This document outlines a federal contract opportunity for renovation and construction work at Homestead Air Reserve Base in Florida. The Army Corps of Engineers seeks to renovate an aircraft maintenance hangar and construct an addition, with an estimated cost between $10-25 million. The project will use full and open competition and require a 10% price evaluation preference for HUBZone businesses. The NAICS code is 236220 for commercial and institutional building construction. Funds are not presently available and no award will be made until appropriated. Technical inquiries must be submitted through the listed project website by the response deadline. The agency is the Department of the Army Corps of Engineers Louisville District.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Add/Repair Unscheduled Maintenance Hangar 200, Homestead ARB, FL
P2: 478240
Design-Bid-Build
Specifications Volume 2 of 3
Certified Final Design
04 August 2020
W912QR20R0078
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0078-0000
This page intentionally left blank.
VOL 2 of 2
CERTIFIED FINAL DESIGN SUBMITTAL
29 JULY 2020
2 3
P2#: 478240
P2#478240 – Add/Repair Unscheduled Maintenance Hangar 200
Homestead ARB, FL
CERTIFIED FINAL
SUBMITTAL
ISSUE FOR
CONSTRUCTION
SIGNATURE PAGE
Civil, Dave Schmidgall
Architecture, Andy Malanowski
Structural, Donny Matthews
Mechanical & Plumbing, Charles
Solberg
Electrical, Karl Anderson
Fire Protection, Kevin Clay
Technology, Jason McCann
07-29-2020
P2#478240 - Add/Repair Unscheduled Maintenance Hangar 200
PROJECT TABLE OF CONTENTS Page 1
Certified Final Design Submittal
29 JUL 2020
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
00 80 00.00 06A CONSTRUCTION PROJECT SIGN DETAILS
00 80 00.00 06B SUBMITTAL REGISTER
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 00A SHEET INDEX
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 35 26.01 06 FORM 16-1 Cert of Compliance
01 35 26.02 06 FORM 1259 AHA Nov 2013
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 22 13 MOVEMENT AND VIBRATION ASSESSMENT
02 41 00 DEMOLITION
02 83 13.00 06 LEAD IN CONSTRUCTION
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 87 33 BIRD, BAT AND RODENT DROPPINGS REMEDIATION AND DISPOSAL
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 62 15.00 06 FLOWABLE FILL
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
PROJECT TABLE OF CONTENTS Page 2
VOLUME 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 72 46 ROOF WALKWAYS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 41 16 EMERGENCY KEY CABINETS
10 44 16 FIRE EXTINGUISHERS
10 81 13 BIRD CONTROL DEVICES
DIVISION 12 - FURNISHINGS
12 22 00 CURTAINS AND DRAPES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 90 00 FIRE PROTECTION SYSTEM COMMISSIONING
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
VOLUME 3
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 21 13 RADON MITIGATION
PROJECT TABLE OF CONTENTS Page 4
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 11 00
33 71 02 33 82 00
WATER UTILITY DISTRIBUTION PIPING
WATER METERS
UNDERGROUND ELECTRICAL DISTRIBUTION
TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
-- End of Project Table of Contents --
33 12 33.00 30
PROJECT TABLE OF CONTENTS Page 4
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
-- End of Project Table of Contents --
SECTION 07 14 00
FLUID-APPLIED WATERPROOFING
02/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C836/C836M (2015) High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-03 Product Data
Fluid-Applied Membrane
Membrane Primer
Elastomeric Sheet
Flexible Foam-Backed Elastomeric Sheet
Solvent
Moisture Meter
Protection Board
Bond Breaker
Submit material description and physical properties, application
SECTION 07 14 00 Page 1 Certified Final Design Submittal 29 JUL 2020 details, and recommendations regarding shelf life, application procedures, and precautions on flammability and toxicity.
SD-11 Closeout Submittals
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver waterproofing materials in manufacturer's original, unopened containers, with labels intact and legible. Containers of materials covered by a referenced specification number shall bear the specification number, type, and class of the contents. Deliver materials in sufficient quantity to continue work without interruption. Store and protect materials in accordance with manufacturer's instructions, and use within their indicated shelf life. When hazardous materials are involved, adhere to special precautions of the manufacturer, unless precautions conflict with local, state, and federal regulations. Promptly remove from the site materials or incomplete work adversely affected by exposure to moisture or freezing. Store materials on pallets and cover from top to bottom with canvas tarpaulins.
1.4 ENVIRONMENTAL CONDITIONS
Apply materials when ambient temperature is 40 degrees F or above for a period of 24 hours prior to the application and when there is no ice, frost, surface moisture, or visible dampness on the substrate surface.
Apply materials when air temperature is expected to remain above 40 degrees F during the cure period recommended by the manufacturer. Moisture test for substrate is specified under paragraph entitled "Moisture Test." Work may be performed within heated enclosures, provided the surface temperature of the substrate is maintained at a minimum of 40 degrees F for 24 hours prior to the application of the waterproofing, and remains above that temperature during the cure period recommended by the manufacturer.
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE
ASTM C836/C836M.
2.2 MEMBRANE PRIMER
As recommended by the fluid-applied membrane manufacturer unless specifically prohibited by the manufacturer of the fluid-applied membrane.
2.3 SEALANT
As specified in Section 07 92 00 JOINT SEALANTS.
2.4 SEALANT PRIMER
As specified in Section 07 92 00 JOINT SEALANTS.
2.5 BACKING MATERIAL
Premolded, closed-cell, polyethylene, or polyurethane foam rod having a diameter 25 percent larger than joint width before being compressed into joint. Provide bond breaker of polyethylene film or other suitable material between backing material and sealant.
SECTION 07 14 00 Page 2
2.6 JOINT FILLER
As specified in Section 03 30 00 CAST-IN-PLACE CONCRETE, .
2.7 BOND BREAKER
As recommended by the fluid-applied membrane manufacturer. Bond breaker shall not interfere with the curing process or other performance properties of the fluid-applied membrane.
2.8 ELASTOMERIC SHEET
Preformed; as recommended by the fluid-applied membrane manufacturer. Bond strength between the fluid-applied membrane and the preformed elastomeric sheet shall be a minimum of one psi when tested in accordance with
ASTM C836/C836M.
2.9 ELASTOMERIC SHEET ADHESIVE
As recommended by the elastomeric sheet manufacturer.
2.10 FLEXIBLE FOAM-BACKED ELASTOMERIC SHEET
Flexible foam-backed elastomeric sheet for protection over preformed elastomeric sheet at expansion joints shall be 1/2 inch thick, minimum, closed cell foam conforming to ASTM D1056, Type 2, Class B, Grades 2 or 3, factory-bonded to 1/16 inch thick, minimum, preformed elastomeric sheet.
2.11 PROTECTION BOARD
Premolded bitumen composition board, 1/8 inch minimum thickness or other composition board compatible with the fluid-applied membrane.
2.12 DRAINAGE COURSE AGGREGATE
ASTM C33/C33M, size No. 8.
2.13 INSULATION
Polystyrene foam conforming to ASTM C578, Class IV, thickness as indicated .
PART 3 EXECUTION
3.1 PREPARATION
Coordinate work with that of other trades to ensure that components to be incorporated into the waterproofing system are available when needed.
Inspect and approve surfaces immediately before application of waterproofing materials. Remove laitance, loose aggregate, sharp projections, grease, oil, dirt, curing compounds, and other contaminants which could adversely affect the complete bonding of the fluid-applied membrane to the concrete surface.
3.1.1 Flashings
Make penetrations through sleeves in concrete slab watertight before application of waterproofing. After flashing is completed, cover elastomeric sheet with fluid-applied waterproofing during waterproofing application.
SECTION 07 14 00 Page 3
3.1.1.1 Drains
Make drain flanges flush with surface of structural slab. Apply a full elastomeric sheet around the drain, with edges fully adhered to drain flange and to structural slab. Do not adhere elastomeric sheet over joint between drain and concrete slab. Do not plug drainage or weep holes. Cover elastomeric sheet with fluid-applied waterproofing during waterproofing application. Lap elastomeric sheet a minimum of 4 inches onto concrete slab.
3.1.1.2 Penetrations and Projections
Flash penetrations and projections through structural slab with an elastomeric sheet adhered to the concrete slab and the penetration. Leave elastomeric sheet unadhered for one inch over joint between penetration and concrete slab. Adhere elastomeric sheet a minimum of 4 inches onto horizontal deck.
