About this file

This document is an Amendment to Solicitation W912QR24R0010 for the Reconfiguration and Modernization of the 1600-member LTC Luis E. Martinez Army Reserve Center (ARC) located in Perrine, FL.

The key changes in this amendment include:

a. The required response date has been extended from 22 July 2024 to 12 August 2024.

b. Several specification sections and drawings have been replaced or added.

c. The Price Breakout Schedule provides details on the base proposal items and various optional items, including work on the Training Building, AMSA/VMS Building, Organizational Storage Building, site work, telecommunications, utility/permit fees, and OMAR-funded equipment items.

The overall federal contract opportunity is for a Firm-Fixed-Price design-bid-build contract using a Best Value Trade Off source selection process. The magnitude of the construction project is anticipated to be between $25 million and $100 million. The acquisition will be an unrestricted, full and open procurement.

View the file

Other files

File Type Posted
W912QR24R0010-0014.pdf PDF
W912QR24R0010-0013.pdf PDF
W912QR24R0010_Specs-0012.pdf PDF
W912QR24R0010_Plans-0011.pdf PDF
W912QR24R0010-0010.pdf PDF
Pre-Proposal Conference Slides_13 Nov 2024.pdf PDF
Pre-Proposal Conference Sign-in Sheet_13 Nov 2024.pdf PDF
W912QR24R0010-0009.pdf PDF
W912QR24R0010-0008.pdf PDF
W912QR24R0010_Plans-0007.pdf PDF
W912QR24R0010-0006.pdf PDF
Pre-Proposal Conference (Industry Day) Virtual Participation List - Perrrine ARC and AMSA_28 JUN 2024.xlsx XLSX spreadsheet
Pre-Proposal Conference (Industry Day) In-Person Sign-In Sheet - Perrine ARC and AMSA_28 JUN 2024.pdf PDF
Pre-Proposal Conference (Industry Day) - Perrine ARC and AMSA Presentation 28 JUN 2024.pdf PDF
W912QR24R0010-0005.pdf PDF
W912QR24R0010-0004.pdf PDF
W912QR24R0010_Specs-0003.pdf PDF
W912QR24R0010_Plans-0003.pdf PDF
W912QR24R0010_Plans-0002.pdf PDF
W912QR24R0010_Specs-0002.pdf PDF
Site Visit Roster - April 10 2024.pdf PDF
W912QR24R0010-0001.pdf PDF
W912QR24R0010_Plans_Vol1-0000.pdf PDF
W912QR24R0010_Specs_Vol1-0000.pdf PDF
W912QR24R0010_Specs_Vol3-0000.pdf PDF
W912QR24R0010_Plans_Vol2-0000.pdf PDF
W912QR24R0010_Specs_Vol2-0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR24R0010 for the Reconfiguration and Modernization of the 1600-member LTC Luis E. Martinez Army Reserve Center (ARC) located in Perrine, FL is hereby amended as follows:

SEE ATTACHED SUMMARY OF CHANGES AMENDMENT 0007.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR24R0010

X 9B. DATED (SEE ITEM 11)

22-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2024

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0010-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUMMARY OF CHANGES

a. The required response date has changed from 22 July 2024 at 3:00 PM ET. To 12 August 2024 at 3:00 PM ET.

b. The following SPECIFICATION SECTIONS have been replaced in their entirety:

00 10 00 PRICE BREAKOUT SCHEDULE

c. The following DRAWINGS have been added in their entirety:

CU503 UTILITY DETAILS

d. The following DRAWINGS have been replaced in their entirety:

G-002 SHEET INDEX

G-131 CODE COMPLIANCE SITE PLAN

CS100 OVERALL SITE PLAN LAYOUT

CS101 SITE PLAN

CS102 SITE PLAN

CS301 SITE PLAN

CG101 SITE GRADING AND DRAINAGE PLAN – AREA ‘A’

CP101 SITE PAVING PLAN

CU101 SITE UTILITY PLAN – AREA ‘A’

CU102 SITE UTILITY PLAN – AREA ‘B’

CU103 SITE UTILITY PLAN – AREA ‘C’

CU501 UTILITY DETAILS

CU800 COVER SHEET, LOCATION MAP & DRAWING LIST

CU801 NOTES

CU802 SITE DEMOLITION PLAN – AREA ‘D’

CU803 SITE PAVING PLAN

CU810 SITE UTILITY PLAN - OVERALL

CU820 SITE UTILITY PLAN – AREA ‘D’

CU821 SITE UTILITY PLAN – AREA ‘D’

CU822 SITE UTILITY PLAN – AREA ‘D’

