W912QR24R0046_Specs-0005.pdf

PDF 2 MB Posted

Attached to
ARCENT Readiness Training Center Microgrid Project - Camp Buehring, Kuwait
Solicitation number
W912QR24R0046
Issued by

About this file

This document is an Amendment to Solicitation W912QR24R0046 for the Camp Buehring Microgrid Project in Kuwait. The project will connect the ARCENT Readiness Training Center (ARTC) at Camp Buehring to the existing power plant, install a new 1.5 MW diesel generator, and implement a microgrid system with 700 KW of solar PV and a 1.5 MW / 1.5 MWh battery energy storage system. Key amendments include:

  • The proposal due date has been extended from August 5 to August 15, 2024.
  • Several plan sheets and specification sections have been replaced or updated.
  • New details have been added for pullboxes, manholes, and building as-built drawings.
  • Requirements for electronic proposal submission via the PIEE system have been clarified, including file naming conventions and size limitations.
  • Bid Guarantee requirements under FAR 52.228-1 have been updated.
  • All amendments must be acknowledged by offerors.

The Government will evaluate proposals using the Best Value Trade-Off process to award a firm-fixed price contract.

View the file

Other files

File Type Posted
W912QR24R0046_Specs-0009.pdf PDF
W912QR24R0046_Plans-0009.pdf PDF
W912QR24R0046-0008.pdf PDF
W912QR24R0046_Specs-0007.pdf PDF
W912QR24R0046_Plans-0006.pdf PDF
W912QR24R0046_Specs-0006.pdf PDF
W912QR24R0046_Plans-0005.pdf PDF
W912QR24R0025_APPENDIX_A_FRO-0005.pdf PDF
W912QR24R0046-0004.pdf PDF
W912QR24R0046-0003.pdf PDF
W912QR24R0046_Plans-0002.pdf PDF
W912QR24R0046_Specs-0002.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
Site Visit Photos.pdf PDF
W912QR24R0046_Specs-0001.pdf PDF
W912QR24R0046_Specs-0001.pdf PDF
W912QR24R0046_Specs-0000.pdf PDF
W912QR24R0046_Plans-0000.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR24R0046

X 9B. DATED (SEE ITEM 11)

16-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation W912QR24R0046 for the Camp Buehring Microgrid Project is hereby amended as follows:

SEE ATTACHED CONTINUATION PAGE

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE

DATE

31-JUL-2024

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0046_Specs-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

CONTINUATION PAGE-0005

a. The proposal due date has been extended from 05 August 2024 to 15 August 2024 at 10:00AM Eastern Time.

b. The following PLAN SHEETS have been replaced in their entirety:

G-001 COVER SHEET

E-101 MAIN ELECTRICAL SITE PLAN – 1

E-601 ELECTRICAL ONE-LINE DIAGRAM

c. The following PLAN SHEETS have been replaced in their entirety due to a printing scale error. No other changes occurred on the following sheets:

E-102 MAIN ELECTRICAL SITE PLAN - 2 - reissued E-103 ELECTRICAL SITE PLAN - 1 - reissued E-104 ELECTRICAL SITE PLAN - 2- reissued E-105 ELECTRICAL SITE PLAN – 3 - reissued E-106 ELECTRICAL SITE PLAN – 4 - reissued E-107 ELECTRICAL SITE PLAN – 5 - reissued E-108 ELECTRICAL SITE PLAN – 6 - reissued E-110 AC COMBINER SWITCHBOARD EQUIPMENT LAYOUT- reissued E-602 PV SYSTEM ONE-LINE DIAGRAMS - reissued E-603 PV SYSTEM ONE-LINE DIAGRAMS - reissued E-610 TELECOMMUNICATIONS & DATA MONITORING ONE-LINE DIAGRAM - reissued E-615 GROUNDING PLAN - reissued E-617 SOLAR SYSTEM GROUNDING DETAIL - reissued

d. The following PLAN SHEETS have been added in their entirety:

E-502 PULLBOX DETAIL

E-503 MANHOLE DETAIL

Appendix A BUILDING 606 AS-BUILT DRAWINGS

e. The following PLAN SHEETS have been deleted in their entirety:

NA

f. The following SPECIFICATION SECTIONS have been replaced in their entirety:

Project Table of Contents

00 10 00 PRICE BREAKOUT SCHEDULE

01 10 00 SUMMARY OF WORK

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 APPARATUS INSPECTION AND TESTING

26 11 16 COMPACT SUBSTATIONS

26 20 00 I NTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 ELECTRICAL METERING

26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS

26 32 15.00 ENGINE-GENERATOR SET STATIONARY

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

g. The following SPECIFICATION SECTIONS have been deleted in their entirety:

NA

h. The following SPECIFICATION SECTIONS are added in their entirety:

NA

i. The Electronic Proposal Submission section is hereby amended and is highlighted in yellow.

j. Provision 52.228-1 Bid Guarantee has been edited to include submission instructions for clarification and is highlighted in yellow.

k. PERFORMANCE SURETY FORM, in its entirety, is hereby removed from Section 00 22 00 Supplementary Instructions.

l. All Amendments must be acknowledged.

m. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 05-Aug-2024 10:00 AM to 15-Aug-2024 10:00 AM.

The following have been added by full text:

PRICE BREAKOUT SCHEDULE

PROJECT: The Scope of Work (SOW) is for supply resilient power to ARCENT Readiness Training Center (ARTC) at Camp Buehring. The project will connect the ARTC to Camp Buehring's power plant ring 4 thru new 1500 KVA transformer, install 1.5 MW new diesel generator and install a microgrid system including 700 KW PV solar panels and a 1.5MW/1.5 MWH technically proven Battery Energy Storage System (BESS), all to be synchronized.

LOCATION: Camp Buehring, Kuwait.

PROPOSER’S NAME:

ITEM

NUMBER Description UNIT AMOUNT

BASE

0001 Mobilization and Demobilization: Mobilization and Demobilization shall consist of all labor, equipment, supplies, and temporary facilities required to stage all equipment and facilities needed for the construction of this project.

0002 Survey: All work, materials, and labor required to perform site survey, site layout, site grading and drainage.

JOB $

JOB $

0003 Power Plant Control and Communication System: All work, materials, and labor required for the site, including, the Sync panel, adding or upgrading existing power plant controls and software as required to make them completely compatible, interoperable, and functional with the microgrid controls.

0004 Fencing: All work, materials, and labor required for providing security fencing around each PV inverter concrete pad, and around the AC combiner, BESS, and step-up transformer area.

0005 As-Built Drawings: All labor, equipment, and all supplies needed to produce design records, documents, and drawings by the requirements specified in the Specifications

JOB $

JOB $

JOB $

0006 AC Combiner Switchboard and BESS Shade Canopy: All work and labor required to design and construct a canopy to cover the AC combiner switchboard and BESS equipment concrete pad.

JOB $

0007 Power Distribution System Site Work: All work, materials, and labor required to install all electrical infrastructure components for the microgrid and feeding power to the site’s existing equipment This includes wire, cables, conduits, pull boxes, junction boxes, trench work, and labor.

JOB $

0008 Communication Distribution System: All work, materials, and labor required to install all communications infrastructure components for the microgrid.

JOB $

0009 Solar PV System: All work, materials, and labor required to install all components of the solar PV system including solar panels, combiners, disconnect switches, recombiners, inverters, and cabling for an operable solar PV system.

0010 Battery Energy Storage System (BESS): All work and labor required to install a complete and functional battery energy storage system.

The lithium-ion battery shall be of the LFP chemistry type and be capable of a minimum of 5,000 cycles.

0011 AC Combiner Switchboard: All work, materials, and labor required to install an AC combiner switchboard to accept power from the solar PV system and battery energy storage system.

0012 Step-Down Transformer: All work and labor required to install a 1,500KVA step- down transformer.

0013 Automatic Transfer Switch (ATS) and Main Switchboard (MSB): All work, materials, and labor required to install and connect Automatic Transfer Switch and Main Switchboard.

JOB $

JOB $

JOB $

JOB $

0014 New 1.5 MW Diesel Generator: All work and Labor required to supply, install and connect the Generator.

JOB $

0015 New Carport Structures: All work, materials, and labor required to install complete and functional carport structures.

JOB $

0016 Structural Evaluation of Existing Buildings:

All work, materials, and labor required to perform structural evaluation of existing buildings.

JOB $

0017 Manual Transfer Switches (MTS): All work, materials, and labor required to install and connect Main Transfer Switches to existing generators.

W912QR24R0046

TOTAL PROJECT BASE PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Price Breakout Schedule schedules as published in the solicitationor the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including options of the Price Breakout Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid will be evaluated for best value to the Government. The basis of award is the Best Value Trade-Off Process.

--END OF CLIN SCHEDULE—

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

ELECTRONIC PROPOSAL SUBMISSION

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED

ELECTRONICALLY THROUGH THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT

(PIEE) SOLICITATION MODULE BEFORE THE TIME SPECIFIED IN BLOCK 13 OF THE SF1442. No paper copies, CD-ROMS, facsimile, or DoD SAFE submissions will be accepted.

A User ID and Password are required to access PIEE. Offerors are required to self-register as a Vendor or Contractor with the user's CAGE code(s) and must have an active registration in the System for Award Management (SAM) prior to the PIEE registration process.

1. Instructions for registering in PIEE:

a. Navigate to https://piee.eb.mil/

b. Select “Register” [top right],or go to https://piee.eb.mil/xhtml/unauth/registration/notice.xhtml

c. Select “Vendor”

d. Create a User ID and Password and follow the prompts [next]

e. Create Security Questions [next]

f. Complete your User Profile Information [next]

g. Complete your Supervisor or Approving Official Information [next]

h. Complete Roles:

(1) Step 1. Select SOL-Solicitation

(2) Step 2. Select Proposal Manager

(3) Step 3. Click Add Roles

(4) Step 4. Fill in your Location Code (CAGE Code) [next]

i. Provide a justification for your registration [next]

j. Follow the remaining prompts to submit your registration

2. Instructions for Electronic Proposal Submissions in PIEE Solicitation Module:

a. Log into PIEE and select the Solicitation Icon.

b. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status).

c. The search results display. Select the Solicitation Number link to open the solicitation.

d. The solicitation displays. The information is view only.

e. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.

https://piee.eb.mil/

f. Click the Offer tab to Add and review current offers on the Solicitation. Click the Add button to add an offer to the Solicitation.

g. Select the applicable CAGE Code for which submitting the offer for. The list is prefiltered based on the CAGEs in the Proposal Manager’s profile.

h. Upload the attachments that comprise the offer by selecting the Choose Files link.

i. After entering all necessary information enter a Signature Date and Click the Signature button.

j. The “Sign Document” pop-up window will be displayed requiring the user to enter a Digital PIN and One Time Password (OTP). Click the “Sign and Submit” button to continue.

k. After successfully adding the Offer a success message of the submission will be displayed and the offer displayed collapsed. Users may expand and view all their offers on a Solicitation.

File Size Limitations: Offerors are advised to follow the above instructions for uploading files. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention:

To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

• W912QR24R0046_FIRMNAME_VOLUME_I

• W912QR24R0046_FIRMNAME_VOLUME_II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above. File Naming Convention will be strictly adhered to and enforced. Information submitted which exceeds the specified Naming Convention will not be evaluated. (***NOTE: The PIEE Solicitation Module will replace special characters and spaces in the attachment filename with underscores “_”***)

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Upload Completion & Deadline: Offerors are highly encouraged to become familiar with the PIEE Solicitation module well in advance of the proposal due date. Interested Offerors shall submit proposals no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within PIEE Solicitation module. Do not assume that electronic submission will occur instantaneously. Large files will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the Solicitation.

The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

For training and help using the PIEE Solicitation module, reference the links below.

• New User Information and Help:

https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml

• Vendor Customer Support:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml

• Solicitation - Web Based Training:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

Bid guarantee in the form of postal money order, certified check, or cashier’s check shall be sent to:

U.S. Army Corps of Engineers, Louisville District Attn: Patrick Duggins 600 Dr. Martin Luther King Jr. Place Room 821 Louisville, KY 40202

(End of provision)

W912QR24R0046_Specs-0005 https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been deleted:

PERFORMANCE SURETY FORM

(End of Summary of Changes)

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 04/21 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK (SOW)

01 32 01.00 06 07/18 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 02/14 METRIC MEASUREMENTS

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE(RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 MICROGRID COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 02/19 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS

EQUIPMENT

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 05/21 Microgrid Control System

CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES

26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

PROJECT TABLE OF CONTENTS Page 1

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

Amendment 0005

AMENDMENT 0005

CERTIFIED FINAL

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE

DEVICES

26 08 00 08/08, CHG 2: 08/21 APPARATUS INSPECTION AND TESTING

26 11 16 11/21 COMPACT SUBSTATIONS

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 13 13 11/21 SWITCHGEAR

26 20 00 08/19, CHG 2: 05/21 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 31 00 05/15 SOLAR PHOTOVOLTAIC (PV) COMPONENTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 33 53 05/19 BATTERY ENERGY STORAGE SYSTEM (BESS)

26 35 43 08/21 60-HERTZ (HZ) SOLID STATE FREQUENCY

CONVERTER

26 36 00 10/07 MANUAL TRANSFER SWITCH AND

BY-PASS/ISOLATION SWITCH

DIVISION 27 - COMMUNICATIONS

27 10 00 11/20 TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 08/08, CHG 2: 02/21 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 31 13 11/16 CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

27 21 10.00 40 08/11 FIBER OPTIC DATA TRANSMISSION SYSTEM

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00

SUMMARY OF WORK (SOW)

PART 1 GENERAL

1.1 SUMMARY OF WORK

1.2 LOCATION

1.3 SUBMITTALS

1.4 SECURITY AND SITE ACCESS

1.4.1 Working Hours

1.4.2 Utility Cutovers and Interruptions

1.4.3 Occupied Buildings

1.4.4 Work Outside Regular Hours

PART 2 GENERAL WORK ITEMS

2.1 MOBILIZATION AND DEMOBILIZATION

2.2 SURVEY

2.2.1 Survey Requirements

2.2.2 Site Layout

2.2.3 Site Grading and Drainage

2.2.4 Drainage Ditches

2.3 POWER PLANT CONTROL AND COMMUNICATIONS SYSTEM

2.4 FENCING

2.5 AS-BUILT DRAWINGS

2.6 AC COMBINER SWITCHBOARD AND BESS SHADE CANOPY

2.7 POWER DISTRIBUTION SYSTEM SITE WORK

2.8 COMMUNICATION DISTRIBUTION SYSTEM

2.9 SOLAR PV SYSTEM

2.10 BATTERY ENERGY STORAGE SYSTEM (BESS)

2.11 AC COMBINER SWITCHBOARD

2.12 STEP-DOWN TRANSFORMER

2.13 NEW 1.5MW DIESEL GENERATOR

2.14 NEW CARPORT STRUCTURE

2.15 STRUCTURAL EVALUATION OF EXISTING BUILDINGS

-- End of Section Table of Contents --

SECTION 01 10 00 Page 1

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

SECTION 01 10 00

SUMMARY OF WORK (SOW)

Amendment 0005

PART 1 GENERAL

Amendment 0005**************************************************************

1.1 SUMMARY OF WORK

This project will supply resilient power to ARCENT Readiness Training Center (ARTC) at Camp Buehring. The project will connect the ARTC to Camp Buehring's power plant ring 4 thru new 1500 KVA transformer, install 1.5 MW new diesel generator and install a microgrid system includes 700 KW PV solar panels and a 1.5MW/1.5 MWH technically proven Battery Energy Storage System (BESS), all to be synchronized. The microgrid shall be load side interconnected to a new Main Switchboard (MSB). Rooftop PV will be installed at four existing buildings in ARTC compound ( Buildings 606, 608, 610 and 611), one existing shade structure located outside ARTC compound on the south of the compound (RVTT) , and three (3)new carports .

Project is a design bid build for the installation microgrid system consisting of 700KW roof mounted solar arrays and a 1.5MWH BESS. The project includes all associated electrical cable and conduit, electrical panels, transformers, inverter system, ethernet, and fiber optic communication lines, cyber security measures, security fencing, concrete pads. The Microgrid system will include a master and synchronization controllers. The master controller will integrate the energy sources to provide overall monitoring and control of the power assets.

Equipment concrete pads shall be constructed for all outdoor equipment as shown on the Contract drawings. The project also calls for building a shade canopy over the AC combiner switchboard equipment and BESS. A chain link security fence shall be installed around each of the PV inverter concrete pads and the AC combiner shade canopy.

This project is a load side interconnection to a new Main Switchboard (MSB) at the ARTC, and an existing power plant connection to the loads fed by existing 18 spot generators at ARTC sectionlizing Box to a new 1.5 KVA Transformer to connect to the new MSB at ARTC.

This project shall pick the loads of existing 18 spot generators at ARTC.

Manual transfer switches (MTSs) shall be installed next to every generator that is not connected to a MTS. Feeders shall be installed from the MSB to each generator. A new 450 KVA frequency converter shall be installed upstream of one MTS.

The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform the microgrid project at Camp Buehring, Kuwait as specified in the solicitation. Work shall comply with all local, and US applicable code requirements. All the interconnection work shall be performed and in accordance with NEC 705.12.

**************************************************************Amend ment 0005

1.2 LOCATION

The work site is located at Camp Buehring, Kuwait. The exact location is

SECTION 01 10 00 Page 2

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

shown on the Contract drawings.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" classification. Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Survey Report; G

Drainage Report; G

Utility Outage Requests

Utility Connection Requests

Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

Salvage Plan;G

SD-02 Shop Drawings

Structure Drawings; G

SD-05 Design Data

Structural Analysis and Design; G

Structural Analysis and Evaluation Reports; G

Cost Estimate; G

Amendment 0005**************************************************************

1.4 SECURITY AND SITE ACCESS

Security and site access shall be the responsibility of the Contractor including, but not limited to, the following:

a. On-site Security : The Contractor shall be responsible for physical security of all materials, supplies, and equipment of every description, including property which may be Government-furnished or owned, for all areas occupied jointly by the Contractor and the Government, as well as for all work performed. Fire-arms and/or armed security guards will not be permitted within the project boundaries.

b. Site Access : Getting site access shall be the responsibility of the Contractor. It can take up to 100 days for Foreign nationals to access Camp Buehring. All access requirements shall be coordinated

SECTION 01 10 00 Page 3

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

through the Contracting Officer.

1.4.1 Working Hours

The tentative regular working hours will be from 0700 to 1700 daily. The Contracting Officer, Site Security Manager and Contractor's representative will coordinate and agree upon actual work hours based on mission requirements and heat index. The tentative work week will be Sunday through Thursday unless specified and agreed upon after award, excluding the following Government holidays:

U.S. Government Holidays: Work may go on during the below U.S. Federal holidays, but critical elements of work or meetings must not be scheduled on such days.

New Year's Day Martin Luther King Jr's Birthday Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Christmas

Kuwait Holidays: Religious holidays in Kuwait are subject to change as they are governed by the lunar calendar and exact dates must be confirmed by religious authorities.

New Year's Day National Day Liberation Day Ascension Day Isra and Miraj Eid-al-Fitr (End of Ramadan) Waqfat Arafat Day Eid-al-Adha (Feast of Sacrifice) Islamic New Year The Prophet's (PBUH) Birthday

1.4.2 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hou rs or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the conne ction, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone se rvice, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

1.4.3 Occupied Buildings

The Contractor shall be working around existing buildings/trailers which are occupied. Do not enter the buildings/trailers without prior app roval of the Contracting Officer. Coordinate any access/escort requiremen ts with

SECTION 01 10 00 Page 4

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

Contracting Officer a minimum of 15 days in advance.

1.4.4 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Submit application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

**************************************************************Amendment 0005

PART 2 GENERAL WORK ITEMS

2.1 MOBILIZATION AND DEMOBILIZATION

Mobilization and Demobilization shall consist of all labor, equipment, supplies, and temporary facilities required to stage all equipment and facilities needed for construction of this project. See Contract Clauses for further information. The Contractor's temporary facilities shall be in accordance with Section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS.

Mobilization & Demobilization shall have a unit of measure "JOB" under bid item, Mobilization & Demobilization, of the Price Breakout Schedule.

2.2 SURVEY

The Contractor shall survey the limits of work for the project to provide, or complete, any design work that requires survey data. The survey shall include all topographic data, surface features, and all existing conditions of the project site. Once the survey is complete, the Contractor shall develop and submit an Existing Conditions Plans/Map/Drawings.

2.2.1 Survey Requirements

The survey shall be conducted by a professional survey team and be supervised by a professional surveyor with at least five (5) years of experience. This survey shall be set to the World Geodetic Coordinate System 1984, UTM84-38N (UTM-WGS 1984 Datum, Zone 38 North, Meter, Cent, Meridian 45E).

Units : The survey shall be conducted in meters.

Horizontal : All coordinates shall be provided and shown in UTM, not Lat. and Long.

Vertical : Elevations shall be provided, and shown in meters.

Contours : All contours shall be provided and shown in quarter (0.25) meter intervals. All major contours shall be a thicker line type than minor contours when shown on drawings. Existing Contours shall be dashed linetypes, not solid.

Benchmarks : At a minimum, three (3) benchmarks shall be developed.

SECTION 01 10 00 Page 5

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

The Contractor shall submit a Survey Report to include, but not limited to, the following:

a. The location and project name of the area surveyed.

b. Date the survey was completed.

c. Name of the surveyor and company that completed the survey.

d. The type of surveying equipment used.

e. The Datum used.

f. Horizontal and Vertical Controls used.

g. The benchmarks placed and used and respective benchmark information, such as coordinates and elevations.

2.2.2 Site Layout

The layout of all carports, equipment pads, fences and gates, and utilities shall be designed in accordance with the UFC Design Requirement. Site layout shall include all elements necessary to fulfill all requirements listed in this Section.

Amendment 0005**************************************************************

2.2.3 Site Grading and Drainage

The site grading and drainage shall be designed in accordance with the Drainage Report, UFC Design Requirements, and adhere to the requirements herein. The site shall be designed for a 10 year rain event and where possible shall utilize the existing ditches and respective drainage conveyance. All new drainage ditches shall be earthen ditches and have a maximum side slopes of 1 vertical to 3 horizontal (1V:3H). Ditches with velocities exceeding 0.6 meters per seconed shall be lined to prevent erosion. The Contractor shall provide all necessary site grading to ensure adequate drainage so that no areas will be flooded due to a rainfall of a 10-year frequency. The Contractor is responsible for designing for positive drainage for the project site. The site grading and drainage shall adhere to, but not limited to, the following requirements:

a. Equipment pads floor elevations shall be a minimum 150 mm above highest adjacent grade.

b. Each pad shall be graded to provide a 5% slope around the building foundation for a length of three (3) meters out.

c. All other grading on site shall be a minimum of 1% to ensure proper drainage.

d. Swales shall be used between buildings, as required, to provide positive drainage away from all buildings.

SECTION 01 10 00 Page 6

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

e. Drainage shall be compatible with the existing terrain.

f. Proper drainage calculations shall be conducted in order to size drainage structures and channels properly.

g. Rainfall data shall be based on data obtained from meteorological records collected in Kuwait.

h. Ditches shall be constructed in accordance with paragraph, DRAINAGE DITCHES.

The Contractor shall submit the Contractor's Grading and Drainage Plan(s) for government's approval.

**************************************************************Amendment 0005

2.2.4 Drainage Ditches

All new drainage ditches shall be earthen ditches and have a maximum side slopes of 1 vertical to 3 horizontal (1V:3H).

The Survey and Existing Conditions Plan shall have a unit of measure "JOB" under bid item "Survey" in the Price Breakout Schedule.

Amendment 0005**************************************************************

2.3 POWER PLANT CONTROL AND COMMUNICATIONS SYSTEM

The Contractor shall completely upgrade all existing power plant controls and software as required to make them completely compatible, interoperable, and functional with the microgrid controls. Contractor shall place conduit, cables,and communication devices so that components of the microgrid and existing power plant components are able to communicate.

Existing Power Plant Details:

1. Existing Low Voltage Controllers: Load sharing and synchronizing control module - Deep Sea Electronics 8810

2. Existing MV Switchgear coupler and busbars: ABB REB670

3. Existing MV Breaker controller: ABB REF542 Plus

4. Existing SCADA Controller server: ABB SYS600C

5. Existing SCADA Controls: RTU560

6. Existing Generators: Eleven(11) Caterpillar 3516B 2000kVA generators (some are different sizes, but the described is the contracted size) are all connected to LV breakers - 1600KW 415V, 3PH.

The Power Plant Control and Communications System shall have a unit of measure "JOB" under bid item, Power Plant Control and Communications System, of the Price Breakout Schedule.

**************************************************************Amendment 0005

2.4 FENCING

Provide security fencing around each PV inverter concrete pad, and around the AC combiner, BESS, and step-up transformer area. Refer to Contract drawings E-104 and E-105 for approximate fence locations and the number of pedestrian gates and double gates required.

The Fencing shall have a unit of measure "JOB" under bid item, Fencing in the Price Breakout Schedule.

SECTION 01 10 00 Page 7

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

2.5 AS-BUILT DRAWINGS

The Contractor shall provide the Government with complete as-built drawings at the conclusion of the project. The bid item "As-Built Drawings" shall consist of all labor, equipment, and all supplies needed to produce design records, documents, and drawings in accordance with the requirements specified in Section 00 80 00.00 06, SPECIAL PROVISIONS, Paragraph 1.7.

The As-built Drawings shall have a unit of measure "JOB" under bid item, As-Built Drawings in the Price Breakout Schedule.

2.6 AC COMBINER SWITCHBOARD AND BESS SHADE CANOPY

The Contractor must design and construct a complete canopy structure including its foundation/footings to support and cover the AC combiner switchboard and BESS. The contractor must design a reinforced concrete pad (slab-on-grade) to support the AC combiner switchboard and BESS. The minimum dimensions of the pad must be provided as shown in the Contract drawings. The pad must be 300mm minimum in thickness reinforced with #16 rebar at a maximum spacing of 300mm each way, top and bottom. The concrete anchorage of the equipment must be designed and provided per the equipment manufacturers.

The canopy must extend to the full limits of the concrete pad and a minimum height clearance of 2.5m under the canopy. The canopy must be either conventional structural steel framing or Metal Building System (MBS). The conventional structural steel framing must be designed in accordance with all applicable latest AISC manuals; International Building Code (IBC);

ASCE 7-16; and UFC 3-301-01. The MBS structure must be designed in accordance with "Metal Building Systems Manual" (MBMA MBSM); IBC; ASCE 7-16; UFC 3-301-01; and MBS manufacturer's applicable codes, standards, and manuals. The steel structure must comply with Section 05 12 00 STRUCTURAL STEEL, while the concrete structure must comply with Section 03

30 00 CAST-IN-PLACE CONCRETE.

Refer to the structural notes on the Contract drawing G-002 for the load parameters and requirements to be used in the structural analysis and design of the canopy. Submit complete structural analysis and design and structural shop drawings to the Government for review and approval prior to the canopy fabrication. If the canopy is MBS, the design report and structural shop drawings must be provided by the MBS manufacturer.

The complete structural analysis and design must include complete calculations for the structure, its components, and the foundations. At a minimum, the analysis must include statement of assumptions, software input and output files, connection designs, and foundation designs. The analysis and design must be prepared by a licensed/certified professional engineer meeting the requirements of the MBS manufacturer's and/or host nation's license, certification, codes, and laws requirements.

At a minimum, the structural shop drawings must include footing/foundation plan, framing plan, roof framing plan, roof decking panels, elevation views, typical sections, connection details. If the canopy is MBS, installation plans and instructions must be provided by the MBS manufacturer for approval as well.

The AC Combiner Shade Canopy shall have a unit of measure "JOB" under bid

SECTION 01 10 00 Page 8

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

item, AC Combiner Switchboard and BESS Shade Canopy in the Price Breakout Schedule.

2.7 POWER DISTRIBUTION SYSTEM SITE WORK

The Contractor shall provide and install all electrical infrastructure components for the microgrid. This includes wire, cables, conduits, pull boxes, junction boxes, trench work, and labor. Refer to Contract drawings E-101, E-102, E-103, E-104, E-105, E-106, E-107, E-108, E-601, E-602, E-603, E-604, and E-610.

The Electrical Distribution System shall have a unit of measure "JOB" under bid item, Electrical Distribution System in the Price Breakout Schedule.

2.8 COMMUNICATION DISTRIBUTION SYSTEM

The Contractor shall provide and install all communications infrastructure components for the microgrid. This includes wire, cables, conduits, pull boxes, junction boxes, trench work, and labor. Refer to Contract drawing E-610 for details.

The Communication Distribution System shall have a unit of measure "JOB" under bid item, Communication Distribution System in the Price Breakout Schedule.

2.9 SOLAR PV SYSTEM

The Contractor shall provide and install all components of the solar PV system to include solar panels, combiners, disconnect switches, recombiners, inverters, and cablling for an operable solar PV system.

Refer to Contract drawings E-601, E-602, and E-603 for details.

The Solar PV System shall have a unit of measure "JOB" under bid item, Solar PV System in the Price Breakout Schedule.

2.10 BATTERY ENERGY STORAGE SYSTEM (BESS)

The Contractor shall provide and install a complete and functional battery energy storage system. The lithium-ion battery shall be of the LFP chemistry type and be capable of a minimum of 5000 cycles. Refer to Contract drawing E-601 for details.

The Battery Energy Storage System shall have a unit of measure "JOB" under bid item, Battery Energy Storage System (BESS) in the Price Breakout Schedule.

2.11 AC COMBINER SWITCHBOARD

The Contractor shall provide and install an AC combiner switchboard to accept power from the solar PV system and battery energy storage system.

Refer to Contract drawing E-601 for details.

The AC Combiner Switchboard shall have a unit of measure "JOB" under bid item, AC Combiner Switchboard in the Price Breakout Schedule.

Amendment 0005***************************************************** *********

SECTION 01 10 00 Page 9

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

2.12 STEP-DOWN TRANSFORMER

The Contractor shall provide and install a 1500kVA step-down transformer.

The transformer will step-down the medium voltage from the existing sectionalizing box to Automatic Transfer Switch (ATS) and feed the new medium voltage 5000A, 415/240V Main Switchboard (MSB). Refer to Contract drawing E-601 for details.

The Step-Down Transformer shall have a unit of measure "JOB" under bid item, Step-Down Transformer in the Price Breakout Schedule.

The Automatic Transfer Switch (ATS) and the Main Switchboard (MSB)shall have a unit of measure "JOB" under bid item, Automatic Transfer Switch (ATS) and Main Switchboard (MSB) in the Price Breakout Schedule.

**************************************************************Amendment 0005

2.13 NEW 1.5MW DIESEL GENERATOR

The Contractor shall provide and install a new 1.5MW diesel generator.

Refer to Contract drawing E-601 for details.

The new diesel generator shall have a unit of measure "JOB" under bid item, New 1.5 MW Diesel Generator in the Price Breakout Schedule

2.14 NEW CARPORT STRUCTURE

The Contractor shall provide and install the structure of the new carports, including their foundations, steel structures and all components, and gravel pads, as shown on the Contract Drawings. The Contractor shall also clear and grub any vegetation within the new structure footprint.

The New Carport Structure shall have a unit of measure "JOB" under bid item, New Carport Structure, in the Price Breakout Schedule.

Amendment 0005**************************************************************

2.15 STRUCTURAL EVALUATION OF EXISTING BUILDINGS

The Contractor shall perform structural analysis and evaluation of the four existing buildings at ARTC compound ( Buildings 606, 608, 610 and 611) and one existing shade structure (RVTT) located outside ARTC compound on the south of the compound in accordance with "Metal Building Systems Manual" (MBMA MBSM); International Existing Building Code (IEBC); ASCE 7-16; UFC 3-301-01; and MBS manufacturer's applicable codes, standards, and manuals to determine if these existing buildings and foundations are structurally adequate to fully support the additional loads and all associated loads (wind, seismic, etc.) from the Solar PV System installed on the rooftop of these existing buildings. Refer to the structural notes on the Contract drawing G-002 for the load parameters and requirements to be used in the structural analysis and evaluation. Unless otherwise noted, use the latest version of the codes, standards, and manuals in the evaluation.

Field verify existing conditions. Submit the structural analysis and evaluation reports to the Government for review and approval prior to the installation of the Solar PV System.

If the analysis and evaluation reveal that any of the existing buildings are not structurally adequate to support the Solar PV System, the Contractor shall provide a cost estimate for strengthening part(s) of any structurally deficient existing buildings so that the strengthened

SECTION 01 10 00 Page 10

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

existing buildings can fully support the Solar PV System. The Contractor shall submit cost estimate including supporting documents (analysis, design, details, etc.) to the Government for review and approval. The cost estimate shall include compensation for furnishing all materials, equipment, labor, tools, and supervision required for design, procurement, fabrication, and installation of structural member and/or system strengthening.

The structural evaluation and structural strengthening design (if required) shall be prepared by a Registered Professional Engineer.

The Structural Evaluation of Existing Buildings shall have a unit of measure "JOB" under bid item, Structural Evaluation of Existing Buildings, in the Price Breakout Schedule. This bid item shall include any cost estimating efforts and design work required for structurally modifying existing buildings to support the Solar PV Systems as described in this Section; work beyond that described in this Section must be considered outside of the project scope of work.

**************************************************************Amendment 0005 -- End of Section --

SECTION 01 10 00 Page 11

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 26.00 06

GOVERNMENT SAFETY REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 DEFINITIONS

1.4 REGULATORY REQUIREMENTS

1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS

1.5.1 Personnel Qualifications

1.5.1.1 Site Safety and Health Officer Qualifications(SSHO)

1.5.2 Personnel Duties

1.5.2.1 Site Safety and Health Officer (SSHO)

1.5.3 Meetings

1.5.3.1 Prework Safety Conference

1.5.3.2 Weekly Safety Meetings

1.5.3.3 Work Phase Meetings

1.6 TRAINING

1.6.1 New Employee Indoctrination

1.6.2 Periodic Training

1.6.3 Training on Activity Hazard Analysis (AHA)

1.7 ACCIDENT PREVENTION PLAN (APP)

1.8 ACTIVITY HAZARD ANALYSIS (AHA)

1.9 DISPLAY OF SAFETY INFORMATION

1.10 SITE SAFETY REFERENCE MATERIALS

1.11 EMERGENCY MEDICAL TREATMENT

1.12 REPORTS

1.12.1 Accident Reports

1.12.2 Accident Notification

1.12.3 Monthly Exposure Reports

1.12.4 Regulatory Citations and Violations

1.12.5 Crane Reports

1.12.6 Crane Certificate of Compliance

1.12.7 Critical Lift Plan

1.12.8 Confined Space Entry Permit

1.13 HOT WORK PERMIT

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONSTRUCTION AND/OR OTHER WORK

3.1.1 Hazardous Material Use

3.1.2 Hazardous Material Exclusions

3.1.3 Unforeseen Hazardous Material

3.1.4 Unanticipated Discovery of Ordnance and Explosives

3.2 PRE-OUTAGE COORDINATION MEETING

3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM

3.3.1 Training

SECTION 01 35 26.00 06 Page 1

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

3.3.2 Fall Protection Equipment and Systems

3.3.2.1 Personal Fall Arrest Equipment

3.3.3 Fall Protection for Roofing Work

3.3.4 Existing Anchorage

3.3.5 Horizontal Lifelines

3.3.6 Guardrails and Safety Nets

3.3.7 Rescue and Evacuation Procedures

3.4 SCAFFOLDING

3.4.1 Stilts

3.5 EQUIPMENT

3.5.1 Material Handling Equipment

3.6 Weight Handling Equipment

3.7 EXCAVATIONS

3.7.1 DIGGING PERMITS

3.7.2 Utility Locations

3.7.3 Utility Location Verification

3.7.4 Shoring Systems

3.7.5 Trenching Machinery

3.8 UTILITIES WITHIN CONCRETE SLABS

3.9 ELECTRICAL

3.9.1 Conduct of Electrical Work

3.9.2 Portable Extension Cords

-- End of Section Table of Contents --

SECTION 01 35 26.00 06 Page 2

P2 506498 FY24 ERCIP Camp Buehring Microgrid and Backup Power Camp Buehring, Kuwait

AMENDMENT 0005

SECTION 01 35 26.00 06

GOVERNMENT SAFETY REQUIREMENTS

04/20

Amendment 0005

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced.