W912QR24R0044_Specs-0001.pdf
PDF 2 MB Posted
- Solicitation number
- W912QR24R0044
About this file
This document is an amendment to a solicitation (W912QR24R0044) for the construction of the Ramey Army Reserve Center (ARC) Microgrid in Aguadilla, Puerto Rico. The solicitation is for a full and open procurement with a NAICS code of 237130 - Power and Communication Line and Related Structures Construction. The estimated price range is between $10,000,000 and $25,000,000. This amendment revises several plan sheets and specification sections in the solicitation, including updates to the Energy Control Center Plan and Elevation, Typical Raceway Details, Conduit Section Views, Partial Single Line Diagram, and the Submittal Register. All other terms and conditions remain unchanged.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See attached Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0044
X 9B. DATED (SEE ITEM 11)
23-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
31- May-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR24R0044_Specs-0001
W912QR24R0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES 001
SUMMARY OF CHANGES
Solicitation W912QR24R0044 for Ramey ARC Microgrid in Aguadilla, Puerto Rico, is hereby amended as follows:
a. The following PLAN SHEETS have been replaced in their entirety:
E-200 ENERGY CONTROL CENTER PLAN AND ELEVATION
E-504 TYPICAL RACEWAY DETAILS
E-505 CONDUIT SECTION VIEWS
E-506 CONDUIT SECTION VIEWS
E-601 PARTIAL SINGLE LINE DIAGRAM - NEW WORK
b. The following SPECIFICATION SECTIONS have been replaced in their entirety:
00 80 00.01 06-B SUBMITTAL REGISTER
c. The following SPECIFICATION SECTIONS have been added in their entirety:
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
d. All other terms and conditions remain unchanged.
(End of Summary of Changes)
ERCIP Microgrids
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 04/20 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 04/20 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS
07 57 12 09/23 LIQUID APPLIED ELASTOMERIC SILICONE
WALL COATING
07 57 16 09/23 LIQUID APPLIED ELASTOMERIC ACRYLIC
ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
DIVISION 09 - FINISHES
DOCUMENT PROJECT Page 1 Amendment 002
ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.R. ERC. .ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P. .ERCIP MicrogridsERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.ERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz PP2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.P2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.
Certified Final
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.16 05/11, CHG 2: 08/19 INTERIOR COATING OF WELDED STEEL WATER
TANKS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DOCUMENT PROJECT Page 2 Amendment 002
ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.R. ERC. .
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.26 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL SYSTEM
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 24 13 08/21 SWITCHBOARDS
26 28 00.00 10 08/22 MOTOR CONTROL CENTERS, SWITCHBOARDS
AND PANELBOARDS
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 33 61 08/23 STATIC BATTERY ENERGY STORAGE SYSTEM
(BESS)
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00.00 48 10/20 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 10 00 02/21 SITE CLEARING
31 11 00 11/18 CLEARING AND GRUBBING
ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P. .ERCIP MicrogridsERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.ERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz PP2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.P2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.
Amendment 001****************************************************************************
***********************************************************************************Amendment 001
Amendment 001************************************************************************************ **********************************************************************************Amendment 001
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 31 13.56 12/23 BLAST-RESISTANT GATES
32 92 23 04/06, CHG 1: 08/21 SODDING
DIVISION 33 - UTILITIES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 40 00 11/21 STORMWATER UTILITIES
33 52 23.15 11/18 FUEL AND DIESEL EXHAUST FLUID (DEF)
SERVICE PIPING WELDING
33 52 40 11/18, CHG 2: 11/20 FUEL AND DIESEL EXHAUST FLUID (DEF)
SYSTEMS PIPING
33 52 43.11 08/18 FUEL AND DIESEL EXHAUST FLUID (DEF)
MECHANICAL EQUIPMENT
33 52 80 08/22 LIQUID FUELS PIPELINE COATING SYSTEMS
33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/18, CHG 1: 11/20 FUEL AND DIESEL EXHAUST FLUID (DEF)
SYSTEM COMPONENTS
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00.00 48 04/20 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
DOCUMENT PROJECT Page 3 Amendment 002
ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.R. ERC. .ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P. .ERCIP MicrogridsERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.ERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz PP2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.P2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT PROJECT Page 4 Amendment 002
ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.R. ERC. .ERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P. .ERCIP MicrogridsERCIP MicrogridsERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz P.ERCIP MicrogridsP2#503428, ERCIP Microgrid, Pesquera ARC, Juana Diaz PP2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.P2#503254, ERCIP MicrogridsERCIP Microgrid, Ramey ARC, Aguadilla P.R.ERCIP Microgrid, Ramey ARC, Aguadilla P.R.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 64 PAGES
00 80 00.00 06 SD-01 Preconstruction Submittals
1.10Local Agency Check
1.8SF1413 Statement and
Acknowledgement
1.25 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.27 GMechanical/Electrical Room
Layout
SD-04 Samples
1.12 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.30Progress Photographs
SD-07 Certificates
1.12Warranty of Construction
1.11 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.11.1 GCertification for each individual
product installed and identified to contain mineral fibers that no asbestos-containing materials were installed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 64 PAGES
00 80 00.00 06 1.11.1 GDocumentation to show that the products containing mineral fiber materials have been microscopically examined by an
AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos
1.23Insurance
1.21Sales and Use Tax
SD-11 Closeout Submittals
1.5.4 GPreliminary (Working) As-Built
Drawings
1.5.1 GFinal As-Built Drawings
1.5.1.2 GCAD Working As-Built Drawings
1.6.1Equipment-in-Place List
1.6.1Maintenance and Parts Data
1.12 GWarranty Management Plan
01 32 01.00 06 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29.00 06 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 64 PAGES
01 33 29.00 06 1.4.1.1 GSustainability Action Plan
1.4.1.4 GSustainability Progress Report
SD-11 Closeout Submittals
1.4.1.2 GFinal Sustainability eNotebook
1.4.1.2 GAmended Final Sustainability
eNotebook
1.4.1.2 GFinal High Performance and
Sustainable Building Checklist
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 64 PAGES
01 35 26.00 06 1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Severe Weather Plan for Marine
Activities
1.7Float Plan for Launches, Motorboats, Skiffs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 64 PAGES
01 35 26.00 06 1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention & Protection Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 64 PAGES
01 35 26.00 06 1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 64 PAGES
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Steel Truss Plant Quality
Assurance Program
2.1AC472 Accreditation
2.1Steel Joist Institute Membership
2.1Certificate of Compliance
1.5.17 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
SD-11 Closeout Submittals
3.1.1 GComprehensive Final Report
01 46 00.00 06 SD-01 Preconstruction Submittals
1.4 G DOCommissioning Specialists
1.4.3 G DOCommissioning Specialists
1.7 G DOProject Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 64 PAGES
01 46 00.00 06 SD-05 Design Data
3.1.4 G DODesign Review Report
SD-06 Test Reports
3.1.3 G DOConstruction Phase
Commissioning Plan
3.1.6.2 G DOPre-Functional Checklists
3.7 G DOCommissioning Report
3.8 G DOPost-Construction
Commissioning Report
3.8 G DOPost-Construction
Commissioning Report
3.8.1 G DOMonthly Monitoring Based
Commissioning Update
3.8.1 G DOMonitoring Based Commissioning
Report
SD-07 Certificates
1.6 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2 G DOSystems Training
3.3 G ROTraining Plan
3.3 G ROTraining Attendance Rosters
3.4 G DOSystems Manual
3.8 G DOPost-Construction Systems
Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 64 PAGES
01 46 00.00 06 3.8 G DOPost-Construction Systems
Manual
3.5 G DOMaintenance and Service Life
Plans
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
1.7 GEnvironmental Protection Plan
1.7.9.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 64 PAGES
01 57 19.00 06 1.6.4 GEnvironmental Manager
Qualifications
3.2.1 GStormwater Pollution Prevention
Plan (Swppp)
SD-06 Test Reports
3.2.2.2Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.2.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.4 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.4.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.7.4.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 64 PAGES
01 57 19.00 06 3.7.2.1 GSales Documentation
3.2.2.4As-Built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
03 30 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 64 PAGES
03 30 00 1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 G AEReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.2Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder and Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 64 PAGES
03 30 00 2.2.2Waterstops
1.8.1Local/Regional Materials
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 G AEConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.2.1Tolerance Report
3.14.3.3 G AECompressive Strength Tests
3.14.3.5Unit Weight of Structural
Concrete
3.14.3.6Chloride Ion Concentration
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 64 PAGES
03 30 00 1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
05 05 20 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 G AEMechanical Anchors in Concrete
2.1.1.4 G AEAdhesive Anchor System in
Concrete
3.1.3 G AENon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 64 PAGES
05 05 20 SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 64 PAGES
05 05 23.16 1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G AEErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
1.4.3 G AEDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 64 PAGES
05 12 00 SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
07 27 36 SD-01 Preconstruction Submittals
1.9.1 GQualification of Manufacturer
1.9.2 GQualification of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 64 PAGES
07 27 36 1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.10 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GPrimers, Adhesives, and Mastics
2.4 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-04 Samples
1.5 GSpray Foam Air Barrier
SD-06 Test Reports
1.5.4 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.5.3 GPrimers
1.5.4 GFire-Ratings Of Thermal Barrier
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 64 PAGES
07 27 36 1.5.4 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.4 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
2.2 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.10Core Samples
3.3.3Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
07 57 12 SD-03 Product Data
2.2Protective Water-based
Elastomeric Silicone Coating
2.3Primer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 64 PAGES
07 57 12 2.5Sealants
2.4Mineral Granules
SD-04 Samples
1.4.4Elastomeric Silicone Wall System
Mock-up
1.4.5Sample Warranty
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
SD-08 Manufacturer’s Instructions
2.2Protective Coating
2.1.3Manufacturer's Application
Instructions
SD-11 Closeout Submittals
1.11Warranty
07 57 16 SD-04 Samples
1.4.4Elastomeric Acrylic Roofing
Systems Mock-up
1.4.5Sample Warranty
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
SD-11 Closeout Submittals
1.11Warranty
3.12Information Card
07 60 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 64 PAGES
07 60 00 2.2.1 GExposed Sheet Metal
3.1.5 GDownspouts
2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
2.2.3 SRecycled Content of Aluminum
Material
SD-04 Samples
1.5.2 GFinish Samples
1.2.2 GAir Infiltration
1.2.3 GWater Penetration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 64 PAGES
08 11 16 1.2.4 GNFRC Project Label Certificates for Fenestration
SD-08 Manufacturer’s Instructions
1.5.1 GDoor and Frame Assembly
1.5.3 GAdjustments, Cleaning, and
Maintenance
1.2.4 GNFRC Project Label Certificates
for Fenestration
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.7 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
09 90 00 SD-02 Shop Drawings
3.8Piping Identification
SD-03 Product Data
2.1 GCoating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 64 PAGES
09 90 00 2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.5.2 GQualification Testing
SD-08 Manufacturer’s Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 97 13.16 SD-05 Design Data
1.4.4.1Environmental Control System
SD-06 Test Reports
1.4.5.1Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.9.2.2Inspection Report Forms
3.9.2.3Daily Inspection Reports
1.4.5.2Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 64 PAGES
09 97 13.16 1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.6Qualifications of Testing
Laboratory for Coatings
1.4.6.7Qualifications of Testing
Laboratory for Abrasive
1.4.6.8Qualifications of Coating
Contractors
1.4.6.9Roof Joint Sealant Materials
1.4.6.10Roof Joint Sealant Compatibility
1.4.6.11Epoxy Coating Materials
1.4.6.12Non-metallic Abrasive
1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Roof Joint Sealant Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 64 PAGES
09 97 13.16 1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.6.6 GDisposal of Used Abrasive
3.9.2.4 GInspection Logbook
09 97 13.27 SD-05 Design Data
1.4.4.1Containment System
SD-06 Test Reports
1.4.5.1Joint Sealant Qualification Test
Reports
1.4.5.2Coatings Qualification Test
Reports
1.4.5.3Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.8.2.2Inspection Report Forms
3.8.2.3Daily Inspection Reports
1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 64 PAGES
09 97 13.27 1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.6Qualifications of Testing
Laboratory for Coatings
1.4.6.7Qualifications of Testing
Laboratory for Abrasive
1.4.6.8Qualifications of Coating
Contractors
1.4.6.9Joint Sealant Materials
1.4.6.10Coating Materials
1.4.6.11Coating System Component
Compatibility
1.4.6.12Non-metallic Abrasive
1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Joint Sealant Instructions
1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.5.6Disposal of Used Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 64 PAGES
09 97 13.27 3.8.2.4 GInspection Logbook
13 49 20.00 10 SD-02 Shop Drawings
3.4 G AEInstallation
SD-03 Product Data
3.4.1 G AEEM Shielding System
3.4 G AEInstallation
3.7 GQuality Control Plan
1.3.1 GQualifications
2.5.4 G AEFilter Assemblies
SD-06 Test Reports
3.1.4Pre-Compliance Test Plan
3.1.5Pre-Compliance Test Report
3.3Electromagnetic Environmental
Effects Integration Analysis Report
3.9.1.1EMI Compliance Test Plan
3.9.1.2EMI Compliance Test Reports
2.6.1.3Impulse Sparkover Voltage
2.6.1.4ESA Extinguishing Test
2.6.1.5ESA Extreme Duty Discharge
Test
3.9.2Field Testing
SD-10 Operation and Maintenance
Data
1.6.3 GOperating and Maintenance
Manuals
2.2.1 GService Organization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 64 PAGES
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
2.5.1 GCoil Corrosion Protection
3.4 GTraining
1.4Inventory
2.1 GSupplied Products
2.2 GManufacturer's Standard Catalog
Data
2.4.1Humidifier
3.6 GSystem Performance Tests
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
3.7.2Service Organizations
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.2.3 SOzone Depleting Substances
25 05 11.26 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 64 PAGES
25 05 11.26 3.2.3.2 GMultiple Ethernet Connection
Device Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.8.2 GCybersecurity Interconnection
Schedule
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
1.8.1 GProposed STIG and SRG
Applicability Report
SD-02 Shop Drawings
1.8.3 G AENetwork Communication Report
1.8.6 G AECybersecurity Riser Diagram
SD-03 Product Data
1.8.8 G AEControl System Cybersecurity
Documentation
SD-07 Certificates
1.9 G AESoftware Licenses
SD-11 Closeout Submittals
3.4.4.5 GConfidential Password Report
3.4.4.5 GPassword Change Summary
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 64 PAGES
25 05 11.26 3.3.6 GEnclosure Keys
1.8.5 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
1.8.7 GSTIG, SRG and Vendor Guide
Compliance Result Report
1.8.4 GControl System Inventory Report
25 08 10 SD-06 Test Reports
3.1.1 G AEPVT Plan
3.1.2.1 G AEPVT Phase I Report
3.1.2.2 G AEPVT Phase II Report
SD-07 Certificates
1.5 G AETest Instrumentation Calibration
Certificates
25 10 10 SD-02 Shop Drawings
3.3.2 G AEUMCS Contractor Design
Drawings
3.3.3 G AEDraft As-Built Drawings
3.3.3 G AEFinal As-Built Drawings
SD-03 Product Data
2.1.5 G AEProduct Data Sheets
2.5 G AEComputer Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 64 PAGES
25 10 10 2.7.1 G AEEnclosure Keys
SD-05 Design Data
3.3.1 G AEUMCS IP Network Bandwidth
Usage Estimate
SD-06 Test Reports
1.10 G AEPre-Construction QC Checklist
1.10 G AEPost-Construction QC Checklist
3.1 G AEFactory Test Procedures
3.1 G AEFactory Test Report
3.2 G AEExisting Conditions Report
3.7 G AEStart-Up and Start-Up Testing
Report
3.8.1 G AEPVT Phase I Procedures
3.8.2 G AEPVT Phase I Report
3.8.3 G AEPVT Phase II Report
SD-07 Certificates
1.7 G AEIntegrator Qualifications
SD-10 Operation and Maintenance
Data
1.11 GOperation and Maintenance
(O&M) Instructions
3.9.8.1 GPreventive Maintenance Work
Plan
3.10.1 GBasic Training Documentation
3.10.1 GAdvanced Training
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 64 PAGES
25 10 10 3.10.1 GRefresher Training
Documentation
SD-11 Closeout Submittals
1.10 GCloseout QC Checklist
26 05 19.00 10 SD-01 Preconstruction Submittals
3.2 G AECable Installation Plan
SD-03 Product Data
2.1.1 G AEWire and Cable
2.1.3.1 G AEConductors
3.1Cable Manufacturing Data
SD-06 Test Reports
3.3 G AETest Report(s), Inspection
Report(s), and Verification
Report(s)
3.3.2.3 G AECable Installation Report
26 05 48.00 10 SD-02 Shop Drawings
3.1 G AELighting Fixtures in Buildings
1.3 G AEEquipment Requirements
SD-03 Product Data
3.1 G AELighting Fixtures in Buildings
1.3 G AEEquipment Requirements
1.2.4 G AEContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1Acceptance Tests and
Inspections
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL