W912QR24R0027_Specs-0005.pdf
PDF 2 MB Posted
- Solicitation number
- W912QR24R0027
About this file
This document is a solicitation for a design-build project to renovate an Army Reserve Center (ARC) building and a Vehicle Maintenance Shop (VMS) building located in Des Moines, Iowa. The key details are:
The objective is to obtain a facility where the using units can effectively implement their Army Reserve support and training missions. The project includes renovating the existing 74,280 SF ARC building and 13,190 SF VMS building, as well as associated site improvements such as utilities, drainage, communications, electrical, plumbing, HVAC, paving, walkways, parking, lighting, fencing, grading, and landscaping. The primary scope for the ARC building is to reconfigure and renovate interior spaces, upgrade the kitchen, and renovate interior finishes. A new elevator will be added to meet accessibility requirements. The VMS building will undergo minor interior renovations and the demolition/reconstruction of the vehicle maintenance bay to increase the height for a new bridge crane.
The solicitation requires the facility to achieve LEED Certified with a goal of LEED Silver. Antiterrorism/Force Protection requirements must be met. The estimated construction cost range is $25,000,000 to $100,000,000. This is a full and open procurement with a HUBZone 10% price evaluation preference. Proposals are due by August 28, 2024 at 1:00 PM EDT.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0027
X 9B. DATED (SEE ITEM 11)
03-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR24R0027_Specs-0005
W912QR24R0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Solicitation W912QR24R0027 for the Design/Build for the Renovation of an Army Reserve Center (ARC) and Vehicle Maintenance Shop (VMS) located in Des Moines, IA is hereby amended as follows:
A. The following CLINS are no longer applicable and are hereby descoped from the Specifications.
CLIN 0012
CLIN 0013
CLIN 0018
CLIN 0019
CLIN 0020
CLIN 0021
CLIN 0024
CLIN 0025
B. The PRICE BREAKOUT SCHEDULE is hereby replaced in its entirety.
C. The SPECIFICATION SECTIONS have been replaced in their entirety.
TABLE OF CONTENTS
01 02 00.00 48 PART 1- DESIGN OBJECTIVES AND FUNCTIONAL AND
AREA REQUIREMENTS
01 02 00.00 48 PART 9- PLUMBING DESIGN
01 02 00.00 48 PART 10- ELECTRICAL DESIGN
D. The following PLAN SHEETS have been replaced in their entirety.
G-001 COVER SHEET
A-101 ARC – OVERALL FIRST FLOOR PLAN
A-102 ARC – OVERALL SECOND FLOOR PLAN
A-104 ARC – FIRST FLOOR PLAN AREA “A”
A-105 ARC – FIRST FLOOR PLAN AREA “B”
A-107 ARC – SECOND FLOOR PLAN AREA “A”
A-108 ARC – SECOND FLOOR PLAN AREA “B”
AD101 ARC – DEMOLITION OVERALL FIRST FLOOR PLAN
AD102 ARC – DEMOLITION OVERALL SECOND FLOOR PLAN
AD201 ARC – DEMOLITION ELEVATIONS
AD202 ARC – DEMOLITION ELEVATIONS
I-101 FINISH LEGEND AND SCHEDULE – FIRST FLOOR
I-102 FINISH LEGEND AND SCHEDULE – SECOND FLOOR
I-111 FIRST FLOOR FUNITURE PLAN – AREA “A”
I-112 FIRST FLOOR FUNITURE PLAN – AREA “B”
CD101 DEMOLITION PLAN
E. Offerors must acknowledge all Amendments.
F. The proposal due date is hereby extended from 16 August 2024 at 1:00 P.M. (Eastern Daylight Time) to 28 August 2024 at 1:00 PM EDT for Phase II proposals.
G. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 16-Aug-2024 01:00 PM to 28-Aug-2024 01:00 PM.
The following have been modified:
PRICE BREAKOUT SCHEDULE
PRICE BREAKOUT SCHEDULE
Amendment 0005
PROJECT: Repair of Bldg. 100 Army Reserve Center
LOCATION: Fort Des Moines – Des Moines, IA
PROPOSER'S NAME:
BASE PROPOSAL
Item Description Unit Amount No.
0001 Primary Facility – Building 100 (ARC) Repair JOB $
0002 Site Work – Building 100 (ARC) JOB $
0003 Design Fees – Building 100 (ARC) JOB $
0004 MidAmerican Gas/Power/Electric Utilities (Electrical) JOB $ 35,000.00
0005 Des Moines Water Works (Fire) JOB $ 23,400.00
0006 Des Moines Water Works (Water) JOB $ 75.00
0007 Fire Department Review and Permit Fees JOB $ 6,595.00
0008 Asbestos Remediation – Building 100 JOB $
0009 Lead Remediation – Building 100 JOB $
0010 Monument Sign at Entrance JOB $
0011 MKT Pad (new work) JOB $____________
SUBTOTAL - BASE PROPOSAL $
BID OPTION ITEMS
0014 Site Work – MEP Fence, Lighting, Fire Loops, & Hydrants JOB $_____________
0015 Design Fees – MEP Fence, Lighting, Fire Loops, JOB $ & Hydrants
0016 Site Work – MEP Paving JOB $
0017 Design Fees - Site Work (MEP Paving) JOB $
0022 Operations and Maintenance – Army Reserve (OMAR) Funded Collateral Equipment Items for B.100 (ARC) JOB $
0023 “Bona Fide Need” Operations and Maintenance, Army Reserve (OMAR) Funded Collateral Equipment Items for B.100 (ARC) JOB $
SUBTOTAL – BID OPTION ITEMS $
TOTAL BASE PROPOSAL AND BID OPTION ITEMS $
Description of Proposal Items
BASE PROPOSAL
(a) Item No. 0001 "Primary Facility – Building 100 Repair" Includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0006 and 0007.
(b) Item No. 0002 "Site Work – Building 100" Includes all Base Proposal construction work required beyond a line five feet outside of the primary building, excluding all site Option work.
(c) Item No. 0003 "Design Fees - Building 100” Includes the fees for the Offeror's Design professionals to complete the Base Proposal design and construction documents for the project.
(d) Item No. 0006 “Des Moines Water Works (Water)” Includes the cost for the Offeror to pay fees associated with Water equipment, connections and permits, base bid only.
(e) Item No. 0007 "Fire Department Review and Permit Fees" Includes the cost for the Offeror to pay the National Pollutant Discharge Elimination System (NPDES) Construction Permit, Fire Department Review, Right of Way Permits and Excavation Bond, base bid only.
(f) Item No. 0008 "Asbestos Remediation – Building 100” Includes the cost to remediate asbestos containing materials from existing Building 100.
(g) Item No. 0009 "Lead Remediation – Building 100” Includes the cost to remediate lead containing materials from existing Building 100.
(h) Item No. 0010 “Monument Sign at Entrance” Includes the cost to demolish and replace the existing monument sign at the main entrance to the Army Reserve Post off Chaffee Road. See site plan for location.
(i) Item No. 0011 “Mobile Kitchen Trailer (MKT) Pad (New Work)” Includes the cost to install new MKT Pad outside the existing Building 100 (ARC) footprint.
BID OPTION ITEMS
(j) Item No. 0014 "Site Work – MEP Fence, Lighting, Fire Loops, & Hydrants” Includes work required to replace MEP Fence, Lighting, and install the required fire loop to support the placement of new hydrants and associated MEP surface repair work to support this option.
(k) Item No. 0015 “Design Fees – MEP Fence, Lighting, Fire Loops, & Hydrants” Includes design fees associated with item No. 0014. To be awarded with Item No. 0014.
Price for this option shall be good for 30 calendar days from Notice to Proceed (NTP).
(l) Item No. 0016 "Site Work – MEP Paving" Includes removing and replacing MEP pavement and all work required beyond a line five feet outside of Building 101 to support MEP replacement. See site plan for MEP extent.
(m) Item No. 0017 “Design Fees - MEP Paving” Includes design fees associated with item No. 0016. To be awarded with Item No. 0016.
Price for this option shall be good for 30 calendar days from Notice to Proceed (NTP).
(n) Item No. 0022 - Operations, Maintenance Army Reserve (OMAR) Funded Collateral Equipment Items for Building 100 (Items funded shortly at or shortly after the time of construction award) Includes all work required to furnish and install “OMAR Funded” equipment items which are considered to not be permanently attached to the construction, in Building 100. OMAR funded equipment is to be Contractor Furnished and Contractor Installed (CFCI). CFCI OMAR Funded Equipment Items for this project consists of:
1) Metal Lockers
2) Wire Mesh Caging
Price for this option shall be good for 120 calendar days from Notice to Proceed (NTP).
(o) Item No. 0023 – “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded Collateral Equipment Items for Building 100 Includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to the construction, in Building 100. OMAR funded equipment is to be Contractor Furnished and Contractor Installed (CFCI). CFCI OMAR Funded Equipment Items for this project consists of:
1) Freestanding Metal Shelving.
2) Refrigerators and Microwaves at Breakrooms.
3) Undercounter Refrigerator and Microwave at Lactation room.
4) Exterior Ash/Trash.
5) Window Treatments.
6) Fire Extinguishers (cabinets in Base Bid).
Price for this option shall be good for 700 calendar days from Notice to Proceed (NTP).
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR24R0027
The Bidder Inquiry Key is: GKX6JD-BBHIYX
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret
Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your SecretQuestion.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs.
Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled on 19 August 2024 at 12:00 p.m. Eastern Daylight Time (EDT). No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: IA20240071 08/02/2024
Superseded General Decision Number: IA20230071
State: Iowa
Construction Type: Building
County: Polk County in Iowa.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 03/01/2024 3 04/12/2024 4 05/17/2024 5 05/31/2024 6 06/07/2024 7 06/28/2024 8 07/05/2024 9 07/12/2024 10 07/19/2024 11 08/02/2024
BOIL0083-009 01/01/2021
Rates Fringes
BOILERMAKER......................$ 41.52 30.36
BRIA0003-020 05/01/2024
Rates Fringes
TILE SETTER......................$ 36.00 18.69
BRIA0003-042 05/01/2024
Rates Fringes
Bricklayer and Stonemason........$ 36.00 18.69
ELEC0347-002 06/01/2024
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 44.45 19.40
ELEV0033-002 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 53.94 37.885+a+b
FOOTNOTES:
A. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for employees with less than 5 years of service.
B. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day; Day after Thanksgiving; & Christmas Day.
ENGI0234-005 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR
Class 1 Backhoe/Excavator/Trackhoe.$ 34.10 20.75 Class 2 Bulldozer; Forklift(On steel erection and machinery moving or hoisting above one complete story); Loader....$ 33.80 20.75 Class 3 Loader(under 35 h.p.)
with or without attachments;
Forklift(other than above); Paver(All Types);
Roller.....................$ 31.81 20.75
IRON0067-003 05/01/2024
Rates Fringes
IRONWORKER (Structural)..........$ 35.85 23.24
IRON0089-003 05/01/2023
Rates Fringes
IRONWORKER (Ornamental)..........$ 31.81 23.34
* IRON0111-002 07/01/2024
Rates Fringes
IRONWORKER (Reinforcing).........$ 37.50 30.99
LABO0177-002 05/01/2024
LABORER (Mason Tender - Brick)...$ 28.61 16.80
LABO0177-010 05/01/2024
Rates Fringes
LABORER (Common or General)......$ 28.61 16.80
PAIN0246-001 05/01/2023
Rates Fringes
PAINTER (Brush and Roller).......$ 29.43 15.33
PLAS0021-001 05/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.94 23.35
PLUM0033-002 06/01/2024
Rates Fringes
PIPEFITTER (HVAC Pipe Installation Only)...............$ 43.20 23.25
PLUM0033-004 05/23/2024
Rates Fringes
PLUMBER..........................$ 43.20 23.25
ROOF0142-001 06/01/2024
Rates Fringes
ROOFER...........................$ 31.50 15.28
SFIA0669-002 04/01/2024
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 43.04 25.83
SHEE0045-002 06/01/2023
SHEET METAL WORKER (Includes HVAC Duct and Unit Installation)....................$ 37.37 23.23
* UAVG-IA-0003 01/01/2024
Rates Fringes
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 32.39 19.25
* SUIA2016-046 07/19/2016
Rates Fringes
CARPENTER, Includes Drywall Hanging..........................$ 24.93 11.17
DRYWALL FINISHER/TAPER...........$ 21.25 10.32
INSULATOR: Mechanical (Duct, Pipe and Mechanical System Insulation)......................$ 18.17 4.01
LABORER: Pipelayer..............$ 16.11 ** 0.00
OPERATOR: Crane.................$ 25.70 9.13
PAINTER: Spray..................$ 19.77 6.64
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
515372 Repair of Bldgs. 100 ARC & 101 VMS Des Moines, Iowa
Section 01 02 00.00 48 Page 1 of 7 Certified Final
Table of Contents
VOLUME I
DIVISION 00 – PROCUREMENT AND CONTRACTING
00 00 01 Table of Contents
00 10 00 Des Moines MRAR Price Breakout Schedule 00 80 00.00 06 Special Provisions
DIVISION 01 – GENERAL REQUIREMENTS
01 02 00.00 48 Statement of Work
Part 1 – Design Objectives and Functional and Area Requirements Part 2 – Applicable Criteria and Coordination with Local Authorities Part 3 – Site Civil Design Part 4 – Site Electrical Design Part 5 – Landscape Architecture Design Part 6 – Architectural and Interior Design Part 7 – Structural Design Part 8 – Thermal Design Part 9 – Plumbing Design Part 10 – Electrical Design Part 11 – HVAC Design Part 12 – Energy Conservation and Sustainable Design Part 13 – Fire Protection Design Part 14 – Commissioning and Building Envelope Sealing Performance
Requirements Part 15 – Telecommunications Design
01 03 00.00 48 Design Submission Requirements After Award 01 04 00.00 48 The Design/Build Process 01 32 01.00 06 Project Schedule 01 33 00 Submittal Procedures 01 33 29.00 06 Sustainability Reporting 01 35 26.00 06 Government Safety Requirements 01 42 00 Sources for Reference Publications 01 45 00.15 10 Resident Management System Contractor MODE (RMS CM) 01 45 01.10 06 USACE Quality Control System (QCS), for Army Reserve
Centers (ARCs) 01 45 04.10 06 Contractor Quality Control 01 45 35 Special Inspections 01 46 00.00 06 Total Building Commissioning 01 50 00 Temporary Construction Facilities and Controls 01 57 19.00 06 Temporary Environmental Controls and Permits 01 74 19 Construction Waste Management and Disposal 01 78 23 Operation and Maintenance Data
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
Amendment 0005*********************************************************************************************************************
*********************************************************************************************************************Amendment 0005
AMENDMENT 0005
Amendment 0005
CLINS 0012, 0013, 0018, 0019, 0020, 0021, 0024, 0025 related to the Vehicle Maintenance Shop (VMS) are no longer applicable and should not be included in bid.
Section 01 02 00.00 48 Page 2 of 7 Certified Final
Attachments to the Volume I
Attachment A Geotechnical Report Attachment B Hazardous Materials Report Attachment C Fire Flow Data Attachment D Room-by-Room Supplemental Requirements Attachment E Site Photos Attachment F LEED v4 Credit Guidance
Amendment 0005*********************************************************************************************************************
*********************************************************************************************************************Amendment 0005
AMENDMENT 0005
CLINS 0012, 0013, 0018, 0019, 0020, 0021, 0024, 0025 related to the Vehicle
Section 01 02 00.00 48 Page 3 of 7 Certified Final
VOLUME II
Building 100 – As-Builts Building 101 – As-Builts Submittal Register Building 100 & 101 - As-Builts
Amendment 0005*********************************************************************************************************************
*********************************************************************************************************************Amendment 0005
AMENDMENT 0005
CLINS 0012, 0013, 0018, 0019, 0020, 0021, 0024, 0025 related to the Vehicle
Section 01 02 00.00 48 Page 4 of 7 Certified Final
VOLUME III
DIVISION 03 -CONCRETE
03 20 00.00 48 Concrete Reinforcement 03 30 00.00 48 Cast -in-Place Concrete
DIVISION 04 - MASONRY
04 20 00.00 48 Unit Masonry
DIVISION 05 - METAL
05 12 00.00 48 Structural Steel 05 21 00.00 48 Steel Joist Framing 05 30 00.00 48 Steel Decks 05 40 00.00 48 Cold-Formed Metal Framing 05 50 00.00 48 Metal Fabrications
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00.00 48 Rough Carpentry 06 20 00.00 48 Finish Carpentry 06 61 16.00 48 Solid Surfacing Fabrication
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 00.00 48 Bituminous Dampproofing 07 19 00.00 48 Water Repellent Coating 07 21 00.00 48 Building Insulation 07 22 00.00 48 Roof and Deck Insulation 07 42 13.00 48 Metal Wall Panels 07 52 00.00 48 Modified Bituminous Roofing System 07 53 23.00 48 Ethylene Propylene Diene Monomer Roofing 07 54 19.00 48 Thermoplastic Membrane Roofing System 07 60 00.00 48 Flashing and Sheet Metal 07 84 00.00 48 Firestopping 07 90 00.00 48 Joint Sealers
DIVISION 08 - OPENINGS
08 11 13.00 48 Steel Doors and Frames 08 11 16.00 48 Aluminum Doors and Frames 08 14 00.00 48 Wood Doors 08 31 13.00 48 Access Doors and Frames 08 33 23.00 48 Overhead Rolling Doors 08 51 13.00 48 Aluminum Windows 08 70 00.00 48 Door Hardware 08 80 00.00 48 Glazing 08 90 00.00 48 Louvers and Vents
DIVISION 09 - FINISHES
09 29 00.00 48 Gypsum Board 09 30 00.00 48 Ceramic Tile 09 50 00.00 48 Acoustical Ceilings
6AMENDMENT 0005
CLINS 0012, 0013, 0018, 0019, 0020,
0021, 0024, 0025 related to the Vehicle Maintenance Shop (VMS) are no longer applicable and should not be included in bid.
Amendment 0005************************************************
************************************************Amendment 0005
Section 01 02 00.00 48 Page 5 of 7 Certified Final
09 65 00.00 48 Resilient Flooring 09 67 00.00 48 Fluid Applied Flooring 09 68 00.00 48 Carpeting 09 90 00.00 48 Paints and Coatings
DIVISION 10 - SPECIALTIES
10 00 10.00 48 Miscellaneous Specialties 10 14 01.00 48 Exterior Signage 10 14 02.00 48 Interior Signage 10 21 13.00 48 Plastic Toilet Partitions 10 22 13.00 48 Wire Mesh Partitions 10 26 00.00 48 Wall and Corner Guards 10 28 00.00 48 Toilet Accessories 10 44 00.00 48 Fire Extinguishers Cabinets and Accessories 10 50 00.00 48 Metal Lockers 10 56 13.00 48 Storage Shelving 10 75 00.00 48 Flag Poles
DIVISION 11 - EQUIPMENT
11 52 13.00 48 Projection Screens
DIVISION 12 - FURNISHINGS
12 20 00.00 48 Window Treatment 12 48 00.00 48 Rugs and Mats
DIVISION 14 – Vertical Transportation
14 24 00.00 48 Hydraulic Elevators
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 48 Wet Pipe Sprinkler Systems, Fire Protection 21 30 00.00 48 Fire Pumps
DIVISION 22 – PLUMBING
22 11 23.00 48 Plumbing Pumps 22 13 00.00 48 Sanitary, Waste, Vent, and Storm Specialties 22 15 00.00 48 General Service Compressed Air Equipment 22 34 00.00 48 Domestic Water Heaters 22 42 00.00 48 Plumbing Fixtures
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
23 05 29.00 48 Hangers and Supports 23 05 48.00 48 Vibration Isolation 23 05 53.00 48 Identification for HVAC Piping and Equipment 23 05 93.00 48 Testing, Adjusting, and Balancing 23 07 00.00 48 Mechanical Insulation 23 09 00.00 48 HVAC Instrumentation and Controls 23 21 13.00 48 Piping 23 21 14.00 48 Valves
Amendment 0005************************************************
************************************************Amendment 0005
AMENDMENT 0005
Amendment 0004******************************************************************************************************************************** DELETED*******************************************************************************************************************Amendment 0004
CLINS 0012, 0013, 0018, 0019, 0020,
0021, 0024, 0025 related to the Vehicle Maintenance Shop (VMS) are no longer applicable and should not be included in bid.
Section 01 02 00.00 48 Page 6 of 7 Certified Final
23 21 23.00 48 Pumps 23 31 13.00 48 Metal Ductwork 23 33 00.00 48 Ductwork Accessories 23 34 00.00 48 Fans 23 35 16.00 48 Overhead Vehicle Tailpipe Exhaust Systems 23 36 00.00 48 Air Terminal Units 23 37 00.00 48 Air Outlets and Inlets 23 38 13.00 48 Range Hood 23 40 00.00 48 Air Cleaning Devices 23 52 00.00 48 Heating Boilers and Accessories 23 54 16.00 48 Direct-Fired Makeup Air Units 23 64 10.00 48 Packaged Air-Cooled Scroll Chillers 23 64 26.00 48 Packaged Air-Cooled Rotary Screw Chillers 23 73 00.00 48 Air Handling Units 23 81 26.00 48 Split System Air Conditioning Units 23 81 43.00 48 Air-To-Air Heat Pumps 23 82 00.00 48 Terminal Heating Units 23 82 19.00 48 Fan Coil Units 23 84 16.00 48 Dehumidifier Units
DIVISION 26 – ELECTRICAL
26 05 00.00 48 Common Work Results for Electrical 26 05 19.00 48 Low-Voltage Electrical Power Conductors and Cables 26 05 26.00 48 Grounding and Bonding for Electrical Systems 26 05 29.00 48 Hangers and Supports for Electrical Systems 26 05 33.00 48 Raceway and Boxes for Electrical Systems 26 05 53.00 48 Identification for Electrical Systems 26 06 00.00 48 Electrical Utility Services 26 08 00.00 48 Equipment Inspection and Testing 26 22 00.00 48 Low-Voltage Transformers 26 24 00.00 48 Switchboards, Panelboards, and Control Centers 26 27 13.00 48 Electricity Metering 26 27 26.00 48 Wiring Devices 26 28 16.00 48 Enclosed Switches and Circuit Breakers 26 29 00.00 48 Enclosed Controllers 26 41 13.00 48 Lightning Protection 26 51 00.00 48 Interior Lighting 26 56 00.00 48 Exterior Lighting
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76.00 48 Fire Alarm and Mass Notification Systems
DIVISION 31 - EARTHWORK
31 00 00.06 48 Earthwork 31 11 00.00 48 Clearing and Grubbing
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 19.00 48 Field Molded Sealants for Sealing Joints in Rigid Pavement 32 05 33.00 48 Landscaping 32 11 20.00 48 Base Course for Rigid and Subbases for Flexible Paving 32 12 16.00 48 Hot Mix Asphalt (HMA) for Roads
Amendment 0005************************************************
*********************************************Amendment 0005
AMENDMENT 0005
CLINS 0012, 0013, 0018, 0019, 0020, 0021, 0024,
0025 related to the Vehicle Maintenance Shop (VMS) are no longer applicable and should not be included in bid.
Section 01 02 00.00 48 Page 7 of 7 Certified Final
32 13 13.06 48 Portland Cement Concrete Pavement for Road and Site Facilities 32 17 23.00 48 Pavement Markings
DIVISION 33 – UTILITIES
33 11 00.00 48 Water Utility Distribution Piping 33 30 00.00 48 Sanitary Sewerage 33 40 00.00 48 Storm Drainage Utilities 33 46 13.00 48 Foundation Drainage System 33 46 16.00 48 Sub-drainage Piping 33 70 02.00 48 Electric Distribution System
DIVISION 41 – MATERIALS PROCESSING AND HANDLING EQUIPMENT
41 22 00.00 48 Hoists and Cranes
Amendment 0005*********************************************************************************************************************
*********************************************************************************************************************Amendment 0005
AMENDMENT 0005
CLINS 0012, 0013, 0018, 0019, 0020, 0021, 0024, 0025 related to the Vehicle
PART 1
DESIGN OBJECTIVES AND FUNCTIONAL AND AREA REQUIREMENTS
1.1 SCOPE OF WORK.
The objective of this solicitation is to obtain a facility in which the Using Units are able to effectively implement their Army Reserve support and training missions. These activities require sufficient space with up-to-date furnishings and equipment to support the Units’ full-time and Army Reserve personnel. The facility will consist of two existing buildings and associated site improvements, complete and adequate for assignment as the Repair of Building 100 Army Reserve Center (ARC) and Building 101 Vehicle Maintenance Shop (VMS).
1.1.1 Requirements stated in this Request for Proposal (RFP) are minimums;
design and construction shall meet or exceed the requirements. The design and technical criteria contained and cited in this RFP establish minimum standards for design and construction quality. For BV acquisitions: Innovative and creative solutions which meet or exceed these requirements are encouraged.
1.1.2 This project shall consist of the design and renovation/construction of two buildings: the Army Reserve Center (ARC) Training Building is a two-story facility, and the Vehicle Maintenance Shop (VMS) is a one-story facility as described in this RFP on Government-owned land at 225 East Army Post Road, Des Moines, IA. This project includes modifications to required utilities, storm drainage, communications, electrical, plumbing, HVAC, paving, walkways, curbs, parking, exterior lighting, exterior fencing, grading, landscaping, and other site improvements. The site improvements are anticipated to generate 74.5 CY of waste soil. The Contractor must coordinate disposal of excess materials and designate an approved dump site All site signage shall be new.
A new fire line, fire hydrants, fire access drive, and fire protection/alarm system shall be part of the scope of work.
1.1.3 This project consists of interior repairs to the existing buildings. The primary scope for the ARC building is to reconfigure and reallocate several interior spaces, fully renovate the kitchen, and renovation of interior finishes throughout. In the absence of a current elevator to meet accessibility requirements in a two-story building, a new elevator shall be added inside the facility. Exterior/perimeter work shall include necessary corrections to damaged brickwork, new doors and windows, new roof, improved moisture/air barrier measures, and the inclusion of a new prominent entrance feature.
1.1.4 This RFP is offered on the basis that the facility will meet the cited criteria for energy efficiency, under ASHRAE 90.1 and LEED. This requires the DOR and DB team to achieve energy goals under these improved conditions. The US Army Reserve Design Guide 20 October 2023 establishes Sustainability and Resource Conservation goals for all projects. This RFP sets the requirement for the facility to achieve LEED Certified, with a goal of LEED Silver. Available options should be presented to the governement to meet LEED Silver during design. The preliminary LEED scorecard is provided in Attachment ‘F’.
1.1.5 Fire Protection – Provide fully automatic fire suppression and fire alarm system. This scope of work will include the installation of new service lateral connected
Section 01 02 00.00 48 Part 1 - Page 1 of 12 Certified Final
Amendment 0005*******************************************************************************************************
*******************************************************************************************************Amendment 0005
AMENDMENT 0005
Amendment 0005
Section 01 02 00.00 48 Part 1 - Page 2 of 12 Certified Final to the municipal water supply and routed through the site to feed new hydrant locations and fire department connection to the building.
1.1.6 Bid Options. The Government has identified Bid Option items which may be included in the project if available funds allow and government authorization is given.
Renovation of the Vehicle Maintenance Building (VMS) shall be presented as an Optional Bid item, with the primary scope being minor interior renovations and the demolition/ reconstruction of the VMS to include the reconfiguration of interior toilet space to construct single Unisex Toilet with shower, and partial demolition of the vehicle maintenance bay to increase height for installation of a new bridge crane with a 20’ hook height.
1.2 DESIGN OBJECTIVES.
1.2.1 Applicable Criteria. Applicable design and construction criteria references are listed in this Statement of Work and in the Outline Technical Specifications. Criteria shall be taken from the most current references as of the date of issue of the RFP, unless noted otherwise. Referenced codes and standards are minimum acceptable requirements.
1.2.1.1 This RFP and its referenced documents define the necessary criteria to plan and design the Building 100 (ARC) and Building 101 (VMS) facilities. Functional space requirements are indicated in the United States Army Reserve (USAR) Design Guide, referred to as the Design Guide’ (DG), which also provides general criteria and guidance for the design of Army Reserve facilities. Typical functional space furniture layouts and inventories are provided in the RFP drawings; Contractor’s designers shall adapt these to the final floor plans.
1.2.1.2 Where specific manufacturer or vendor names are called out in this RFP, the intention is to provide the desired quality and salient features for the system or material.
1.2.1.2.1 Unless the manufacturer or vendor is identified as “sole-source”, or with similar language, the Contractor may provide an equivalent or better system or material of another vendor or manufacturer.
1.2.2 Primary Consideration. The primary consideration of this solicitation is to obtain the Repair of Building 100 (ARC) and Building 101 (VMS) within funds available, and to maximize design quality. Offerors are encouraged to review the RFP to familiarize themselves with all RFP requirements.
1.2.3 Design Quality. Design quality is achieved through the optimization of interior planning, integration of the buildings with the site, sustainability, selection of building materials and systems for durable low-cost maintenance and operation, and an overall balance of esthetics and functionality. The Army Reserve encourages a project design of award-winning caliber.
1.2.4 Design Freedom. Requirements stated in this RFP are minimums.
Innovative, creative, or cost-saving proposals, which meet or exceed these requirements are encouraged, and will be considered more favorably.
RFP Volume III Technical Outline Specs. Criteria
49AMENDMENT 0005
Section 01 02 00.00 48 Part 1 - Page 3 of 12 Certified Final
1.2.4.1 The project conceptual design was developed by the Army Reserve, the Corps of Engineers, and a RFP preparation A/E design team; this conceptual design is acceptable to the Government.
1.2.4.2 The conceptual design Drawings, this Statement of Work, and the Outline Technical Specifications, along with the other information and requirements in this RFP, serve as requirements for Contractor building design and construction completion, along with other code, regulatory and professional practice requirements. The extent of development of these RFP documents in no way relieves the successful offeror from responsibility for the design, construction documentation, and construction of the facility in conformance with Applicable Criteria and codes.
1.2.4.3 The conceptual design illustrates desired general arrangements, orientation, and adjacencies – it is not intended to dictate the final layout and image for the project, but does represent the preferred layout and configuration by the end User, as established during the RFP development period. The locations of Telecommunication Rooms, Small/Large Team Rooms, Simulator Room, Elevator, Physical Readiness Room, Pump Room, Prominent Entrance, and General Officer Suite have been indicated in the conceptual design plans and should not be changed. The Contractor’s designers shall develop and refine the conceptual site and building design in their completion of the design and construction documents. Such development shall be consistent with the criteria and acceptable to the Government.
1.2.4.3.1 Quantities, sizes, and locations of doors and windows indicated on the conceptual elevations in this RFP are not intended to dictate the final fenestration design, unless indicated as specifically required in the RFP.
1.2.4.3.2 Design building(s) to enhance or complement the visual environment of the Installation or neighborhood. The design shall reflect a human scale, and primary entrances shall be architecturally designed for easy visibility. Exterior materials, roof forms, and detailing shall be compatible with surrounding development and adjacent buildings, and shall follow established architectural themes. Exterior colors shall match and complement the existing buildings to be repaired. Use architectural elements to reflect human scale, break up building massing and roof lines, and add visual interest;
such as stringcourses, reveals, corbels/cornices to produce shadow lines, stone or pre-cast sills and similar elements, dormers, inserts, detailing, etc.
1.2.4.4 The Contractor shall accommodate minor site and building plan changes by the Government in the early stages of the design process, as a normal part of the design development process. The Contractor may adjust spaces, within the overall and specific functional area guidelines, as required to accommodate structural layout, and as necessary to provide adequate space for mechanical, electrical and telecommunication spaces. The mechanical and electrical spaces must provide adequate space to safely and efficiently accommodate equipment operation and maintenance. The spatial relationships and adjacencies in the RFP drawings, however, must be maintained, unless the Contractor recommends changes to the Government, and the Government accepts such changes.
1.2.4.5 The Contractor shall develop and refine the exterior image and aesthetics of the building as part of the design development process. The Contractor shall utilize materials, detailing, fenestration, lighting, and ornamentation to develop a high-quality
RFP Volume III Technical Outline Specs, 50AMENDMENT 0005
Section 01 02 00.00 48 Part 1 - Page 4 of 12 Certified Final exterior image for the facility. The conceptual elevations in the RFP drawings are not acceptable as finish elevations.
1.2.4.6 The Contractor’s architect or interior designer shall select the final palette of colors and materials for building interior and exterior, acceptable to the Government and coordinated throughout.
1.2.5 Installation Design Guidance.
1.2.5.1 Installation Real Property Master Plan – not used.
1.2.5.2 Installation Design Guide – not used.
1.2.6 Antiterrorism and Force Protection Considerations. Project design and construction shall comply with the Department of Defense Antiterrorism (AT) Standards for Buildings, UFC 4-010-01, and other AT criteria listed in Part 2 of this Statement of Work. The conceptual site and building design has been developed in general accordance with AT requirements. Contractor shall continue to coordinate AT design with the Government throughout design and construction.
1.2.6.1 Refer to the MEMORANDUM FOR PPMD titled “Implementation of UFC 4- 010-01 revision 12 Dec 2018” dated 22 January 2019. Privately Owned Vehicle (POV) Parking is permitted within the unobstructed space, however may be temporarily eliminated within the unobstructed space.
1.2.6.2 Compliance with the minimum protective measures for DoD inhabited buildings, as defined in UFC 4-0101-01, is required.
1.2.6.3 The Training Center is an Inhabited Building.
1.2.6.4 The Vehicle Maintenance Shop (VMS) is an Inhabited Building.
1.3 CONTRACTOR RESPONSIBILITY.
1.3.1 The Contractor shall provide all labor, materials, equipment, supplies, permits, fees, and consultant services to design and construct this complex. The complex shall be a complete and usable facility, meeting the requirements of this RFP.
The Contractor shall develop a complete site, building and interior design package.
1.3.2 Throughout the RFP, references are made to MCAR and OMAR funds. For clarification, this refers to the funding source – either Construction funds or Operations and Maintenance funds – for the Project.