W912QR24R0027_Plans-0004.pdf

PDF 2 MB Posted

Attached to
Renovation of Des Moines Army Reserve Center (ARC) and Vehicle Maintenance Shop (VMS)
Solicitation number
W912QR24R0027
Issued by

About this file

This document contains a set of design plans and specifications for the renovation of the Des Moines Army Reserve Center (ARC) and Vehicle Maintenance Shop (VMS) in Des Moines, Iowa. It includes a first floor reflected ceiling plan, finish legend and schedule, first floor furniture plan, demolition plan, grading and drainage plan, and enlarged mechanical plans. Key details include:

The project involves a Design/Build renovation of the Army Reserve Center and Vehicle Maintenance Shop with an estimated construction cost between $25,000,000 and $100,000,000. The NAICS code is 236220 and the project is designated a small business set-aside with a HUBZone 10% price evaluation. The solicitation number is W912QR24R0027. The federal agency issuing the solicitation is the Department of the Army Corps of Engineers Engineering District Louisville.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPOSED

EXISTING CEILING

TO BE PAINTED.

SEE I-101 FOR

ADDITIONAL

INFORMATION.

RCP LEGEND - NEW WORK

NEW 2'X2' ACT CEILING TILES

NEW GYPSUM BOARD CEILING

NO WORK IN THIS AREA UNLESS

OTHERWISE NOTED

2 x 4 RECESSED LIGHT FIXTURE

AB

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T E

T R

A T

E C

H

IN

C

U

S H

W Y

L o u is v ill e

K Y

P h o n e

-5

F a x

(5

-5 w w w .t e tr a te c h .c o m

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

A-120

F

IR

S T

F L O

O R

R E

F L

E C

T E

D C

E

IL

IN

G

P L

A N

U S

A R

M Y

R E

S E

R V

E

E

A R

M Y

P O

S T

R D

D

E S

M O

IN

E

S

IA

L

O U

IS

V

IL

L

E L

O U

IS

V

IL

L

E

K E

N T

U C

K Y

G M

A C

K A

Y

B .E

L E

Y

D R

IC

H

T E

R

J C

L O

S E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L R

F P

S U

B M

IT

T

A L

D E

S M

O

IN

E S

A R

M Y

R E

S E

R V

E C

E N

T E

R D

/B R

F P

D E

V E

L O

P M

E N

T F

O R

A R

M Y

R E

S E

R V

E C

E N

T E

R B

U

IL

D

IN

G

V

E H

IC

L E

M A

IN

T

E N

A N

C E

S H

O P

B U

IL

D

IN

G

P

F

Y

1/16" = 1'-0"A-120

ARC - FIRST FLOOR RCPA1

PLAN NORTH

= 1'-0"

08' 32'16'

1/16" = 1'-0"

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

W

2Q R

R

_P la ns -0

ARIMS: 200A Disposition: Maintain for 15 yrs after construction.

1. ALL FINISH PRODUCTS ARE TO BE INSTALLED IN ACCORDANCE WITH

CONTRACT SPECIFICATIONS AND MANUFACTURERS INSTRUCTIONS.

2. WALL DESIGNATION REFERS TO PLAN NORTH.

3. REFER TO FINISH SCHEDULE FOR EXTENT OF PAINTING.

4. ACCENT WALLS TO BE PAINTED TO CORNER OR BREAKLINE WHERE

WALL CHANGES DIRECTION. REFERENCE FINISH PLANS FOR MORE

INFORMATION.

5. ALL EXPOSED STRUCTURES, INCLUDING BUT NOT LIMITED TO:

PIPING AND FIREPROOFING, CONDUIT, AND ALL ASSOCIATED

EQUIPMENT ARE TO BE PAINTED.

6. APPLY PAINT TO ITEMS, INCLUDING BUT NOT LIMITED TO: FEC'S,

LADDERS, BEAMS,DOOR FRAMES - BOTH SIDES, GLAZING FRAMES IN

DOORS AND IN WALLS, STAIR RAILINGS, HAND AND GUARD RAILINGS,

ALL EXPOSED METAL STAIR PARTS.

7. SOFFIT AND GYP BOARD CEILINGS TO BE PAINTED COLOR OF

ADJACENT WALL. REFER TO FINISH PLANS FOR MORE INFORMATION.

8. PROVIDE THRESHOLDS AND TRANSITION STRIPS AT ALL DISSIMILAR

FLOOR MATERIALS. PROVIDE MARBLE THRESHOLD AT ALL TOILET

ROOMS, AND RUBBER TRANSITIONS AT ALL OTHER LOCATIONS.

INSTALL TRANSITIONS AT THE MIDDLE OF CLOSED DOOR. REFER TO

FINISH DETAILS FOR TYPICAL FLOOR FINISH TRANSITIONS.

9. FLOOR MATERIALS, INCLUDING BUT NOT LIMITED TO CARPET,

RUBBER TILE, IS TO RUN WALL TO WALL, UNDER ALL FURNITURE,

MOVEABLE EQUIPMENT, SHELVING UNITS, MILLWORK, PLUMBING,

AND FLOOR FIXTURES, INCLUDING ALL UNITS AT PERIMETER WALLS.

10. IN THE EVENT THAT DISCREPANCIES ARE FOUND BETWEEN THE

FINISH PLANS, REFLECTED CEILING PLANS, AND THE FINISH

SCHEDULE. ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES

AND CLARIFICATION PRIOR TO PROCUREMENT AND INSTALLATION

OF FINISHES.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T E

T R

A T

E C

H

IN

C

U

S H

W Y

L o u is v ill e

K Y

P h o n e

-5

F a x

(5

-5 w w w .t e tr a te c h .c o m

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

I-101

F

IN

IS

H

L E

G E

N D

A N

D S

C H

E D

U L

E

F

IR

S T

F L

O O

R

U S

A R

M Y

R E

S E

R V

E

E

A R

M Y

P O

S T

R D

D

E S

M O

IN

E

S

IA

L

O U

IS

V

IL

L

E L

O U

IS

V

IL

L

E

K E

N T

U C

K Y

L G

R

IM

M E

L S

M A

N

S

A M

IR

I

E

M A

L D

O N

A D

O

J

U L Y

C E

R T

IF

IE

D F

IN

A

L R

F P

S U

B M

IT

T

A L

D E

S M

O

IN

E S

A R

M Y

R E

S E

R V

E C

E N

T E

R D

/B R

F P

D E

V E

L O

P M

E N

T F

O R

A R

M Y

R E

S E

R V

E C

E N

T E

R B

U

IL

D

IN

G

V

E H

IC

L E

M A

IN

T

E N

A N

C E

S H

O P

B U

IL

D

IN

G

P

F

Y

FINISH SCHEDULE -FIRST FLOOR

ROOM NO ROOM NAME

FLOOR BASE FINISH WALL FINISH CEILING

NOTES & REMARKS (SEE NOTES)MAT FIN NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST FIN HEIGHT

100 VEST CONC WOM/CT CT CT CT CT PT PT PT PT ACT

101 LOBBY CONC CPT CT CT CT CT PT PT PT PT ACT

102 LACTATION

ROOM

CONC CPT RB RB RB RB EPT EPT EPT EPT ACT

103 ARCC

OFFICE

104 RETENTION OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

105 FAMILY SUPPORT OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

106 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

107 TR 2 CONC SDT RB RB RB RB PT PT PT PT - EXPOSED

108 CLASSROOM CONC CPT RB RB RB RB PT PT PT PT ACT

109 INSTRUCTOR CLASSROOM CONC CPT RB RB RB RB PT PT PT PT ACT

110 CLASSROOM CONC CPT RB RB RB RB PT PT PT PT ACT

111 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

112 BREAK ROOM CONC LVT RB RB RB RB PT PT PT PT ACT

113 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

114 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

115 WOMEN'S

LOCKERS/ SHOWERS

CONC RES CT CT CT CT PT/SS PT/SS PT/SS PT/SS ACT3/EPT LOCKER ROOM WALLS: EPT. SHOWER WALLS:

SS LOCKER ROOM CLG: ACT-3. SHOWER CLG:

EPT

Shower Wall: TBD

116 MEN'S LOCKERS/

SHOWERS

CONC RES CT/SS CT/SS CT/SS CT/SS PT/SS PT/SS PT/SS PT/SS ACT3/EPT LOCKER ROOM WALLS: EPT. SHOWER WALLS:

SS LOCKER ROOM CLG: ACT-3. SHOWER CLG:

EPT

117 PHYSICAL

READINESS

CONC VRF RB RB RB RB PT PT PT PT ACT

118 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

119 COR CONC RT RB RB RB RB PT PT PT PT ACT

120 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

121 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

122 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

123 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

124 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

125 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

126 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

127 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

128 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

129 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT ACT

130 COR CONC RT RB RB RB RB PT PT PT PT ACT

131 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

132 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

133 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

134 HALLWAY CONC RT RB RB RB RB PT PT PT PT ACT

135 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

136 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

137 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

138 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

139 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

140 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

141 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

142 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

143 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

144 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

145 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

146 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

147 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

148 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

149 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

150 PUMP

ROOM

CONC SC RB RB RB RB PT PT PT PT OTS

151 CORRIDOR CONC CPT RB RB RB RB PT PT PT PT ACT

152 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

153 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

154 MEN CONC RES CT CT CT CT CT/PT CT/PT CT/PT CT/PT ACT CERAMIC TILE WAINSCOT, PAINTED GWB

ABOVE

155 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

156 WOMEN CONC RES CT CT CT CT CT/PT CT/PT CT/PT CT/PT ACT CERAMIC TILE WAINSCOT, PAINTED GWB

ABOVE

157 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

158 JAN CONC SC RB RB RB RB PT PT PT PT OTS/PT

159 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

160 TR 1 CONC SDT RB RB RB RB PT PT PT PT EX EXPOSED

161 KITCHEN CONC QT QT QT QT QT CT CT CT CT ACT-2 CERAMIC FACED 2X2 ACT IN ALUM. GRID, USDA-FSIS APPROVED

161A PANTRY CONC QT QT QT QT QT CT CT CT CT ACT-2

162 LOBBY CONC CT CT CT CT CT PT PT PT PT ACT

163 ASSEMBLY HALL CONC RT RB RB RB RB PT/AWP PT/AWP PT/AWP PT/AWP OTS/PT ACOUSTICAL WALL PANELS 8 FT. AFF

164 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

165 WEAPONS SIMULATOR CONC RT RB RB RB RB PT PT PT PT ACT

166 MECHANICAL ROOM CONC EX EX EX EX EX EX EX EX EX EX

167 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

168 ELECTRICAL CONC SC RB RB RB RB PT PT PT PT OTS/PT

169 LARGE

TEAM ROOM

CONC SC RB RB RB RB EX EX EX EX EX

170 SMALL

TEAM ROOM

CONC SC RB RB RB RB EX EX EX EX EX

171 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

172 CORRIDOR CONC SC RB RB RB RB EPT EPT EPT EPT OTS/PT

173 UNIT STORAGE CONC SC RB RB RB RB EPT EPT EPT EPT OTS/PT

174 UNIT STORAGE CONC SC RB RB RB RB EPT EPT EPT EPT OTS/PT RUBBER BASE AT PAINTED CMU WALLS

175 UNIT STORAGE CONC SC RB RB RB RB EPT EPT EPT EPT OTS/PT

176 CORRIDOR CONC SC RB RB RB RB EPT EPT EPT EPT OTS/PT

177 ARMS VAULT CONC EX EX EX EX EX EX EX EX EX EX

EL 1 ELEVATOR 1 MANUFACTURER STANDARD ELEVATOR

INTERIOR FINISHES

ST1 STAIR 1 CONC RT RB RB RB RB PT PT PT PT -

ST2 STAIR 2 CONC RT RB RB RB RB PT PT PT PT -

ST3 STAIR 3 CONC RT RB RB RB RB PT PT PT PT -

ST4 STAIR 4 CONC RT RB RB RB RB PT PT PT PT -

ST5 STAIR 5 CONC RT RB RB RB RB PT PT PT PT -

V101 HIGH BAY N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

V111 TOILET CONC SC CT CT CT CT CT CT CT CT GWB/PT

V112 TR CONC SDRE RB RB RB RB PT PT PT PT - EXPOSED

INTERIOR FINISH LEGEND

MATERIAL CODE B.O.D. MANUF. DESCRIPTION COMMENTS

ACOUSTIC CEILING TILE ACT ARMSTRONG 2 X 2 W/ LAY. IN GRID

ACOUSTIC CEILING TILE ACT-2 ARMSTRONG CERAMIC FACED 2X2 ACT CEILING TILE

IN ALUMINUM GRID, USDA-FSIS

APPROVED

ACOUSTIC CEILING TILE ACT-3 ARMSTRONG MOLD RESISTANT ACOUSTICAL

CEILING TILE W/ PREFINISHED

WHITE ALUMINUM GRID

ACOUSTIC WALL PANELS AWP ATS ACOUSTICS COMMERCIAL GRADE FABRIC WRAPPED

ACOUSTIC PANELS. CLASS A RATING

ASSEMBLY HALL

CARPET TILE CPT INTERFACE OPEN AIR. 50 CM X 50 CM

CERAMIC TILE CT CROSSVILLE 12 X 24 PORCELAIN FLOOR AND WALL

TILE

5 FEET HIGH WAINSCOT WHEN

USED ON WALLS

EPOXY PAINT EPT

EXISTING FINISH EX N/A EXISTING FINISH TO REMAIN

GYPSUM WALL BOARD GWB BY CONTRACTOR PER USAR DESIGN GUIDE 20 OCT

2023 AND UFC REQUIREMENTS

LUXURY VINYL TILE LVT INTERFACE 20 MIL WEAR LAYER G.O. SUITE

OPEN TO STRUCTURE OTS SHERWIN WILLIAMS ALL OPEN STRUCTURE TO BE

PAINTED

PAINT PT SHERWIN WILLIAMS LOW VOC PAINT

QUARRY TILE QT CROSSVILLE TEXTURED IN WALK AREAS, INCLUDING

OFFICE. SMOOTH FINISH UNDER EQUIP.

EPOXY GROUT.

RUBBER WALL BASE, 4"H COVE RB TARKETT 4" BH RUBBER COVE BASE

RESINOUS FLOORING RES STONHARD MULTI-COLOR DECORATIVE CHIPS

(100% COVERAGE), 3-PART

APPLICATION MIN.

RUBBER TILE RT NORA NORA PLAN ENVIRON CARE

SEALED CONCRETE SC ASHFORD FORMULA

STATIC DISSIPATIVE RESINOUS

EPOXY

SDRE DUR-A-FLEX DUR-A-GARD

STATIC DISSIPATIVE TILE SDT TARKETT 12" X 12" STATIC DISSAPATIVE RUBBER

TILE

SOLID SURFACE SS CORIAN FULL HT. SOLID SURFACE WALL

PANELS (SHOWER ROOMS)

VULCANIZED RUBBER FLOORING,

9MM MIN.

VRF 1/2" THICK, MIN., SPECKLED, THROUGH

BODY COLOR

WALK OFF MAT SYSTEM WOM PEDI.MAT

NOTE:

ROOM FINISHES LABELED WITH PREFIX 'V' ARE TO BE

PROVIDED AS OPTION 1 TO THE BASE BID, FOR RENOVATIONS

TO THE VEHICLE MAINTENANCE SHED (VMS) ONLY.

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

CONC CPT RB RB PT ACTPT PT PTRB RB

W

2Q R

R

_P la ns -0

1. ALL FINISH PRODUCTS ARE TO BE INSTALLED IN ACCORDANCE WITH

CONTRACT SPECIFICATIONS AND MANUFACTURERS INSTRUCTIONS.

2. WALL DESIGNATION REFERS TO PLAN NORTH.

3. REFER TO FINISH SCHEDULE FOR EXTENT OF PAINTING.

4. ACCENT WALLS TO BE PAINTED TO CORNER OR BREAKLINE WHERE

WALL CHANGES DIRECTION. REFERENCE FINISH PLANS FOR MORE

INFORMATION.

5. ALL EXPOSED STRUCTURES, INCLUDING BUT NOT LIMITED TO:

PIPING AND FIREPROOFING, CONDUIT, AND ALL ASSOCIATED

EQUIPMENT ARE TO BE PAINTED.

6. APPLY PAINT TO ITEMS, INCLUDING BUT NOT LIMITED TO: FEC'S,

LADDERS, BEAMS,DOOR FRAMES - BOTH SIDES, GLAZING FRAMES IN

DOORS AND IN WALLS, STAIR RAILINGS, HAND AND GUARD RAILINGS,

ALL EXPOSED METAL STAIR PARTS.

7. SOFFIT AND GYP BOARD CEILINGS TO BE PAINTED COLOR OF

ADJACENT WALL. REFER TO FINISH PLANS FOR MORE INFORMATION.

8. PROVIDE THRESHOLDS AND TRANSITION STRIPS AT ALL DISSIMILAR

FLOOR MATERIALS. PROVIDE MARBLE THRESHOLD AT ALL TOILET

ROOMS, AND RUBBER TRANSITIONS AT ALL OTHER LOCATIONS.

INSTALL TRANSITIONS AT THE MIDDLE OF CLOSED DOOR. REFER TO

FINISH DETAILS FOR TYPICAL FLOOR FINISH TRANSITIONS.

9. FLOOR MATERIALS, INCLUDING BUT NOT LIMITED TO CARPET,

RUBBER TILE, IS TO RUN WALL TO WALL, UNDER ALL FURNITURE,

MOVEABLE EQUIPMENT, SHELVING UNITS, MILLWORK, PLUMBING,

AND FLOOR FIXTURES, INCLUDING ALL UNITS AT PERIMETER WALLS.

10. IN THE EVENT THAT DISCREPANCIES ARE FOUND BETWEEN THE

FINISH PLANS, REFLECTED CEILING PLANS, AND THE FINISH

SCHEDULE. ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES

AND CLARIFICATION PRIOR TO PROCUREMENT AND INSTALLATION

OF FINISHES.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T E

T R

A T

E C

H

IN

C

U

S H

W Y

L o u is v ill e

K Y

P h o n e

-5

F a x

(5

-5 w w w .t e tr a te c h .c o m

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

I-102

F

IN

IS

H

L E

G E

N D

A N

D S

C H

E D

U L

E

S E

C O

N D

F L

O O

R

U S

A R

M Y

R E

S E

R V

E

E

A R

M Y

P O

S T

R D

D

E S

M O

IN

E

S

IA

L

O U

IS

V

IL

L

E L

O U

IS

V

IL

L

E

K E

N T

U C

K Y

L G

R

IM

M E

L S

M A

N

S

A M

IR

I

E

M A

L D

O N

A D

O

J

U L Y

C E

R T

IF

IE

D F

IN

A

L R

F P

S U

B M

IT

T

A L

D E

S M

O

IN

E S

A R

M Y

R E

S E

R V

E C

E N

T E

R D

/B R

F P

D E

V E

L O

P M

E N

T F

O R

A R

M Y

R E

S E

R V

E C

E N

T E

R B

U

IL

D

IN

G

V

E H

IC

L E

M A

IN

T

E N

A N

C E

S H

O P

B U

IL

D

IN

G

P

F

Y

FINISH SCHEDULE - SECOND FLOOR

ROOM NO ROOM NAME

FLOOR BASE FINISH WALL FINISH CEILING

NOTES & REMARKS (SEE NOTES)MAT FIN NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST FIN HEIGHT

201 LOBBY CONC CT CT CT CT CT PT PT PT PT ACT

202 UNISEX

RR

CONC RES CT CT CT CT CT/EPT CT/EPT CT/EPT CT/EPT ACT3 CERAMIC TILE WAINSCOT, 5FT. H AFF/ EPOXY

PTD. GWB ABOVE.

203 MEN CONC RES CT CT CT CT CT/EPT CT/EPT CT/EPT CT/EPT ACT3 CERAMIC TILE WAINSCOT, 5FT. H AFF/ EPOXY

PTD. GWB ABOVE.

205 CORRIDOR CONC RT RB RB RB RB PT PT PT PT ACT

206 LIBRARY

STORAGE

CONC LVT RB RB RB RB PT PT PT PT ACT STATIC DISSAPATIVE VCT

207 ELECTRICAL CONC SC RB RB RB RB PT PT PT PT OTS/PT

208 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

209 TR 3 CONC SDT RB RB RB RB PT PT PT PT - EXPOSED

210 LEARNING

CENTER

CONC CPT RB RB RB RB PT PT PT PT ACT

211 TRAINING

AIDS

STORAGE

CONC RT RB RB RB RB PT PT PT PT ACT

212 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

213 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

214 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

215 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

216 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

217 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

218 TRAINING

TABLES

STORAGE

CONC RT RB RB RB RB PT PT PT PT ACT

219 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

220 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

221 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

222 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

223 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

224 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

225 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

226 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

227 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

228 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

229 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

230 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

231 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

232 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

233 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

234 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

235 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

236 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

237 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

238 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

239 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

240 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

241 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

242 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

243 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

244 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

245 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

246 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

247 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT OTS

248 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

249 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

250 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

251 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

252 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

253 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

254 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

255 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

256 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

258 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

259 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

260 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

261 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

262 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

263 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

264 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

265 CORR. CONC CPT RB RB RB RB PT PT PT PT ACT

266 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

267 CORR. CONC CPT RB RB RB RB PT PT PT PT ACT

268 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

269 CORRIDOR CONC LVT RB RB RB RB PT PT PT PT ACT

270 CORRIDOR CONC LVT RB RB RB RB PT PT PT PT ACT

271 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

272 FT. ADMIN CONC CPT RB RB RB RB PT PT PT PT ACT

273 PRINC. STAFF

OFFICE

CONC CPT RB RB RB RB PT PT PT PT ACT

274 CMD OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

275 COL OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

276 COL OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

277 G.O.

OFFICE

CONC CPT RB RB RB RB PT PT PT PT ACT

278 G.O. RR CONC CPT RB RB RB RB PT PT PT PT ACT

279 G.O. ADMIN CONC CPT RB RB RB RB PT PT PT PT ACT

280 CONFERENCE CONC CPT RB RB RB RB PT PT PT PT ACT

281 COL OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

282 OPEN OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

283 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

284 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

285 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

286 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

287 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

288 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

289 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

290 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

291 STORAGE CONC RT RB RB RB RB PT PT PT PT ACT

292 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

293 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

294 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

295 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

296 OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

297 COL OFFICE CONC CPT RB RB RB RB PT PT PT PT ACT

298 CORRIDOR CONC LVT RB RB RB RB PT PT PT PT ACT

INTERIOR FINISH LEGEND

MATERIAL CODE B.O.D. MANUF. DESCRIPTION COMMENTS

ACOUSTIC CEILING TILE ACT ARMSTRONG 2 X 2 W/ LAY. IN GRID

ACOUSTIC CEILING TILE ACT-2 ARMSTRONG CERAMIC FACED 2X2 ACT CEILING TILE

IN ALUMINUM GRID, USDA-FSIS

APPROVED

ACOUSTIC CEILING TILE ACT-3 ARMSTRONG MOLD RESISTANT ACOUSTICAL

CEILING TILE W/ PREFINISHED

WHITE ALUMINUM GRID

ACOUSTIC WALL PANELS AWP ATS ACOUSTICS COMMERCIAL GRADE FABRIC WRAPPED

ACOUSTIC PANELS. CLASS A RATING

ASSEMBLY HALL

CARPET TILE CPT INTERFACE OPEN AIR. 50 CM X 50 CM

CERAMIC TILE CT CROSSVILLE 12 X 24 PORCELAIN FLOOR AND WALL

TILE

5 FEET HIGH WAINSCOT WHEN

USED ON WALLS

EPOXY PAINT EPT

EXISTING FINISH EX N/A EXISTING FINISH TO REMAIN

GYPSUM WALL BOARD GWB BY CONTRACTOR PER USAR DESIGN GUIDE 20 OCT

2023 AND UFC REQUIREMENTS

LUXURY VINYL TILE LVT INTERFACE 20 MIL WEAR LAYER G.O. SUITE

OPEN TO STRUCTURE OTS SHERWIN WILLIAMS ALL OPEN STRUCTURE TO BE

PAINTED

PAINT PT SHERWIN WILLIAMS LOW VOC PAINT

QUARRY TILE QT CROSSVILLE TEXTURED IN WALK AREAS, INCLUDING

OFFICE. SMOOTH FINISH UNDER EQUIP.

EPOXY GROUT.

RUBBER WALL BASE, 4"H COVE RB TARKETT 4" BH RUBBER COVE BASE

RESINOUS FLOORING RES STONHARD MULTI-COLOR DECORATIVE CHIPS

(100% COVERAGE), 3-PART

APPLICATION MIN.

RUBBER TILE RT NORA NORA PLAN ENVIRON CARE

SEALED CONCRETE SC ASHFORD FORMULA

STATIC DISSIPATIVE RESINOUS

EPOXY

SDRE DUR-A-FLEX DUR-A-GARD

STATIC DISSIPATIVE TILE SDT TARKETT 12" X 12" STATIC DISSAPATIVE RUBBER

TILE

SOLID SURFACE SS CORIAN FULL HT. SOLID SURFACE WALL

PANELS (SHOWER ROOMS)

VULCANIZED RUBBER FLOORING,

9MM MIN.

VRF 1/2" THICK, MIN., SPECKLED, THROUGH

BODY COLOR

WALK OFF MAT SYSTEM WOM PEDI.MAT

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

W

2Q R

R

_P la ns -0

UP

UP

UP

A R

E A

B

A R

E A

A

A R

E A

B

A R

E A

A

A R

E A

B

A R

E A

C

AREA 'B'

AREA 'C'

TR 1

LARGE

TEAM ROOM

MECHANICAL ROOM

UNIT STORAGE

ARMS VAULT

UNIT STORAGE

UNIT STORAGE

LACTATION

ROOM

KITCHEN

WOMEN

FAMILY SUPPORT

OFFICE

RETENTION OFFICE

LOBBY

STORAGE

MEN

ELEVATOR 1

EL 1STAIR 5

ST5

CORRIDOR

CORRIDOR

VEST

CORRIDOR

CORRIDOR

LOBBY

CORRIDOR

STAIR 1

ST1

STAIR 4

ST4

BB

BB

ST-4

D -2

CH-6

CH-6 CH-1

CH-7

CH-7

T-6

T-5 CH-6

16' - 2 3/4" 16' - 2 3/4"

T-6 CH-7

ST-3

D-2

CH-1

ST-4

ST-2ST-3

ST-2

TYP.2

TYP.6

JAN

SMALL

TEAM ROOM

PANTRY

ELECTRICAL

ST-3

CH-1

CH-6

D-2

TYP.6

CH-1

D-2

ARCC

OFFICE

STORAGE

TABLES:

T-5: 48 DIA. CONF. TABLE W/ WOOD TOP

TOTAL QUANTITY:1

T-6: WOOD SIDE TABLE

TOTAL QUANTITY:2

DESKS:

D-2: L-SHAPE UNIT W/WOOD TOP; OVERHEAD W/TASK LT;

BOX/BOX/FILE; FILE/FILLE.

TOTAL QUANTITY:3

STORAGE:

ST-1: 48" X 24" D TALL, HEAVY DUTY STORAGE SHELF

UNITS

TOTAL QUANTITY: 232

ST-2: LATERAL FILE. METAL W/ WOOD FRONT.

TOTALL QUANTITY:2

ST-3: WOOD BOOKCASE

TOTAL QUANTITY:3

ST-4: FREE STANDING LITERATURE RACK

TOTAL QUANTITY:1

ST-5: 5-DRAWER FILE; LOCKABLE

TOTAL QUANTITY:1

CHAIR:

CH-6: GUEST CHAIR, W/ ARMS; UPHOLST. SEAT AND

BACK; HIGH PERFORMANCE FABRIC.

TOTAL QUANTITY:14

CH-7: FULLY UPHOLST. LOUNGE CHAIR WITH HIGH

PERFORMANCE FABRIC

TOTAL QUANTITY: 7

NOTE: ALL STEEL SHELVING (AS SPECIFIED IN USAR

DESIGN GUIDE 20OCT2024), IN UNIT STORAGE ROOMS

173, 174, 175 IS PART OF THE CONSTRUCTION

CONTRACT UNDER OMAR FUNDING."

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T E

T R

A T

E C

H

IN

C

U

S H

W Y

L o u is v ill e

K Y

P h o n e

-5

F a x

(5

-5 w w w .t e tr a te c h .c o m

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

I-112

F

IR

S T

F L

O O

R F

U R

N

IT

U R

E P

L A

N

A R

E A

B

U S

A R

M Y

R E

S E

R V

E

E

A R

M Y

P O

S T

R D

D

E S

M O

IN

E

S

IA

L

O U

IS

V

IL

L

E L

O U

IS

V

IL

L

E

K E

N T

U C

K Y

L G

R

IM

M E

L S

M A

N

S

A M

IR

I

E

M A

L D

O N

A D

O

J

U L Y

C E

R T

IF

IE

D F

IN

A

L R

F P

S U

B M

IT

T

A L

D E

S M

O

IN

E S

A R

M Y

R E

S E

R V

E C

E N

T E

R D

/B R

F P

D E

V E

L O

P M

E N

T F

O R

A R

M Y

R E

S E

R V

E C

E N

T E

R B

U

IL

D

IN

G

V

E H

IC

L E

M A

IN

T

E N

A N

C E

S H

O P

B U

IL

D

IN

G

P

F

Y

1/8" = 1'-0"I-112

ARC - FIRST FLOOR PLAN - AREA 'B'A1

OVERALL BUILDING FURNITURE QTY

MARK COUNT

C-4 2

CH-1 323

CH-2 86

CH-3 4

CH-4 148

CH-5 8

CH-6 12

CH-7 3

CH-8 168

CH-9 6

CH-10 34

CH-11 4

CH-12 1

CH-13 14

D-1 80

D-2 4

D-3 4

D-4 1

D-6 5

M-1 1

ST-1 269

ST-2 3

ST-3 3

ST-4 4

ST-7 4

ST-8 4

ST-9 2

T-1 43

T-3 4

T-4 2

T-5 1

T-6 2

T-7 21

T-8 5

T-9 1

T-11 3

WS-1 174

WS-2 82

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

W

2Q R

R

_P la ns -0

X X X X X X X X X X X X X X

X X

X X

X

X

X X

XX

X X

S

San San

San

San

San

San

San

San

San

CO

S San San

San

San

San

San

San

D

San

San

D

D

StS StS StS StS StS StS StS StSStS StS StS StS StS StS StS StS

BUILDING 100

UNITED STATE ARMY RESERVE CENTER

2-STORY

BRICK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

ROCK

AC UNIT

AC UNIT

LANDSCAPE RIVER ROCK

PICNIC TABLE

PICNIC TABLE

BBQ

TRASH CAN

TRASH CAN

BBQ

DAMAGED

LIGHT POLE

BASE

TREE STUMP

SATELLITE PAD

OPE

N

AI

R

PI

CN

IC

SH

EL

TE

R

PCC

PAD

MONUMENT

TRASH CAN

TREE STUMP

PLANTER BOX

PLANTER BOX

TOMBSTONE

6-INCH CLAY

8-INCH CLAY

UNKNOWN SIZE-FIELD

VERIFY

8-INCH CLAY

O

VER

H

AN

G

OVERHANG

TRAFFIC CONTROL MANHOLETELE. PED

TELE. HANDHOLE

TELE. HANDHOLE

StS StS

"U.S. ARMY RESERVE" SIGN

EAST ARMY POST ROAD

FLAGPOLE

STAIRS

BM

BM

BM

BM

BM

BUILDING

1-STORY

BRICK

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD DOOR

DOOR

GATE

GATE

DOOR W/ OVERHANG

DOOR W/ OVERHANG

E

E ELECTRICAL RISER

PICNIC TABLES

CIRCULAR PLANTER

CONDUIT

WALL MOUNTED AC UNIT

FO FO FO FO FO FO FO FO FO FO

FO

72-INCH DIA. TREE

54-INCH DIA. TREE

12-INCH DIA. TREE

16-INCH DIA. TREE

48-INCH DIA. TREE

48-INCH DIA. TREE

OHE

OHE

OHEOHE

OHE

OHE

OHE

OHE

OHEOHE

OHE

OHE

OH

E

OH

E

E E E E E E E E E E E E

FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO

FO

W W W W W W W W W W W W W W W W W W W W W W W W W W

StS StS StS

W W

W W

W

W

W

W

W

W W

W

CB

SIGN LIGHTS

SE 3RD STREET

SE 2N

D

STR

EET

LEFT TURN ARROW

BROKEN LANE LINE (WHITE)

BROKEN LANE

LINE (WHITE) SOLID LANE LINE (WHITE)

DOUBLE CENTERLINE (YELLOW)

NO PASSING ZONE LINE (YELLOW)

8-INCH WATERMAIN (PVC)

8-INCH WATERMAIN

(CAST IRON)

FIRE HYDRANT

FIRE HYDRANT ASSEMBLY

VALVE

24-INCH DIA. TREE

TRAFFIC CONTROL HANDHOLE

HANDHOLE

ICN MECHANICAL CABINET

TRAFFIC CONTROL BASE

E E

6-INCH DIA. TREE

G

LANDSCAPE RIVER ROCK

50.00' INGRESS/EGRESS EASEMENT

BOOK 7811, PAGE 354

EAST ARMY POST ROAD

SOMERSET RESIDENTIAL COOPERATIVE

STORM CATCH BASIN

GRATE=948.23

INV. OUT EAST=

STORM CATCH BASIN

GRATE=

DOWNSPOUT GRATE

INV.=949.62

DOWNSPOUT GRATE

INV.=949.56

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

4-INCH TRENCH DRAIN W/ GRATE

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

12-INCH RCP

10-INCH RCP

STORM SEWER CATCH BASIN

GRATE=943.94

INV. IN WEST=940.84

INV. IN NORTH=939.44

INV. OUT EAST=938.96

STORM SEWER SW-505 STRUCTURE

GRATE=944.18

INV. OUT SOUTH=939.68

15-INCH RCP

SANITARY CLEAN OUT

RIM=952.50

NO PIPES VISIBLE

BOTTOM OF STRUCTURE=946.50

36-INCH DIA. TREE

32-INCH DIA. TREE

89-INCH DIA. TREE

96-INCH DIA. TREE

DOOR CP TEST

E

E

E

E

E

T

T

T

T

T

G

E

E E

E E

G G

G

GAS RISER

ELECTRICAL RISER

G

G

G

G

G

GAS RISER

STORM MANHOLE

RIM=951.12

INV. IN WEST=945.12

INV. IN SOUTH=944.97

INV. OUT

EAST=944.92

"SOMERSET" SIGN

CAN WASH DRAIN

RIM=949.86

NO PIPES VISIBLE

OIL/WATER SEPARATOR

VAULT=950.90

TOP OF 6-INCH PIPE=945.10

NO OPEN PIPES

OVERHEAD DOOR

GAS RISER

24-INCH DIA. TREE

STORM MANHOLE

RIM=947.51

INV. IN WEST=943.51

INV. OUT EAST=943.06

SANITARY MANHOLE (CASTING COVERED WITH ASPHALT)

RIM=950.79

INV. IN EAST=944.12

INV. OUT SOUTHEAST=943.92

SANITARY MANHOLE (CASTING

COVERED WITH ASPHALT)

RIM=949.66

INV. IN NORTHWEST=943.20

INV. IN NORTHEAST=943.16

INV. OUT SOUTHEAST=943.16

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD LOD

LODLODLODLODLODLODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLODLODLODLOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LODLOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

X X

D

D

S

S

S

S

San

S

S

CO

S

StS

D

D

DStSStS

D

CO

CO

E

BUILDING 100

UNITED STATE ARMY RESERVE CENTER

2-STORY

BRICK

BUILDING 101

1-STORY

BRICK

BUILDING 102

1-STORY

METAL

PULL-UP BARS

TETHER BALL

MAILBOX

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

ROCK

AC UNIT

AC UNIT

LANDSCAPE RIVER ROCK

PICNIC TABLE

PICNIC TABLE

BBQ

TRASH CAN

TRASH CAN

BBQ

DAMAGED

LIGHT POLE

BASE

TREE STUMP

SATELLITE PAD

OPE

N

AI

R

PI

CN

IC

SH

EL

TE

R

PCC

PAD

MONUMENT

TRASH CAN

TREE STUMP

PLANTER BOX

PLANTER BOX

TOMBSTONE

6-INCH CLAY

8-INCH CLAY

UNKNOWN SIZE-FIELD

VERIFY

8-INCH CLAY

SANITARY MANHOLE

RIM=949.12

INV. IN NORTH=942.66

INV. IN WEST=942.54

INV. OUT SOUTH=942.54

6-INCH CLAY

8-INCH CLAY

SANITARY MANHOLE

RIM=949.14

INV. IN NORTHWEST=942.89

INV. IN NORTH=942.35

INV. OUT SOUTH=942.35

6-INCH CLAY

8-INCH CLAY

SANITARY MANHOLE

8-INCH CLAY

8-INCH PVC

O

VER

H

AN

G

OVERHANG

TRAFFIC CONTROL MANHOLETELE. PED

TELE. HANDHOLE

TELE. HANDHOLE

"U.S. ARMY RESERVE" SIGN

EAST ARMY POST ROAD

FLAGPOLE

STAIRS

BM

BM

BM

BM

BM

BM

BM

BM

GATE

BUILDING

1-STORY

BRICK

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD

DOOR

DOOR

OVERHEAD DOOR

LANDSCAPE ROCK

500-GALLON FUEL TANK

GATE

GATE

DOOR W/ OVERHANG

DOOR W/ OVERHANG

ELECTRICAL RISER

PICNIC TABLES

CIRCULAR PLANTER

CONDUIT

WALL MOUNTED AC UNIT

FO

72-INCH DIA. TREE

54-INCH DIA. TREE

12-INCH DIA. TREE

16-INCH DIA. TREE

48-INCH DIA. TREE

48-INCH DIA. TREE

OHE

EFO FO

W W

W

CB

D

D

SANITARY SEWER MANHOLE

SIGN LIGHTS

SE 3RD STREET

SE 2N

D

STR

EET

LEFT TURN ARROW

BROKEN LANE LINE (WHITE)

BROKEN LANE

LINE (WHITE) SOLID LANE LINE (WHITE)

DOUBLE CENTERLINE (YELLOW)

NO PASSING ZONE LINE (YELLOW)

8-INCH WATERMAIN (PVC)

8-INCH WATERMAIN

(CAST IRON)

FIRE HYDRANT

VALVE

VALVE

24-INCH DIA. TREE

41-INCH DIA. TREE

TRAFFIC CONTROL HANDHOLE

HANDHOLE

ICN MECHANICAL CABINET

TRAFFIC CONTROL BASE

36-INCH DIA. TREE

LANDSCAPE RIVER ROCK

10.00' PUBLIC UTILITY

EASEMENT/10.00'

BUILDING SETBACK

BOOK 7811 PAGE 354

30.00' STORM SEWER EASEMENT

BOOK 7811, PAGE 354

50.00' INGRESS/EGRESS EASEMENT

BOOK 7811, PAGE 354

EAST ARMY POST ROAD

SOMERSET RESIDENTIAL COOPERATIVE

STORM CURB INLET

RIM=938.72

INV. IN WEST=935.30

INV. OUT EAST =935.22

INV.=935.46

24-INCH RCP

18-INCH RCP

STORM CURB INLET

RIM=947.51

INV. IN SOUTHWEST=941.11

INV. OUT EAST =936.41

18-INCH PVC

STORM CATCH BASIN

GRATE=948.46

INV. IN WEST=943.06

INV. OUT NORTHEAST =942.96

18-INCH PVC

STORM CATCH BASIN

GRATE=949.19

INV. IN NORTH=944.23

INV. OUT EAST =944.11

12-INCH PVC

STORM CATCH BASIN

GRATE=950.00

INV. OUT SOUTH =944.94

STORM CATCH BASIN

GRATE=948.23

INV. OUT EAST=

STORM CATCH BASIN

GRATE=

DOWNSPOUT GRATE

INV.=949.62

DOWNSPOUT GRATE

INV.=949.56

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

4-INCH TRENCH DRAIN W/ GRATE

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

12-INCH RCP

10-INCH RCP

STORM SEWER CATCH BASIN

GRATE=943.94

INV. IN WEST=940.84

INV. IN NORTH=939.44

INV. OUT EAST=938.96

12-INCH RCP

STORM SEWER MANHOLE

RIM=938.52

INV. IN NORTHEAST =933.81

INV. IN WEST=932.92

INV. OUT SOUTHEAST=932.82

STORM SEWER MANHOLE

RIM=938.80

INV. IN NORTHWEST =930.90

INV. OUT EAST=930.80

24-INCH RCP

STORM SEWER SW-505 STRUCTURE

GRATE=944.18

INV. OUT SOUTH=939.68

15-INCH RCP

SANITARY CLEAN OUT

RIM=952.50

NO PIPES VISIBLE

BOTTOM OF STRUCTURE=946.50

ELECTRICAL RISER

OIL/WATER SEPARATOR

VAULT=949.77

NO OPEN PIPES

36-INCH DIA. TREE

32-INCH DIA. TREE

89-INCH DIA. TREE

96-INCH DIA. TREE

48-INCH DIA. TREE

120-INCH

DIA. TREE

DOOR CP TEST

G

GAS RISER

ELECTRICAL RISER

GAS RISER

STORM MANHOLE

RIM=951.12

INV. IN WEST=945.12

INV. IN SOUTH=944.97

INV. OUT

EAST=944.92

"SOMERSET" SIGN

LANDSCAPE LAVA ROCK

8-INCH CLAY

DOOR

OVERHEAD DOOR

GROUND WIRE

SANITARY MANHOLE

RIM=949.18

INV. IN NORTH=943.11

INV. OUT SOUTHEAST=942.83

CAN WASH DRAIN

RIM=949.86

NO PIPES VISIBLE

OIL/WATER SEPARATOR

VAULT=950.90

TOP OF 6-INCH PIPE=945.10

NO OPEN PIPES

OVERHEAD DOOR

GAS RISER

24-INCH DIA. TREE

STORM MANHOLE

RIM=947.51

INV. IN WEST=943.51

INV. OUT EAST=943.06

SANITARY MANHOLE

RIM=950.03

INV. IN WEST=943.83

INV. IN NORTH=941.73

INV. OUT SOUTHWEST=941.68

SANITARY MANHOLE (CASTING COVERED WITH ASPHALT)

RIM=950.79

INV. IN EAST=944.12

INV. OUT SOUTHEAST=943.92

SANITARY MANHOLE (CASTING

COVERED WITH ASPHALT)

RIM=949.66

INV. IN NORTHWEST=943.20

INV. IN NORTHEAST=943.16

INV. OUT SOUTHEAST=943.16

LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

(BID OPTION)

(BID OPTION)

(BID OPTION)

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 20

P

M

K

H

F

D

B

TE

TR

A

TE

C H

, I N

C

U S

H W

Y

Lo ui sv ille

, K Y

Ph on e

(5

) 5

-5

Fa x (5

) 5

-5 w w w .te tra te ch .c om

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

U S

AR

M

Y R

ES

ER

VE

, 2

E

A R

M Y

PO

ST

R D

D

ES

M

O

IN

ES

, I

A

LO

U

IS

VI

LL

E

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

D .R

IC

H

TE

R

J

U N

E

D

ES

M

O

IN

ES

A

R M

Y R

ES

ER

VE

C

EN

TE

R D

/B R

FP

D

EV

EL

O

PM

EN

T

FO

R

A R

M Y

R

ES

ER

VE

C

EN

TE

R

B U

IL

D

IN

G

V

EH

IC

LE

M

AI

N

TE

N

AN

C

E

SH

O P

BU

IL

D

IN

G

P2

F Y:

D

.M . L

EC

KI

E

M .S

O

SA

A.

C

AS

TI

LL

O

E.

M

AN

G

IW

A

/ A . D

U

EH

R

18 19

C

ER

TI

FI

ED

F

IN

AL

R

FP

S U

BM

IT

TA

L

LEGEND:

SCALE: 1" = 30' 0 15' 30' 60' 90'A1 DEMOLITION PLAN

NORTH CD101

MATCH LINE - SEE SHEET CD102 FOR CONTINUATION

KEY PLAN

N.T.S.

SHEET KEYNOTES

1. DEMOLISH EXISTING 6' HIGH FENCE AROUND

PERIMETER OF VMS AREA (BID OPTION)

2. DEMOLISH FULL DEPTH EXISTING ASPHALT

PAVEMENT TO THE BOTTOM OF AGGREGATE BASE

(1.5 FEET DEEP PER GEOTECH REPORT)

(BID OPTION)

3. MILL EXISTING ASPHALT (4")

4. PROTECT EXISTING STORM PIPE AT ALL TIMES

THROUGHOUT DEMOLITION PHASE.

5. DEMOLISH EXISTING CURB AND GUTTER

6. DEMOLISH EXISTING SIDEWALK

7. DEMOLISH EXISTING TREE

8. PROTECT SIGN

9. PROTECT EXISTING CURB AND GUTTER

10. PROTECT EXISTING UTILITY MANHOLE / FEATURE

DURING DEMOLITION PHASE

11. DEMOLISH EXISTING SANITARY SEWER LINE

12. PROTECT EXISTING TREES. USE TREE PROTECTION

FENCE. (BID OPTION)

13. REMOVE EXISTING CANNONS AND TURN OVER TO

GOVERNMENT.

14. NOT USED.

15. PROTECT EXISTING UTILITY LINES AT ALL TIMES

THROUGHOUT CONSTRUCTION.

16. DEMOLISH EXISTING OIL WATER SEPARATOR

17. PROTECT EXISTING LIGHT POLE

18. REMOVE EXISTING AND SALVAGE SIGN

19. SAWCUT AND DEMOLISH ASPHALT PAVEMENT FOR

HDD BORE PIT. (BID OPTION)

20. REMOVE AND SALVAGE AC UNITS

21. DEMOLISH FULL DEPTH EXISTING ASPHALT

PAVEMENT TO THE BOTTOM OF AGGREGATE BASE

(1.5 FEET DEEP PER GEOTECH REPORT)

22. LANDSCAPE RIVER ROCK REMOVAL.

23. DEMOLISH 6" HIGH FENCE FOR UTILITY INSTALLATION

24. PROTECT EXISTING FENCE.

25. REMOVE EXISTING CONCRETE MONUMENT AND

TURN OVER TO GOVERNMENT.

FULL DEPTH REMOVAL ASPHALT PAVEMENT

MILL EXISTING ASPHALT (4")

DEMOLISH / REMOVE EXISTING CONCRETE

SIDEWALK/ FLUME/ MONUMENT/ DRIVEWAY/AC

UNITS

DEMOLISH UTILITY

DEMOLISH EXISTING FENCE

DEMOLISH CURB AND GUTTER

LANDSCAPE RIVER ROCK REMOVAL

DEMOLISH EXISTING TREE

LIMITS OF DISTURBANCE

X X

GENERAL SHEET NOTES

1. THIS PLAN IS CONCEPTUAL IN NATURE AND

SUBJECT TO CHANGE AS THE DESIGN

PROGRESSES.

2. REFER TO SHEET C-001 FOR CIVIL LEGEND AND

ABBREVIATIONS.

3. REFER TO SHEET C-002 TO C-004 FOR GENERAL

CIVIL NOTES.

4. THIS SHEET IS PART OF A MULTI-SHEET SET OF

CONSTRUCTION PLANS AND SHALL BE READ

WITH THE FULL SET TO BEST ENSURE PROPER

INTERPRETATION.

5. EROSION AND SEDIMENT CONTROL MEASURES

AND TEMPORARY CONSTRUCTION FENCING

SHALL BE IN PLACE PRIOR TO COMMENCEMENT

OF CONSTRUCTION AND REMAIN IN PLACE.

6. CONCURRENT WITH DEMOLITION, CONTRACTOR

SHALL ESTABLISH SURVEY CONTROL NETWORK

OUTSIDE LIMITS OF DEMOLITION PRIOR TO

COMMENCEMENT OF WORK. THIS WORK MUST

BE PERFORMED BY A LICENSED AND

REGISTERED IOWA LAND SURVEYOR.

7. ALL DEMOLITION WORK SHALL BE

COORDINATED WITH CONTRACTOR'S

SCHEDULE, LOGISTICS PLAN (APPROVED BY

OWNER), AND EROSION, SEDIMENTATION, AND

POLLUTION CONTROL PLAN PRIOR TO WORK.

8. UTILITIES THAT ARE STATED TO BE PROTECTED

SHALL BE PROTECTED THROUGHOUT ALL

PHASES OF CONSTRUCTION.

9. COORDINATE WITH COR FOR REMOVAL AND

TRANSPORTATION OF MECHANICAL AND

ELECTRICAL EQUIPMENT.

CD101

CD102

D

EM

O

LI

TI

O

N P

LA

N

X

X

XX

X

LOD LOD

(BID OPTION)

(BID OPTION)

(BID OPTION)

(BID OPTION)

(BID

OPTION)

(BID OPTION)5

18(BID OPTION)

R

E V

IS

E

D

IN

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/1

2/

W

2Q R

R

_P la ns -0

X X X X X X X X X X X X X X

X X

X X

X

XX

X X

S

San San

San

San

San

San

San

San

San

CO

S San San

San

San

San

San

San

D

San

D

D

StS StS StS StS StS StS StS StSStS StS StS StS StS StS StS StS

BUILDING 100

UNITED STATE ARMY RESERVE CENTER

2-STORY

BRICK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

ROCK AC UNIT

PICNIC TABLE

PICNIC TABLE

BBQ

TRASH CAN

TRASH CAN

BBQ

DAMAGED

LIGHT POLE

BASE

SATELLITE PAD

OPE

N

AI

R

PI

CN

IC

SH

EL

TE

R

PCC

PAD

TRASH CAN

TREE STUMP

PLANTER BOX

PLANTER BOX

TOMBSTONE

6-INCH CLAY

8-INCH CLAY

UNKNOWN SIZE-FIELD

VERIFY

8-INCH CLAY

O

VER

H

AN

G

OVERHANG

TRAFFIC CONTROL MANHOLETELE. PED

TELE. HANDHOLE

TELE. HANDHOLE

StS StS

"U.S. ARMY RESERVE" SIGN

EAST ARMY POST ROAD

FLAGPOLE

STAIRS

BM

BM

BM

BM

BM

BUILDING

1-STORY

BRICK

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD DOOR

DOOR

GATE

GATE

DOOR W/ OVERHANG

DOOR W/ OVERHANG

E

E ELECTRICAL RISER

PICNIC TABLES

CIRCULAR PLANTER

CONDUIT

WALL MOUNTED AC UNIT

FO FO FO FO FO FO FO FO FO FO

FO

72-INCH DIA. TREE

54-INCH DIA. TREE

OHE

OHE

OHEOHE

OHE

OHE

OHE

OHE

OHEOHE

OHE

OHE

OH

E

OH

E

E E E E E E E E E E E E

FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO

FO

W W W W W W W W W W W W W W W W W W W W W W W W W W

StS StS StS

W W

W W

W

W

W

W

W

W W

W

CB

SIGN LIGHTS

SE 3RD STREET

SE 2N

D

STR

EET

LEFT TURN ARROW

BROKEN LANE LINE (WHITE)

BROKEN LANE

LINE (WHITE) SOLID LANE LINE (WHITE)

DOUBLE CENTERLINE (YELLOW)

NO PASSING ZONE LINE (YELLOW)

8-INCH WATERMAIN (PVC)

8-INCH WATERMAIN

(CAST IRON)

FIRE HYDRANT

FIRE HYDRANT ASSEMBLY

VALVE

24-INCH DIA. TREE

TRAFFIC CONTROL HANDHOLE

HANDHOLE

ICN MECHANICAL CABINET

TRAFFIC CONTROL BASE

E E

6-INCH DIA. TREE

G

LANDSCAPE RIVER ROCK

50.00' INGRESS/EGRESS EASEMENT

BOOK 7811, PAGE 354

EAST ARMY POST ROAD

SOMERSET RESIDENTIAL COOPERATIVE

STORM CATCH BASIN

GRATE=948.23

INV. OUT EAST=

STORM CATCH BASIN

GRATE=

DOWNSPOUT GRATE

INV.=949.62

DOWNSPOUT GRATE

INV.=949.56

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

4-INCH TRENCH DRAIN W/ GRATE

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

12-INCH RCP

10-INCH RCP

STORM SEWER CATCH BASIN

GRATE=943.94

INV. IN WEST=940.84

INV. IN NORTH=939.44

INV. OUT EAST=938.96

STORM SEWER SW-505 STRUCTURE

GRATE=944.18

INV. OUT SOUTH=939.68

15-INCH RCP

SANITARY CLEAN OUT

RIM=952.50

NO PIPES VISIBLE

BOTTOM OF STRUCTURE=946.50

36-INCH DIA. TREE

32-INCH DIA. TREE

89-INCH DIA. TREE

96-INCH DIA. TREE

DOOR CP TEST

E

E

E

E

E

T

T

T

T

T

G

E

E E

E E

G G

G

GAS RISER

ELECTRICAL RISER

G

G

G

G

G

GAS RISER

STORM MANHOLE

RIM=951.12

INV. IN WEST=945.12

INV. IN SOUTH=944.97

INV. OUT

EAST=944.92

"SOMERSET" SIGN

CAN WASH DRAIN

RIM=949.86

NO PIPES VISIBLE

OIL/WATER SEPARATOR

VAULT=950.90

TOP OF 6-INCH PIPE=945.10

NO OPEN PIPES

OVERHEAD DOOR

GAS RISER

24-INCH DIA. TREE

STORM MANHOLE

RIM=947.51

INV. IN WEST=943.51

INV. OUT EAST=943.06

SANITARY MANHOLE (CASTING COVERED WITH ASPHALT)

RIM=950.79

INV. IN EAST=944.12

INV. OUT SOUTHEAST=943.92

SANITARY MANHOLE (CASTING

COVERED WITH ASPHALT)

RIM=949.66

INV. IN NORTHWEST=943.20

INV. IN NORTHEAST=943.16

INV. OUT SOUTHEAST=943.16

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD LOD

LODLODLODLODLODLODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLODLODLODLOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LODLOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

CO

CO

CO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

S

H

H

H

EOP: 948.33

EOP: 945.11

EOP: 946.93

949.69

949.29

949.12 949.41

949.54

949.59

EOP: 948.30

EOP: 948.34

942.98

942.64

950.98

951.08

BC: 949.95

950.63950.25

950.17

949.85 949.56

949.56

949.93

949.62

EOP: 945.21

944.97

951.35

949.30

949.16

951.36

950.97

950.73

949.68

EOP: 945.00

949.42949.37

951.10

951.26

951.44 951.44

951.05

950.18

950.29

951.00

951.11

951.50

951.36

946.36946.57

948.94

948.88

EOP: 949.70

EOP: 949.39

EOP: 950.62

EOP: 950.72

EOP: 949.60

EOP: 950.50

EOP: 950.04

EOP: 950.26

EOP: 950.00

EOP: 950.56

EOP: 950.62

EOP: 950.30

946.32 945.81

945.13

944.67

944.55 944.55

950.79

950.80 950.90

951.37

951.21951.40

EOP: 947.55

EOP: 946.53

EOP: 947.56

-4.9%

-4.6%

-1.0%

EOP: 947.45

951.02

950.91

EOP: 941.61

EOP: 946.50 EOP: 945.40

EOP: 944.51

EOP: 945.87

94894

951.12

X X

D

D

S

S

S

S

San

S

S

CO

S

StS

D

D

DStSStS

D

CO

CO

E

BUILDING 100

UNITED STATE ARMY RESERVE CENTER

2-STORY

BRICK

BUILDING 101

1-STORY

BRICK

BUILDING 102

1-STORY

METAL

PULL-UP BARS

TETHER BALL

MAILBOX

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

LANDSCAPE RIVER ROCK

ROCK AC UNIT

PICNIC TABLE

PICNIC TABLE

BBQ

TRASH CAN

TRASH CAN

BBQ

DAMAGED

LIGHT POLE

BASE

SATELLITE PAD

OPE

N

AI

R

PI

CN

IC

SH

EL

TE

R

PCC

PAD

TRASH CAN

TREE STUMP

PLANTER BOX

PLANTER BOX

TOMBSTONE

6-INCH CLAY

8-INCH CLAY

UNKNOWN SIZE-FIELD

VERIFY

8-INCH CLAY

SANITARY MANHOLE

RIM=949.12

INV. IN NORTH=942.66

INV. IN WEST=942.54

INV. OUT SOUTH=942.54

6-INCH CLAY

8-INCH CLAY

SANITARY MANHOLE

RIM=949.14

INV. IN NORTHWEST=942.89

INV. IN NORTH=942.35

INV. OUT SOUTH=942.35

6-INCH CLAY

8-INCH CLAY

SANITARY MANHOLE

8-INCH CLAY

8-INCH PVC

O

VER

H

AN

G

OVERHANG

TRAFFIC CONTROL MANHOLETELE. PED

TELE. HANDHOLE

TELE. HANDHOLE

"U.S. ARMY RESERVE" SIGN

EAST ARMY POST ROAD

FLAGPOLE

STAIRS

BM

BM

BM

BM

BM

BM

BM

BM

GATE

BUILDING

1-STORY

BRICK

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD DOOR

DOOR

DOOR

DOOR

DOOR

OVERHEAD

DOOR

DOOR

OVERHEAD DOOR

LANDSCAPE ROCK

500-GALLON FUEL TANK

GATE

GATE

DOOR W/ OVERHANG

DOOR W/ OVERHANG

ELECTRICAL RISER

PICNIC TABLES

CIRCULAR PLANTER

CONDUIT

WALL MOUNTED AC UNIT

FO

72-INCH DIA. TREE

54-INCH DIA. TREE

OHE

EFO FO

W W

W

CB

D

D

SANITARY SEWER MANHOLE

SIGN LIGHTS

SE 3RD STREET

SE 2N

D

STR

EET

LEFT TURN ARROW

BROKEN LANE LINE (WHITE)

BROKEN LANE

LINE (WHITE) SOLID LANE LINE (WHITE)

DOUBLE CENTERLINE (YELLOW)

NO PASSING ZONE LINE (YELLOW)

8-INCH WATERMAIN (PVC)

8-INCH WATERMAIN

(CAST IRON)

FIRE HYDRANT

VALVE

VALVE

24-INCH DIA. TREE

41-INCH DIA. TREE

TRAFFIC CONTROL HANDHOLE

HANDHOLE

ICN MECHANICAL CABINET

TRAFFIC CONTROL BASE

36-INCH DIA. TREE

LANDSCAPE RIVER ROCK

10.00' PUBLIC UTILITY

EASEMENT/10.00'

BUILDING SETBACK

BOOK 7811 PAGE 354

30.00' STORM SEWER EASEMENT

BOOK 7811, PAGE 354

50.00' INGRESS/EGRESS EASEMENT

BOOK 7811, PAGE 354

EAST ARMY POST ROAD

SOMERSET RESIDENTIAL COOPERATIVE

STORM CURB INLET

RIM=938.72

INV. IN WEST=935.30

INV. OUT EAST =935.22

INV.=935.46

24-INCH RCP

18-INCH RCP

STORM CURB INLET

RIM=947.51

INV. IN SOUTHWEST=941.11

INV. OUT EAST =936.41

18-INCH PVC

STORM CATCH BASIN

GRATE=948.46

INV. IN WEST=943.06

INV. OUT NORTHEAST =942.96

18-INCH PVC

STORM CATCH BASIN

GRATE=949.19

INV. IN NORTH=944.23

INV. OUT EAST =944.11

12-INCH PVC

STORM CATCH BASIN

GRATE=950.00

INV. OUT SOUTH =944.94

STORM CATCH BASIN

GRATE=948.23

INV. OUT EAST=

STORM CATCH BASIN

GRATE=

DOWNSPOUT GRATE

INV.=949.62

DOWNSPOUT GRATE

INV.=949.56

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

4-INCH TRENCH DRAIN W/ GRATE

4-INCH TRENCH DRAIN W/ GRATE

15-INCH RCP

12-INCH RCP

10-INCH RCP

STORM SEWER CATCH BASIN

GRATE=943.94

INV. IN WEST=940.84

INV. IN NORTH=939.44

INV. OUT EAST=938.96

12-INCH RCP

STORM SEWER MANHOLE

RIM=938.52

INV. IN NORTHEAST =933.81

INV. IN WEST=932.92

INV. OUT SOUTHEAST=932.82

STORM SEWER MANHOLE

RIM=938.80

INV. IN NORTHWEST =930.90

INV. OUT EAST=930.80

24-INCH RCP

STORM SEWER SW-505 STRUCTURE

GRATE=944.18

INV. OUT SOUTH=939.68

15-INCH RCP

SANITARY CLEAN OUT

RIM=952.50

NO PIPES VISIBLE

BOTTOM OF STRUCTURE=946.50

ELECTRICAL RISER

OIL/WATER SEPARATOR

VAULT=949.77

NO OPEN PIPES

36-INCH DIA. TREE

32-INCH DIA. TREE

89-INCH DIA. TREE

96-INCH DIA. TREE

48-INCH DIA. TREE

120-INCH

DIA. TREE

DOOR CP TEST

G

GAS RISER

ELECTRICAL RISER

GAS RISER

STORM MANHOLE

RIM=951.12

INV. IN WEST=945.12

INV. IN SOUTH=944.97

INV. OUT

EAST=944.92

"SOMERSET" SIGN

LANDSCAPE LAVA ROCK

8-INCH CLAY

DOOR

OVERHEAD DOOR

GROUND WIRE

SANITARY MANHOLE

RIM=949.18

INV. IN NORTH=943.11

INV. OUT SOUTHEAST=942.83

CAN WASH DRAIN

RIM=949.86

NO PIPES VISIBLE

OIL/WATER SEPARATOR

VAULT=950.90

TOP OF 6-INCH PIPE=945.10

NO OPEN PIPES

OVERHEAD DOOR

GAS RISER

24-INCH DIA. TREE

STORM MANHOLE

RIM=947.51

INV. IN WEST=943.51

INV. OUT EAST=943.06

SANITARY MANHOLE

RIM=950.03

INV. IN WEST=943.83

INV. IN NORTH=941.73

INV. OUT SOUTHWEST=941.68

SANITARY MANHOLE (CASTING COVERED WITH ASPHALT)

RIM=950.79

INV. IN EAST=944.12

INV. OUT SOUTHEAST=943.92

SANITARY MANHOLE (CASTING

COVERED WITH ASPHALT)

RIM=949.66

INV. IN NORTHWEST=943.20

INV. IN NORTHEAST=943.16

INV. OUT SOUTHEAST=943.16

LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

E

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 20

P

M

K

H

F

D

B

TE

TR

A

TE

C H

, I N

C

U S

H W

Y

Lo ui sv ille

, K Y

Ph on e

(5

) 5

-5

Fa x (5

) 5

-5 w w w .te tra te ch .c om

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

U S

AR

M

Y R

ES

ER

VE

, 2

E

A R

M Y

PO

ST

R D

D

ES

M

O

IN

ES

, I

A

LO

U

IS

VI

LL

E

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

D .R

IC

H

TE

R

J

U N

E

D

ES

M

O

IN

ES

A

R M

Y R

ES

ER

VE

C

EN

TE

R D

/B R

FP

D

EV

EL

O

PM

EN

T

FO

R

A R

M Y

R

ES

ER

VE

C

EN

TE

R

B U

IL

D

IN

G

V

EH

IC

LE

M

AI

N

TE

N

AN

C

E

SH

O P

BU

IL

D

IN

G

P2

Y:

D

.M . L

EC

KI

E

M .S

O

SA

A.

C

AS

TI

LL

O

E.

M

AN

G

IW

A

/ A . D

U

EH

R

18 19

C

ER

TI

FI

ED

F

IN

AL

R

FP

S U

BM

IT

TA

L

SCALE: 1" = 30' 0 15' 30' 60' 90'A1 GRADING AND DRAINAGE PLAN NORTH

CG101

MATCH LINE - SEE SHEET CG102 FOR CONTINUATION

KEY PLAN

N.T.S.

KEYNOTES STORM LINE

1. NEW 8" PVC PIPE

2. DROP INLET

3. STORM CLEANOUT. (BID OPTION)

4. 6" ROOF DRAIN. (BID OPTION)

5. CONTRACTOR MUST PROVIDE CURB OPENING IF IT IS NOT

PRESENT ON SITE.

6. 8" PERFORATED PVC PAVEMENT UNDERDRAIN (BID OPTION)

7. 8" DIP STORM DRAIN (BID OPTION)

8. 12" DIP STORM DRAIN (BID OPTION)

9. CONCRETE FLUME

10. PIPE DAYLIGHT TO GRADE

GENERAL SHEET NOTES

1. THIS PLAN IS CONCEPTUAL IN NATURE AND SUBJECT TO CHANGE AS THE DESIGN

PROGRESSES.

2. REFER TO SHEET C-001 FOR CIVIL LEGEND AND ABBREVIATIONS.

3. REFER TO SHEETS C-002 TO C-004 FOR CIVIL GENERAL NOTES.

4. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS AND SHALL BE

READ WITH THE FULL SET TO BEST ENSURE PROPER INTERPRETATION.

5. TOP OF CURB ELEVATION IS APPROXIMATELY 6" ABOVE EDGE OF PAVEMENT.

6. IF ANY BENCHMARKS ARE DAMAGED OR DEMOLISHED, ANY RELOCATED BENCHMARK

MUST BE RESET OR RE-ESTABLISHED BY A LICENSED PROFESSIONAL SURVEYOR.

7. CONTRACTOR TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDING AND TOWARD

DRAINAGE STRUCTURES.

CG101

CG102

G R

AD

IN

G A

N D

D R

AI

N

AG

E

PL

AN

R

E V

IS

E

D

IN

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/1

7/

W

2Q R

R

_P la ns -0

(E)B-1 (E)B-2

(E)HWP-1 (E)HWP-2

(E)BP-1 (E)BP-2

CHWP-1

CHWP-2

ACC-1 ACC-2

(E)GWH-1 (E)GWH-2

1 1

2 2

B-3

BP-3

(E)ET-1

(E)BT-1

(E)CF-1

(E)CF-1

(E)ET-1

(E) 12" ST

CHWP-3 31

(E)B-1 (E)B-2

(E)HWP-1 (E)HWP-2

(E)BP-1 (E)BP-2

(E)GWH-1 (E)GWH-2

2 2

(E)WCC

(E)BT-1

(E)AS-1

(E)CHWP-2 (E)CHWP-1

3 3

(E)CF-1

(E)ET-1

(E)CF-1

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T E

T R

A T

E C

H

IN

C

U

S H

W Y

L o u is v ill e

K Y

P h o n e

-5

F a x

(5

-5 w w w .t e tr a te c h .c o m

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

M-401

M E

C H

A N

IC

A

L H

V A

C E

N L A

R G

E D

P L A

N S

U S

A R

M Y

R E

S E

R V

E E

A R

M Y

P O

S T

R D

D

E S

M O

IN

E

S

IA

D E

S M

O

IN

E S

A R

M Y

R E

S E

R V

E C

E N

T E

R D

/B R

F P

D E

V E

L O

P M

E N

T F

O R

A R

M Y

R E

S E

R V

E C

E N

T E

R B

U

IL

D

IN

G

V E

H

IC

L E

M A

IN

T

E N

A N

C E

S H

O P

B U

IL

D

IN

G

P

Y

L O

U

IS

V

IL

L E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

J N

A

IZ

E R

J N

A

IZ

E R

W C

U R

R Y

J

U N

E

C E

R T

IF

IE

D F

IN

A

L R

F P

S U

B M

IT

T

A L

KEYNOTES:

KEY

# KEYNOTE DESCRIPTION

1 LOCATE NEW AIR COOLED CHILLERS OUTSIDE OF

MECHANICAL ROOM IN NEW MECHANICAL YARD. ROUTE

CHILLED WATER PIPING UNDERGROUND INTO MECHANICAL

ROOM FOR DISTRIBUTION.

2 EXISTING BOILER SYSTEM TO REMAIN. NEW HOT WATER

PIPING, INSULATION, AND APPURTENANCES TO BE PROVIDED.

PROVIDE NEW CONTROLS CONNECTION TO USER INTERFACE.

3 RELOCATE EXISTING EXPANSION TANK, AIR SEPARATOR, AND

BUFFER TANK. PROVIDE NEW CHILLED WATER PUMP, VALVES,

PIPING, MAKE-UP WATER CONNECTIONS, AND

APPURTENANCES.

4 PROVIDE ADDITIONAL BOILER AND BOILER CIRCULATOR PUMP

TO PLANT.

5 EXISTING TANKLESS WATER HEATER TO REMAIN.

6 ASSOCIATED CHILLER COMPONENTS LOCATED ON ROOF - TO

BE DEMOLISHED.

7 RELOCATE CHILLED WATER BUFFER TANK.

8 LOCATE NEW CHILLERS TO AVOID EXISTING AREA DRAIN.

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

SCALE: 1/4" = 1'-0"A1

ENLARGED MECHANICAL ROOM - NEW WORK

SCALE: 1/4" = 1'-0"A10

ENLARGED MECHANICAL ROOM - DEMOLITION

GENERAL NOTES:

T R

U E

N

PLAN

NORTH

SCALE:

2' 4' 8'0

1/4" = 1'-0"

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

W

2Q R

R

_P la ns -0

A-120 - FIRST FLOOR REFLECTED CEILING PLAN_AMDT 4
I-101 - FINISH LEGEND AND SCHEDULE - FIRST FLOOR_AMDT 4
I-102 - FINISH LEGEND AND SCHEDULE - SECOND FLOOR_AMDT 4
I-112 - FIRST FLOOR FURNITURE PLAN - AREA "B"_AMDT 4
CD101 - DEMOLITION PLAN_AMDT 4
CG101 - GRADING AND DRAINAGE PLAN_AMDT 4
M-401 MECHANICAL HVAC ENLARGED PLANS_AMDT 4

File details come from the government source that posted it. Updated .