CU830 DETAILS

A-110 AMSA/VMS – UNDERSLAB RADON PLAN

A-120 AMSA/VMS – UNDERSLAB RADON PLAN

A-171 ORGANIZATIONAL STORAGE – ROOF PLAN

A-172 ORGANIZATIONAL STORAGE – ROOF PLAN – OPTION E

A-181 AMSA/VMS – ROOF PLAN

A-505 EXTERIOR DETAILS – WALL

A-512 TRAINING BUILDING – EXTERIOR DETAILS – OPTION

A-513 TRAINING BUILDING – EXTERIOR DETAILS – EIFS/MWP BAND

A-520 EXTERIOR DETAILS – CURTAIN WALL

A-521 EXTERIOR DETAILS – CURTAIN WALL/WINDOW

A-522 EXTERIOR DETAILS – WINDOW AND TRASNLUCENT PANEL

A-525 EXTERIOR DETAILS – DOOR

A-526 EXTERIOR DETAILS – OPENING DETAILS

A-602 DOOR SCHEDULE

A-603 DOOR SCHEDULE

e. The following DRAWINGS have been deleted in their entirety:

CU831 DETAILS

CU832 DETAILS

CU833 DETAILS

CU834 DETAILS

(End of Summary of Changes)

P2:481817 Army Reserve Center and AMSA Perrine, Florida

PRICE BREAKOUT SCHEDULE

PROJECT: Army Reserve Center and AMSA

LOCATION: Perrine, Florida

PROPOSER’S NAME:

BASE PROPOSAL

Item No. Description Unit Amount

0001 Primary Facilities

Training Building Renovation JOB $

0002 Primary Facilities

AMSA/VMS Building JOB $

0003 Primary Facilities

Organizational Storage Building JOB $

0004 Project Site Work JOB $

0005 Training Building Area ‘E’ and Area ‘F’

Telecommunications Renovation JOB $ ____________

Amendment 0007***************************************************************

Amendment 0003***************************************************************

0006 Project Utility and Permit Fees JOB $ 68,882.61

***************************************************************Amendment 0003

***************************************************************Amendment 0007

Subtotal – BASE PROPOSAL $

OPTION ITEMS

0007 Option ‘A’ - Operations and

Maintenance – Army Reserve (OMAR)

Funded Equipment Items JOB $

0008 Option ‘B’ – “Bona Fide Need”

Operations and Maintenance, Army Reserve

(OMAR) Funded Equipment Items JOB $

0009 Option ‘C’ - Operations and

Maintenance – Army Reserve (OMAR)

Funded Equipment Items.

Associated with Optional

Item ‘E’ Organizational

Storage Building Area Increase. JOB $

0010 Option ‘D’ – “Bona Fide Need”

Operations and Maintenance, Army Reserve

(OMAR) Funded Equipment Items.

Associated with Optional

Item ‘E’ Organizational

0011 Option ‘E’ – Organizational

0012 Option ‘F’ – Wash Platform and Aprons. JOB $

0013 Option ‘G’ – Bi-Level Loading

Ramp and Apron. JOB $

0014 Option ‘H’ – Concrete Pavement at AMSA/VMS. JOB $

0015 Option ‘J’ – Existing POV

Parking Lot Sealcoat/Striping JOB $

0016 Option ‘K’ – Training Building

Replacement of Existing EIFS Band with

Metal Panels. JOB $

Subtotal – OPTION ITEMS $

TOTAL BASE PROPOSAL + OPTION ITEMS $

Description of Base Proposal Items

(a) Item No. 0001 “Primary Facilities – Training Center Building Renovation” includes all Base

Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0005, 0007, 0008, 0016, and 0017.

(b) Item No. 0002 “Primary Facilities – AMSA/VMS Building” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0007 and 0008.

(c) Item No. 0003 “Primary Facilities – Organizational Storage Building” includes all Base

Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0007 0008, 0009, 0010, and 0011.

(d) Item No. 0004 “Project Site Work”, includes all Base Proposal construction work required beyond a line five feet outside the buildings and within construction limits except that work covered by Items No. 0001, 0002, 0003, 0012, 0013, 0014 and 0015.

(e) Item No. 0005 “Training Building Area ‘E’ and Area ‘F’ Telecommunications Renovation”, includes the cost for telecommunications work in Area ‘E’ and ‘F’ of the Training Building.

See Drawing Sheets T-106 and T-107 (and all related drawings and specification sections).

(f) Item No. 0006 “Project Utility and Permit Fees”, includes the cost for the Offeror to pay fees associated with required permits from Miami-Dade County and the State of Florida for sanitary sewer, watermain, driveways, erosion control, and NPDES – unless noted otherwise below.

Fees for this project include:

1. Stormwater

i. Miami Dade County for Class II Permit for

Drainage and Storm Sewer: $0.00.

$31,433.00 Already paid by RSP Architects/EVS.

ii. NPDES Permit – GCP Small Construction: $0.00.

$400.00 Already paid by RSP Architects/EVS.

iii. Stormwater Total: $0.00

Amendment 0003 **************************************************************

2. Watermain

i. Utility Install/Repair Fire Line Fee: $200.00

ii. MOT Small Reviews (6 hr traffic control): $330.00 (per phase; 2 assumed)

iii. MDWASD Watermain Connection Fee: $13,249.98

iv. Watermain Total: $13,779.98

************************************************************** Amendment 0003

3. Sanitary Sewer

i. Sewer main & connection fee: $4,200.00

ii. MOT Large Reviews: $555.00 (per phase; 4 assumed)

iii. Sanitary Sewer Total: $6,420.00

4. Dewatering

i. Miami-Dade County Class V Permit (Dewatering) : $682.63

ii. Dewatering Total: $682.63

5. Florida Power & Light

i. Transformer Design and Removal Fees (Total): $48,000.00

(g) Item No. 0007 “Optional Item ‘A’ - Operations, Maintenance Army Reserve (OMAR)

Funded Equipment Items (Items funded at or shortly after the time of construction award) ” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to not be permanently attached to the construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI), except that work covered by Item

No. 0009.

CFCI OMAR Funded Equipment Items for this project consists of:

1. Caging at AMSA/VMS Building.

2. Caging at Organizational Storage Building.

i. Unit Storage.

ii. Arms Vault.

3. Metal Lockers at Training Building and AMSA/VMS Building.

This option may be exercised within 90 calendar days of Notice to Proceed.

(h) Item No. 0008 “Optional Item ‘B’ “Bona Fide Need” Operations, Maintenance Army

Reserve (OMAR) Funded Equipment Items” includes all work required to furnish and install

“OMAR Funded Equipment Items” which are considered to not be permanently attached to construction. OMAR funded equipment is to be Contractor provided and Contractor installed

(CFCI), except that work covered by Item No. 0010.

CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:

1. Arms Vault dehumidifier at Organizational Storage Building.

2. Freestanding Metal Shelving.

3. Refrigerators at Training Building Break Room and Lactation Room, and at the

AMSA/VMS Building Break Room.

4. Ice Machine at AMSA/VMS Building Break Room.

5. Microwave at Training Building Break Room and Lactation Room, and at the

AMSA/VMS Building Break Room.

6. Exterior Ash/Trash north of the Training Building.

7. Window Treatments (mini blinds and roller shades).

8. Fire Extinguishers (extinguisher cabinets are to be in the building-specific respective Base Proposal Item No. 0001, 0002, and 0003).

This option may be exercised within 600 calendar days of Notice to Proceed.

(i) Item No. 0009 “Optional Item ‘C’ - Operations, Maintenance Army Reserve (OMAR)

Funded Equipment Items. Associated with Optional Item ‘E’ Organizational Storage Building

Area Increase (Items funded at or shortly after the time of construction award) ” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to not be permanently attached to the construction. OMAR funded equipment is to be

Contractor provided and Contractor installed (CFCI).

CFCI OMAR Funded Equipment Items for this project consists of:

1. Caging at Organizational Storage Building at the area of plan increase only. See

Drawing Sheet A-114.

(j) Item No. 0010 “Optional Item ‘D’ – “Bona Fide Need” Operations, Maintenance Army

Reserve (OMAR) Funded Equipment Items. Associated with Optional Item ‘E’

Organizational Storage Building Area Increase (Items funded at or shortly after the time of construction award)” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to not be permanently attached to the construction.

OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).

CFCI OMAR Funded Equipment Items for this project consists of:

1. Freestanding Metal Shelving and Fire Extinguishers at the Organizational

Storage Building at the area of plan increase only. See Drawing Sheet A-114.

(k) Item No. 0011 “Optional Item ‘E’ – Organizational Storage Building Area Increase includes the cost for Option E construction work required within a line five feet outside of the building, except that work covered by Items No. 0009 and 0010. See Drawing Sheets CS303, CG103, CG201C, CP101, L-105, L-106, L-109, S-114, S-174, A-114, A-144, A-172, A-215, F-114, MH114, EL114, EP114, EY114, and T-114 (and all related drawings and specification sections).

(l) Item No. 0012 “Optional Item ‘F’ – Wash Platform and Aprons includes the cost for Option F construction work to provide the Wash Platform and associated aprons, and associated pavement/grading/utility items. See Drawing Sheets CS100, GC102, CS302, CG102, CP101, CP503, CU102, S-001, AS101, and E-131 (and all related drawings and specification sections).

(m) Item No. 0013 “Optional Item ‘G’ – Bi-Level Loading Ramp and Apron includes the cost for

Option G construction work to provide the Bi-Level Loading Ramp and associated pavement/grading items. See Drawing Sheets CS100, CS302, CG102, CP101, and AS102

(and all related drawings and specification sections).

(n) Item No. 0014 “Optional Item ‘H’ – Concrete Pavement at AMSA/VMS includes the cost for

Option H construction work to provide concrete pavement around the area of the

AMSA/VMS Building. See Drawing Sheets CP101, and CP504 (and all related drawings and specification sections).

(o) Item No. 0015 “Optional Item ‘J’ – Existing POV Parking Lot Sealcoat/Striping, includes the cost for Option J construction work. See Drawing Sheets CS105, L-105, and ES101 (and all related drawings and specification sections).

(p) Item No. 0016 “Optional Item ‘K’ – Training Building Replacement of Existing EIFS Band with Metal Panels includes the cost for Option K construction work. See Drawing Sheets

A201-A205, and EL102-EL107 (and all related drawings and specification sections).

SF30
SUMMARY OF CHANGES
PRICE BREAKOUT SCHEDULE

File details come from the government source that posted it. Updated .