W912QR23B0014_Specs-0002.pdf

PDF 1 MB Posted

Attached to
Fort Knox Toilet/Shower Facility
Solicitation number
W912QR23B0014
Issued by

About this file

This document is an amendment to a solicitation for the construction of a Toilet/Shower Facility at Fort Knox, Kentucky. The amendment provides revised specifications and pricing schedules. The project involves the construction of a consolidated shower facility building and associated site work. The amendment modifies the contract line item schedule to include revised pricing for line items one and two covering the primary facility building and site work. It also provides an estimated price of $399,205.80 for utility connection fees. An optional line item is included for additional site work for a shower trailer yard. Bids are due by the date specified in the original solicitation. The project has an estimated total construction cost between $5-10 million and is set aside for small businesses under NAICS code 236220. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville.

View the file

Other files

File Type Posted
Bid Opening Results.pdf PDF
W912QR23B0014-0003.pdf PDF
W912QR23B0014_Plans-0001.pdf PDF
W912QR23B0014_Specs-0001.pdf PDF
W912QR23B0014_Plans-0000.pdf PDF
W912QR23B0014_Specs_Vol3-0000.pdf PDF
W912QR23B0014_Specs_Vol1-0000.pdf PDF
W912QR23B0014_Specs_Vol2-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Design/Bid/Build for the construction of Toilet/Show er Facility - Fort Knox, KY is hereby amended as follow s:

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23B0014

X 9B. DATED (SEE ITEM 11)

13-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2023

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR23B0014_Specs-0002

499990 Consolidated Shower Facility Fort Knox, KY

SECTION 00 10

00 CERTIFIED

FINAL AMENDMENT

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0002 SUMMARY OF CHANGES

Consolidated Shower Facility P2 499990 Fort Knox, KY Amendment 0002

SUMMARY OF CHANGES

1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

00 10 00 PRICE BREAKOUT SCHEDULE

End Summary of Changes

SECTION 00 10 00 - SOLICITATION

The following have been modified:

BID SCHEDULE

00 10 00

PRICE BREAKOUT SCHEDULE

AMENDMENT 0002

OFFEROR'S NAME:

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Amount

BASE PROPOSAL

0001. Primary Facility: Consolidated Showerhouse Facility Job $

0002. Sitework Job $

AMENDMENT 0002*******************************************************************

SECTION 00 10

00 CERTIFIED

FINAL AMENDMENT

0003. Utility: Electric Job $ 399,205.80

******************************************************************* AMENDMENT 0002

TOTAL BASE PROPOSAL $

OPTIONS

0004. Sitework: Shower Trailer Yard Job $

TOTAL OPTIONS $

TOTAL PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN)

SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Bidders must insert a price on each numbered item, including options in the Bid Schedule.

Failure to do so may result in the bid being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated on price only. Evaluation of options will not obligate the Government to exercise the option(s).

W912QR23B0014

DESCRIPTION OF BASE PROPOSAL ITEMS

a. 0001. – “Primary Facility: Showerhouse” includes all work, materials, and labor to construct the Consolidated Shower Facility within a line five feet outside of the face of the building except that work covered by Item No. 0002

b. 0002. – “Sitework” includes all work, materials, and labor to construct the site work for the Consolidated Shower Facility within a line five feet outside the face of the building out to the construction limits except work covered by Item No.0001.

AMENDMENT 0002*******************************************************************

c. 0003. – “Utility - Electric” includes the fee(s) to the Contractor to complete and submit the utility connection application(s) to Nolin RECC. Contractor to coordinate with DPW to pay Nolin RECC directly for work, materials, and labor to demolish existing overhead single phase electric line, trench primary line, install primary line, service transformer, meter, meter socket, and underground primary service line and any/all associated fees. Contractor to coordinate with Nolin RECC for Contractor’s installation of concrete transformer pad. Refer to plans and specifications for further information. The estimated utility fee to be proposed for bidding purposes is shown in the schedule. If the actual fee varies from this amount after award, the Contract will be adjusted accordingly. This is an estimated cost.

******************************************************************* AMENDMENT 0002

DESCRIPTION OF OPTION ITEMS

a. 0004 – “Sitework: Shower Trailer Yard” includes all work, materials and labor to construct the site work for the Shower Trailer Yard as indicated on the drawings.

This option can be exercised within 60 days from receipt of construction Notice to Proceed (NTP).

--END OF CLIN SCHEDULE—

(End of Summary of Changes)

00 10 00

PRICE BREAKOUT SCHEDULE

AMENDMENT 0002

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Amount

BASE PROPOSAL

0001. Primary Facility: Consolidated Showerhouse Facility Job $ ______________________

0002. Sitework Job $ ___

AMENDMENT 0002*******************************************************************___________________

0003. Utility: Electric Job $ 399,205.80

******************************************************************* AMENDMENT 0002

TOTAL BASE PROPOSAL $ ______________________

OPTIONS

0004. Sitework: Shower Trailer Yard Job $

TOTAL OPTIONS $

TOTAL PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Bidders must insert a price on each numbered item, including options in the Bid Schedule. Failure to do so may result in the bid being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated on price only. Evaluation of options will not obligate the Government to exercise the option(s).

SECTION 00 10 00

CERTIFIED FINAL

AMENDMENT 0002

SECTION 00 10 00

CERTIFIED FINAL

AMENDMENT 0002

DESCRIPTION OF BASE PROPOSAL ITEMS

a. 0001. – “Primary Facility: Showerhouse” includes all work, materials, and labor to construct the Consolidated Shower Facility within a line five feet outside of the face of the building except that work covered by Item No.

b. 0002. – “Sitework” includes all work, materials, and labor to construct the site work for the Consolidated Shower Facility within a line five feet outside the face of the building out to the construction limits except work covered by Item No.0001.

AMENDMENT 0002*******************************************************************

c. 0003. – “Utility - Electric” includes the fee(s) to the Contractor to complete and submit the utility connection application(s) to Nolin RECC. Contractor to coordinate with DPW to pay Nolin RECC directly for work, materials, and labor to demolish existing overhead single phase electric line, trench primary line, install primary line, service transformer, meter, meter socket, and underground primary service line and any/all associated fees.

Contractor to coordinate with Nolin RECC for Contractor’s installation of concrete transformer pad. Refer to plans and specifications for further information. The estimated utility fee to be proposed for bidding purposes is shown in the schedule. If the actual fee varies from this amount after award, the Contract will be adjusted accordingly. This is an estimated cost.

******************************************************************* AMENDMENT 0002

DESCRIPTION OF OPTION ITEMS

a. 0004 – “Sitework: Shower Trailer Yard” includes all work, materials and labor to construct the site work for the Shower Trailer Yard as indicated on the drawings.

This option can be exercised within 60 days from receipt of construction Notice to Proceed (NTP).

--END OF CLIN SCHEDULE—