W912QR25BA007_Specs-0002.pdf
PDF 16 MB Posted
- Attached to
- IFB - Beale Aircrew Readiness Facility Federal contract opportunity
- Solicitation number
- W912QR25BA007
About this file
This file is a detailed project specifications document for the renovation of Building 1232 at Beale Air Force Base in California. The project involves comprehensive renovations across multiple building systems, including plumbing, electrical, fire protection, air barriers, and mechanical systems. The solicitation (W912QR25BA007) is a 100% small business set-aside construction project with an estimated cost between $5M and $10M.
Key specifications include installing a new wet chemical fire extinguishing system, updating plumbing fixtures with water-efficient models, implementing building air barrier systems, and installing an electric heat pump water heater. The project requires detailed technical submittals, compliance with numerous engineering and safety standards, and rigorous testing protocols for all installed systems. The work must adhere to specific government safety requirements, with particular attention to fall protection, electrical safety, and environmental controls. The project will be managed by the U.S. Army Corps of Engineers, Louisville District, and contractors must be registered in the System for Award Management (SAM) to be eligible.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912QR25BA007_Specs-0002
P2#: 513180/82 - Renovate ARF Building 1232
Beale AFB, CA
PROJECT TABLE OF CONTENTS Page 1
Certified Final
Amendment 0002
PROJECT TABLE OF
CONTENTS AMENDMENT 0002
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
DIVISION 03 – CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
03 62 15.00 06 07/16 FLOWABLE FILL
DIVISION 04 – MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 – METALS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
Certified Final
Amendment 0002
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 21 16 08/23 MINERAL FIBER BLANKET INSULATION
Amendment 0002***************************************************************
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
***************************************************************Amendment 0002 Amendment 0002***************************************************************
07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS
***************************************************************Amendment 0002
07 60 00 08/23 FLASHING AND SHEET METAL
07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
95 13 01/21 EXPANSION JOINT COVER ASSEMBLIES
DIVISION 08 – OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 – FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 01/08, CHG 2: 11/18 LATH
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
DIVISION 11 – EQUIPMENT
11 31 13 08/17, CHG 1: 08/18 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 – FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
PROJECT TABLE OF CONTENTS Page 3
Certified Final
Amendment 0002
EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
Amendment 0002***************************************************************
21 23 00 WET CHEMICAL FIRE EXTINGUISHING
SYSTEMS
***************************************************************Amendment
DIVISION 22 – PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-HVAC
SYSTEMS
25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-FIRE
ALARM/MNS
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
UMCS) FRONT END AND INTEGRATION
DIVISION 26 – ELECTRICAL
05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 2: 11/23 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 01 08/13, CHG 1: 02/20 PAD-MOUNTED DEAD-FRONT AIR INSULATED
PROJECT TABLE OF CONTENTS Page 4
Certified Final
Amendment 0002
SWITCHGEAR
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY 15-
2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND BY-
PASS/ISOLATION SWITCH
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS)
FOR SIPRNET COMMUNICATION SYSTEMS
10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 – EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
05 22.00 06 07/16 GEOTEXTILES USED AS FILTERS
31 11 00 11/18 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 – UTILITIES
33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 5
Certified Final
Amendment 0002
35 42 37.00 06 11/23 STONE PROTECTION
-- End of Project Table of Contents --
SECTION 01 35 26.00 06
GOVERNMENT SAFETY REQUIREMENTS
04/20
Amendment 0002
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.32 (2013) Fall Protection
ASSP A10.34 (2021) Protection of the Public on or Adjacent to Construction Sites
ASSP Z359.1 (2020) The Fall Protection Code
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B30.22 (2023) Articulating Boom Cranes
ASME B30.3 (2020) Tower Cranes
ASME B30.5 (2021) Mobile and Locomotive Cranes
ASME B30.8 (2020) Floating Cranes and Floating Derricks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2022; ERTA 1 2021) Standard for Portable Fire Extinguishers
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B (2024) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2023; ERTA 4 2023; ERTA 5 2023; ERTA 6
2023) National Electrical Code
NFPA 70E (2024) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
SECTION 01 35 26.00 06 Page 1 Certified Final Amendment 0002
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.500 Fall Protection
1.2 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP) Fatigue Management Plan Bloodborne Pathogen Plan Exposure Control Plan Automatic External Defibrillator (AED) Program Site Layout Plan
Access/Haul Road Plan Hearing Conservation Program Respiratory Protection Plan Health Hazard Control Program Hazard Communication Program
Process Safety Management Plan Lead Compliance Plan & Specifications Asbestos Abatement Plan & Specifications Radiation Safety Program Abrasive Blasting Plan
Heat Stress Monitoring Plan Cold Stress Monitoring Plan Indoor Air Quality Management Plan Mold Remediation Plan Chromium (VI) Exposure Evaluation
Crystalline Silica Assessment Lighting Plan for Night Operations Traffic Control Plan Fire Prevention Plan Wild Land Fire Management Plan
Arc Flash Hazard Analysis Assured Equipment Grounding Control Program (AEGCP) Hazardous Energy Control Plan Standard Pre-Lift Plan (LHE)
SECTION 01 35 26.00 06 Page 2 Certified Final
Critical Lift Plan - LHE
Naval Architectural Analysis-LHE (Floating) Floating Plant Inspection and Certification Severe Weather Plan for Marine Activities Emergency Plan for Marine Activities Man Overboard/Abandon Ship Procedures
Float Plan for Launches, Motorboats, Skiffs Fall Protection and Prevention Plan Demolition/Renovation Plan (to include engineering survey) Rope Access Work Plan Excavation/Trenching Plan
Fire Prevention & Protection Plan for Underground Construction Compressed Air Plan for Underground Construction Erection and Removal Plan for Formwork and Shoring PreCast Concrete Plan Lift-Slab Plans
Masonry Bracing Plan Steel Erection Plan Explosives Safety Site Plan (ESSP) Blasting Plan Dive Operations Plan
Safe Practices Manual for Diving Activities Emergency Management Plan for Diving Tree Felling/Maintenance Program Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) Aircraft/Airfield Safety Plan Compliance Document (SPCD)
Site Safety and Health Plan (HTRW) Confined Space Entry Procedures Confined Space Program
Activity Hazard Analysis (AHA); G, RO
Site Safety and Health Officer Qualifications(SSHO); G, RO
Proof of qualification for Crane Operators; G, RO
Critical Lift Plan; G, RO
SD-06 Test Reports
Reports
Accident Reports
Monthly Exposure Reports
Crane Reports
Regulatory Citations and Violations
SD-07 Certificates
SECTION 01 35 26.00 06 Page 3 Certified Final
Confined Space Entry Permit
Hot work permit
Crane Certificate of Compliance
Submit one copy of each permit/certificate attached to each daily Quality Control Report.
1.3 DEFINITIONS
a. Site Safety and Health Officer (SSHO). The qualified or competent person who is responsible for the on-site safety and health management required for the contract project work.
b. Competent Person, Fall Protection: A person designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
c. High Visibility Accident. Any mishap which may generate publicity and/or high visibility.
d. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
e. Qualified Person, Fall Protection: A person with a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, evaluating and specifying fall protection and rescue systems; shall have an advanced understanding of the regulatory requirements, physical sciences and engineering principles that affect equipment and systems for FP and rescue; be able to calculate forces generated by an arrested fall, the total loading and the deflection of the fall arrest anchorage, the impact on the structural members to which the fall arrest system is attached and shall be able to determine safe locations of anchorages; shall supervise the design, selection, installation and inspection of certified anchorages and horizontal lifelines.
f. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
(3) Fatal injury / illness;
(4) Permanent totally disabling injury/illness;
SECTION 01 35 26.00 06 Page 4 Certified Final
(5) Permanent partial disabling injury/illness;
(6) One(1) or more persons hospitalized as inpatients as a result of a single occurrence;
(7) $500,000 or greater accidental property damage;
(8) Three(3) or more individuals become ill or have a medical condition which is suspected to be related to a site condition, or a hazardous or toxic agent on the site;
(9) Restricted work;
(10) Transfer to another job;
(11) Medical treatment beyond first aid;
(12) Loss of consciousness; or
(13) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (13) above.
g. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
h. Weight Handling Equipment (WHE) Accident. A WHE accident occurs when any one or more of the six elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload; and/or collision, including unplanned contact between the load, crane, and/or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.).
i. Low-slope roof. A roof having a slope less than or equal to 4 in 12 (vertical to horizontal).
j. Steep roof. A roof having a slope greater than 4 in 12 (vertical to horizontal).
k. Certified Safety Professional/Certified Industrial Hygienist Qualifications
(1) Certified Construction Health & Safety Technician (CHST). An individual who is currently certified by the Board of Certified Safety Professionals.
(2) Certified Industrial Hygienist (CIH). An individual who is currently certified by the American Board of Industrial Hygiene.
(3) Certified Safety Professional (CSP). An individual who is currently certified by the Board of Certified Safety Professionals.
SECTION 01 35 26.00 06 Page 5 Certified Final
(4) Certified Safety Trained Supervisor (STS). An individual who is currently certified by the Board of Certified Safety Professionals.
(5) Associate Safety Professional (ASP). An individual who is currently certified by the Board of Certified Safety Professionals.
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1 , federal, state, local, host nation laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
Amendment 0002 ******************************************************
1.5.1.1 Site Safety and Health Officer Qualifications(SSHO)
a. A Site Safety and Health Officer (SSHO)and alternate(s) shall be provided at the work site at all times and shall be a member of the onsite work organization and be responsible for overall management of the safety and occupational health program. The SSHO shall have the authority to act in all safety matters for the Contractor at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The SSHO and alternate(s) shall be employed by the Prime Contractor and shall report to a corporate safety official or other corporate official not engaged in quality control or supervision.
The SSHO shall be:
assigned solely as SSHO, and may not have duties as the CQC System Manager, or the Superintendent.
b. The SSHO and alternate(s)shall have an experience Level as follows and the Contractor must show evidence that the SSHO and alternate(s) have met these requirements. When an alternate is required for the project, the alternate shall have the same experience level and other qualifications as the SSHO. In addition, the SSHO and alternate(s) are also required to have:
(1) Completed, as a minimum, the 30-Hour OSHA Construction Industry safety class with current First Aid and CPR Training / AED.
(2) Either a person with 10 years of demonstratable SSHO experience on similar projects or a College graduate with Ten (10) years of Construction Industry safety experience on similar projects in supervising or managing general or industry construction (managing safety programs or processes or conducting hazard analyses and developing controls).
(3) Maintained experience through having taken 24 hours of documented
SECTION 01 35 26.00 06 Page 6 Certified Final formal or on-line safety and health related coursework in the past three years. The training must be applicable to the work being performed on the contract. Teaching is not considered the equivalent of attending training.
(4) SSHO shall be able to demonstrate training in the following areas: personal protective equipment and clothing to include selection, use and maintenance; hazard communication; excavation;
scaffolding; fall protection; hazardous energy; ; health hazard recognition, evaluation and control of chemical, physical and biological agents; and, lifting equipment.
c. To insure that safety and health conditions are maintained/enforced at all times, and a SSHO is present at all times, the Contractor shall designate one or more alternates to perform the safety and health requirements stated herein to cover any period when the SSHO can not be present, such as during absences for vacations/extended sickness, or when there are multiple shifts that requires additional coverage. The alternate(s) shall have the same qualifications/training/ education requirements as the SSHO.
d. The Contractor shall identify the SSHO and alternate(s)for this project and shall submit qualifications to the Government in resume form for acceptance. A copy of the letter to the SSHO and alternate(s) signed by an authorized official of the firm describing responsibilities and delegating authority to stop work when safety or occupational health of workers is compromised must be provided to the Government.
e. Acceptance of the Contractor's SSHO and alternate(s) is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during construction. The Government reserves the right to require the Contractor to make changes to operations including removal of personnel, as necessary, to obtain a safe work site. At no time will the job be permitted to operate without a SSHO on duty at the work site.
f. Duties of the SSHO shall include, as a minimum, the following in addition to the duties now listed per other paragraphs of this Section:
(1) Prepare the Contractor's Safety Plan, and Activity Hazard Analysis for each definable feature of work;
(2) Provide safety indoctrination to all construction site visitors;
(3) Ensure the Contractor's accepted Accident Prevention Plan is carried out;
(4) Ensure that all Contractor/subcontractor employees have all HTRW, asbestos, and lead paint training, and their personnel protection equipment meets applicable OSHA/EPA requirements;
(5) Conducts daily walk through of the site ensuring work is being accomplished safely and occupational health is not compromised;
(6) Attend and participate in all preparatory and initial quality control phase meetings;
(7) Conduct weekly safety meetings for all workers;
SECTION 01 35 26.00 06 Page 7 Certified Final
(8) Conduct monthly supervisory safety meetings;
(9) Provide accident reports;
(10) Produce a Daily Safety Report of activities performed and attach this report to the Contractor's Quality Control Report.
(11) Provide minutes for weekly and monthly safety meetings, minutes to be attached with the Daily Safety Report.
****************************************************** Amendment 0002
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Safety inspection logs shall be attached to the Contractors' daily quality control report.
b. Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 for prime contractor.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work safety conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
e. Implement and enforce accepted APPS and AHAs.
f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety bulletin board.
g. Ensure sub-contractor compliance with safety and health requirements.
h. Other duties as identified per LRL Section 01 45 00 Quality Control.
Failure to perform the above duties shall result in dismissal of the SSHO, and/or CQC System Manager, and/or superintendent and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.
1.5.3 Meetings
1.5.3.1 Prework Safety Conference
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the prework safety conference. The purpose of the prework safety conference is for the Contractor and the Contracting Officer's representatives to become acquainted and explain the functions and operating procedures of their respective organizations and to reach mutual understanding relative to the administration of the overall project's APP before the initiation of work.
This includes the project superintendent, Site Safety and Health Officer, Quality Control System Manager, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and
SECTION 01 35 26.00 06 Page 8 Certified Final procedures associated with it).
b. The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review, and acceptance of AHAs shall be established to preclude project delays.
c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the prework safety conference,and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance.
Work shall not begin until there is an accepted APP.
d. The functions of a prework safety conference, may take place at the Post-Award Kickoff meeting for Design Build Contracts.
1.5.3.2 Weekly Safety Meetings
Shall be conducted and documented as required by EM 385-1-1 . Minutes showing contract title, signatures of attendees and a list of topics discussed shall be attached to the Contractors' daily quality control report.
1.5.3.3 Work Phase Meetings
The appropriate AHA shall be reviewed and attendance documented by the Contractor at the preparatory, initial, and follow-up control phases of quality control inspection in accordance with LRL Section 01 45 00 QUALITY CONTROL. The analysis should be used during daily inspections to ensure the implementation and effectiveness of safety and health controls; and the results reported on the daily QC Report.
1.6 TRAINING
1.6.1 New Employee Indoctrination
New employees (prime and sub-contractor) will be informed of specific site hazards before they begin work. Documentation of this orientation shall be kept on file at the project site.
1.6.2 Periodic Training
Provide Safety and Health Training in accordance with USACE EM 385-1-1 and the accepted APP. Ensure all required training has been accomplished for all onsite employees.
1.6.3 Training on Activity Hazard Analysis (AHA)
Prior to beginning a new control phase, training will be provided to all affected employees to include a review of the AHA to be implemented.
1.7 ACCIDENT PREVENTION PLAN (APP)
a. The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and
SECTION 01 35 26.00 06 Page 9 Certified Final requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1 , Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific.
The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.
Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed per requirements of EM 385-1-1 , Appendix A-1, Paragraph 3, Signature Sheet.
