W912QR23B0014_Specs-0001.pdf
PDF 1 MB Posted
- Attached to
- Fort Knox Toilet/Shower Facility
- Solicitation number
- W912QR23B0014
About this file
This is an invitation for bid for a Toilet/Shower Facility project at Fort Knox, Kentucky. The project involves construction services with an estimated cost between $5-10 million. Bids are due by July 13, 2023. The project is 100% set aside for small businesses. The Department of the Army Corps of Engineers Engineering District Louisville is the contracting agency. The NAICS code for the work is 236220.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Design/Bid/Build for the construction of Toilet/Show er Facility - Fort Knox, KYis hereby amended as follow s:
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23B0014
X 9B. DATED (SEE ITEM 11)
13-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jul-2023
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR23B0014_Specs-0001
W912QR23B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0001 SUMMARY OF CHANGES
Consolidated Shower Facility P2 499990 Fort Knox, KY Amendment 0001
SUMMARY OF CHANGES
1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
31 00 00.00 06 EARTHWORK
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
2. The following PLAN SHEETS have been revised and replaced in their entirety:
CU101 OVERALL UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU108 UTILITY PLAN
CU202 SANITARY SEWER FORCE MAIN PROFILES
CU203 SANITARY SEWER FORCE MAIN PROFILES
CU204 SANITARY SEWER FORCE MAIN PROFILES
CU205 SANITARY SEWER FORCE MAIN PROFILES
CU206 SANITARY SEWER FORCE MAIN PROFILES
CU207 SANITARY SEWER FORCE MAIN PROFILES
CU208 SANITARY SEWER FORCE MAIN PROFILES
CU209 SANITARY SEWER FORCE MAIN PROFILES
CU210 SANITARY SEWER FORCE MAIN PROFILES
CU211 SANITARY SEWER FORCE MAIN PROFILES
CU212 SANITARY SEWER FORCE MAIN PROFILES
W912QR23B0014
CU502 UTILITY DETAILS
3. The proposal due date has been extended from 13 July 2023 at 10am Eastern to 21 July 2023 at 1pm Eastern.
4. FAR Clause 52.204-27 Prohibition on a ByteDance Covered Application (June 2023) has been added in it’s entirety by reference.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 13-Jul-2023 10:00 AM to 21-Jul-2023 01:00 PM.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by reference:
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023
(End of Summary of Changes)
SECTION 31 00 00.00 06
EARTHWORK
07/18
AMENDMENT 0001
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA C2 (2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes
AWPA P5 (2015) Standard for Waterborne Preservatives
ASTM INTERNATIONAL (ASTM)
ASTM A139/A139M (2016) Standard Specification for Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)
ASTM A252 (2010) Standard Specification for Welded and Seamless Steel Pipe Piles
ASTM C136/C136M (2014) Standard Test Method for Sieve
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility Fort Knox, KY
Analysis of Fine and Coarse Aggregates
ASTM C33/C33M (2016) Standard Specification for Concrete Aggregates
ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D1883 (2016) Standard Test Method for California Bearing Ratio (CBR) of Laboratory-Compacted Soils
ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D2434 (1968; R 2006) Permeability of Granular Soils (Constant Head)
ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D2937 (2017; E 2017) Standard Test Method for Density of Soil in Place by the Drive-Cylinder Method
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils
ASTM D4318 (2017) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D6913/D6913M (2017) Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis
ASTM D6938 (2017) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes
EPA SW-846.3-3a (1999) Test Methods for Evaluating Solid Waste: Physical/Chemical Methods; Third Edition; Final Update III-A
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS A-A-203 (Rev C; Notice 2) Paper, Kraft, Untreated
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
Satisfactory materials shall comprise any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, and CL-ML. Satisfactory materials for grading shall be comprised of stones less than 3 inches.
1.2.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials.
1.2.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Testing required for classifying materials shall be in accordance with ASTM D4318, ASTM C136/C136M, ASTM D422, and ASTM D1140 or ASTM D6913.
1.2.4 Degree of Compaction
Degree of compaction required is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density.
1.2.5 Topsoil
Topsoil thickness ranged from 5-inches to 10-inches (average of 6-inches) across the site. Material suitable for topsoil is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.2.6 Hard/Unyielding Materials
Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 12 inches in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.2.7 Rock
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.
1.2.8 Unstable Material
Unstable material shall consist of materials too wet or soft to properly support the utility pipe, conduit, or appurtenant structure.
1.2.9 Select Granular Material
1.2.9.1 General Requirements
Select granular material shall consist of materials classified as GW, GP, SW, or SP, by ASTM D2487 where indicated. Coefficient of permeability shall be a minimum of 0.002 feet per minute when tested in accordance with
ASTM D2434.
1.2.9.2 California Bearing Ratio Values
Bearing Ratio: At 0.1 inch penetration, the bearing ratio shall be 5 percent for all soil compacted to 95 percent ASTM D1557 maximum density at 2 percent optimum moisture content as determined in accordance with ASTM D1883 for a laboratory soaking period of not less than 4 days.
Maximum expansion shall be 2.5 percent.
1.2.10 Initial Backfill Material
Initial backfill shall consist of select granular material free from rocks 3 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller. When the pipe is coated or wrapped for corrosion protection, the initial backfill material shall be free of stones larger than 1 inches in any dimension or as recommended by the pipe manufacturer, whichever is smaller.
1.2.11 Expansive Soils
Expansive soils are defined as soils that have a plasticity index equal to
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility or greater than 30 when tested in accordance with ASTM D4318.
1.2.12 Nonfrost Susceptible (NFS) Material
Nonfrost susceptible material shall be a uniformly graded washed sand with a maximum particle size of 1 inch and less than 5 percent passing the No.
200 size sieve, and with not more than 3 percent by weight finer than 0.02 mm grain size.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Shoring; G, RO,DO
Dewatering Work Plan; G, RO,DO
Submit 15 days prior to starting work.
SD-03 Product Data
Utilization of Excavated Materials; G, RO Opening of any Excavation or Borrow Pit Shoulder Construction
Procedure and location for disposal of unused satisfactory material. Proposed source of borrow material. Notification of encountering rock in the project. Advance notice on the opening of excavation or borrow areas. Advance notice on shoulder construction for rigid pavements.
SD-06 Test Reports
Testing Borrow Site Testing
Within 24 hours of conclusion of physical tests, 2 copies of test results, including calibration curves and results of calibration tests. Results of testing at the borrow site.
SD-07 Certificates
Testing Qualifications of the Corps' validated commercial testing laboratory or the Contractor's validated testing facilities.
Geotechnical Engineer Qualifications of the Contractor's Geotechnical Engineer.
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
1.4 SUBSURFACE DATA
Subsurface soil boring logs are shown on the drawings. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.
1.5 CLASSIFICATION OF EXCAVATION
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.6 CRITERIA FOR BIDDING
Base bids on the following criteria:
a. Surface elevations are as indicated.
b. Material character is indicated by the boring logs.
c. Groundwater elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent groundwater elevation at the time of construction.
d. Based on the in-situ moistures encountered, it shall be assumed that all subgrade will require disking/plowing and recompaction of the upper 12 inches to achieve the required subgrade density and moisture requirements.
1.7 DEWATERING WORK PLAN
Submit procedures for accomplishing dewatering work.
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR BORROW AND EXCESS SOIL
Borrow soils shall meet the requirement of LRL Section 01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS; paragraphs BORROW SOILS and
MANAGEMENT OF BORROW MATERIAL AND EXCESS SOIL.
2.2 BURIED WARNING AND IDENTIFICATION TAPE
Polyethylene plastic and metallic core or metallic-faced, acid- and alkali-resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines.
Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Color and printing shall be permanent, unaffected by moisture or soil.
Warning Tape Color Codes
Red: Electric
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
Warning Tape Color Codes Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems White: Steam Systems Gray: Compressed Air
2.2.1 Warning Tape for Metallic Piping
Acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation.
2.2.2 Detectable Warning Tape for Non-Metallic Piping
Polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of the tape shall be 0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
2.3 DETECTION WIRE FOR NON-METALLIC PIPING
Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG.
2.4 MATERIAL FOR RIP-RAP
Provide Bedding material, Grout, Filter fabric, and rock conforming to these requirements for construction indicated.
2.4.1 Bedding Material
Consisting of sand, gravel, or crushed rock, well graded, or poorly graded with a maximum particle size of 2 inches. Material shall be composed of tough, durable particles. Fines passing the No. 200 standard sieve shall have a plasticity index less than six.
2.4.2 Grout
Composed of cement, water, an air-entraining admixture, and sand mixed in proportions of one part portland cement to two parts of sand, sufficient water to produce a workable mixture, and an amount of admixture which will entrain sufficient air to produce durable grout, as determined by the Contracting Officer. Mix grout in a concrete mixer. Mixing time shall be sufficient to produce a mixture having a consistency permitting gravity flow into the interstices of the rip-rap with limited spading and brooming.
2.4.3 Rock
Rock fragments sufficiently durable to ensure permanence in the structure and the environment in which it is to be used. Rock fragments shall be
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility free from cracks, seams, and other defects that would increase the risk of deterioration from natural causes. The size of the fragments shall be such that no individual fragment exceeds a weight of 150 pounds and that no more than 10 percent of the mixture, by weight, consists of fragments weighing 2 pounds or less each. Specific gravity of the rock shall be a minimum of
2.50. The inclusion of more than trace 1 percent quantities of dirt, sand, clay, and rock fines will not be permitted.
2.5 CAPILLARY WATER BARRIER
Provide capillary water barrier of clean, poorly graded crushed rock, crushed gravel, or uncrushed gravel placed beneath a building slab with a vapor barrier to cut off the capillary flow of pore water to the area immediately below. Aggregate shall conform to ASTM C33 Size Number 57 or 67 with a maximum of 2 percent by weight passing the No. 4 sieve. A suitable separation layer (e.g. filter fabric and/or aggregate base course) shall be provided below the clean aggregate to prevent migration of stone into cohesive soils.
2.6 PIPE CASING
2.6.1 Casing Pipe
ASTM A139/A139M, Grade B, or ASTM A252, Grade 2, smooth wall pipe. Casing size shall be of the outside diameter and wall thickness as indicated.
Protective coating is not required on casing pipe.
2.6.2 Wood Supports
Treated Yellow Pine or Douglas Fir, rough, structural grade. Provide wood with nonleaching water-borne pressure preservative (ACA or CCA) and treatment conforming to AWPA P5 and AWPA C2, respectively. Secure wood supports to carrier pipe with stainless steel or zinc-coated steel bands.
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, topsoil shall be stripped until removed (varied from 5-inches to 10-inches in the borings (averaged 6-inches)).
Topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Any surplus of topsoil from excavations and grading shall be removed from the site.
3.2 GENERAL EXCAVATION
The Contractor shall perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Grading shall be in conformity with the typical sections shown and the tolerances specified in paragraph FINISHING. Satisfactory excavated materials shall be transported to and placed in fill within the limits of the work. Unsatisfactory materials
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility encountered within the limits of the work shall be excavated below grade and replaced with satisfactory materials as directed. Such excavated material and the satisfactory material ordered as replacement shall be included in excavation. Surplus satisfactory excavated material not required for fill shall be disposed of in areas approved for surplus material storage or designated waste areas. Unsatisfactory excavated material shall be disposed of in designated waste or spoil areas. During construction, excavation and fill shall be performed in a manner and sequence that will provide proper drainage at all times. Material required for fill in excess of that produced by excavation within the grading limits shall be excavated from the borrow areas indicated or from other approved areas selected by the Contractor as specified.
In the event environmental contamination is found/encountered, contact the Environmental Management Division (EMD) at 502-624-1929/3629. Cease work until site is cleared.
3.2.1 Ditches, Gutters, and Channel Changes
Excavation of ditches, gutters, and channel changes shall be accomplished by cutting accurately to the cross sections, grades, and elevations shown.
Ditches and gutters shall not be excavated below grades shown. Excessive open ditch or gutter excavation shall be backfilled with satisfactory, thoroughly compacted, material or with suitable stone or cobble to grades shown. Material excavated shall be disposed of as shown or as directed, except that in no case shall material be deposited less than 4 feet from the edge of a ditch. The Contractor shall maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.
3.2.2 Drainage Structures
Excavations shall be made to the lines, grades, and elevations shown, or as directed. Trenches and foundation pits shall be of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. Excavations shall be cleaned of loose debris and cut to a firm, level, stepped, or serrated surface.
When concrete or masonry is to be placed in an excavated area, the bottom of the excavation shall not be disturbed. Excavation to the final grade level shall not be made until just before the concrete or masonry is to be placed.
3.2.3 Drainage
Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and groundwater conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
3.2.4 Dewatering
Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at or below the working level.
3.2.5 Trench Excavation Requirements
The trench shall be excavated as recommended by the manufacturer of the pipe to be installed. Trench walls below the top of the pipe shall be sloped, or made vertical, and of such width as recommended in the manufacturer's installation manual. Where no manufacturer's installation manual is available, trench walls shall be made vertical. Trench walls more than 4 feet high shall be shored, cut back to a stable slope, or provided with equivalent means of protection for employees who may be exposed to moving ground or cave in. Trench walls which are cut back shall be excavated to at least the angle of repose of the soil. Special attention shall be given to slopes which may be adversely affected by weather or moisture content. The trench width below the top of pipe shall not exceed 24 inches plus pipe outside diameter (O.D.) for pipes of less than 24 inches inside diameter and shall not exceed 36 inches plus pipe outside diameter for sizes larger than 24 inches inside diameter. Where recommended trench widths are exceeded, redesign, stronger pipe, or special installation procedures shall be utilized by the Contractor. The cost of redesign, stronger pipe, or special installation procedures shall be borne by the Contractor without any additional cost to the Government.
3.2.5.1 Bottom Preparation
The bottoms of trenches shall be accurately graded to provide uniform bearing and support for the bottom quadrant of each section of the pipe.
Bell holes shall be excavated to the necessary size at each joint or coupling to eliminate point bearing. Stones of 3 inches or greater in any dimension, or as recommended by the pipe manufacturer, whichever is smaller, shall be removed to avoid point bearing.
3.2.5.2 Removal of Unyielding Material
Where overdepth is not indicated and unyielding material is encountered in the bottom of the trench, such material shall be removed 4 inches below the required grade and replaced with suitable materials as provided in paragraph BACKFILLING AND COMPACTION.
3.2.5.3 Removal of Unstable Material
Where unstable material is encountered in the bottom of the trench, such material shall be removed to the depth directed and replaced to the proper grade with select granular material as provided in paragraph BACKFILLING AND COMPACTION. When removal of unstable material is required due to the Contractor's fault or neglect in performing the work, the resulting
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility material shall be excavated and replaced by the Contractor without additional cost to the Government.
3.2.5.4 Excavation for Appurtenances
Excavation for manholes, catch-basins, inlets, or similar structures shall be of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. The excavation shall be cleaned of loose debris and cut to a firm surface either level, stepped, or serrated, as shown or as directed. Removal of unstable material shall be as specified above. When concrete or masonry is to be placed in an excavated area, special care shall be taken not to disturb the bottom of the excavation. Excavation to the final grade level shall not be made until just before the concrete or masonry is to be placed.
3.2.5.5 Jacking, Boring, and Tunneling
Unless otherwise indicated, excavation shall be by open cut except that sections of a trench may be jacked, bored, or tunneled if, in the opinion of the Contracting Officer, the pipe, cable, or duct can be safely and properly installed and backfill can be properly compacted in such sections.
3.2.6 Underground Utilities
Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Perform work adjacent to non-Government utilities as indicated in accordance with procedures outlined by utility company. Excavation made with power-driven equipment is not permitted within 2 feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.
3.2.7 Structural Excavation
Ensure that footing subgrades have been inspected and approved by the Geotechnical Engineer prior to concrete placement. Backfill and compact over excavations and changes in grade to 95 percent of ASTM D1557 maximum density.
Amendment 0001*************************************************************
3.3 SELECTION OF BORROW MATERIAL
Borrow material shall be selected to meet the requirements and conditions of the particular fill for which it is to be used. Adequate borrow site is located within 1 mile of project location. Contractor responsible for procurement of material from location and to seal and seed once complete.
Contractor to coordinate with Contracting Officer on precise location of borrow site. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, no borrow shall be obtained within the limits of the project site without prior written approval. Necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon shall be considered related operations to the borrow excavation.
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
******************************************************* Amendment 0001
3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS
Except as otherwise permitted, borrow pits and other excavation areas shall be excavated providing adequate drainage. Overburden and other spoil material shall be transported to designated spoil areas or otherwise disposed of as directed. Borrow pits shall be neatly trimmed and drained after the excavation is completed. The Contractor shall ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.
3.5 GEOTECHNICAL ENGINEER
The Contractor is required to hire a Professional Geotechnical Engineer to provide inspection of foundations excavation, earthwork, and soil/groundwater conditions throughout construction. The Geotechnical Engineer shall provide recommendations to the Contractor for soil related matters on the project. The Geotechnical Engineer shall be responsible for performing pre-construction and periodic site visits throughout construction to assess site conditions. The Geotechnical Engineer shall update the excavation, sheeting and dewatering plans as construction progresses to reflect changing conditions and shall submit an updated plan if necessary. A written report shall be submitted, at least monthly, informing the Contractor and Contracting Officer of the status of the plan and an accounting of the Contractor's adherence to the plan addressing any present or potential problems. The Geotechnical Engineer shall be available to meet with the Contracting Officer at any time throughout the contract duration.
3.5.1 General Requirements for Shoring
The Contractor shall submit a Shoring and Sheeting plan for approval 15 days prior to starting work if shoring is to be used. Submit drawings and calculations, certified by a registered professional geotechnical engineer, describing the methods for shoring and sheeting of excavations. Shoring, including sheet piling, shall be furnished and installed as necessary to protect workmen, banks, adjacent paving, structures, and utilities.
Shoring, bracing, and sheeting shall be removed as excavations are backfilled, in a manner to prevent caving.
3.6 GRADING AREAS
Where indicated, work will be divided into grading areas within which satisfactory excavated material shall be placed in fills, and required backfills. The Contractor shall not haul satisfactory material excavated in one grading area to another grading area except when so directed in writing. Stockpiles of satisfactory and unsatisfactory and wasted materials shall be placed and graded as specified. Stockpiles shall be kept in a neat and well drained condition, giving due consideration to drainage at all times. The ground surface at stockpile locations shall be cleared, grubbed, and sealed by rubber-tired equipment, excavated satisfactory and unsatisfactory materials shall be separately stockpiled. Stockpiles of satisfactory materials shall be protected from contamination which may destroy the quality and fitness of the stockpiled material. If the Contractor fails to protect the stockpiles, and any material becomes unsatisfactory, such material shall be removed and replaced with
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility satisfactory material from approved sources.
3.7 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE
Excavation to final grade shall not be made until just before concrete is to be placed. The foundation bearing area shall be level. Loose soil, debris, and excess surface water shall be removed from the bearing surface prior to concrete placement. All surfaces shall be protected from erosion or degradation resulting from ponding or flow of water. Foundation bearing soils exposed in open excavations shall be protected from severe drying and water accumulation. Any soils disturbed by exposure shall be removed prior to foundation concrete placement.
If the excavations must remain open overnight, the bearing soils shall be protected with black plastic or similar opaque impermeable material to reduce moisture loss and shrinkage of the soils. If the excavation must remain open for an extended period of time, a "lean" concrete mud-mat with a minimum thickness of 3 inches shall be placed over the bearing soils.
Excavation of disturbed soil may be required if these protective measures are not implemented.
3.8 GROUND SURFACE PREPARATION
3.8.1 General Requirements
Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. The ground surface shall be broken up to a minimum depth of 12 inches, pulverized, and compacted to the specified density at a moisture within 2 percent of the optimum moisture for compaction.
3.8.2 Frozen Material
Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to plus or minus 2 percent of optimum moisture to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Minimum subgrade density shall be as specified in paragraph SUBGRADE PREPARATION.
3.9 UTILIZATION OF EXCAVATED MATERIALS
Unsatisfactory materials removed from excavations shall be disposed of in designated waste disposal or spoil areas. Satisfactory material removed from excavations shall be used, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. No satisfactory excavated material shall be wasted without specific written authorization. Satisfactory material authorized to be wasted shall be disposed of in designated areas approved for surplus material storage or designated waste areas as directed. Newly designated waste areas on Government-controlled land shall be cleared and grubbed before disposal of waste material thereon. Coarse rock from excavations shall be stockpiled and used for constructing slopes or embankments
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility adjacent to streams, or sides and bottoms of channels and for protecting against erosion. No excavated material shall be disposed of to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.
3.10 BURIED TAPE AND DETECTION WIRE
3.10.1 Buried Warning and Identification Tape
Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade.
3.10.2 Buried Detection Wire
Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over its entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe.
3.11 BACKFILLING AND COMPACTION
Backfill adjacent to any and all types of structures shall be placed and compacted between 85 and 90 percent laboratory maximum density for cohesionless materials to prevent wedging action or eccentric loading upon or against the structure. Ground surface on which backfill is to be placed shall be prepared as specified in paragraph GROUND SURFACE PREPARATION.
Compaction requirements for backfill materials shall also conform to the applicable portions of Section 33 40 00 STORM DRAINAGE UTILITIES, and LRL Section 31 00 00.00 06 EARTHWORK. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.11.1 Trench Backfill
Trenches shall be backfilled to the grade shown. The trench shall be backfilled to 2 feet above the top of pipe prior to performing the required pressure tests. The joints and couplings shall be left uncovered during the pressure test.
3.11.1.1 Replacement of Unyielding Material
Unyielding material removed from the bottom of the trench shall be replaced with select granular material or initial backfill material.
3.11.1.2 Replacement of Unstable Material
Unstable material removed from the bottom of the trench or excavation shall be replaced with select granular material placed in layers not exceeding 6 inches loose thickness.
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
3.11.1.3 Bedding and Initial Backfill
Bedding shall be of the type and thickness shown. Initial backfill material shall be placed and compacted with approved tampers to a height of at least one foot above the utility pipe or conduit. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Care shall be taken to ensure thorough compaction of the fill under the haunches of the pipe. Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide materials as follows:
a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells.
b. Class II: Coarse sands and gravels with maximum particle size of
1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D2487.
c. Clean, coarse-grained sand classified as SW or SP by ASTM D2487 for bedding and backfill as indicated.
d. Clean, coarsely graded natural gravel, crushed stone or a combination thereof identified as GW or GP in accordance with ASTM D2487 for bedding and backfill as indicated. Maximum particle size shall not exceed 3 inches.
3.11.1.4 Final Backfill
The remainder of the trench, except for special materials for roadways shall be filled with satisfactory material. Backfill material shall be placed and compacted as follows:
a. Roadways: Backfill shall be placed up to the required elevation as specified. Water flooding or jetting methods of compaction will not be permitted.
b. Sidewalks, Turfed or Seeded Areas and Miscellaneous Areas:
Backfill shall be deposited in layers of a maximum of 12 inch loose thickness, and compacted to 85 percent maximum density for cohesive soils and 90 percent maximum density for cohesionless soils. Compaction by water flooding or jetting will not be permitted. This requirement shall also apply to all other areas not specifically designated above.
3.11.2 Backfill for Appurtenances
After the manhole, catch basin, inlet, or similar structure has been constructed and the concrete has been allowed to cure for 7 days, backfill shall be placed in such a manner that the structure will not be damaged by the shock of falling earth. The backfill material shall be deposited and compacted as specified for final backfill, and shall be brought up evenly
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility on all sides of the structure to prevent eccentric loading and excessive stress.
3.12 SPECIAL REQUIREMENTS
Special requirements for both excavation and backfill relating to the specific utilities are as follows:
3.12.1 Gas Distribution
Trenches shall be excavated to a depth that will provide not less than 24 inches of cover. Trenches shall be graded as specified for pipe-laying requirements in UFGS Section 33 63 14 EXTERIOR BURIED PUMPED CONDENSATE
RETURN.
3.12.2 Water Lines
Trenches shall be of a depth to provide a minimum cover of 30 inches from the existing ground surface, or from the indicated finished grade, whichever is lower, to the top of the pipe. For fire protection yard mains or piping, an additional 12 inches of cover is required.
3.12.3 Heat Distribution System
Initial backfill material shall be free of stones larger than 1/4 inch in any dimension.
3.12.4 Electrical Distribution System
Direct burial cable and conduit or duct line shall have a minimum cover of 24 inches from the finished grade, unless otherwise indicated. Special trenching requirements for direct-burial electrical cables and conduits are specified in UFGS Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION.
3.13 STRUCTURAL FILL
3.13.1 Structural Fill
All structural fill placed to facilitate desired site grades shall be constructed from satisfactory material free of organic or frozen material and rocks with any dimension greater than 3 inches. The fill shall be placed in maximum 8 inch loose lifts and compacted to the following criteria. Beneath foundations: at least 95 percent laboratory maximum density as determined by the project geotechnical engineer; beneath concrete slabs and roads: at least 95 percent laboratory maximum density as determined by the geotechnical engineer; behind retaining walls:
between 85-90 percent laboratory maximum density as determined by the geotechnical engineer; beneath pipe bedding and trench bottom areas: at least 90 percent laboratory maximum density as determined by the geotechnical engineer; beneath landscape areas: at least 85 percent laboratory maximum density as determined by the geotechnical engineer. All fill shall be compacted at a moisture within 2 percent of the optimum moisture content.
3.14 SUBGRADE PREPARATION
3.14.1 Proof Rolling
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility
Proof rolling shall be conducted on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping and before placement of the granular base for slabs or access roads, proof roll the existing subgrade with 2 passes of a dual axel dump truck loaded with 20 tons, or similar rubber-tired equipment judged acceptable by the Contracting Officer. Operate the truck in a systematic manner to ensure the number of passes over all areas (i.e., tire to tire), and at speeds between 2 1/2 to 3 1/2 mph. When proof rolling, one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Geotechnical Engineer and the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Geotechnical Engineer and the Contracting Officer.
Rutting or pumping of material shall be undercut as directed by the Geotechnical Engineer and approved by the Contracting Officer. Where proof rooling is not possible due to tight space restrictions, the subgrade shall be evaluated by the Contractor's Geotechnical Engineer using a suitable alternative method, such as visual observations and hand probing.
3.14.2 Construction
Subgrade shall be shaped to line, grade, and cross section, and compacted as specified. This operation shall include plowing, disking, and any moistening or aerating required to obtain specified compaction. Soft or otherwise unsatisfactory material shall be removed and replaced with satisfactory excavated material or other approved material as directed.
Low areas resulting from removal of unsatisfactory material or excavation of rock shall be brought up to required grade with satisfactory materials, and the entire subgrade shall be shaped to line, grade, and cross section and compacted as specified. After rolling, the surface of the subgrade for roadways shall not show deviations greater than 3/8 inch when tested with a 12 foot straightedge applied both parallel and at right angles to the centerline of the area. The elevation of the finish subgrade shall not vary more than 0.05 foot from the established grade and cross section.
3.14.3 Compaction
Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.14.3.1 Subgrade for New Fill Placement, Pavements, and Floor Slabs
The upper 12 inches of the subgrade shall be disked and recompacted to at least 95 percent of the laboratory maximum density within 2 percent of the optimum moisture content. When more than one soil classification is present in the subgrade, the top 12 inches of subgrade shall be scarified, windrowed, thoroughly blended, reshaped, and compacted.
3.14.3.2 Subgrade for Shoulders
Subgrade for shoulders shall be disked and recompacted to at least 95 percent of the laboratory maximum density within 2 percent of the optimum moisture content.
3.15 SHOULDER CONSTRUCTION
Shoulders shall be constructed of satisfactory excavated or borrow material
AMENDMENT 0001
CERTIFIED FINAL
499990 Consolidated Shower Facility or as otherwise shown or specified. Shoulders shall be constructed as soon as possible after adjacent paving is complete, but in the case of rigid pavements, shoulders shall not be constructed until permission of the Contracting Officer has been obtained. The entire shoulder area shall be compacted to at least the percentage of maximum density as specified in paragraph SUBGRADE PREPARATION above, for specific ranges of depth below the surface of the shoulder. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment. Shoulder construction shall be done in proper sequence in such a manner that adjacent ditches will be drained effectively and that no damage of any kind is done to the adjacent completed pavement.
This is the start of the file's text. The full file is on GovTribe.