITTAL REGISTER
13 34 19 METAL BUILDING SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
b) The following Specifications have been added in their entirety:
10 50 20 PRE-ENGINEERED BUILDING-MOUNTED METAL CANOPY
c) The following PLAN SHEETS have been replaced in their entirety:
CD101 DEMOLITION PLAN
CP501 PAVING DETAILS
CU101 SITE UTILITY PLAN
CU503 UTILITY DETAILS
A-301 BUILDING SECTIONS
A-311 WALL SECTIONS
A-502 DETAILS
A-801 AIR BARRIER DIAGRAMS
d) Wage Decision NJ20240001, dated 01 November 2024, is hereby revised and replaced in its entirety by Wage Decision NJ20250001, dated 03 January 2025.
e) Wage Decision NJ20240027, dated 01 November 2024, is hereby revised and replaced in its entirety by Wage Decision NJ20250027, dated 03 January 2025.
f) All other terms and conditions remain unchanged.
(End of Summary of Changes)
P2: 479787 Vertical Skills Instruction Facility Joint Base McGuire-Dix-Lakehurst, NJ
DOCUMENT PROJECT Page 1 Amendment 0001 - Certified Final
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 0 00 80 00.00
04/21
SOLICITATION CONTRACT FORM
SPECIAL PROVISIONS
00 80 00.01 06 ATTACHMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 82 00 11/18 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 7: 02/24 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
06 73 01 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 21 13 08/23 BOARD AND BLOCK INSULATION
DOCUMENT PROJECT Page 2
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS
07 41 14.00 48 10/10 STRUCTURAL STANDING SEAM METAL ROOFING
SYSTEM (HYDROSTATIC-HS-SSSMRS)
07 62 00.00 48 10/10 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00.00 48 10/10 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/17 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
Amendment 0001***********************************************************
10 50 20 01/25 PRE-ENGINEERED BUILDING-MOUNTED METAL
CANOPY
********************************************************** Amendment 0001
10 90 00.00 48 04/06 MISCELLANEOUS SPECIALTIES (PARTIAL
OMAR FUNDED)
DIVISION 12 - FURNISHINGS
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
DOCUMENT PROJECT Page 3
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
11.01
11.02
11/17
05/21, CHG
1:
08/23
CYBERSECURITY FOR FACILITY-HVAC
RELATED CONTROL SYSTEMS
CYBERSECURITY FOR FIRE ALARM LIFE
11.03
05/21, CHG
1:
SAFETY FACILITY-RELATED CONTROL SYSTEMS
CYBERSECURITY FOR ELECTRICAL
FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 29 23
26 41 00
02/20, CHG 1: 05/21
ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 48 04/20 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00.00 48 10/20 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 17.61 05/17 SEALING CRACKS IN ASPHALT PAVING
32 11 20 08/17 AGGREGATE BASE COURSE
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
DOCUMENT PROJECT Page 4
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 12 36.13 05/17 ASPHALTIC SEAL AND FOG COATS
32 16 19 05/18 CONCRETE CURBS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00.00 48 04/20 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 77 PAGES
00 80 00.00 06 SD-01 Preconstruction Submittals
1.14Local Agency Check
1.12SF1413 Statement and
Acknowledgement
1.32 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.34 GMechanical/Electrical Room
Layout
SD-04 Samples
1.16 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.37Progress Photographs
SD-07 Certificates
1.16Warranty of Construction
1.15 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.15.2 GCertification for each individual
product installed and identified to contain mineral fibers that no asbestos-containing materials were installed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
479787 JBMDL VERTICAL SKILLS INSTRUCTION FACILITY
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 77 PAGES
00 80 00.00 06 1.15.2 GDocumentation to show that the products containing mineral fiber materials have been microscopically examined by an
AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos
1.29Insurance
1.27Sales and Use Tax
SD-11 Closeout Submittals
1.7.4 GPreliminary (Working) As-Built
Drawings
1.7.1 GFinal As-Built Drawings
1.7.1.2 GCAD Working As-Built Drawings
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
1.16 GWarranty Management Plan
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1List of Contact Personnel
01 32 01.00 06 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
479787 JBMDL VERTICAL SKILLS INSTRUCTION FACILITY
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 77 PAGES
01 33 00 1.8 GSubmittal Register
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.1.1 GSustainability Action Plan
1.4 GLEED AP BD+C
1.5.1.4 GSustainability Progress Report
SD-11 Closeout Submittals
1.5.1.2 GFinal Sustainability eNotebook
1.5.1.2 GAmended Final Sustainability
eNotebook
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 77 PAGES
01 35 26.00 06 1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Naval Architectural Analysis-LHE
(Floating)
1.7Floating Plant Inspection and
Certification
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 77 PAGES
01 35 26.00 06 1.7Severe Weather Plan for Marine
Activities
1.7Emergency Plan for Marine
Activities
1.7Man Overboard/Abandon Ship
Procedures
1.7Float Plan for Launches, Motorboats, Skiffs
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention & Protection Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 77 PAGES
01 35 26.00 06 1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.3 G ROCertified Safety
Professional/Certified Industrial
Hygienist Qualifications
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 77 PAGES
01 35 26.00 06 SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1AC472 Accreditation
2.1Certificate of Compliance
1.5 G GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 77 PAGES
01 46 00.00 06 SD-01 Preconstruction Submittals
1.4 G DOCommissioning Specialists
1.4.2 G DOCommissioning Specialists
1.9 G DOProject Schedule
SD-05 Design Data
3.1.4 G DODesign Review Report
SD-06 Test Reports
3.1.3 G DOConstruction Phase
Commissioning Plan
3.1.6.2 G DOPre-Functional Checklists
1.7Issues Log
3.7.1Post-Construction Trend Log
Report
3.6 G DOCommissioning Report
3.7 G DOPost-Construction
Commissioning Report
SD-07 Certificates
1.8 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2 G DOSystems Training
3.3 G ROTraining Plan
3.3 G ROTraining Attendance Rosters
3.4 G DOSystems Manual
3.7 G DOPost-Construction Systems
Manual
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 77 PAGES
01 46 00.00 06 3.5 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
1.6 S DOFinal Commissioning Report
1.6 SFinal Construction Phase
Commissioning Plan
01 50 00 SD-01 Preconstruction Submittals
1.3Construction Site Plan
3.3.1Traffic Control Plan
1.6.1.4Contractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10Solid Waste Management Permit
1.5.2Regulatory Notifications
1.6Environmental Protection Plan
1.6.9.1Dirt and Dust Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 77 PAGES
01 57 19.00 06 1.5.5Employee Training Records
1.5.4Environmental Manager
Qualifications
3.15Notice Of Soil Treatment
SD-06 Test Reports
3.5.2.1Solid Waste Management Report
SD-07 Certificates
1.5.5Employee Training Records
SD-11 Closeout Submittals
3.5.1Waste Determination
Documentation
3.5.4.6Disposal Documentation for
Hazardous and Regulated Waste
1.5.5Assembled Employee Training
Records
1.10Solid Waste Management Permit
3.5.2.1Solid Waste Management Report
3.5.4.1Hazardous Waste/Debris
Management
1.5.2Regulatory Notifications
3.5.2.1Sales Documentation
3.5.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 77 PAGES
01 74 19 1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.2Receipts
02 82 00 SD-01 Preconstruction Submittals
1.3.4 GPermits And Licenses
1.5.3Worker's License
1.5.4Contractor's License
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 77 PAGES
02 82 00 1.5.8Protective Clothing
Decontamination Facility
Notification
3.1.9Glovebags
SD-03 Product Data
1.2.2 GAmended Water
1.3.8 GSafety Data Sheets (SDS) for All
Materials
3.1.2.1 GRespirators
3.1.7 GVacuums
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.3 GEmployee Training
1.3.4 GNotifications
1.3.6 GRespiratory Protection Program
1.3.9 GAsbestos Hazard Abatement Plan
1.3.10 GTesting Laboratory
1.3.11 GLandfill Approval
1.3.11 GDelivery Tickets
1.3.11 GWaste Shipment Records
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 77 PAGES
02 82 00 1.3.12Transporter Certification
1.3.13 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.4 GContractor's License
1.5.9 GFederal, State or Local Citations
on Previous Projects
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 GWater Filtration Equipment
3.1.7 GVacuums
3.1.7 GVentilation Systems
SD-11 Closeout Submittals
1.3.4 GPermits and Licenses
1.3.4 GNotifications
1.3.6.1 GRespirator Program Records
1.5.7 GProtective Clothing
Decontamination Quality Control
Records
1.7.1 GRental Equipment
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Program
1.6.6 GQuality Control Personnel
Certifications
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 77 PAGES
03 30 00 1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 SJoint Sealants
2.4.4 SJoint Filler
2.1Formwork Materials
2.3.3.2 SRecycled Aggregate Materials
2.3.1 SCementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6 SReinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.2.2Waterstops
1.8.1 SLocal/Regional Materials
2.2.3Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 77 PAGES
03 30 00 1.6.1.1 GConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Slag Cement
1.6.3.3Aggregates
3.14.3.3 GCompressive Strength Tests
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 77 PAGES
04 20 00 2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.7 GInsulation
SD-04 Samples
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.2.3 GPrecast Concrete Units
2.6.7 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.5 GBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 77 PAGES
04 20 00 2.6.3Joint Reinforcement
2.6.7Insulation
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.2 SRecycled Content
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.4 GBollards/Pipe Guards
2.6 GAngles and Plates
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 77 PAGES
05 50 13 2.5 GDownspout Terminations
2.1 SRecycled Content
SD-07 Certificates
2.1 GCertificates of Compliance
06 10 00 SD-03 Product Data
2.4Underlayment
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
2.3.2.2Structural-use and OSB Panels
2.3Oriented Strand Board
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.1 SCertified Sustainably Harvested
Framing Lumber
2.3.1.1 SCertified Sustainably Harvested
Plywood Subflooring
2.3.1.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Subfloor Sheathing
2.3.2.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 77 PAGES
06 10 00 2.3.2.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Wall Sheathing
2.3.3.1 SCertified Sustainably Harvested
Plywood for Other Uses
2.3.3.2 SCertified Sustainably Harvested
Structural-use and OSB Panels for
Other Uses
2.4.1 SCertified Sustainably Harvested
Plywood Underlayment
1.7Preservative Treatment
06 41 16.00 10 SD-02 Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9.7.3Finish Schedule
1.5.2Certification
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 77 PAGES
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Fabrication Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
06 73 01 SD-02 Shop Drawings
1.3 GInstallation Drawings, Templates, and Directions
SD-03 Product Data
1.3 GFRP Grating
1.3 GClips and Anchorage
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 77 PAGES
06 73 01 2.1.1Bearing Strength Testing
2.1.1Flexural Properties
2.1.1Ultraviolet Testing
2.1.1Shear Strength
2.1.1Tensile Properties
2.1.1Toxicity Testing
2.1.1Coefficient of Lineal Thermal
Expansion
2.1.1Flame Spread Testing
SD-07 Certificates
1.3Manufacturer's Sample Warranty
1.3Certification of Anchorage
System compliance with ASCE
7-16
SD-08 Manufacturer’s Instructions
1.4Shipping, Handling, and Erection
Procedures
1.4Care and Maintenance
Instructions
SD-09 Manufacturer’s Field
Reports
3.1Manufacturer's Certification of
Installation
SD-11 Closeout Submittals
3.2.1Manufacturer's Warranty
07 11 13 SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 77 PAGES
07 11 13 1.3Materials
07 21 13 SD-02 Shop Drawings
1.3 GManufacturer's Standard Details
SD-03 Product Data
1.4 GEnvironmental Data for Materials
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
2.4 GProtection Board or Coating
2.5 GAccessories
1.5.2 SEnergy Star Label For Insulation
Product
2.1.5 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1.6 SIndoor Air Quality For Block Or
Board Insulation
1.5.3 SAcceptable Foam Blowing Agents
SD-08 Manufacturer’s Instructions
3.3.1Insulation Installation and
Handling
3.4.5Protection Board or Coating
Installation
2.5.1Adhesive
SD-11 Closeout Submittals
1.8.1 GDraft Guarantee
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 77 PAGES
07 21 13 1.8.1 GFinal Guarantee
1.8.2 GDraft Warranty
1.8.2 GFinal Warranty
07 27 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
2.1 GMaterial Samples For Air Barrier
System
SD-06 Test Reports
3.1.2 GTesting and Inspection
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4.1 GSelf-adhering Air Barrier Shop
Drawings
SD-03 Product Data
2.1 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GSelf-adhering Air Barrier System
Mockup
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 77 PAGES
07 27 19.01 SD-06 Test Reports
1.7.3 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
3.4.1 GSite Inspections and Testing
SD-08 Manufacturer’s Instructions
1.4.2 GSelf-adhering Air Barrier
Manufacturer's Printed Instructions
2.2 GPrimers, Adhesives, and Mastics
07 41 14.00 48 SD-02 Shop Drawings
2.1 GRoof Panel
SD-03 Product Data
2.1 GRoof panel
2.4 GROOF PANEL FACTORY
COLOR FINISH
2.2.2 GPanel Clips
2.3 GFasteners
2.5 GSealant
2.8.1 GSnow Retention System
SD-04 Samples
2.1 GRoof panel
2.4 GROOF PANEL FACTORY
COLOR FINISH
SD-05 Design Data
1.3.4 GWind Uplift Calculations
1.3.4.2 GPoint Line of Fixity Calculations
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 77 PAGES
07 41 14.00 48 2.8.1 GSnow Retention System
SD-07 Certificates
2.1Roof Panel
3.1Installation
2.2Accessories
1.7.4Qualification of Installer
SD-08 Manufacturer’s Instructions
2.1Roof Panel
SD-11 Closeout Submittals
1.9WARRANTIES
3.6INFORMATION CARD
07 62 00.00 48 SD-11 Closeout Submittals
3.12Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00.00 48 SD-03 Product Data
2.1 SSealants
2.2 SPrimers
2.3Bond breakers
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 77 PAGES
07 92 00.00 48 2.4Backstops
2.6 SSpray Foam Filler/Sealant
2.1.1VOC Content
SD-07 Certificates
1.7Installer Certificates
1.8Manufacturer Certificates
SD-08 Manufacturer’s Instructions
2.1Sealants
2.2Primers
2.3Bond breakers
2.4Backstops
2.6Spray Foam Filler/Sealant
SD-11 Closeout Submittals
1.9Warranties
2.1 SSealants
2.2 SPrimers
2.6 SSpray Foam Filler/Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories
SD-03 Product Data
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 77 PAGES
08 11 13 2.1 SRecycled Content for Steel Door
Product
2.5 GFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
08 33 23 SD-02 Shop Drawings
2.2.1 GOverhead Coiling Doors
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
2.2.1.3 GBottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.2.2 GHood
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 77 PAGES
08 33 23 2.1.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
2.2.1.1 SRecycled content for steel curtain
slats
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 GElectric Door Operators
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GWarranty
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 77 PAGES
08 41 13 2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.7Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.7.1 GHardware
2.2.2 GFasteners
1.8 GWindow Performance
2.3 GThermal-Barrier Windows
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 77 PAGES
08 51 13 2.2.9 GScreens
2.1.5 GWeatherstripping
2.2.7 GAccessories
2.2.3Adhesives
1.8.5 GThermal Performance
SD-04 Samples
1.3.4.1Finish Sample
1.3.4.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.5 GDesign Analysis
SD-06 Test Reports
1.3.6Minimum Condensation
Resistance Factor
SD-07 Certificates
1.3.3Engineer's Qualifications
SD-10 Operation and Maintenance
Data
2.1 GWindows
1.5Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 77 PAGES
08 71 00 SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.3.1Sealants
SD-04 Samples
2.3Insulating Glass
2.4.2Glazing Compound
2.4.5Tape
2.4.5Sealing Tapes
SD-07 Certificates
2.3Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
TITLE AND LOCATION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 77 PAGES
08 91 00 1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal…