W912QR25B0001_Specs_Vol4-0000.pdf
PDF 2 MB Posted
- Attached to
- Construction of an Indoor Small Arms Range (ISAR) located in Grissom Air Reserve Base, IN.
- Solicitation number
- W912QR25B0001
About this file
This document appears to be Volume 4 of the technical specifications for an Indoor Small Arms Range construction project at Grissom Air Reserve Base in Indiana. The specifications detail electrical requirements covering Divisions 26-35, with emphasis on interior electrical distribution systems, telecommunications infrastructure, grounding and bonding, motor controls, transformers, circuit breakers, and related components. Key technical requirements include 480V/277V three-phase power systems, copper or aluminum conductors (minimum #12 AWG for branch circuits), rigid steel and EMT conduit installations, surge protection devices rated for 80,000 amperes, and telecommunications pathways conforming to TIA standards. The specifications mandate specific installation requirements for hazardous locations, underground service, and concrete-embedded conduits. Equipment must meet UL listings and NEMA ratings appropriate for the installation environment, with detailed requirements for mounting heights, support systems, and conductor identification.
The document is certified as final design dated December 12, 2024, under contract W912QR25B0001. While primarily focused on electrical specifications, it references related mechanical, structural and architectural requirements that must be coordinated during construction. The specifications emphasize quality control, safety requirements, and proper documentation through submittals for major electrical components. This volume appears to be part of a larger design-bid-build package for the complete small arms range facility.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Indoor Small Arms Range Grissom Air Reserve Base, IN
P2: 502689
Design-Bid-Build
Specifications - Vol 4 of 4 (Div 26 - 35) Certified Final Design
12 December 2024
W912QR25B0001
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25B0001_Specs_Vol4-0000
502689 Indoor Small Arms Range Grissom Air Reserve Base, IN
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21 SPECIAL PROVISIONS
APPENDIX A: CONSTRUCTION PROJECT SIGN DETAILS
APPENDIX B: SUBMITTAL REGISTER
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
APPENDIX A: HPSB CHECKLIST
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
APPENDIX A: STATEMENT OF SPECIAL INSPECTIONS
APPENDIX B: SCHEDULE OF SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
APPENDIX A: OPR AND PRE-FUNCTIONAL PERFORMANCE CHECKLISTS
APPENDIX B: BOD AND PRE-FUNCTIONAL PERFORMANCE CHECKLISTS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
APPENDIX A: SWPPP
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 83 00 11/18 LEAD REMEDIATION
APPENDIX A: GRISSOM LEAD SURFACE SAMPLING FOR DEMO
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
04 72 00 04/06 CAST STONE
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
CERTIFIED FINAL
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 54 19.00 48 08/13 THERMOPLASTIC MEMBRANE ROOFING SYSTEM
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 48 60 05/10 FIREARMS TRAINING EQUIPMENT
11 67 10 08/07 BAFFLE AND SAFETY CEILING SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - DDC
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FIRE ALARM AND MASS
NOTIFICATION SYSTEMS
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM
(SACRIFICIAL ANODE)
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 05 22.00 06 07/16 GEOTEXTILES USED AS FILTERS
31 11 00 11/18 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE AND/OR AGGREGATE
SEPARATION LAYER
32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10, CHG 6: 02/19 STORM DRAINAGE UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 42 37.00 06 07/16 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/21
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.2 Acceptance Tests and Inspections Reports
1.4.3 Acceptance Test and Inspections Procedure
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
3.2 SYSTEM ACCEPTANCE
3.3 PLACING EQUIPMENT IN SERVICE
-- End of Section Table of Contents --
SECTION 26 08 00 Page 1
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM applies to this section with additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Acceptance Tests and Inspections; G
SD-07 Certificates
Qualifications of Organization, and Lead Engineering Technician; G
Acceptance Test and Inspections Procedure; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein.
Organization shall be independent of the supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor. No work required by this section of the specification shall be performed by a second tier subcontractor.
a. Submit name and qualifications of organization. Organization shall have been regularly engaged in the testing of electrical materials, devices, installations, and systems for a minimum of 5 years. The
SECTION 26 08 00 Page 2 organization shall have a calibration program, and test instruments used shall be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, and adjustments shall be performed by an engineering technician, certified by NETA (Level III) or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.4.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Reports shall include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate.
Type and neatly bind test reports to form a part of the final record.
Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.4.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization shall perform acceptance tests and inspections. Test methods, procedures, and test values shall be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph entitled "Field Quality Control" of each applicable specification section. Tests identified as optional in NETA ATS are not required unless otherwise specified. Equipment shall be placed in service only after completion of required tests and evaluation of the test results have been completed. Contractor shall supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Contracting Officer shall be notified at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
e. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Medium voltage cables and grounding systems only.
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion
SECTION 26 08 00 Page 3 of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization shall be present when equipment tested by the organization is initially energized and placed in service.
-- End of Section --
SECTION 26 08 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 20 00
INTERIOR DISTRIBUTION SYSTEM
08/19, CHG 3: 11/21
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Fuses
1.4.2 Regulatory Requirements
1.4.3 Standard Products
1.4.3.1 Alternative Qualifications
1.4.3.2 Material and Equipment Manufacturing Date
1.5 MAINTENANCE
1.5.1 Electrical Systems
1.6 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.2 CONDUIT AND FITTINGS
2.2.1 Rigid Metallic Conduit
2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit
2.2.1.2 Rigid Aluminum Conduit
2.2.2 Rigid Nonmetallic Conduit
2.2.3 Intermediate Metal Conduit (IMC)
2.2.4 Electrical, Zinc-Coated Steel Metallic Tubing (EMT)
2.2.5 Plastic-Coated Rigid Steel and IMC Conduit
2.2.6 Flexible Metal Conduit
2.2.6.1 Liquid-Tight Flexible Metal Conduit, Steel
2.2.7 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit
2.2.7.1 Fittings for Rigid Metal Conduit and IMC
2.2.7.2 Fittings for EMT
2.2.8 Fittings for Rigid Nonmetallic Conduit
2.3 SURFACE RACEWAY
2.3.1 Surface Metal Raceway
2.3.2 Not Used
2.4 Not Used
2.5 CABLE TRAYS
2.5.1 Basket-Type Cable Trays
2.5.2 Not Used
2.5.3 Ladder-Type Cable Trays
2.5.4 Not Used
2.5.5 Not Used
2.6 OPEN TELECOMMUNICATIONS CABLE SUPPORT
2.6.1 Open Top Cable Supports
2.6.2 Closed Ring Cable Supports
2.7 OUTLET BOXES AND COVERS
SECTION 26 20 00 Page 1
2.7.1 Floor Outlet Boxes
2.7.2 Outlet Boxes for Telecommunications System
2.8 CABINETS, JUNCTION BOXES, AND PULL BOXES
2.9 WIRES AND CABLES
2.9.1 Conductors
2.9.1.1 Not Used
2.9.1.2 Aluminum Conductors
2.9.1.3 Minimum Conductor Sizes
2.9.2 Color Coding
2.9.2.1 Ground and Neutral Conductors
2.9.2.2 Ungrounded Conductors
2.9.3 Insulation
2.9.4 Bonding Conductors
2.9.4.1 Telecommunications Bonding Backbone (TBB)
2.9.4.2 Bonding Conductor for Telecommunications
2.9.5 Service Entrance Cables
2.9.6 Not Used
2.9.7 Not Used
2.9.8 Not Used
2.9.9 Not Used
2.9.10 Not Used
2.9.11 Not USed
2.9.12 Cable Tray Cable or Power Limited Tray Cable
2.9.13 Cord Sets and Power-Supply Cords
2.10 SPLICES AND TERMINATION COMPONENTS
2.11 DEVICE PLATES
2.12 SWITCHES
2.12.1 Toggle Switches
2.12.2 Not Used
2.12.3 Not Used
2.12.4 Disconnect Switches
2.13 FUSES
2.13.1 Fuseholders
2.13.2 Cartridge Fuses, Current Limiting Type (Class R)
2.13.3 Cartridge Fuses, High-Interrupting Capacity, Current Limiting
Type (Classes J, L, and CC)
2.13.4 Cartridge Fuses, Current Limiting Type (Class T)
2.14 RECEPTACLES
2.14.1 Split Duplex Receptacles
2.14.2 Weatherproof Receptacles
2.14.3 Ground-Fault Circuit Interrupter Receptacles
2.14.4 Special Purpose Receptacles
2.14.5 Not Used
2.14.6 Not Used
2.14.7 Not Used
2.14.8 Tamper-Resistant Receptacles
2.14.9 Arc-Fault Circuit Interrupter Receptacles
2.15 PANELBOARDS
2.15.1 Enclosure
2.15.2 Panelboard Buses
2.15.2.1 Panelboard Neutrals for Non-Linear Loads
2.15.3 Circuit Breakers
2.15.3.1 Multipole Breakers
2.15.3.2 Circuit Breaker With Ground-Fault Circuit Interrupter
2.15.3.3 Not Used
2.15.4 Fusible Switches for Panelboards
2.15.5 Branch Circuit Monitoring Panelboards
2.15.6 Lighting Control Panelboards
2.16 Not Used
SECTION 26 20 00 Page 2
2.17 Not Used
2.18 ENCLOSED CIRCUIT BREAKERS
2.19 MOTOR SHORT-CIRCUIT PROTECTOR (MSCP)
2.20 TRANSFORMERS
2.20.1 Specified Transformer Efficiency
2.21 MOTORS
2.21.1 High Efficiency Single-Phase Motors
2.21.2 Premium Efficiency Polyphase and Single-Phase Motors
2.21.3 Motor Sizes
2.21.4 Wiring and Conduit
2.22 MOTOR CONTROLLERS
2.22.1 Control Wiring
2.22.2 Control Circuit Terminal Blocks
2.22.2.1 Types of Terminal Blocks
2.22.3 Control Circuits
2.22.4 Enclosures for Motor Controllers
2.22.5 Multiple-Speed Motor Controllers and Reversible Motor
Controllers
2.22.6 Pushbutton Stations
2.22.7 Pilot and Indicating Lights
2.22.8 Reduced-Voltage Controllers
2.23 MANUAL MOTOR STARTERS (MOTOR RATED SWITCHES)
2.23.1 Pilot Lights
2.24 MOTOR CONTROL CENTERS
2.24.1 Not Used
2.24.2 Motor Disconnecting Devices and Controllers
2.24.3 Combination Motor Controllers
2.25 LOCKOUT REQUIREMENTS
2.26 TELECOMMUNICATIONS SYSTEM
2.27 Not Used
2.28 GROUNDING AND BONDING EQUIPMENT
2.28.1 Ground Rods
2.28.2 Ground Bus
2.28.3 Secondary Bonding Busbar
2.29 HAZARDOUS LOCATIONS
2.30 MANUFACTURER'S NAMEPLATE
2.31 FIELD FABRICATED NAMEPLATES
2.32 WARNING SIGNS
2.33 FIRESTOPPING MATERIALS
2.34 WIREWAYS
2.35 METER BASE ONLY
2.36 SURGE PROTECTIVE DEVICES
2.37 FACTORY APPLIED FINISH
2.38 SOURCE QUALITY CONTROL
2.38.1 Transformer Factory Tests
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Underground Service
3.1.2 Not Used
3.1.3 Hazardous Locations
3.1.4 Service Entrance Identification
3.1.4.1 Labels
3.1.5 Wiring Methods
3.1.5.1 Pull Wire
3.1.6 Conduit Installation
3.1.6.1 Restrictions Applicable to Aluminum Conduit
3.1.6.2 Restrictions Applicable to EMT
SECTION 26 20 00 Page 3
3.1.6.3 Restrictions Applicable to Nonmetallic Conduit
3.1.6.4 Restrictions Applicable to Flexible Conduit
3.1.6.5 Underground Conduit
3.1.6.6 Conduit for Circuits Rated Greater Than 600 Volts
3.1.6.7 Conduit Installed Under Floor Slabs
3.1.6.8 Conduit Through Floor Slabs
3.1.6.9 Conduit Installed in Concrete Floor Slabs
3.1.6.10 Stub-Ups
3.1.6.11 Conduit Support
3.1.6.12 Directional Changes in Conduit Runs
3.1.6.13 Locknuts and Bushings
3.1.6.14 Flexible Connections
3.1.6.15 Telecommunications and Signal System Pathway
3.1.7 Not Used
3.1.8 Cable Tray Installation
3.1.9 Boxes, Outlets, and Supports
3.1.9.1 Boxes
3.1.9.2 Pull Boxes
3.1.9.3 Extension Rings
3.1.10 Mounting Heights
3.1.11 Not Used
3.1.12 Not Used
3.1.13 Conductor Identification
3.1.13.1 Marking Strips
3.1.14 Splices
3.1.14.1 Splices of Aluminum Conductors
3.1.15 Terminating Aluminum Conductors
3.1.15.1 Termination to Copper Bus
3.1.15.2 Termination to Aluminum Bus
3.1.16 Covers and Device Plates
3.1.17 Electrical Penetrations
3.1.18 Grounding and Bonding
3.1.18.1 Ground Rods
3.1.18.2 Grounding Connections
3.1.18.3 Ground Bus
3.1.18.4 Resistance
3.1.18.5 Telecommunications System
3.1.19 Equipment Connections
3.1.20 Not Used
3.1.21 Government-Furnished Equipment
3.1.22 Not Used
3.1.23 Watthour Meters
3.1.24 Surge Protective Devices
3.2 FIELD FABRICATED NAMEPLATE MOUNTING
3.3 WARNING SIGN MOUNTING
3.4 FIELD APPLIED PAINTING
3.5 FIELD QUALITY CONTROL
3.5.1 Devices Subject to Manual Operation
3.5.2 600-Volt Wiring Test
3.5.3 Transformer Tests
3.5.4 Ground-Fault Receptacle Test
3.5.5 Arc-Fault Receptacle Test
3.5.6 Grounding System Test
3.5.7 Phase Rotation Test
-- End of Section Table of Contents --
SECTION 26 20 00 Page 4
SECTION 26 20 00
INTERIOR DISTRIBUTION SYSTEM
08/19, CHG 3: 11/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C12.1 (2014; Errata 2016) Electric Meters - Code for Electricity Metering
ASTM INTERNATIONAL (ASTM)
ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire
ASTM B8 (2011; R 2017) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA NEIS 1 (2015) Standard for Good Workmanship in Electrical Construction
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C12.7 (2014) Requirements for Watthour Meter Sockets
SECTION 26 20 00 Page 5
ANSI C80.1 (2020) American National Standard for Electrical Rigid Steel Conduit (ERSC)
ANSI C80.3 (2020) American National Standard for Electrical Metallic Tubing (EMT)
ANSI C80.5 (2020) American National Standard for Electrical Rigid Aluminum Conduit
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA FU 1 (2012) Low Voltage Cartridge Fuses
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 4 (2015) Application Guideline for Terminal Blocks
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA KS 1 (2013) Enclosed and Miscellaneous Distribution Equipment Switches (600 V Maximum)
NEMA MG 1 (2016) Motors and Generators - Revision 1: 2018; Includes 2021 Updates to Parts 0, 1, 7, 12, 30, and 31
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NEMA RN 1 (2005; R 2013) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit
NEMA ST 20 (2014) Dry-Type Transformers for General Applications
NEMA TC 2 (2020) Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NEMA TC 3 (2021) Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit and Tubing
NEMA VE 1 (2017) Metal Cable Tray Systems
SECTION 26 20 00 Page 6
NEMA WD 1 (1999; R 2020) Standard for General Color Requirements for Wiring Devices
NEMA WD 6 (2016) Wiring Devices Dimensions Specifications
NEMA Z535.4 (2011; R 2017) Product Safety Signs and Labels
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 70E (2021) Standard for Electrical Safety in the Workplace
NFPA 780 (2020) Standard for the Installation of Lightning Protection Systems
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-568.1 (2020e) Commercial Building Telecommunications Infrastructure Standard
TIA-569 (2019e) Telecommunications Pathways and Spaces
TIA-607 (2019d) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 431 Energy Efficiency Program for Certain Commercial and Industrial Equipment
29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1910.303 Electrical, General
UNDERWRITERS LABORATORIES (UL)
UL 1 (2005; Reprint Jan 2020) UL Standard for Safety Flexible Metal Conduit
UL 5 (2016; Reprint Aug 2020) UL Standard for Safety Surface Metal Raceways and Fittings
UL 6 (2007; Reprint Sep 2019) UL Standard for Safety Electrical Rigid Metal Conduit-Steel
UL 6A (2008; Reprint Mar 2021) UL Standard for Safety Electrical Rigid Metal Conduit - Aluminum, Red Brass, and Stainless Steel
UL 20 (2018; Reprint Jan 2021) UL Standard for
SECTION 26 20 00 Page 7
Safety General-Use Snap Switches
UL 44 (2018; Reprint May 2021) UL Standard for Safety Thermoset-Insulated Wires and Cables
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 67 (2018; Reprint Jul 2020) UL Standard for Safety Panelboards
UL 83 (2017; Reprint Mar 2020) UL Standard for Safety Thermoplastic-Insulated Wires and Cables
UL 248-4 (2010; Reprint Apr 2019) Low-Voltage Fuses
- Part 4: Class CC Fuses
UL 248-8 (2011; Reprint Aug 2020) Low-Voltage Fuses
- Part 8: Class J Fuses
UL 248-10 (2011; Reprint Aug 2020) Low-Voltage Fuses
- Part 10: Class L Fuses
UL 248-12 (2011; Reprint Aug 2020) Low Voltage Fuses
- Part 12: Class R Fuses
UL 248-15 (2018) Low-Voltage Fuses - Part 15: Class T Fuses
UL 360 (2013; Reprint Aug 2021) UL Standard for Safety Liquid-Tight Flexible Metal Conduit
UL 467 (2013; Reprint Jun 2017) UL Standard for Safety Grounding and Bonding Equipment
UL 486A-486B (2018; Reprint May 2021) UL Standard for Safety Wire Connectors
UL 486C (2018; Reprint May 2021) UL Standard for Safety Splicing Wire Connectors
UL 489 (2016; Rev 2019) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 498 (2017; Reprint Sep 2021) UL Standard for Safety Attachment Plugs and Receptacles
UL 506 (2017; Reprint Jan 2022) UL Standard for Safety Specialty Transformers
UL 508 (2018; Reprint Jul 2021) UL Standard for Safety Industrial Control Equipment
UL 510 (2020) UL Standard for Safety Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
SECTION 26 20 00 Page 8
UL 514A (2013; Reprint Aug 2017) UL Standard for Safety Metallic Outlet Boxes
UL 514B (2012; Reprint May 2020) Conduit, Tubing and Cable Fittings
UL 514C (2014; Reprint Feb 2020) UL Standard for Safety Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers
UL 651 (2011; Reprint Mar 2020) UL Standard for Safety Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings
UL 674 (2011; Reprint Dec 2020) UL Standard for Safety Electric Motors and Generators for Use in Hazardous (Classified) Locations
UL 797 (2007; Reprint Mar 2021) UL Standard for Safety Electrical Metallic Tubing -- Steel
UL 817 (2015; Reprint Sep 2021) UL Standard for Safety Cord Sets and Power-Supply Cords
UL 854 (2020) Standard for Service-Entrance Cables
UL 869A (2006; Reprint Jun 2020) Reference Standard for Service Equipment
UL 870 (2016; Reprint Mar 2019) UL Standard for Safety Wireways, Auxiliary Gutters, and Associated Fittings
UL 943 (2016; Reprint Feb 2018) UL Standard for Safety Ground-Fault Circuit-Interrupters
UL 984 (1996; Reprint Sep 2005) Hermetic Refrigerant Motor-Compressors
UL 1063 (2017) UL Standard for Safety Machine-Tool Wires and Cables
UL 1203 (2013; Reprint Mar 2021) UL Standard for Safety Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations
UL 1242 (2006; Reprint Aug 2020) Standard for Electrical Intermediate Metal Conduit -- Steel
UL 1283 (2017) UL Standard for Safety Electromagnetic Interference Filters
UL 1449 (2021) UL Standard for Safety Surge Protective Devices
UL 1699 (2017; Reprint Feb 2022) UL Standard for
SECTION 26 20 00 Page 9
Safety Arc-Fault Circuit-Interrupters
UL 2043 (2013) Fire Test for Heat and Visible Smoke Release for Discrete Products and Their Accessories Installed in Air-Handling Spaces
UL 4248-1 (2017) UL Standard for Safety Fuseholders
- Part 1: General Requirements
UL 4248-12 (2018) UL Standard for Safety Fuseholders
- Part 12: Class R
1.2 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in
IEEE 100 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Panelboards; G
Transformers; G
Cable Trays; G
Wireways; G
Marking Strips Drawings; G
SD-03 Product Data
Receptacles; G
Circuit Breakers; G
Switches; G
Transformers; G
Enclosed Circuit Breakers; G
Motor Controllers; G
Combination Motor Controllers; G Manual Motor Starters; G Metering; G
Meter Base Only; G
Secondary Bonding Busbar; G
SECTION 26 20 00 Page 10
Surge Protective Devices; G
Cable Trays; G
SD-05 Design Data
Cable Tray Design; G
SD-06 Test Reports
600-volt Wiring Test; G, RO
Grounding System Test; G, RO
Transformer Tests; G, RO
Ground-fault Receptacle Test; G,RO
Arc-fault Receptacle Test; G
SD-07 Certificates
Fuses; G
SD-09 Manufacturer's Field Reports
Transformer Factory Tests
SD-10 Operation and Maintenance Data
Electrical Systems, Data Package 5; G
1.4 QUALITY ASSURANCE
1.4.1 Fuses
Submit coordination data as specified in paragraph, FUSES of this section.
1.4.2 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Provide equipment, materials, installation, and workmanship in accordance with NFPA 70 unless more stringent requirements are specified or indicated. NECA NEIS 1 shall be considered the minimum standard for workmanship.
1.4.3 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.
SECTION 26 20 00 Page 11
b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.4.3.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.4.3.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site are not acceptable.
1.5 MAINTENANCE
1.5.1 Electrical Systems
Submit operation and maintenance data in accordance with Section 01 78 23, OPERATION AND MAINTENANCE DATA and as specified herein. Submit operation and maintenance manuals for electrical systems that provide basic data relating to the design, operation, and maintenance of the electrical distribution system for the building. Include the following:
a. Single line diagram of the "as-built" building electrical system.
b. Schematic diagram of electrical control system (other than HVAC, covered elsewhere).
c. Manufacturers' operating and maintenance manuals on active electrical equipment.
1.6 WARRANTY
Provide equipment items supported by service organizations that are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
As a minimum, meet requirements of UL, where UL standards are established for those items, and requirements of NFPA 70 for all materials, equipment, and devices.
2.2 CONDUIT AND FITTINGS
Conform to the following:
SECTION 26 20 00 Page 12
2.2.1 Rigid Metallic Conduit
2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit
ANSI C80.1 , UL 6 .
2.2.1.2 Rigid Aluminum Conduit
ANSI C80.5 , UL 6A .
2.2.2 Rigid Nonmetallic Conduit
PVC Type EPC-40 in accordance with NEMA TC 2, UL 651 .
2.2.3 Intermediate Metal Conduit (IMC)
UL 1242 , zinc-coated steel only.
2.2.4 Electrical, Zinc-Coated Steel Metallic Tubing (EMT)
UL 797 , ANSI C80.3 .
2.2.5 Plastic-Coated Rigid Steel and IMC Conduit
NEMA RN 1, Type 40( 40 mils thick).
2.2.6 Flexible Metal Conduit
UL 1 , limited to 6 feet.
2.2.6.1 Liquid-Tight Flexible Metal Conduit, Steel
UL 360 , limited to 6 feet.
2.2.7 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit
UL 514B . Ferrous fittings: cadmium- or zinc-coated in accordance with
UL 514B .
2.2.7.1 Fittings for Rigid Metal Conduit and IMC
Threaded-type. Split couplings unacceptable.
2.2.7.2 Fittings for EMT
Die Cast compression type.
2.2.8 Fittings for Rigid Nonmetallic Conduit
NEMA TC 3 for PVC, and UL 514B .
2.3 SURFACE RACEWAY
2.3.1 Surface Metal Raceway
UL 5 , two-piece painted steel, totally enclosed, snap-cover type. Provide multiple outlet-type raceway with grounding-type receptacle where indicated. Provide receptacles as specified herein, spaced a minimum of one every 18 inches. Wire alternate receptacles on different circuits.
SECTION 26 20 00 Page 13
2.3.2 Not Used
2.4 Not Used
2.5 CABLE TRAYS
NEMA VE 1. Provide the following:
Submit cable tray design, including dimensional layout, load and seismic calculations, and fill calculations. Dimensional layout includes cable spacings, cable tray splices, and supports. Fill calculations include an index of cables for each section and identification of the lb/ft, cross sectional area, and insulation voltage class for each cable.
a. Cable trays: form a wireway system, with a nominal4 inch depth as indicated.
b. Cable trays: constructed of aluminum.
c. Cable trays: include splice and end plates, dropouts, and miscellaneous hardware.
d. Edges, fittings, and hardware: finished free from burrs and sharp edges.
e. Fittings: ensure not less than load-carrying ability of straight tray sections and have manufacturer's minimum standard radius.
f. Radius of bends: 24 inches.
2.5.1 Basket-Type Cable Trays
Provide of nominal 6, inch width and 4 inch depth with maximum wire mesh spacing of 2 by 4 inch.
2.5.2 Not Used
2.5.3 Ladder-Type Cable Trays
Provide size as indicated of nominal 12 inch width with maximum rung spacing of 12 inches. Cable tray must be suitable for use as an equipment grounding conductor.
2.5.4 Not Used
2.5.5 Not Used
2.6 OPEN TELECOMMUNICATIONS CABLE SUPPORT
2.6.1 Open Top Cable Supports
Provide open top cable supports in accordance with UL 2043 . Provide
SECTION 26 20 00 Page 14 galvanized steel open top cable supports.
2.6.2 Closed Ring Cable Supports
Provide closed ring cable supports in accordance with UL 2043 . Provide galvanized steel closed ring cable supports.
2.7 OUTLET BOXES AND COVERS
UL 514A , cadmium- or zinc-coated, if ferrous metal. UL 514C , if nonmetallic.
2.7.1 Floor Outlet Boxes
Provide the following:
a. Boxes: adjustable and concrete tight.
b. Each outlet: consisting of nonmetallic or cast-metal body with threaded openings, for conduits, adjustable ring, and cover plate with 1 1/4 inch threaded plug.
c. Telecommunications outlets: consisting of flush, aluminum or stainless steel housing with a receptacle as specified and one inch bushed side opening.
d. Receptacle outlets: consisting of flush aluminum or stainless steel housing with duplex-type receptacle as specified herein.
e. Provide gaskets where necessary to ensure watertight installation.
2.7.2 Outlet Boxes for Telecommunications System
Provide the following:
a. Standard type 4 inches square by 2 1/8 inches deep.
b. Outlet boxes for wall-mounted telecommunications outlets: 4 by 2 1/8 by 2 1/8 inches deep.
c. Depth of boxes: large enough to allow manufacturers' recommended conductor bend radii.
d. Outlet boxes for fiber optic telecommunication outlets: include a minimum 3/8 inch deep single or two gang plaster ring as shown and installed using a minimum one inch conduit system.
2.8 CABINETS, JUNCTION BOXES, AND PULL BOXES
UL 50 ; volume greater than 100 cubic inches, NEMA Type 1 enclosure; sheet steel, hot-dip, zinc-coated. Where exposed to wet, damp, or corrosive environments, NEMA Type 3R.
2.9 WIRES AND CABLES
Provide wires and cables in accordance applicable requirements of NFPA 70 and UL for type of insulation, jacket, and conductor specified or indicated. Do not use wires and cables manufactured more than 12 months prior to date of delivery to site.
SECTION 26 20 00 Page 15
2.9.1 Conductors
Provide the following:
a. Conductor sizes and capacities shown are based on copper, unless indicated otherwise.
b. Conductors No. 8 AWG and larger diameter: stranded.
c. Conductors No. 10 AWG and smaller diameter: solid.
d. Conductors for remote control, alarm, and signal circuits, classes 1, 2, and 3: stranded unless specifically indicated otherwise.
e. Conductors indicated to be No. 6 AWG or smaller diameter: copper.
Conductors indicated to be No. 4 AWG and larger diameter: either copper or aluminum, unless type of conductor material is specifically indicated, or specified, or required by equipment manufacturer.
2.9.1.1 Not Used
2.9.1.2 Aluminum Conductors
Provide aluminum conductors of AA-8000 series electrical grade aluminum alloy conductors. Type EC/1350 aluminum is not acceptable. If Contractor chooses to provide aluminum for conductors No. 4 AWG and larger diameter, Contractor is responsible for increasing conductor size to have same ampacity as copper size indicated; increasing conduit and pull box sizes to accommodate larger size aluminum conductors in accordance with NFPA 70 ;
ensuring that pulling tension rating of aluminum conductor is sufficient;
providing panelboards that are UL listed for use with aluminum, and so labeled; relocating equipment, modifying equipment terminations, resizing equipment; and resolving problems that are direct results of providing aluminum conductors in lieu of copper.
2.9.1.3 Minimum Conductor Sizes
Provide minimum conductor size in accordance with the following:
a. Branch circuits: No. 12 AWG.
b. Class 1 remote-control and signal circuits: No. 14 AWG.
c. Class 2 low-energy, remote-control and signal circuits: No. 16 AWG.
d. Class 3 low-energy, remote-control, alarm and signal circuits: No. 22
AWG.
e. Digital low voltage lighting control (DLVLC) system at 24 Volts or less: Category 6 UTP cables in accordance with DLVLC system manufacturer requirements.
2.9.2 Color Coding
Provide color coding for service, feeder, branch, control, and signaling circuit conductors.
SECTION 26 20 00 Page 16
2.9.2.1 Ground and Neutral Conductors
Provide color coding of ground and neutral conductors as follows:
a. Grounding conductors: Green.
b. Neutral conductors: White.
c. Exception, where neutrals of more than one system are installed in same raceway or box, other neutrals color coding: white with a different colored (not green) stripe for each.
2.9.2.2 Ungrounded Conductors
Provide color coding of ungrounded conductors in different voltage systems as follows:
a. 208/120 volt, three-phase
(1) Phase A - black
(2) Phase B - red
(3) Phase C - blue
b. 480/277 volt, three-phase
(1) Phase A - brown
(2) Phase B - orange
(3) Phase C - yellow
c. 120/240 volt, single phase: Black and red
2.9.3 Insulation
Unless specified or indicated otherwise or required by NFPA 70 , provide power and lighting wires rated for 600-volts, Type THWN/THHN conforming to UL 83 or Type XHHW or RHW conforming to UL 44 , except that grounding wire may be type TW conforming to UL 83 ; remote-control and signal circuits:
Type TW or TF, conforming to UL 83 . Where equipment or devices require 90-degree Centigrade (C) conductors, provide only conductors with 90-degree C insulation or better.
2.9.4 Bonding Conductors
ASTM B1, solid bare copper wire for sizes No. 8 AWG and smaller diameter;
ASTM B8, Class B, stranded bare copper wire for sizes No. 6 AWG and larger diameter.
2.9.4.1 Telecommunications Bonding Backbone (TBB)
Provide a copper conductor TBB in accordance with TIA-607 with No. 6 AWG minimum size, and sized at 2 kcmil per linear foot of conductor length up to a maximum size of 750 kcmil.
SECTION 26 20 00 Page 17
2.9.4.2 Bonding Conductor for Telecommunications
Provide a copper conductor Bonding Conductor for Telecommunications between the telecommunications main grounding busbar (PBB) and the electrical service ground in accordance with TIA-607 . Size the bonding conductor for telecommunications the same as the TBB.
2.9.5 Service Entrance Cables
Service Entrance (SE) and Underground Service Entrance (USE) Cables, UL 854 .
2.9.6 Not Used
2.9.7 Not Used
2.9.8 Not Used
2.9.9 Not Used
2.9.10 Not Used
2.9.11 Not USed
2.9.12 Cable Tray Cable or Power Limited Tray Cable
UL listed; type TC or PLTC.
2.9.13 Cord Sets and Power-Supply Cords
UL 817 .
2.10 SPLICES AND TERMINATION COMPONENTS
UL 486A-486B for wire connectors and UL 510 for insulating tapes.
Connectors for No. 10 AWG and smaller diameter wires: insulated, pressure-type in accordance with UL 486A-486B or UL 486C (twist-on splicing connector). Provide solderless terminal lugs on stranded conductors.
2.11 DEVICE PLATES
Provide the following:
a. UL listed, one-piece device plates for outlets to suit the devices installed.
b. For metal outlet boxes, plates on unfinished walls: zinc-coated sheet
SECTION 26 20 00 Page 18 steel or cast metal having round or beveled edges.
c. For nonmetallic boxes and fittings, other suitable plates may be provided.
d. Plates on finished walls: nylon or lexan, minimum 0.03 inch wall thickness and same color as receptacle or toggle switch with which they are mounted.
f. Screws: machine-type with countersunk heads in color to match finish of plate.
g. Sectional type device plates are not be permitted.
h. Plates installed in wet locations: gasketed and UL listed for "wet locations."
2.12 SWITCHES
2.12.1 Toggle Switches
NEMA WD 1, UL 20 , single pole, three-way, and four-way, totally enclosed with bodies of thermoplastic or thermoset plastic and mounting strap with grounding screw. Include the following:
a. Handles: ivory thermoplastic.
b. Wiring terminals: screw-type, side-wired or of the solderless pressure type having suitable conductor-release arrangement.
c. Contacts: silver-cadmium and contact arm - one-piece copper alloy.
d. Switches: rated quiet-type ac only, 120/277 volts, with current rating and number of poles indicated.
2.12.2 Not Used
2.12.3 Not Used
2.12.4 Disconnect Switches
NEMA KS 1. Provide heavy duty-type switches where indicated, where switches are rated higher than 240 volts, and for double-throw switches.
Utilize Class R fuseholders and fuses for fused switches, unless indicated otherwise. Provide horsepower rated for switches serving as the motor-disconnect means. Provide switches in NEMA 1 or 3R, enclosure as indicated per NEMA ICS 6 .
2.13 FUSES
NEMA FU 1. Provide complete set of fuses for each fusible switch.
Coordinate time-current characteristics curves of fuses serving motors or connected in series with circuit breakers or other circuit protective devices for proper operation. Submit coordination data for approval.
Provide fuses with a voltage rating not less than circuit voltage.
2.13.1 Fuseholders
Provide in accordance with UL 4248-1 .
SECTION 26 20 00 Page 19
2.13.2 Cartridge Fuses, Current Limiting Type (Class R)
UL 248-12 , Class RK-1. Provide only Class R associated fuseholders in accordance with UL 4248-12 .
2.13.3 Cartridge Fuses, High-Interrupting Capacity, Current Limiting Type (Classes J, L, and CC)
UL 248-8 , UL 248-10 , UL 248-4 , Class J for zero to 600 amperes, Class L for 601 to 6,000 amperes, and Class CC for zero to 30 amperes.
2.13.4 Cartridge Fuses, Current Limiting Type (Class T)
UL 248-15 , Class T for zero to 1,200 amperes, 300 volts; and zero to 800 amperes, 600 volts.
2.14 RECEPTACLES
Provide the following:
a. UL 498 , general purpose specification grade, grounding-type.
Residential grade receptacles are not acceptable.
b. Ratings and configurations: as indicated.
c. Bodies: ivory as per NEMA WD 1.
d. Face and body: thermoplastic supported on a metal mounting strap.
e. Dimensional requirements: per NEMA WD 6.
f. Screw-type, side-wired wiring terminals or of the solderless pressure type having suitable conductor-release arrangement.
g. Grounding pole connected to mounting strap.
h. The receptacle: containing triple-wipe power contacts and double or triple-wipe ground contacts.
2.14.1 Split Duplex Receptacles
Provide separate terminals for each ungrounded pole. One receptacle must be controlled separately.
2.14.2 Weatherproof Receptacles
Provide receptacles, UL listed for use in "wet locations" with integral GFCI protection. Include cast metal box with gasketed, hinged, lockable and weatherproof while-in-use, die-cast metal/aluminum cover plate.
2.14.3 Ground-Fault Circuit Interrupter Receptacles
UL 943 , duplex type for mounting in standard outlet box. Provide device capable of detecting current leak when the current to ground is 6 milliamperes or higher, and tripping per requirements of UL 943 for Class A ground-fault circuit interrupter devices. Provide screw-type, side-wired wiring terminals or pre-wired (pigtail) leads.
SECTION 26 20 00 Page 20
2.14.4 Special Purpose Receptacles
Provide special purpose receptacles as indicated on drawings.
2.14.5 Not Used
2.14.6 Not Used
2.14.7 Not Used
2.14.8 Tamper-Resistant Receptacles
Provide duplex receptacle with mechanical sliding shutters that prevent the insertion of small objects into its contact slots.
2.14.9 Arc-Fault Circuit Interrupter Receptacles
UL 1699 , duplex type for mounting in standard outlet box. Provide device capable of detecting series arcing current when the current to ground is 5 amperes or higher, and tripping per requirements of UL 1699 .
2.15 PANELBOARDS
Provide panelboards in accordance with the following:
a. UL 67 and UL 50 having a short-circuit current rating as indicated.
b. Panelboards for use as service disconnecting means: additionally conform to UL 869A .
c. Panelboards: circuit breaker-equipped unkess indicated otherwise.
d. Designed such that individual breakers can be removed without disturbing adjacent units or without loosening or removing supplemental insulation supplied as means of obtaining clearances as required by UL.
e. "Specific breaker placement" is required in panelboards to match the breaker placement indicated in the panelboard schedule on the design drawings. If it is not possible to match "specific breaker placement" during construction, obtain Government approval prior to device installation.
f. Use of "Subfeed Breakers" is not acceptable.
g. Main breaker: "separately" mounted "above" or "below" branch breakers.
h. Where "space only" is indicated, make provisions for future installation of breakers.
i. Directories: indicate load served by each circuit in panelboard.
j. Directories: indicate source of service to panelboard (e.g., Panel PA
SECTION 26 20 00 Page 21 served from Panel MDP).
l.Type directories and mount in holder behind transparent protective covering.
m. Panelboards: listed and labeled for their intended use.
n. Panelboard nameplates: provided in accordance with paragraph FIELD
FABRICATED NAMEPLATES.
2.15.1 Enclosure
Provide panelboard enclosure in accordance with the following:
a. UL 50 .
b. Cabinets mounted outdoors or flush-mounted: hot-dipped galvanized after fabrication.
c. Cabinets: painted in accordance with paragraph PAINTING.
d. Cabinets shall be fabricated from sheet steel of not less than No. 10 gauge if flush-mounted or mounted outdoors, and not less than No. 12 gauge if surface-mounted indoors, with full seam-welded box ends.
e. Outdoor cabinets: NEMA 3R raintight with a removable steel plate 1/4 inch thick in the bottom for field drilling for conduit connections.
f. Front edges of cabinets: form-flanged or fitted with structural shapes welded or riveted to the sheet steel, for supporting the panelboard front.
g. All cabinets: fabricated such that no part of any surface on the finished cabinet deviates from a true plane by more than 1/8 inch.
h. Holes: provided in the back of indoor surface-mounted cabinets, with outside spacers and inside stiffeners, for mounting the cabinets with a 1/2 inch clear space between the back of the cabinet and the wall surface.
i. Flush doors: mounted on hinges that expose only the hinge roll to view when the door is closed.
j. Each door: fitted with a combined catch and lock latch.
k. Keys: two provided with each lock, with all locks keyed alike.
l. Finished-head cap screws: provided for mounting the panelboard fronts on the cabinets.
2.15.2 Panelboard Buses
Support bus bars on bases independent of circuit breakers. Design main buses and back pans so that breakers may be changed without machining, drilling, or tapping. Provide isolated neutral bus in each panel for connection of circuit neutral conductors. Provide separate ground bus identified as equipment grounding bus per UL 67 for connecting grounding conductors; bond to steel cabinet. In addition to equipment grounding bus, provide second "isolated" ground bus, where indicated.
SECTION 26 20 00 Page 22
2.15.2.1 Panelboard Neutrals for Non-Linear Loads
Provide in accordance with the following:.
a. UL listed, with panelboard type specifically UL heat rise tested for use on non-linear loads.
b. Panelboard: heat rise tested in accordance with UL 67 , except with the neutral assembly installed and carrying 200 percent of the phase bus current during testing.
c. Verification of the testing procedure: provided upon request.
d. Two neutral assemblies paralleled together with cable is not acceptable.
e. Nameplates for panelboard rated for use on non-linear loads: marked "SUITABLE FOR NON-LINEAR LOADS" and in accordance with paragraph FIELD
FABRICATED NAMEPLATES.
f. Provide a neutral label with instructions for wiring the neutral of panelboards rated for use on non-linear loads.
2.15.3 Circuit Breakers
UL 489 , thermal magnetic-type having a minimum short-circuit current rating equal to the short-circuit current rating of the panelboard in which the circuit breaker will be mounted. Breaker terminals: UL listed as suitable for type of conductor provided. Where indicated on the drawings, provide circuit breakers with shunt trip devices. Series rated circuit breakers and plug-in circuit breakers are unacceptable.
2.15.3.1 Multipole Breakers
Provide common trip-type with single operating handle. Design breaker such that overload in one pole automatically causes all poles to open.
Maintain phase sequence throughout each panel so that any…