W912QR25B0001_Specs-0002.pdf
PDF 3 MB Posted
- Attached to
- Construction of an Indoor Small Arms Range (ISAR) located in Grissom Air Reserve Base, IN.
- Solicitation number
- W912QR25B0001
About this file
This file contains Amendment 0002 to a solicitation for the Design/Bid/Build Construction of an Indoor Small Arms Range (ISAR) at Grissom Air Reserve Base, IN. The amendment makes various technical specification changes and clarifications across multiple sections including concrete, metal wall panels, roofing systems, doors and frames, flooring, and firearms training equipment.
Key changes include removing spray-applied fireproofing and prefabricated underground hydronic energy distribution specifications, updating metal wall panel gauge requirements to 24 gauge, clarifying seismic calculation requirements, modifying design wind load requirements, and revising various material and installation specifications. The amendment also includes additions/modifications to plan sheets and drawings. The bid due date is extended to March 11, 2025 at 1:00 PM ET, with a bid opening teleconference at 3:30 PM ET. A new Option 003 for soil removal and replacement (up to 250 CY) was added to the price breakout schedule. The estimated construction cost remains between $10-25 million under NAICS code 236220.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Amendment 0002 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
1 101
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25B0001
X 9B. DATED (SEE ITEM 11)
12-Dec-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2025
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR25B0001_Specs-0002
W912QR25B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0002 CONTINUATION PAGE
Block 14:
Solicitation W912QR25B0001 for the Construction of an Indoor Small Arms Range (ISAR) located in Grissom Air Reserve Base, IN is hereby amended as follows:
a. The Due Date has been extended from 2:00 ET 04 March 2025 to 1:00 ET 11 March 2025.
b. The PRICE BREAKOUT SCHEDULE has been replaced in its entirety.
c. Wage Decision IN20250002, dated 31 January 2025, is hereby revised, and replaced in its entirety by Wage Decision IN20250002, dated 21 February 2025.
d. Wage Decision IN20250006, dated 31 January 2025, is hereby revised, and replaced in its entirety by Wage Decision IN20250006, dated 21 February 2025.
e. The following SPECIFICATION SECTIONS have been added in their entirety:
32 93 00 EXTERIOR PLANTS
f. The following SPECIFICATION SECTIONS have been replaced in their entirety:
TABLE OF CONTENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
07 42 13 METAL WALL PANELS
07 54 19.00 48 THERMOPLASTIC MEMBRANE ROOFING SYSTEM
08 11 16 ALUMINUM DOORS AND FRAMES
09 69 19 STRINGERLESS ACCESS FLOORING
11 48 60 FIREARMS TRAINING EQUIPMENT
11 67 10 BAFFLE AND SAFETY CEILING SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 30 00 HVAC AIR DISTRIBUTION
23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST FOR RANGE VENTILATION
g. The following SPECIFICATION SECTIONS have been deleted in their entirety:
07 81 00 SPRAY-APPLIED FIREPROOFING
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
h. The following PLAN SHEETS have been added in their entirety:
A-615 MISC DETAILS
S-503 LOUVER SUPPORT ELEVATION
i. The following PLAN SHEETS have been replaced in their entirety:
G-002 SHEET INDEX
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CD108 DEMOLITION PLAN
CS101 CIVIL SITE PLAN OVERALL
CS103 CIVIL SITE PLAN
CS104 CIVIL SITE PLAN
CS105 CIVIL SITE PLAN
CG101 GRADING PLAN OVERALL
CG102 GRADING PLAN
CG103 GRADING PLAN
CG104 GRADING PLAN
CU101 UTILITY PLAN OVERALL
CU103 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU108 UTILITY PLAN
S-002 GENERAL STRUCTURAL NOTES
S-102 FOUNDATION PLAN – AREA A
S-113 ROOF FRAMING PLAN – AREA B
S-403 FRAMING DETAILS
S-404 FRAMING DETAILS
S-405 FRAMING DETAILS
S-406 FRAMING DETAILS
A-112 FIRST FLOOR ANNOTATION PLAN - AREA B
A-114 FIRST FLOOR DIMENSION PLAN - AREA B
A-140 FIRST FLOOR REFLECTED CEILING PLAN -COMPREHENSIVE
A-141 FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A-202 EXTERIOR ELEVATIONS
A-312 WALL SECTIONS
A-313 SECTION AT FIRING RANGE
A-314 ENTRANCE WALL DETAILS
A-315 ENTRANCE WALL DETAILS
A-402 ENLARGED PLAN - CONTROL BOOTH
A-511 SECTION DETAILS
A-512 SECTION DETAILS
A-521 ROOF DETAILS
A-601 PARTITION SCHEDULE AND DETAILS
A-602 DEMISING WALL DETAILS
A-612 DOOR AND WINDOW DETAILS - EXTERIOR
A-621 WINDOW SCHEDULE, TYPES, AND DETAILS
A-622 LOUVER ELEVATIONS AND DETAILS
I-601 INTERIOR ROOM, COLOR AND MATERIAL FINISH SCHEDULE AND DETAILS
IG601 SIGNAGE SCHEDULE & SIGNAGE DETAILS
P-601 PLUMBING SCHEDULES
M-002 MECHANICAL LEGEND AND NOTES
M-103 PARTIAL HVAC PLAN - AREA B
M-401 HVAC ENLARGED MECHANICAL ROOM PLANS
M-402 HVAC ENLARGED MECHANICAL ROOM SECTIONS
M-404 ISOMETRIC VIEW - MECHANICAL ROOM 113
M-405 HVAC ISOMETRIC VIEW - AREA B
M-406 HVAC ISOMETRIC VIEW - RANGE SUPPLY DUCT PLAN
M-601 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-703 HVAC CONTROL SYSTEM NETWORK
M-704 HVAC CONTROL SYSTEM NETWORK
M-721 ENERGY AND WATER MONITORING SCHEMATICS AND POINTS LIST
E-112 POWER PLAN – AREA B
E-120 MECHANICAL POWER PLAN – COMPREHENSIVE
j. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 04-Mar-4025 02:00 PM to 11-Mar-2025 01:00 PM.
The following have been modified:
BID OPENING
All sealed bids must be delivered electronically per the instructions contained within this solicitation. The bid opening will be conducted telephonically via the below conference call-in number. Bids must be received by the time specified in the solicitation, otherwise they will be deemed late and unacceptable. The bid opening teleconference will begin promptly two (2) hours after the bid submission time. The conference call-in number is as follows:
Conference Call-In Number: 503-207-9433 Phone conference ID: 982 068 154#
The Contracting Officer with assistance from the assigned Contract Specialist will download all of the bid submissions and record all of the pertinent information prior to the conference call.
The bid opening teleconference will begin promptly at 3:30 PM ET on 11 March 2025.
At that time, the bid opening officer will 1) read the names of the submitting contractors and their bids, and 2) read the independent government estimate. Once the information has been disseminated, the call will come to an end. The bid abstract will be posted to the SAM website by close of business of the day bids are opened.
PRICE BREAKOUT SCHEDULE
OFFEROR'S NAME: ___________________________________________
CONTRACT LINE-ITEM SCHEDULE
Line Item No. Description Unit Amount
BASE PROPOSAL
0001. Construction: All work, materials, and labor required to construct the Indoor Small Arms Range. Job $
0002. Construction: All work, materials, and labor required for site work for the Indoor Small Arms Range. All work, materials and labor required for demolition of the existing Indoor Small Arms Range. Job $
0003. Utility Connection: All work, materials, labor, to construct proposed primary electric service Job $ 36,157.59
0004. Utility Connection: Water Company meter purchase and permitting and connection fees. Job $ 2,000.00
0005. Utility Connection: Sanitary sewer line permitting & connection fees. Job $ 1,000.00
Total Base Proposal $
OPTIONS
0006. Option 1: Construction: All work, materials, and labor required for construction of the Asphalt pavement for Indoor Small Arms Range. Job $
0007. Option 2: Construction: All work, materials, and labor required for construction of the Auger Type Bullet Trap, Mechanical Spent Round Collection System in lieu of Bucket Type Spent Round Collection System and associated Work for Indoor Small Arms Range. Job $
Amendment 0002****************************************************************************************
0008. Option 003: Soil Removal: Unstable or otherwise unsatisfactory Soil Removal and replacement (250 CY) Job $
**************************************************************************************** Amendment 0002
Total Options $_______________________
TOTAL PROPOSAL $
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items [including options] of the CLIN Schedule. Failure to do so may result in the offer being unresponsive.
NOTE NO. 3. The Offeror’s Base Bid [and all Options] will be evaluated in accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes [by adding the total price for all options to] the total price for the basic requirement. [Evaluation of options will not obligate the Government to exercise the option(s).]
NOTE NO 4. The estimated utility fees to be proposed for bidding purposes are shown in the schedule (CLINS 0003-0005) and were provided by the utility owners. If the actual fees vary from these amounts after award, the Contract will be adjusted accordingly.
DESCRIPTION OF CLIN ITEMS
a) Line Item No. 0001: All work, materials, and labor required to construct the Indoor Small Arms Range within a line five feet outside the face of the building except that work covered by Line Item No. 0002.
b) Line Item No. 0002: All work, materials, and labor required to for site work for the Indoor Small Arms Range performed outside of a line five feet outside of the building except that work covered by Line Item No. 0001. All work, materials and labor required for demolition of the existing Indoor Small Arms Range.
c) Line Item No. 0003: All work, materials, and labor required to construct the primary electric service, including service transformer and components, by private utility company Miami-Cass REMC.
d) Line Item No. 0004: Water line connection fee includes the cost of the water meter and connection/permit fee to the Contractor for Peru Utilities to provide a meter to be installed and inspect and oversee final connection to the water meter. All work, materials, labor, to construct proposed water line and installation of the meter will be performed by the Contractor and shall be included in Line Item 0001 or 0002.
e) Line Item No. 0005: Sanitary sewer line permit/connection fee to the Contractor for Peru Utilities. All work, materials, labor, to construct proposed sanitary line will be performed by the Contractor and shall be included in Line Item 0001 or 0002.
f) Line Item No. 0006, Option 001: Construction of the Asphalt Pavement and all work, materials and labor required for the Asphalt Pavement. This option can be exercised within 180 calendar days of Administrative Notice to Proceed.
g) Line Item No. 0007, Option 002: Construction of one (1) Auger Type Bullet Trap Mechanical Spent Round
Collection System in lieu of Bucket Type Spent Round Collection System and all work, materials and labor required for the Bullet Trap Mechanical Spent Round Collection System. Refer to Specification section 11 48 60 and drawings for additional information. This option can be exercised within 180 calendar days of Administrative Notice to Proceed.
Amendment 0002****************************************************************************************
h) Line Item No. 0008, Option 003: Soil Removal: Unstable or otherwise unsatisfactory Soil Removal and replacement (up to 250 CY). Includes all work, materials, and labor required to remove and replace unstable or otherwise unsatisfactory soils discovered on site where appropriate in accordance with the plans and specifications. This option may be exercised up to
(20) times for a total of up to 5,000 CY of material. The basis of estimate and price evaluation is a single job up to 250 CY.
**************************************************************************************** Amendment 0002
--END OF CLIN SCHEDULE—
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION IN20240002
"General Decision Number: IN20250002 02/21/2025
Superseded General Decision Number: IN20240002
State: Indiana
Construction Type: Building
Counties: Adams, Allen, Bartholomew, Benton, Blackford, Boone, Carroll, Cass, Clinton, DeKalb, Delaware, Fountain, Fulton, Grant, Hamilton, Hancock, Hendricks, Howard, Huntington, Jay, Johnson, Madison, Marion, Miami, Monroe, Montgomery, Morgan, Noble, Shelby, Steuben, Tippecanoe, Tipton, Wabash, Warren, Wells, White and Whitley Counties in Indiana.
BUILDING CONSTRUCTION(does not include single family homes and apartments up to and including 4 stories)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed|
| | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2025 1 01/17/2025 2 01/31/2025 3 02/21/2025
ASBE0018-004 06/01/2024
BARTHOLOMEW, BENTON, BOONE, CARROLL, CLINTON, DELAWARE,
FOUNTAIN, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON,
MADISON, MARION, MONROE, MONTGOMERY, MORGAN, SHELBY,
TIPPECANOE, TIPTON, AND WARREN COUNTIES:
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 38.55 23.53
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
ASBE0041-002 07/01/2024
ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY,
MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES:
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 35.10 19.39
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings, stripping, removal, scrapping, vaccuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 35.10 19.39
* ASBE0075-003 06/01/2024
CASS, FULTON and WHITE COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 39.50 28.19
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 35.50 29.04
BOIL0374-002 01/01/2024
Rates Fringes
BOILERMAKER......................$ 42.41 35.72
BRIN0003-001 06/01/2023
INDIANAPOLIS
BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN
and SHELBY COUNTIES
Rates Fringes
Bricklayer, Stone Mason, Pointer, Caulking................$ 36.24 17.39
TERRAZZO FINISHER................$ 23.38 13.15
TERRAZZO WORKER/SETTER...........$ 36.38 17.24
Tile & Marble Finisher...........$ 24.33 13.16 Tile, Marble Setter..............$ 35.63 17.23
BRIN0004-004 06/01/2024
FORT WAYNE
ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND
WHITLEY COUNTIES:
Rates Fringes
BRICKLAYER (STONE MASON,
MARBLE MASONS, POINTER,
CLEANER, AND CAULKER)............$ 35.00 21.60
Terrazzo Grinder Finisher........$ 31.00 17.89 Terrazzo Worker Mechanic.........$ 36.30 22.04 Tile Setter & Marble Mason Mechanic.........................$ 31.55 19.08 Tile, Marble & Terrazzo Finisher.........................$ 31.55 19.08
BRIN0004-021 06/01/2024
BARTHOLOMEW and MONROE COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 35.21 18.19
TERRAZZO FINISHER................$ 25.33 14.19
TERRAZZO WORKER/SETTER...........$ 37.97 18.06
Tile & Marble Finisher...........$ 25.33 14.19 Tile & Marble Setter; Mosaic Worker...........................$ 37.22 18.05
BRIN0011-001 06/01/2023
LAFAYETTE
BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN and
WHITE COUNTIES
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 33.75 20.12
TERRAZZO FINISHER................$ 23.38 13.15
TERRAZZO WORKER/SETTER...........$ 36.38 17.24
Tile & Marble Finisher...........$ 24.33 13.16 Tile & Marble Setter; Mosaic Worker...........................$ 35.63 17.23
BRIN0018-001 06/01/2023
CASS, FULTON, GRANT, HOWARD, MIAMI and WABASH COUNTIES
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 34.00 19.71 Terrazzo Worker Finisher.........$ 35.50 23.62
TERRAZZO WORKER/SETTER...........$ 33.50 23.62
Tile & Marble Finisher...........$ 34.50 23.62 Tile, Marble Setter..............$ 34.50 23.62
BRIN0019-001 06/01/2023
MUNCIE CHAPTER
BLACKFORD, DELAWARE, HAMILTON, JAY, MADISON AND TIPTON COUNTIES:
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 33.83 20.14
TERRAZZO FINISHER................$ 23.38 13.15
TERRAZZO WORKER/SETTER...........$ 36.38 17.24
Tile & Marble Finisher...........$ 23.38 13.15 Tile & Marble Setter; Mosaic Worker...........................$ 35.63 17.23
CARP0215-001 06/01/2024
BENTON, CARROLL, CLINTON, TIPPECANOE, WARREN AND WHITE
COUNTIES:
Rates Fringes
CARPENTER........................$ 34.99 25.27
MILLWRIGHT.......................$ 36.94 25.82
CARP0232-001 06/01/2024
ALLEN, DEKALB, NOBLE, STEUBEN and WHITLEY COUNTIES
Rates Fringes
Carpenter & Piledrivermen........$ 31.74 24.48
CARP0615-001 06/01/2024
ADAMS, CASS, FULTON, GRANT, HOWARD, HUNTINGTON, MIAMI, TIPTON,
WABASH and WELLS COUNTIES
Rates Fringes
Carpenter & Piledrivermen........$ 31.95 24.20
CARP0912-001 06/01/2024
CARPENTER
ZONE 2: BOONE, FOUNTAIN,
HENDRICKS, MONROE,
MONTGOMERY AND MORGAN
COUNTIES
Carpenters, Drywall........$ 35.55 24.21 Millwright.................$ 36.94 25.82
ZONE 4: BLACKFORD,
DELAWARE, JAY AND MADISON
COUNTIES
Carpenters, Drywall........$ 35.26 24.21 Millwright.................$ 36.94 25.82
CARP0912-002 10/01/2024
HAMILTON, HANCOCK, JOHNSON (Townships of White River, Pleasant and Clark), MARION
Rates Fringes
Carpenters:
Carpenters, Drywall Installers, Piledrivers.....$ 37.06 24.21 Millwright..................$ 36.94 25.82 Soft Floor Layers...........$ 34.45 21.08
CARP0999-008 10/01/2024
BARTHOLOMEW, JOHNSON (Townships of Union, Hensley, Franklin, Nineva, Needham and Blue River), SHELBY COUNTIES
Rates Fringes
Carpenters:
Carpenters, Drywall Installers, Piledriver......$ 34.04 24.21 Millwright..................$ 36.94 25.82 Soft Floor Layers...........$ 34.95 21.30
CARP1029-001 06/01/2024
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 33.90 29.08
ELEC0305-002 12/01/2023
ADAMS, ALLEN, DE KALB, HUNTINGTON, NOBLE, STEUBEN, WELLS, and
WHITLEY COUNTIES
ELECTRICIAN......................$ 38.31 27.43%+10.66
ELEC0481-005 05/31/2024
BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, JOHNSON,
MADISON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES
Rates Fringes
ELECTRICIAN......................$ 42.15 26.88
ELEC0538-006 06/01/2024
FOUNTAIN AND WARREN COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 40.00 26.01
ELEC0668-002 06/01/2024
BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHITE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.33 23.05
FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, July 4th, Labor Day, Veterans Day Thanksgiving Day and Christmas Day
ELEC0725-006 06/01/2022
MONROE COUNTY
Rates Fringes
Communication Technician.........$ 30.00 18.07
Includes the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound and vision production and reproduction apparatus, equipment and appliances used for domestic, commercial, education, entertainment and private telephone systems.
ELEC0725-011 10/01/2024
MONROE COUNTY:
ELECTRICIAN......................$ 43.30 25.32
ELEC0855-003 06/01/2024
BLACKFORD, DELAWARE, AND JAY COUNTIES
Rates Fringes
ELECTRICIAN......................$ 38.53 21.42
ELEC0873-002 03/01/2022
CLINTON, GRANT, HOWARD, MIAMI, TIPTON AND WABASH COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 36.59 20.12
ELEV0034-001 01/01/2024
BARTHOLOMEW, BENTON, BLACKFORD, BOONE, CARROLL, CASS, CLINTON,
DELAWARE, FOUNTAIN, FULTON, GRANT, HAMILTON, HANCOCK,
HENDRICKS, HOWARD,JAY, JOHNSON, MADISON, MARION, MIAMI, MONROE,
MONTGOMERY, MORGAN, SHELBY, TIPPECANOE, TIPTON, WARREN and
WHITE COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 57.68 37.885+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ELEV0044-002 01/01/2024
ADAMS, ALLEN, DeKALB, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS, WHITLEY COUNTIES
ELEVATOR MECHANIC................$ 59.71 37.885+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0103-001 04/01/2021
BENTON, CARROLL, CASS, CLINTON, GRANT, HOWARD, MIAMI,
TIPPECANOE, TIPTON, WABASH, and WHITE COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.08 19.96
GROUP 2.....................$ 36.13 19.96
GROUP 3.....................$ 32.08 19.96
GROUP 4.....................$ 28.38 19.96
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: A-Frame Winch Truck, Air Compressors over 600 cu.ft., Air Tugger, Autograde (CMI), Auto Patrol, Backhoe, Ballast Regulator (RR), Batcher Plant (electricial control concrete), Bending Machine (pipe), Bituminous Plant (engineer), Bituminous Plant, Bituminous Mixer Travel Plant, Bituminous Paver, Bituminous Roller, Buck Hoist, Bull Dozer, Cable Way, Chicago Boom, Clamshell, Concrete Mixer (21 cu. ft. or over), Concrete Paver, Concrete Pump(crete), Crane, Craneman, Crusher Plant, Derrick, Derrick Boat, Dinkey, Dope Pots (pipeline), Dragline, Dredge Operator, Dredge Engineer, Drill Operator,, Elevating Grader, Elevator, Ford Hoe (or similar type equipment), Forklift, Formless Paver, Gantry Crane, Gradall, Grademan, Grout Pump, Helicopter Crew, Heterington Paver, High-Lift, Hoist, Hopto, Hough Loader (or similar type), Hydro Crane, Hydro Hammer, Locomotive Crane, Locomotive, Mechanic, Mobile Mixer, Motor Crane, Mucking Machine, Multiple Tamping Machine (rr), Overhead Crane, Pile Driver, Pulls, Push Dozer, Push Boats, Roller (sheep foot), Ross Carrier, Scoop, Shovel, Side Boom, Swing Crane, Tail Boom, Tar Machine (pipeline), Throttle Valve, Tower Crane, Trench Machine, Welder (heavy duty), Truck Mounted Concrete Pump, Truck-Mounted Drill, Well Point, Whirleys
GROUP 2: Air Compressor (up to 600 cu. ft.), Brakeman, Bull Float, Concrete Mixer (over 10s and under 21s), Concrete Spreader or Puddler, Deck Engine, Drill Helper, Electic Vibrator Kompactor (earth or rock), Finishing Machine, Gireman, Greaser (on grease facilities servicing heavy equipment), Material Pump, Motor Boats, Motor Crane Oiler, Portable Loader, Post Hole Digger, Power Broom, Rock Roller, Roller-Wobble Whell (earth or rock), Spike Machine (RR) Seamen Tiller, Spreader Rock, Sub Grader, Tamping Machine, Truck Mounted Drill Oiler, Welding Machine, Widener (apsco or similar type)
GROUP 3: Air Compressor 210 cu ft & over, Bituminous Distributor, Chair Cart, Concrete Curing Machine, Concrete Saw, Dope Pot Power Agitated, Flex Plane, Form Grader, Hydrohammer, Jacks Hydraulic Power Driven, Paving Joint Machine, Post Hole Digger, Roller Earth, Throttle Valve, Track Jack Power Driven, Tractor Farm Type, Truck Crane Driver
GROUP 4: Air Compressor (under 200 cu. fr. per min), Bituminous Distributor, Cement Gun, Concrete Saw, Conveyor, Deck Hand Oiler, Earth Roller, Form Grader, Generator, Guardrail Driver, Heater, Oiler, Paving Joint Machine, Power Traffic Signals, Steam Jenny, Vibrator, Water Pump, ""JLG"" Lifts and ""Scissor"" Lift or similar machine
ENGI0103-002 04/01/2021
BLACKFORD, DELAWARE, HAMILTON, HANCOCK, JAY, JOHNSON, MADISON,
MARION, and SHELBY COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.08 19.96
GROUP 2.....................$ 36.13 19.96
GROUP 3.....................$ 32.08 19.96
GROUP 4.....................$ 28.30 19.96
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Air Compressor (pressurizing shafts, tunnels & drivers); Air Tugger; Auto Patrol; Back Filler; Back Hoe;
Boom Cat; Boring Machine; Bull Dozer; Caisson Drilling Machine; Cherry Picker; Compactor (with dozer blade);
Concrete Mixer (dual drum); Concrete plant; Concrete Pump;
Crane with all attachments; Crane- Electric overhead;
Derrick; Ditching Machine (18' and over); Dredge; Elevators (when hoisting material or tools); Fork Lift (machinery);
Formless Paver; Generator (power for welders of compressor); Gradall; Helicopter; Helicopter Winch Operator; High Lift-Front End Loader; Hoist-Material and/or Personnel over 3 Floors; Locomotive; Mechanic on job site;
Mucking Machine; Panel Board Concrete Plant; Pile Driver;
Push Cat; Scoop & Tractor; Scraper-Rubber Tired;
Spreader-Tractor Mounted; Straddle Carrier-Ross Type; Sub Base Finish Machine (C.M.I. or smiliar); Tower Crane;
Tractor with Backhoe (over 1/2 yard); Welder (craft)
GROUP 2: A Frame Truck; Batcher Plant (automatic dry batch);
Bending Machine-Power Driven; Bituminous Mixer; Bituminous Paver; Bituminous Plant Engineer; Boatman; Bull Float;
Compactor or Tamper-Self Propelled; Concrete Mixer (21 cu.
ft. or over); Concrete Spreader-Power Driven; Dinkey Engine; Ditching Machine; Ditching Machine (less than 18"");
Drilling Machine; Finish Machine & Bull Float; Finishing Machine; Fireman-Pile Driving and Boilers; Fork Lift-Masonry & Material; Gunite Machine; Head Greaser;
Hoist-Material and/or personnel 3 floors and under;
Mechanic in shop; Mesh Depresser-Mesh Placer; P.C.C.
Concrete Belt Placer; Ruller-Asphalt, stone & sub base;
Sheepsfoot Roller- Self Propelled; Shop Mule; Spreader or Base Paver-Self Propelled; Sub Grader; Throttle valve with air compressor or boiler; Tractor with Backhoe (1/2 yard & under); Tractor-high lift-farm type; Tractor-Industrial Type; Tractor with Winch; Well Points; Winch Trick
GROUP 3: Air Compressor (210 cu. ft. & over); bituminous Distributor; Chair Cart; Concrete Curing Machine; Concrete Saw; Dope Pot Power Agitated; Flex Plane; Form Grader;
Hydrohammer; Jacks-Hydraulic-Power Driven; Minor Equipment opr. 3,4, or 5; Paving Joint Machine; Post Hole Digger;
Roller-Earth; Throttle Valve; Track Jack-Power Driven;
Tractor-Farm Type; Truck Crane Driver
GROUP 4: Air Compressor (less than 210 cu. ft.); Concrete Mixer (under 21cu. ft.); Conveyor; Generator; Mechanical Heater; Oiler; Operator-2 pieces of miner equipment; Power Broom; Pump; Welding Machine
ENGI0103-007 04/01/2021
ADAMS, ALLEN, DEKALB, HUNTINGTON, STEUBEN, WELLS, and WHITLEY
COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.08 19.96
GROUP 2.....................$ 36.13 19.96
GROUP 3.....................$ 32.08 19.96
GROUP 4.....................$ 28.30 19.96
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Air Tugger; Auto Patrol, Back Filler; Back Hoe;
Boom Cat; Boring Machine; Bull Dozer; Caisson Drilling Machine; Cherry Picker; Compactor (with dozer blade);
Concrete Mixer (dual drum); Concrete Plant; Concrete Pump;
Crane with all attachments; Crane Electric overhead;
Derrick; Ditching Machine (18"" and over); Dredge; Fork Lift (machinery); Formless Paver; Gradall; Helicopter;
Helicopter Winch Operator; High Lift Front End Loader;
Hoist Material and/or personnel over 3 floors; Locomotive;
Mechanic on Job Site; Mucking Machine; Panel Board Concrete
Plant; Pile Driver; Push Cat; Scoop & Tractor; Scraper Tubber Tired; Skid Steer Machine (grading and back hoe);
Spreader Tractor Mounted; Straddle Carrier Ross Type; Sub Base Finish Machine (C.M.I.or similar); Tower Crane;
Tractor with backhoe (over 1/2 yard); Welder for Craft Work.
GROUP 2: A-Frame Truck; Batcher Plant (automatic dry batch);
Bending Machine Power Driven; Bituminous Mixer; Bituminous Paver; Bituminous Plant Engineer; Boatman; Bull Float;
Compactor or Tamper Riding Only; Concrete Mixer (21 cu. ft.
or over); Concrete Spreader Power Driven; Dinkey Engine;
Ditching Machine (less than 18"" riding only); Drilling Machine; Elevators (when hoisting material or tools);
Finish Machine and bull Float (excluding trowelling machine); Fireman Pile Driving and Boilers; Gunite Machine;
Head Greaser; Hoist Material and/or personnel 3 floors and under; Mesh Depressor Mesh Placer; P.C.C. Concrete Belt Placer; Roller Asphalt, Stone & Sub Base; Sheepsfoot Roller Self Propelled; Shop Mule; Spreader or Base Paver Self Propelled; Sub Grader; Throttle Valve with Air Compressor or Boiler; Tractor with Backhoe (1/2 yard & under); Tractor High Lift Farm Type; Tractor Industrial Type; Tractor with Winch; Winch Truck.
GROUP 3: Bituminous Distributor; Chair Cart; Concrete Cuting Machine; Dewatering Sytems; Dope Pot Power Agitated; Flex Plane; Fork Lift (masonry and material); Form Grader;
Hydrohammer; Jacks Hydraulic Power Driven; Paving Joint Machine; Post Hole Digger (machine Mounted); Roller Earth;
Skid Steer Machine (fork lift and trasporting); Throttle Valve; Track Jack Power Driven; Tractor Farm Type.
GROUP 4: Air Compressor (pressurizing shafts, tunnels and divers); Air Compressor (over 210 cu. ft.); Concrete Saw;
Conveyor; Generators; Oiler; Operating minor equipment;
Power Broom; Truck Crane Driver; Welding Machines over 300 amps (2 or more).
ENGI0150-017 06/01/2024
FULTON and NOBLE COUNTIES Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 33.15 37.30
GROUP 2.....................$ 31.80 37.30
GROUP 3.....................$ 31.00 37.30
GROUP 4.....................$ 30.20 37.30
GROUP 5.....................$ 27.60 37.30
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto
Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with ""a"" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0181-004 04/01/2024
BARTHOLOMEW COUNTY
Power equipment operators:
GROUP A.....................$ 41.28 19.72
GROUP B.....................$ 33.15 19.72
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: A-frame winch truck, articulating dump, autograde (CMI), auto patrol, ballast regulator (RR), batcher plant (electrical control concrete), bending machine (pipe), bituminous plant (engineer), bituminous plant, bituminous mixer travel plant, bituminous paver, bituminous roller, boring machine, buck hoist, bull dozer, cable way, Chicago boom, chimney hoist, clamshell, concrete mixer (21 cu.ft.
or over), concrete paver, concrete pump (crete), construction elevator (Allmac or similar) creane, creaneman, crawler backhoe, bcreawler high-lift, crusher plant, derrick, derrick boat, dinkey, directional/boring machine, dope pots (pipeline), double drum tugger (electric or air), dragline, dredge operator, dredge engineer, drill operator, elevating grader, extendable boom forklift, formless paver, gantry crane, gator (or similar type tiller), gradeall, grader, grademan, greaser (on grease facility servicing heavy equipment), G.P.S. System (on equipment within the classificaitons), grout pump, head greaser, helicopter crew, Hetherington paver, hoist (motorized, gas or disel), hydraulic crane, ghdro blaster, Industrial type forklift (over 9,000 lbs.), laser concrete screed, laser or remote controlled equipment (within the classifications), locomotive crane, locomotive, mechanic, mobile mixer, botor creane, mucking machine, multiple tamping machine (RR) overhead crane, pile driver, pulls, push dozer, push boats, roller (sheep foot), rough terrain crain, R.T. backhoe, R.T. endloader, Ross carrier, scoop, shovel, side boom, skidsteer loader (bobcat or similar type), swing crane, tail boom, tar machine (pipeline), tower crane, trench machine, welder (heavy duty), truck mounted concrete pump, truck-mounted drill, vacuum truck, well point, whirleys
GROUP B: Air compressor (1 or more, 600 cfm and over), air compressor with throttle valve, bituminous distributor, brakeman, bullfloat, cement gun, concret mixer, concrete say, soncrete spreader or puddlers, conveyor, deck hand oiler, deck engine, drill helper, earth roller electric vibrator compactor (earth or rock), elevator (in-plant, automatic), finishing machine fireman, form grader, generator, guard-rail driver, heater, oiler, Industrial type forklift (9,000 lbs and under), aterail pump, motor boats, paving joint machine, post hole digger, power broom, power traffic signals, rock roller, rock spreader, Roller
(earth or rock), spike machine (RR), steam jenny, sub grader, taping machine, gruck crane oiler, truck mounted drill oiler Tugger (one-drum, air or electric)vibrator, vibro-piling hammer- hydraulic hammer or auger, water pump, widener (apsco or similar type) welding machine, JLG lifts and scissor lifts or similar machine.
ENGI0841-008 04/01/2023
BOONE, FOUNTAIN, HENDRICKS, MONROE, MONGOMERY, MORGAN, and
WARREN COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.90 23.00
GROUP 2.....................$ 26.75 23.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Power Cranes, Draglines, Derricks, Shovels, Gradalls, Mechanics, Tractor Highlift, Tournadozer.
Concret Mixers with Skip Tournamixer, Two-Drum Machine, One-Drum Hoist with Tower or Boom, Cableways, Tower Machines, Motor Patrol, Boo Tractor, Boom or Winch Truck, Winch or Hydraulic Boom Truck, Truck Crane, Tournapull, Tractor Operating Scoops, Bulldozer, Push Tractor, Asphalt Planer, Finishing Machine on Asphalt, Large Rollers on Earth, Rollers on Asphalt Mix, Ross Carrier or Similar Machine, Gravel Processing Machine, Asphalt Plant Engineer, Paver Operator, Farm Tractor with Half Yard Bucket and/or Backhoe Attachments, Dredge Engineer, or Dredge Operator, Central Mix Plant Engineer, CMI or Similar Type Machine, Truck or Skid Mounted Concrete Pump, Tower Crane, Engine or Rock Crusher Plant, Concrete Plant Engineer, Ditching Machine with Dual Attachment, Tractor Mounted Loaders, Cherry Picker, Hydro Crane, Standard or Dinkey Locomotives, Scoopmobiles, Euclid Loader, Soil Cement Machine, Back Filler, Elevating Machine, Power Blade, Drilling Machines including Well Testing, Caissons, Shaft or any similartype Drilling Machines, Motor Driven Paint Machine, Pipe Cleaning Machine, Pipe Wrapping Machine, Pipe Bending Machine, Apsco Paver, Boring Machine, (Equipment Greased), Barber-Greene Loaders, Formless Paver, (Well Point System), Concrete Spreader, Hydra Ax, Span Saw and Similar Types, Marine Scoops, Brush Mulcher, Brush Burner, Mesh Placer, Tree Mover, Helicopter Crew (3), Piledriver-Skid or Crawler, Stump Remover, Root Rake, Tug Boat Operator, Refrigerating Machine, Freezing Operator, Chair Cart-Self Propelled, Hydra Seeder, Straw Blower Power Sub Grader, Bull Float, Finishing Machine, Self-Propelled Pavement Breaker (Backhoe Attached), Lull (or Similar Type Machine), Two Air Compressors, Compressors Hooked in Manifold, Overhead Crane, Chip Spreader, Mud Cat, Sull-Air Fork Lifts (Except when used for Landscaping Work), Soil Stablilizer (Seaman Tiller, Bo Mag, Rago Gator and Similar types or Equipment), Tube Float, Spray Machine, Curing Machine, Concrete or Asphalt Milling Machine, Snooper Truck Operator.
GROUP 2: Concrete Mixers without Skips, Rock Crusher, Ditching Machine Under 6', Curbing Machine, One Drum Machines without Tower or Boom, Air Tugger, Self-Propelled Concrete Saw, Machin- Mounted Post Hole Digger, Two to Four Generators, Water Pumps, or Welding Machines, with 400 ft., Air Compressor 600 cu. ft. and Under, Rollers on Aggregate and Seal Coat Surfaces, Fork Lifts (When used for Landscaping Work), Concrete and Blacktop Curb Machine, Farm Tractor with less than Half Yard Bucket, One Water Pump, Iolers, Air Valves or Steam Valves, One Welding Machine, Truck Jack, Mud Jack, Gunnite Machine, House Elevators when used for Hoisting Material, Engine Tenders, Wagon Drill, Flex Plane, Conveyor, Siphons nad Pulsometer, Switchman, Fireman on Paint Pots, Fireman on Asphalt Plants, Distributor Operators on Trucks, Tampers, Self-Propelled Power Broom, Striping Machine (motor driven), Form Tamper, Bulk Cement Plan Equipment Greaser, Deck Hands, Truck Crane Oiler Driver, Cement Blimps, Form Grader, Temporary Heat, Throttle Valve, Farm Tractor, Super Sucker (and similar type of equipment). FOOTNOTE: Employees operating booms from 149 ft. to 199 ft. including jib, shall receive an additional seventy five cents (.75)per hour above the rate.
Employees operating booms over 199 ft. including jib, shall receive an additional one dollar and twenty-five cents ($1.25) per hour above the regular rate.
IRON0022-004 06/01/2024
BARTHOLOMEW; BENTON, BOONE; CARROLL; CASS; CLINTON; DELAWARE (S
2/3); FOUNTAIN; FULTON (SW 1/4 OF COUNTY); GRANT (SW PORTION);
HAMILTON; HANCOCK; HENDRICKS; HOWARD; JOHNSON; MADISON; MARION;
MIAMI; MONROE; MONTGOMERY; MORGAN; SHELBY; TIPPECANOE; TIPTON;
WARREN AND WHITE COUNTIES
Rates Fringes
IRONWORKER.......................$ 36.70 26.09
The following holidays shall be observed: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day. Any holiday which occurs on a Sunday shall be observed the following Monday, unless the legal observance of these holidays is changed by law.
IRON0147-004 06/01/2024
ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE (NORTHEAST THIRD OF
COUNTY), FULTON (EASTERN PART), GRANT (EXCLUDING SOUTHWEST
PORTION), HUNTINGTON, JAY, MIAMI (NORTHEAST HALF), NOBLE
(EXCLUDING NORTHEAST TIP), STEUBEN, WABASH, WELLS, and WHITLEY
COUNTIES
Rates Fringes
IRONWORKER.......................$ 34.20 26.39
IRON0292-006 06/01/2024
FULTON (Remainder of County) and NOBLE (Northeastern Tip)
COUNTIES
IRONWORKER.......................$ 37.83 24.75
LABO0120-001 06/01/2024
MARION and SHELBY COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 28.14 18.00
GROUP 2.....................$ 28.89 18.00
GROUP 3.....................$ 29.64 18.00
LABORER CLASSIFICATIONS
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Masons and Plasterers); Mechanic Tenders; Window Washers and cleaners; Railroad Workers;
Masonry Wall Washers; Portable Water pumps with discharge up to (3) inches; Flag & Signal Person; Waterproofing;
Handling of Creosot Lumber or like treated material (excluding railroad material); Asphalt Rakers and Lutemen;
Kettlemen; Air Tool Operators; Pneumatic Tool Operators;
Air and Electric Vibrators and Chipping Hammer Operators;
Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth; Laborers working in ditches
(6) ft.in depth or deeper; Assembly of Unicrete Pump; Chain Saw and Demolition Saw; Tile Layers (sewer or field) and Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers; Concrete Conveyor Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing;
Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking (metallic and non-metallic); Screed
Man or Screw Operator on Asphalt Paver; Asbestos Removal and Hazardous Waste Removal.
GROUP 2: Plaster Tenders; Mortar Mixers; Welders (Acetylene or electric); Cutting Torch or Burner; Cement Nozzle Laborers; Cement Gun Operator; Scaffold Builders when working for Plasterers and Masons; Water Blast Machine.
GROUP 3: Dynamite men, Mason Tenders; Drillers-air track or wagon drilling for explosives.
LABO0204-001 06/01/2024
FOUNTAIN, HENDRICKS, and WARREN COUNTIES
Rates Fringes
Laborers:
Caisson and Tunnel Work in Compressed and Free Air
GROUP 1....................$ 23.18 16.00
GROUP 2....................$ 23.93 16.00
GROUP 3....................$ 24.18 16.00
GROUP 4....................$ 23.13 16.00
LABORERS
GROUP 1....................$ 26.93 18.00
GROUP 2....................$ 27.68 18.00
GROUP 3....................$ 28.43 18.00
LABORER CLASSIFICATIONS
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Masons and Plasterers); Mechanic Tenders; Window Washers and cleaners; Railroad Workers;
Masonry Wall Washers; Portable Water pumps with discharge up to (3) inches; Flag & Signal Person; Waterproofing;
Handling of Creosot Lumber or like treated material (excluding railroad material); Asphalt Rakers and Lutemen;
Kettlemen; Air Tool Operators; Pneumatic Tool Operators;
Air and Electric Vibrators and Chipping Hammer Operators;
Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth; Laborers working in ditches
(6) ft.in depth or deeper; Assembly of Unicrete Pump;
Chain Saw and Demolition Saw; Tile Layers (sewer or field) and Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators;
Pump Crete Assemblers; Concrete Conveyor Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing;
Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking (metallic and non- metallic);
Screed Man or Screw Operator on Asphalt Paver, Asbestos Removal, Hazardous Waste Removal.
GROUP 2: Plaster Tenders; Mortar Mixers; Welders (Acetylene or electric); Cutting Torch or Burner; Cement Nozzle Laborers; Cement Gun Operator; Scaffold Builders when working for Plasterers and Masons; Water Blast Machine.
GROUP 3: Dynamite men, Mason Tenders; Drillers-air track or wagon drilling for explosives.
LABORER CLASSIFICATIONS For CAISSON AND TUNNEL WORK In COMPRESSED and FREE AIR
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men.
GROUP 2: Concrete Repairmen, Lock Tenders (pressure side), Motor men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Lock Tenders (free air side), Steel Setters, Tuggers, Switchmen.
GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Welders Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, DRillers, Erectors, Form Men, Jackhammermen, Mining Machine.
GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives.
LABO0213-001 06/01/2024
ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WABASH, WELLS
AND WHITLEY COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 24.93 17.85
GROUP 2.....................$ 25.43 17.85
GROUP 3.....................$ 26.93 17.85
LABORERS CLASSIFICATION
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Masons and Plasterers); Mechanic Tenders; Window Washers and cleaners; Railroad Workers;
Masonry Wall Washers; Portable Water pumps with discharge up to (3) inches; Flag & Signal Person; Waterproofing;
Handling of Creosot Lumber or like treated material (excluding railroad material); Asphalt Rakers and Lutemen;
Kettlemen; Air Tool Operators; Pneumatic Tool Operators;
Air and Electric Vibrators and Chipping Hammer Operators;
Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth; Laborers working in ditches
(6) ft.in depth or deeper; Assembly of Unicrete Pump; Tile Layers (sewer or field) and Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing;
Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking; Screed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .