W912QR23R0003_Specs-0002.pdf
PDF 1 MB Posted
- Solicitation number
- W912QR23R0003
About this file
This is a solicitation for repair and renovation work on Building 1455 at Maxwell Air Force Base in Alabama. The project involves repair of an aircraft maintenance building and has an estimated construction cost between $5-10 million. Responses are due on 24 February 2023 at 10:00 AM. A mandatory site visit will be held on 10 January 2023 at 9:30 AM. Interested parties must submit personal information for base access by 4 January 2023. The solicitation is full and open with a best value tradeoff source selection. The HUBZone price evaluation preference applies. The work includes repair of concrete, metalwork, and other building elements.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR23R0003 to Repair Aircraft Maintenance Building 1455 for MH-139 Beddow n at Maxw ell Air Force Base, Alabama is hereby amended as follow s:
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23R0003
X 9B. DATED (SEE ITEM 11)
29-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
07-Feb-2023
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR23R0003_Specs-0002
W912QR23R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 10-Feb-2023 02:00 PM to 24-Feb-2023 10:00 AM.
The number of offeror copies required 1 has been added.
The following have been added by full text:
AMDT0002 CONTINUATION PAGE
The following SPECIFICATION SECTIONS have been replaced in their entirety:
o 09 90 00 PAINTS AND COATINGS o 31 21 13 RADON MITIGATION
Wage Determination AL20230093 – Building was updated on 03 February 2023 and is hereby incorporated.
The proposal due date has changed to 24 February 2023 at 10:00 AM.
All other terms and conditions remain unchanged.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
General Decision Number: AL20230093 02/03/2023
Superseded General Decision Number: AL20220093
State: Alabama
Construction Type: Building BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories)
County: Montgomery County in Alabama.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/20/2023 2 01/27/2023 3 02/03/2023
ASBE0078-001 09/30/2022
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 29.65 15.11
BOIL0108-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 30.49 23.13
ENGI0653-016 10/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR
Crane.......................$ 27.30 12.08
IRON0092-003 09/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 31.11 13.13
* PLUM0052-009 01/01/2023
Rates Fringes
PIPEFITTER.......................$ 29.00 15.11
PLUM0119-001 07/22/2021
Rates Fringes
PLUMBER..........................$ 30.45 12.56
SFAL0669-002 01/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 27.18 20.30
* SUAL2015-021 08/02/2017
Rates Fringes
BRICKLAYER.......................$ 19.81 0.00
CARPENTER........................$ 16.84 0.00
CEMENT MASON/CONCRETE FINISHER...$ 17.16 0.73
ELECTRICIAN......................$ 19.39 3.91
IRONWORKER, REINFORCING..........$ 22.86 7.94
LABORER: Common or General......$ 11.73 ** 0.00
LABORER: Mason Tender - Brick...$ 11.00 ** 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 12.16 ** 0.00
LABORER: Pipelayer..............$ 12.58 ** 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.69 0.00
OPERATOR: Bulldozer.............$ 16.37 0.00
OPERATOR: Forklift..............$ 20.69 0.00
OPERATOR: Grader/Blade..........$ 17.52 0.89
OPERATOR: Loader................$ 14.69 ** 0.00
OPERATOR: Roller................$ 14.00 ** 1.78
PAINTER (Brush and Roller).......$ 15.41 ** 0.00
PAINTER: Spray..................$ 14.31 ** 0.00
ROOFER...........................$ 12.14 ** 0.00
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 16.16 ** 0.00
TILE SETTER......................$ 15.86 ** 0.00
TRUCK DRIVER: Dump Truck........$ 13.18 ** 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
Repair Aircraft Maintenance B1455 for MH-139 Maxwell AFB, AL
SECTION 09 90 00
PAINTS AND COATINGS
05/11
Amendment 0002
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2017; Suppl 2020) Documentation of the Threshold Limit Values and Biological Exposure Indices
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A13.1 (2020) Scheme for the Identification of Piping Systems
ASTM INTERNATIONAL (ASTM)
ASTM D235 (2002; R 2012) Mineral Spirits (Petroleum Spirits) (Hydrocarbon Dry Cleaning Solvent)
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4444 (2013; R 2018) Standard Test Method for Laboratory Standardization and Calibration of Hand-Held Moisture Meters
ASTM D6386 (2016a) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
ASTM F1869 (2016a) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
MASTER PAINTERS INSTITUTE (MPI)
MPI 1 (2012) Aluminum Paint
SECTION 09 90 00 Page 1
Amendment 0002
CERTIFIED FINAL DESIGN SUBMITTAL
MPI 2 (2012) Aluminum Heat Resistant Enamel (up to 427 C and 800 F
MPI 4 (2016) Interior/Exterior Latex Block Filler
MPI 19 (2012) Primer, Zinc Rich, Inorganic
MPI 21 (2012) Heat Resistant Coating, (Up to 205°C/402°F), MPI Gloss Level 6
MPI 22 (2012) Aluminum Paint, High Heat (up to 590° C/1100° F)
MPI 23 (2015) Primer, Metal, Surface Tolerant
MPI 31 (2012) Varnish, Polyurethane, Moisture Cured, Gloss (MPI Gloss Level 6)
MPI 39 (2018) Primer, Latex, for Interior Wood
MPI 44 (2016) Latex, Interior, (MPI Gloss Level 2)
MPI 45 (2016) Primer Sealer, Interior Alkyd
MPI 47 (2016) Alkyd, Interior, Semi-Gloss (MPI Gloss Level 5)
MPI 48 (2016) Alkyd, Interior, Gloss (MPI Gloss Level 6-7)
MPI 49 (2015) Alkyd, Interior, Flat (MPI Gloss Level 1)
MPI 50 (2015) Primer Sealer, Latex, Interior
MPI 51 (2016) Alkyd, Interior, (MPI Gloss Level 3)2
MPI 52 (2016) Latex, Interior, (MPI Gloss Level 3)
MPI 54 (2016) Latex, Interior, Semi-Gloss (MPI Gloss Level 5)
MPI 56 (2012) Varnish, Interior, Polyurethane, Oil Modified, Gloss
MPI 57 (2012) Varnish, Interior, Polyurethane, Oil Modified, Satin
MPI 59 (2016) Floor Paint, Alkyd, Low Gloss
MPI 60 (2016) Floor Paint, Latex, Low Gloss
MPI 71 (2012) Varnish, Polyurethane, Moisture Cured, Flat (MPI Gloss Level 1)
MPI 77 (2015) Epoxy, Gloss
SECTION 09 90 00 Page 2
Amendment 0002
MPI 79 (2016) Primer, Alkyd, Anti-Corrosive for Metal
MPI 90 (2012) Stain, Semi-Transparent, for Interior Wood
MPI 94 (2016) Alkyd, Exterior, Semi-Gloss (MPI Gloss Level 5)
MPI 95 (2015) Primer, Quick Dry, for Aluminum
MPI 107 (2016) Primer, Rust-Inhibitive, Water Based
MPI 116 (2012) Block Filler, Epoxy
MPI 138 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 2)
MPI 139 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 3)
MPI 140 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 4)
MPI 141 (2016) Latex, Interior, High Performance Architectural, Semi-Gloss (MPI Gloss Level 5)
MPI 144 (2016) Latex, Interior, Institutional Low Odor/VOC, (MPI Gloss Level 2)
MPI 145 (2016) Latex, Interior, Institutional Low Odor/VOC, ( MPI Gloss Level 3)
MPI 146 (2016) Latex, Interior, Institutional Low Odor/VOC, (MPI Gloss Level 4)
MPI 147 (May 2016) Latex, Interior, Institutional Low Odor/VOC, Semi-Gloss (MPI Gloss Level 5)
MPI 151 (2016) Light Industrial Coating, Interior, Water Based (MPI Gloss Level 3)
MPI 153 (2016) Light Industrial Coating, Interior, Water Based, Semi-Gloss (MPI Gloss Level 5)
MPI 154 (2016) Light Industrial Coating, Interior, Water Based, Gloss (MPI Gloss Level 6)
MPI 161 (2016) Light Industrial Coating, Exterior, Water Based ( MPI Gloss Level 3)
MPI 163 (2016) Light Industrial Coating, Exterior, Water Based, Semi-Gloss (MPI Gloss Level 5)
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SECTION 09 90 00 Page 3
Amendment 0002
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007) Brush-Off Blast Cleaning
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 2 (2018) Hand Tool Cleaning
SSPC SP 3 (2018) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 12/NACE No.5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning
SSPC VIS 4/NACE VIS 7 (1998; E 2000; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA Method 24 (2000) Determination of Volatile Matter Content, Water Content, Density, Volume Solids, and Weight Solids of Surface Coatings
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2018) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
SECTION 09 90 00 Page 4
Amendment 0002
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer.
Provide all coats on a particular substrate from a single manufacturer.
No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with specification requirements.
SD-02 Shop Drawings
Piping Identification
SD-03 Product Data
Coating ; G
SD-04 Samples
Color ; G
Textured Wall Coating System ; G
Sample Textured Wall Coating System Mock-Up ; G
SD-07 Certificates
Applicator's Qualifications
Qualification Testing laboratory for coatings; G
Indoor Air Quality for Paints and Primers
Indoor Air Quality for Consolidated Latex Paints
SD-08 Manufacturer's Instructions
Application Instructions
Mixing
Manufacturer's Safety Data Sheets
SECTION 09 90 00 Page 5
Amendment 0002
SD-10 Operation and Maintenance Data
Coatings ; G
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Paints and Coatings
Provide paint and coating products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs.
Provide current product certification documentation from certification body.
1.4 APPLICATOR'S QUALIFICATIONS
1.4.1 SSPC PA 1 Certification
Amendment 0002**************************************************************** Submit the name, address, telephone number, and e-mail address of the Contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on structural steel on similar projects within the past 3 years. List information by individual and include the following:
a. Name of individual and proposed position for this work.
b. Information about each previous assignment including:
1. Position or responsibility
2. Employer (if other than the Contractor)
3. Name of facility owner
4. Mailing address and telephone number of facility owner
5. Name of individual in facility owner's organization who can be contacted as a reference
6. Location, size, and description of structure
7. Dates work was carried out
8. Description of work carried out on structure
***************************************************************** Amendment 0002
1.5 QUALITY ASSURANCE
1.5.1 Field Samples and Tests
The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph SAMPLING PROCEDURES. Test each chosen product as specified in the paragraph TESTING PROCEDURE. Remove products from the job site which do not conform and replace with new products that conform to the referenced specification. Test replacement products that failed initial testing at no cost to the Government.
SECTION 09 90 00 Page 6
Amendment 0002
Another required testing is Batch Quality Conformance Testing to prove conformance of the manufacturer's paint to the specified MPI standard.
This testing is accomplished before the materials are delivered to the job site. Provide testing for all paint products. Test paint products as specified in the paragraph "Testing Procedure".
1.5.1.1 Sampling Procedure
The Contracting Officer will select paint at random from the products that have been delivered to the job site for sample testing. The Contractor will provide one quart samples of the selected paint materials. Take samples in the presence of the Contracting Officer, and label, and identify each sample. Provide labels in accordance with the paragraph PACKAGING, LABELING, AND STORAGE of this specification.
1.5.1.2 Testing Procedure
Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the paragraph "Qualification Testing" laboratory for coatings. Include the backup data and summary of the test results within the qualification testing lab report. Provide a summary listing of all the reference specification requirements and the result of each test. Clearly indicate in the summary whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.
Submit name, address, telephone number, FAX number, and e-mail address of the independent third-party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified. If MPI is chosen to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the testing.
1.5.2 Textured Wall Coating System
Three complete samples of each indicated type, pattern, and color of textured wall coating system applied to a panel of the same material as that on which the coating system will be applied in the work. Provide samples of wall coating systems minimum 5 by 7 inches and of sufficient size to show pattern repeat and texture.
1.5.3 Sample Textured Wall Coating System Mock-Up
After coating samples are approved, and prior to starting installation, provide a minimum 8-foot by 8-foot mock-up for each substrate and for each color and type of textured wall coating, using the actual substrate materials. Use the approved mock-up samples as a standard of workmanship for installation within the facility. Submit at least 48 hour advance written notice to the Contracting Officer's Representative prior to mock-up installation.
SECTION 09 90 00 Page 7
Amendment 0002
1.6 REGULATORY REQUIREMENTS
1.6.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.
Notify Contracting Officer of any paint specified herein which fails to conform.
1.6.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.6.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.6.4 Asbestos Content
Provide asbestos-free materials.
1.6.5 Mercury Content
Provide materials free of mercury or mercury compounds.
1.6.6 Silica
Provide abrasive blast media containing no free crystalline silica.
1.6.7 Human Carcinogens
Provide materials that do not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.7 PACKAGING, LABELING, AND STORAGE
Provide paints in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Furnish pigmented paints in containers not larger than 5 gallons . Store paints and thinners in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F . Do not store paint, polyurethane, varnish, or wood stain products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.
1.8 SAFETY AND HEALTH
Apply coating materials using safety methods and equipment in accordance with the following:
Comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis
SECTION 09 90 00 Page 8
Amendment 0002 as specified in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 . Include in the Activity Hazard Analysis the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.8.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC PA Guide 3 .
1.8.2 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The applicable manufacturer's Safety Data Sheets (SDS) or local regulation.
b. 29 CFR 1910.1000 .
c. ACGIH 0100 , threshold limit values.
Submit manufacturer's Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in FED-STD-313 .
1.9 ENVIRONMENTAL CONDITIONS
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
1.9.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F , unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Do not, under any circumstances, violate the manufacturer's application recommendations.
1.9.2 Post-Application
Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the following ventilation conditions during the curing period, or for 72 hours after application:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 85 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.10 SCHEDULING
Allow paint, polyurethane, varnish, and wood stain installations to cure
SECTION 09 90 00 Page 9
Amendment 0002 prior to the installation of materials that adsorb VOCs, including _____.
1.11 COLOR SELECTION
Provide colors of finish coats as indicated or specified. Allow Contracting Officer to select colors not indicated or specified.
Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements.
Tint each coat progressively darker to enable confirmation of the number of coats.
Provide color, texture, and pattern of wall coating systems as indicated.
Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated. Submit color stencil codes.
1.12 LOCATION AND SURFACE TYPE TO BE PAINTED
1.12.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
c. Existing coated surfaces that are damaged during performance of the work.
1.12.1.1 Exterior Painting
Includes new surfaces of the building and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.
1.12.1.2 Interior Painting
Includes new surfaces of the building and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.
a. Exposed columns, girders, beams, joists, and metal deck; and
b. Other contiguous surfaces.
1.12.2 Painting Excluded
Do not paint the following unless indicated otherwise.
a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.
SECTION 09 90 00 Page 10
Amendment 0002
b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.
c. Steel to be embedded in concrete.
d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.
e. Hardware, fittings, and other factory finished items.
f. Do not paint surfaces in the following areas: with identification information, labeling, or manufacturer nameplate.
1.12.3 Mechanical and Electrical Painting
Includes field coating of interior and exterior new surfaces damaged during shipment or installation.
a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.
(1) Exposed piping, conduit, and ductwork;
(2) Supports, hangers, air grilles, and registers;
(3) Miscellaneous metalwork and insulation coverings.
b. Do not paint the following, unless indicated otherwise:
(1) New zinc-coated, aluminum, and copper surfaces under insulation
(2) New aluminum jacket on piping
(3) New interior ferrous piping under insulation.
1.12.3.1 Fire Extinguishing Sprinkler Systems
Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale. Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress. Upon completion of painting, remove protective covering from sprinkler heads. Remove sprinkler heads which have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:
a. Piping in Unfinished Areas: Provide primed surfaces with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil in attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and spaces where walls or ceiling are not painted or not constructed of a prefinished material.
In lieu of red enamel finish coat, provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals.
SECTION 09 90 00 Page 11
Amendment 0002
b. Piping in Finished Areas: Provide primed surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil . Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals throughout the piping systems.
1.12.4 Exterior Painting of Site Work Items
Field coat the following items:
New Surfaces Existing Surfaces
a. Protective bollards Salvaged bike rack
1.12.5 Definitions and Abbreviations
1.12.5.1 Qualification Testing
Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.
1.12.5.2 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing must be accomplished by an MPI testing lab.
1.12.5.3 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (such as metals, plastics, wood, paper, leather, cloth). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.12.5.4 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.12.5.5 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.12.5.6 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
SECTION 09 90 00 Page 12
Amendment 0002
1.12.5.7 EXT
MPI short term designation for an exterior coating system.
1.12.5.8 INT
MPI short term designation for an interior coating system.
1.12.5.9 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.12.5.10 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.12.5.11 mm
The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.
1.12.5.12 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Description Units Units Level at 60 degrees at 85 degrees
G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85 G7 High Gloss
Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).
1.12.5.13 MPI System Number
The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.12.5.14 Paint
See Coating definition.
SECTION 09 90 00 Page 13
Amendment 0002
1.12.5.15 REX
MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.
1.12.5.16 RIN
MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the coating specifications and standards referenced in PART 3.
Submit product data sheets for specified coatings and solvents. Provide preprinted cleaning and maintenance instructions for all coating systems.
Submit Manufacturer's Instructions on Mixing: Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.
Provide certification of Indoor Air Quality for paints and primers .
Provide certification of Indoor Air Quality for consolidated latex paints .
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
Prior to surface preparation and coating applications, remove, mask, or otherwise protect hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.2 REPUTTYING AND REGLAZING
Remove cracked, loose, and defective putty or glazing compound on glazed sash and provide new putty or glazing compound. Where defective putty or glazing compound constitutes 30 percent or more of the putty at any one light, remove the glass and putty or glazing compound and reset the glass.
Remove putty or glazing compound without damaging sash or glass. Clean rabbets to bare wood or metal and prime prior to reglazing. Provide linseed oil putty for wood sash. Patch surfaces to provide smooth transition between existing and new surfaces. Finish putty or glazing compound to a neat and true bead. Allow glazing compound time to cure, in accordance with manufacturer's recommendation, prior to coating application. Allow putty to set one week prior to coating application.
3.3 SURFACE PREPARATION
Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Remove oil and grease prior to mechanical cleaning.
Schedule cleaning so that dust and other contaminants will not fall on
SECTION 09 90 00 Page 14
Amendment 0002 wet, newly painted surfaces. Spot-prime exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.
3.3.1 Additional Requirements for Preparation of Surfaces With Existing Coatings
Before application of coatings, perform the following on surfaces covered by soundly-adhered coatings, defined as those which cannot be removed with a putty knife:
a. Test existing finishes for lead before sanding, scraping, or removing. If lead is present, refer to paragraph Toxic Materials.
b. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral spirits, ASTM D235. Allow surface to dry. Wipe immediately preceding the application of the first coat of any coating, unless specified otherwise.
c. Sand existing glossy surfaces to be painted to reduce gloss. Brush, and wipe clean with a damp cloth to remove dust.
d. The requirements specified are minimum. Comply also with the application instructions of the paint manufacturer.
e. Thoroughly clean previously painted surfaces that are specified to be repainted or have been damaged during construction from all grease, dirt, dust or other foreign matter.
f. Remove blistering, cracking, flaking and peeling or otherwise deteriorated coatings.
g. Remove chalk so that when tested in accordance with ASTM D4214, the chalk resistance rating is no less than 8.
h. Roughen slick surfaces. Repair damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls with suitable material to match adjacent undamaged areas.
i. Feather and sand smooth edges of chipped paint.
j. Clean rusty metal surfaces as per SSPC requirements. Use solvent, mechanical, or chemical cleaning methods to provide surfaces suitable for painting.
k. Provide new, proposed coatings that are compatible with existing coatings.
3.3.2 Substrate Repair
a. Repair substrate surface damaged during coating removal;
b. Sand edges of adjacent soundly-adhered existing coatings so they are tapered as smooth as practical to areas involved with coating removal;
and
SECTION 09 90 00 Page 15
Amendment 0002
c. Clean and prime the substrate as specified.
3.4 PREPARATION OF METAL SURFACES
3.4.1 Ferrous Surfaces
a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease. Where shop coat is missing or damaged, clean according to SSPC SP 2 , SSPC SP 3 , SSPC SP 6/NACE No.3 , or SSPC SP 10/NACE No. 2 .
Brush-off blast remaining surface in accordance with SSPC 7/NACE No.4 ;
Water jetting to SSPC SP 12/NACE No.5 WJ-4 may be used to remove loose coating and other loose materials. Use inhibitor as recommended by coating manufacturer to prevent premature rusting. Protect shop-coated ferrous surfaces from corrosion by treating and touching up corroded areas immediately upon detection.
b. Surfaces With More Than 20 Percent Rust, Mill Scale, and Other Foreign Substances: Clean entire surface in accordance with SSPC SP 6/NACE No.3 / SSPC SP 12/NACE No.5 WJ-3, SSPC SP 10/NACE No. 2 / SSPC SP 12/NACE No.5 WJ-2.
3.4.2 Final Ferrous Surface Condition:
For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and SSPC SP 3 . Use as a visual reference, photographs in SSPC VIS 3 for the appearance of cleaned surfaces.
For abrasive blast cleaned surfaces, the requirements are stated in SSPC 7/NACE No.4 , SSPC SP 6/NACE No.3 , and SSPC SP 10/NACE No. 2 . Use as a visual reference, photographs in SSPC VIS 1 for the appearance of cleaned surfaces.
For waterjet cleaned surfaces, the requirements are stated in SSPC SP 12/NACE No.5 . Use as a visual reference, photographs in SSPC VIS 4/NACE VIS 7 for the appearance of cleaned surfaces.
3.4.3 Galvanized Surfaces
a. Galvanized Surfaces With Only Dirt and Zinc Oxidation Products: Clean with solvent, steam, or non-alkaline detergent solution in accordance with SSPC SP 1 . Completely remove coating by brush-off abrasive blast if the galvanized metal has been passivated or stabilized. Do not "passivate" or "stabilize" new galvanized steel to be coated. If the absence of hexavalent stain inhibitors is not documented, test as described in ASTM D6386, Appendix X2, and remove by one of the methods described therein.
b. Galvanized with Slight Coating Deterioration or with Little or No Rusting: Water jetting to SSPC SP 12/NACE No.5 WJ3 to remove loose coating from surfaces with less than 20 percent coating deterioration and no blistering, peeling, or cracking. Use inhibitor as recommended by the coating manufacturer to prevent rusting.
c. Galvanized With Severe Deteriorated Coating or Severe Rusting: Water jet to SSPC SP 12/NACE No.5 WJ3 degree of cleanliness. Spot abrasive blast rusted areas as described for steel in SSPC SP 6/NACE No.3 , and waterjet to SSPC SP 12/NACE No.5 , WJ3 to remove existing coating.
SECTION 09 90 00 Page 16
Amendment 0002
3.4.4 Non-Ferrous Metallic Surfaces
Aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces.
Surface Cleaning: Solvent clean in accordance with SSPC SP 1 and wash with mild non-alkaline detergent to remove dirt and water soluble contaminants.
3.4.5 Terne-Coated Metal Surfaces
Solvent clean surfaces with mineral spirits, ASTM D235. Wipe dry with clean, dry cloths.
3.4.6 Existing Surfaces with a Bituminous or Mastic-Type Coating
Remove chalk, mildew, and other loose material by washing with a solution of 1/2 cup trisodium phosphate, 1/4 cup household detergent, one quart 5 percent sodium hypochlorite solution and 3 quarts of warm water.
3.5 PREPARATION OF CONCRETE AND CEMENTITIOUS SURFACE
3.5.1 Concrete and Masonry
a. Curing: Allow concrete, stucco and masonry surfaces to cure at least 30 days before painting, and concrete slab on grade to cure at least 90 days before painting.
b. Surface Cleaning: Remove the following deleterious substances.
(1) Dirt, Chalking, Grease, and Oil: Wash uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, and 4 quarts of warm water. Then rinse thoroughly with fresh water. For large areas, water blasting may be used.
(2) Fungus and Mold: Wash surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water.
Rinse thoroughly with fresh water.
(3) Paint and Loose Particles: Remove by wire brushing.
(4) Efflorescence: Remove by scraping or wire brushing followed by washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid. Do not allow acid to remain on the surface for more than five minutes before rinsing with fresh water. Do not acid clean more than 4 square feet of surface, per workman, at one time.
c. Cosmetic Repair of Minor Defects: Repair or fill mortar joints and minor defects, including but not limited to spalls, in accordance with manufacturer's recommendations and prior to coating application.
d. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not to surfaces with droplets of water. Do not apply epoxies to damp vertical surfaces as determined by ASTM D4263 or horizontal surfaces that exceed 3 lbs of moisture per 1000 square…