This document is an Air Force Sustainability Requirements Scoresheet for a renovation and addition project at the Aircrew Readiness Facility at Beale AFB, California. The project, with solicitation number W912QR25BA007, is a Design-Bid-Build construction opportunity managed by the US Army Corps of Engineers Louisville District. The scoresheet indicates the project is 89% High Performance Sustainable Building (HPSB) compliant, with 57% energy efficiency achieved below the ANSI/ASHRAE/IESNA Standard 90.1-2013. The facility is 7,261 square feet, with design started on 09/29/23 and a projected Board of Directors date of 01/19/24. The project demonstrates compliance across multiple sustainability categories including integrated design principles, energy performance, water conservation, indoor environmental quality, environmental impact of materials, and climate change risk mitigation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Renovate/Add to Aircrew Readiness Facility Beale AFB, CA

P2: 513180/513182

Design-Bid-Build

Scoresheet - For Information Only Certified Final Design

29 April 2025

W912QR25BA007-0002

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR25BA007_FIO_HPSBScoresheet-0002

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information INCOMPLETE

BAEY234305CA & BAEY234305CB Project ID (e.g. ABCD12345)

000000000001522189 Real Property Unique ID (RPUID)

B1232 Facility Number

Aircrew Readiness Facility Building Name

Beale AFB Installation

Yuba City City

CA State

Yes CONUS

ACC MAJCOM

USACE Construction Agent

N/A AFCEC DM/CM (Last Name, First Name)

PA *

7,261 Building Size (SF)

2024 Program Year (FY####)

Design Complete Project Phase

09/29/23 Design Started (MM/DD/YY)

01/19/24 BOD (MM/DD/YY)

Not Certifying Guiding Principles Compliance Certification Method

89% HPSB Compliant

57% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013)

2017V1 Scoresheet version

Color Coding: See Instructions Tab for more detail

Yes or N/A

No

Recommended not Required

90.1-2013

HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2)

Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1

Yes HPSB I.2 Commissioning 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3)

Total Points 3 Possible Points 5

Yes HPSB II.1 Energy Efficiency 1

Yes

Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-

2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

56.7% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

73.5 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

No Roof Attributes (Recommended)

Select roof types (Check below)

Energy Efficient Products 1

Yes

No HPSB II.2 On-site Renewable Energy 1

No Installed renewable energy elements or projects were not lifecycle cost effective

Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building

No HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

No Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand

Yes HPSB II.4 Metering 1

Yes Electric Metering: Select N/A if no service

N/A Natural Gas Metering: Select N/A if no service

N/A Steam Metering: Select N/A if no service

Drop-Down Box

SURVEY

INCOMPLETE

No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

4/3/2025

AMENDMENT 0002

FOR INFORMATION ONLY

AMENDMENT 0002

FOR INFORMATION ONLY

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4)

Total Points 5 Possible Points 6

Yes HPSB III.1 Indoor Water 1

Yes Indoor Water Metering 1

Yes HPSB III.2 Outdoor Water 1

N/A Outdoor Water Metering 1

No HPSB III.3 Alternative Water 1

Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

13900.0 Change in Impervious Area (SF)

Pre-Award Cost Estimate ($) *

Yes Project addressed EISA 438

0 EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools

(Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section

438)

On-Site LID Features Locations

4 Integrated Management Practices Employed

Final LID Construction Cost ($)

Post Construction Analysis (Name of DOR)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5)

Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1

Yes HPSB IV.2 Ventilation 1

N/A HPSB IV.3 Daylighting 1

Yes HPSB IV.4 1

Yes HPSB IV.5 Low Emitting Materials 1

Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1

Yes HPSB IV.7 Environmental Tobacco Smoke Control 1

Yes HPSB IV.8 Occupant Health and Wellness 1

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6)

Total Points 5 INCOMPLETE Possible Points 5

Yes HPSB V.1 Recycled Content 1

Yes HPSB V.2 Biologically-based Products 1

Yes HPSB V.3 Ozone Depleting Substances 1

Yes HPSB V.4 Waste and Materials Management - Recycling 1

Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

Yes 60% or greater diverted

Insert percentage diverted from landfill *

HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7)

Total Points 1 Possible Points 1

Yes HPSB VI.1 Address Climate Change Risk 1

Possible Points 27

24 Federal Requirements - Yes or N/A

4 Federal Requirements - No

89% Percentage of Federal Requirements Met

Moisture Control

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green infrastructure or LID Other

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells

Inlet Pollution

Removal Device

Permeable

Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

4/3/2025

AMENDMENT 0002

FOR INFORMATION ONLY

AMENDMENT 0002

FOR INFORMATION ONLY

File details come from the government source that posted it. Updated .