Fatigue Management Plan Bloodborne Pathogen Plan Exposure Control Plan Automatic External Defibrillator (AED) Program Site Layout Plan
Access/Haul Road Plan Hearing Conservation Program Respiratory Protection Plan Health Hazard Control Program Hazard Communication Program
Process Safety Management Plan Lead Compliance Plan & Specifications Asbestos Abatement Plan & Specifications Radiation Safety Program Abrasive Blasting Plan
Heat Stress Monitoring Plan Cold Stress Monitoring Plan Indoor Air Quality Management Plan Mold Remediation Plan Chromium (VI) Exposure Evaluation
Crystalline Silica Assessment Lighting Plan for Night Operations Traffic Control Plan Fire Prevention Plan Wild Land Fire Management Plan
Arc Flash Hazard Analysis Assured Equipment Grounding Control Program (AEGCP) Hazardous Energy Control Plan Standard Pre-Lift Plan (LHE) Critical Lift Plan - LHE
Naval Architectural Analysis-LHE (Floating) Floating Plant Inspection and Certification Severe Weather Plan for Marine Activities Emergency Plan for Marine Activities
SECTION 01 35 26.00 06 Page 10 Certified Final
Man Overboard/Abandon Ship Procedures
Float Plan for Launches, Motorboats, Skiffs Fall Protection and Prevention Plan Demolition/Renovation Plan (to include engineering survey) Rope Access Work Plan Excavation/Trenching Plan
Fire Prevention & Protection Plan for Underground Construction Compressed Air Plan for Underground Construction Erection and Removal Plan for Formwork and Shoring PreCast Concrete Plan Lift-Slab Plans
Masonry Bracing Plan Steel Erection Plan Explosives Safety Site Plan (ESSP) Blasting Plan Dive Operations Plan
Safe Practices Manual for Diving Activities Emergency Management Plan for Diving Tree Felling/Maintenance Program Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) Aircraft/Airfield Safety Plan Compliance Document (SPCD)
Site Safety and Health Plan (HTRW) Confined Space Entry Procedures Confined Space Program
b. Submit the APP to the Contracting Officer fifteen (15) calendar days prior to the date of the prework safety conference for acceptance. Work cannot proceed without an accepted APP. The Contracting Officer reviews and comments on the Contractor's submitted APP and accepts it when it meets the requirements of the contract provisions.
c. Acceptance is conditional and will be predicated on satisfactory performance during the construction. Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract.
Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified. Work cannot proceed without an accepted APP.
d. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and Construction Quality Control System Manager.
Should any hazard become evident, stop work in the area, and secure the area. The project superintendent shall inform/notify the Contracting Officer within 12 hours of discovery, both verbally and in writing, and develop a plan for resolution as soon as possible to eliminate/ remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSP A10.34 ,) and the environment.
e. Copies of the accepted plan will be maintained at the Resident Engineer's office and at the contractor's job site office.
SECTION 01 35 26.00 06 Page 11 Certified Final
f. The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
a. The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1 as modified by the Louisville District, using CELRL Form 1259, current edition. Submit the AHA for review at least fifteen (15) calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP.
b. An AHA will be developed by the Contractor for every operation involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work. In addition, AHA's are needed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHA's will either be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer. The analysis must identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, define activity being performed, sequence of work, specific safety and health hazards anticipated, control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used, inspection requirements, training requirements for all involved, and the competent person in charge of that phase of work. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. For work with fall hazards, including fall hazards associated with scaffold erection and removal, identify the appropriate fall arrest systems. For work with materials handling equipment, address safeguarding measures related to materials handling equipment. For work requiring excavations, include requirements for safeguarding excavations.
c. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.
d. The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.
e. Activity hazard analyses shall be updated as necessary to provide an effective response to changing work conditions and activities. The on-site superintendent, site safety and health officer and competent persons used to develop the AHAs, including updates, shall sign and date the AHAs before they are implemented.
f. The activity hazard analyses shall be developed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.
1.9 DISPLAY OF SAFETY INFORMATION
Within one (1) calendar day after commencement of work, erect a safety
SECTION 01 35 26.00 06 Page 12 Certified Final bulletin board at the job site. The safety bulletin board shall include information and be maintained as required by EM 385-1-1 , Section 01.A.07.
1.10 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.
1.11 EMERGENCY MEDICAL TREATMENT
Contractors will arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
1.12 REPORTS
Submit reports as their incidence occurs, in accordance with the requirements of this paragraph entitled, "Reports."
1.12.1 Accident Reports
For recordable injuries and illnesses, and property damage accidents resulting in at least $5,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the USACE Accident Report Form 3394 and provide the report to the Contracting Officer within five (5) calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.
1.12.2 Accident Notification
Notify the Contracting Officer as soon as practical, but not later than four hours, after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $5,000, or any weight handling equipment accident.
Information shall include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
1.12.3 Monthly Exposure Reports
Monthly exposure reporting to the Contracting Officer is required to be attached to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor.
1.12.4 Regulatory Citations and Violations
Contact the Contracting Officer immediately of any OSHA or other regulatory agency inspection or visit, and provide the Contracting Officer with a copy of each citation, report, and contractor response. Correct violations and citations promptly and provide written corrective actions to the Contracting Officer.
SECTION 01 35 26.00 06 Page 13 Certified Final
1.12.5 Crane Reports
Submit crane inspection reports required in accordance with USACE EM 385-1-1 and as specified herein with Daily Reports of Inspections.
1.12.6 Crane Certificate of Compliance
The Contractor shall provide a Certificate of Compliance for each crane entering an activity under this contract (see Contracting Officer for a blank certificate). Certificate shall state that the crane and rigging gear meet applicable OSHA regulations (with the Contractor citing which OSHA regulations are applicable, e.g., cranes used in construction, demolition, or maintenance shall comply with 29 CFR 1926 and USACE EM 385-1-1 Section 16. Certify on the Certificate of Compliance that the crane operator(s) is qualified and trained in the operation of the crane to be used. The Contractor shall also certify that all of its crane operators working on the DOD activity have been trained in the proper use of all safety devices (e.g., anti-two block devices). These certifications shall be posted on the crane.
1.12.7 Critical Lift Plan
Prior to performing Load Handling Equipment Critical Lifts, as identified in EM 385-1-1, a detailed Critical Lift Plan shall be developed and written by a competent person complying with all USACE requirements in EM 385-1-1. As part of the Critical Lift Plan, Proof of qualification for Crane Operators, lift supervisors and the rigger shall be submitted to the
GDA.
1.12.8 Confined Space Entry Permit
In accordance with 29 CFR 1910 , 29 CFR 1915 and EM 385-1-1, prior to entering a permit required confined space, a confined space entry permit shall be completed, reviewed, processed, signed and maintained. The entry supervisor or manager shall be required to sign all permits daily before entry.
1.13 HOT WORK PERMIT
Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written Hot Work Permit shall be requested from the area, base, post or local fire district.
CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED.
The Contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal.
It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 60 minutes after completion of the task or as specified on the hot work permit.
When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency Fire Division phone number.
ANY FIRE, NO MATTER HOW SMALL, SHALL BE REPORTED TO THE RESPONSIBLE FIRE
DIVISION IMMEDIATELY.
SECTION 01 35 26.00 06 Page 14 Certified Final
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND/OR OTHER WORK
The Contractor shall comply with USACE EM 385-1-1 , NFPA 241 , the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and installation/activity fire and safety regulations. The most stringent standard shall prevail.
3.1.1 Hazardous Material Use
Each hazardous material must receive approval prior to being brought onto the job site or prior to any other use in connection with this contract.
Allow a minimum of ten (10) working days for processing of the request for use of a hazardous material.
3.1.2 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with USACE EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials.
3.1.3 Unforeseen Hazardous Material
The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos. If additional material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within fourteen (14) calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4 - Changes and FAR 52.236-2 - Differing Site Conditions.
3.1.4 Unanticipated Discovery of Ordnance and Explosives
If during the course of construction operations, any unanticipated or unplanned discovery of Munitions and Explosives of Concern (MEC), Explosive Media, Chemical Warfare Media (CWM), or chemical agent contaminated media (CACM) occurs, all work must cease, personnel must withdraw from the affected area and the Contracting Officer's Representative (COR) must be contacted for further information and direction. Refer ER 385-1-95 and EM 385-1-97 for additional requirements.
3.2 PRE-OUTAGE COORDINATION MEETING
Contractors are required to apply for utility outages at least fifteen
(15) days in advance. As a minimum, the request should include the
SECTION 01 35 26.00 06 Page 15 Certified Final location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, the Contractor shall attend a pre-outage coordination meeting with the Contracting Officer and the Installation representative to review the scope of work and the lock-out/tag-out procedures for worker protection.
No work will be performed on energized electrical circuits unless proof is provided that no other means exist.
3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
The Contractor shall establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. The program shall include company policy, identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures.
3.3.1 Training
The Contractor shall institute a fall protection training program. As part of the Fall Hazard Protection and Prevention Program, the Contractor shall provide training for each employee who might be exposed to fall hazards. A competent person for fall protection shall provide the training. Training requirements shall be in accordance with USACE EM 385-1-1 , Section 21.C.
3.3.2 Fall Protection Equipment and Systems
The Contractor shall enforce use of the fall protection equipment and systems designated for each specific work activity in the Fall Protection and Prevention Plan and/or AHA at all times when an employee is exposed to a fall hazard or on a surface 6 feet or more above lower levels. Fall protection systems such as guardrails/toeboards, personnel fall arrest system, safety nets, etc., are required when working within 6 feet of any leading edge and employees shall be protected from fall hazards as specified in EM 385-1-1, Section 21. In addition to the required fall protection systems, safety skiff, personal floatation devices, life rings etc., are required when working above or next to water in accordance with USACE EM 385-1-1, Section 21. Personal fall arrest systems are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall arrest systems are required when operating other equipment such as scissor lifts if the work platform is capable of being positioned outside the wheelbase. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, or travel. Fall protection must comply with 29 CFR 1926.500 , Subpart M, USACE EM 385-1-1 and
ASSP A10.32 .
3.3.2.1 Personal Fall Arrest Equipment
Personal fall arrest equipment, systems, subsystems, and components shall meet ASSP Z359.1 . Only a full-body harness with a shock-absorbing lanyard or self-retracting lanyard is an acceptable personal fall arrest body support device. Body belts may only be used as a positioning device system (for uses such as steel reinforcing assembly and in addition to an approved fall arrest system). Harnesses shall have a fall arrest attachment affixed to the body support (usually a Dorsal D-ring) and
SECTION 01 35 26.00 06 Page 16 Certified Final specifically designated for attachment to the rest of the system. Only locking snap hooks and carabiners shall be used. Webbing, straps, and ropes shall be made of synthetic fiber. The maximum free fall distance when using fall arrest equipment shall not exceed (6 feet). The total fall distance and any swinging of the worker (pendulum-like motion) that can occur during a fall shall always be taken into consideration when attaching a person to a fall arrest system.
3.3.3 Fall Protection for Roofing Work
Fall protection controls shall be implemented based on the type of roof being constructed and work being performed. The roof area to be accessed shall be evaluated for its structural integrity including weight-bearing capabilities for the projected loading.
a. Low Sloped Roofs:
(1) For work within (6 feet) of an edge, on low-slope roofs, personnel shall be protected from falling by use of personal fall arrest systems, guardrails, or safety nets.
(2) For work greater than (6 feet) from an edge, warning lines shall be erected and installed in accordance with 29 CFR 1926.500 and USACE EM 385-1-1 .
b. Steep-Sloped Roofs: Work on steep-sloped roofs requires a personal fall arrest system, guardrails with toe-boards, or safety nets. This requirement also includes residential or housing type construction.
3.3.4 Existing Anchorage
Existing anchorages, to be used for attachment of personal fall arrest equipment, shall be certified (or re-certified) by a qualified person for fall protection in accordance with ASSP Z359.1 . Exiting horizontal lifeline anchorages shall be certified (or re-certified) by a registered professional engineer with experience in designing horizontal lifeline systems.
3.3.5 Horizontal Lifelines
Horizontal lifelines shall be designed, installed, certified and used under the supervision of a qualified person for fall protection as part of a complete fall arrest system which maintains a safety factor of 2 (
29 CFR 1926.500 ).
3.3.6 Guardrails and Safety Nets
Guardrails and safety nets shall be designed, installed and used in accordance with EM 385-1-1 and 29 CFR 1926 Subpart M.
3.3.7 Rescue and Evacuation Procedures
When personal fall arrest systems are used, the contractor must ensure that the mishap victim can self-rescue or can be rescued promptly should a fall occur. A Rescue and Evacuation Plan shall be prepared by the contractor and include a detailed discussion of the following: methods of rescue; methods of self-rescue; equipment used; training requirement;
specialized training for the rescuers; procedures for requesting rescue
SECTION 01 35 26.00 06 Page 17 Certified Final and medical assistance; and transportation routes to a medical facility.
The Rescue and Evacuation Plan shall be included in the Activity Hazard Analysis (AHA) for the phase of work, in the Fall Protection and Prevention (FP&P) Plan and the Accident Prevention Plan (APP).
3.4 SCAFFOLDING
Employees shall be provided with a safe means of access to the work area on the scaffold.