W912QR25BA007_FIO_HPSBChecklist-0002.pdf
PDF 867 KB Posted
- Attached to
- IFB - Beale Aircrew Readiness Facility
- Solicitation number
- W912QR25BA007
About this file
This document is a Checklist for High Performance and Sustainable Buildings (HPSB) for a renovation and addition project at the Aircrew Readiness Facility at Beale AFB, California. The checklist, dated 29 April 2025, is part of a Design-Bid-Build solicitation (W912QR25BA007-0002) issued by the US Army Corps of Engineers Louisville District. The document details compliance requirements across six key sustainability areas: integrated design principles, energy performance, water conservation, indoor environmental quality, environmental impact of materials, and climate change risk mitigation. Several elements received specific justifications for non-applicability, including mission restrictions on daylighting in certain spaces and locale restrictions on utility services, while most categories remain applicable to the project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Renovate/Add to Aircrew Readiness Facility Beale AFB, CA
P2: 513180/513182
Design-Bid-Build
Checklist - For Information Only Certified Final Design
29 April 2025
W912QR25BA007-0002
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25BA007_FIO_HPSBChecklist-0002
Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02
Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.
Justification for Non-Applicable Answers Common Justification Project Specific Justification Complete?
HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2)
HPSB I.1 Integrated Design Applicable
HPSB I.2 Commissioning Applicable
HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-3)
HPSB II.1 Energy Efficiency Applicable
HPSB II.1 Energy Efficient Products Applicable
HPSB II.2 On-site Renewable Energy Applicable
HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System Applicable
HPSB II.4 Metering
HPSB II.4 Electric Metering: Select N/A if no service Applicable
HPSB II.4 Natural Gas Metering: Select N/A if no service NA Locale Restriction No gas utility service at project locale. Yes
HPSB II.4 Steam Metering: Select N/A if no service NA Locale Restriction No steam utility service at project locale. Yes
HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-4)
HPSB III.1 Indoor Water Applicable
HPSB III.1 Indoor Water Metering: Select N/A if no service Applicable
HPSB III.2 Outdoor Water Applicable
HPSB III.2 Outdoor Water Metering: Select N/A if no service NA Locale Restriction The project does not include potable outdoor water use for irrigation.
Yes
HPSB III.3
Alternative Water
The use of alternative water sources and systems are not life-cycle cost-effective.
Applicable
HPSB III.4 Stormwater Management
HPSB III.4 Project addressed EISA 438 Applicable
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-5)
HPSB IV.1 Thermal Comfort Applicable
HPSB IV.2 Ventilation Applicable
HPSB IV.3
Daylighting
NA Mission Restriction
Most regularly occupied spaces located on the exterior wall have windows. Two spaces - the Mission SIPR and
Dining/Gathering - do not, as their mission precludes the use of windows and daylighting due to the need to plan, discuss, and present potentially secret information and material
Yes
HPSB IV.4 Moisture Control Applicable
HPSB IV.5 Low Emitting Materials Applicable
HPSB IV.6 Protect Indoor Air Quality during Construction Applicable
HPSB IV.8 Occupant Health and Wellness Applicable
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-6)
HPSB V.1 Recycled Content Applicable
HPSB V.2 Biologically based products Applicable
HPSB V.3 Ozone Depleting Substances Applicable
HPSB V.4 Waste and Materials Management - Recycling Applicable
HPSB V.5 Waste and Materials Management - Divert 60% from Disposal Applicable
HPSB VI: Adress Climate Change Riskd (UFC 1-200-02, 2-7)
HPSB VI.1
Address Climate Change Risk
Project does not fall within 100-year floodplain.
Applicable
AMENDMENT 0002
FOR INFORMATION ONLY
AMENDMENT 0002
FOR INFORMATION ONLY
W912QR25BA007_FIO_HPSBChecklist-0002
File details come from the government source that posted it. Updated .