3.1.1.3 Walls and Vertical Surfaces
Flash wall intersections which are not of monolithic pour or constructed with reinforced concrete joints with an elastomeric sheet adhered to both vertical wall surfaces and concrete slab. Flash intersections which are monolithically poured or constructed with reinforced concrete joints with either an elastomeric sheet or a vertical grade of fluid-applied waterproofing adhered to vertical wall surfaces and concrete slab. Leave sheet unadhered for a distance of one inch from the corner on both vertical and horizontal surfaces.
3.1.2 Cracks and Joints
Prepare visible cracks and joints in substrate to receive fluid-applied waterproofing membrane by placing a bond breaker and an elastomeric slip sheet between membrane and substrate. Cracks that show movement shall receive a 2 inch bond breaker followed by an elastomeric sheet adhered to the deck. Nonmoving cracks shall be double coated with fluid-applied waterproofing.
3.1.3 Priming
Prime surfaces to receive fluid-applied waterproofing membrane. Apply primer as required by membrane manufacturer's printed instructions.
3.2 SPECIAL PRECAUTIONS
Protect waterproofing materials during transport and application. Do not dilute primers and other materials, unless specifically recommended by materials manufacturer. Keep containers closed except when removing contents. Do not mix remains of unlike materials. Thoroughly remove residual materials before using application equipment for mixing and transporting materials. Do not permit equipment on the project site that has residue of materials used on previous projects. Use cleaners only for cleaning, not for thinning primers or membrane materials. Ensure that workers and others who walk on cured membrane wear clean, soft-soled shoes to avoid damaging the waterproofing materials.
SECTION 07 14 00 Page 4
3.3 APPLICATION
Over primed surfaces, provide a uniform, wet, monolithic coating of fluid-applied membrane, 60 mils thick, plus or minus 5 mils by following manufacturer's printed instructions. Apply material by trowel, squeegee, roller, brush, spray apparatus, or other method recommended by membrane manufacturer. Check wet film thickness as specified in paragraph entitled "Film Thickness" and adjust application rate as necessary to provide a uniform coating of the thickness specified. Where possible, mark off surface to be coated in equal units to facilitate proper coverage. At expansion joints, control joints, prepared cracks, flashing, and terminations, carry membrane over preformed elastomeric sheet in a uniform 60 mil thick, plus or minus 5 mils, wet thickness to provide a monolithic coating. If membrane cures before next application, wipe previously applied membrane with a solvent to remove dirt and dust that could inhibit adhesion of overlapping membrane coat. Use solvent recommended by the membrane manufacturer, as approved.
3.3.1 Work Sequence
Perform work so that protection board is installed prior to using the waterproofed surface. Do not permanently install protection board until the membrane has passed the flood test specified under paragraph entitled "Flood Test." Move material storage areas as work progresses to prevent abuse of membrane and overloading of structural deck.
3.3.2 Protection Board
Protect fluid-applied membrane by placing protection board over membrane at a time recommended by the membrane manufacturer. Protect membrane application when protection board is not placed immediately. Butt protection boards together and do not overlap.
3.3.3 Drainage Course
Place drainage course where shown after flood tests are completed and concrete protection slab or wearing course is ready to be installed.
3.3.4 Insulation
Place insulation of thickness indicated, on top of drainage course just prior to placement of concrete protection slab.
3.4 FIELD QUALITY CONTROL
3.4.1 Moisture Test
Prior to application of fluid-applied waterproofing, measure moisture content of substrate with a moisture meter in the presence of the Contracting Officer. Do not begin application until meter reading indicates "dry" range.
3.4.2 Film Thickness
Measure wet film thickness every 100 square feetduring application by placing flat metal plates on the substrate or using a mil-thickness gage especially manufactured for the purpose.
SECTION 07 14 00 Page 5
3.4.3 Flood Test
After application and curing is complete, plug drains and fill waterproofed area with water to a depth of 2 inches. A minimum 48 hour cure time, or longer cure time if recommended by the membrane manufacturer, shall be required prior to flood testing. Allow water to stand 24 hours. Test watertightness by measuring water level at beginning and end of the 24 hour period. If water level falls, drain water, allow installation to dry, and inspect. Make repairs or replace as required and repeat the test. Work shall not proceed before approval of repairs or replacement.
-- End of Section --
SECTION 07 14 00 Page 6
SECTION 07 21 13
BOARD AND BLOCK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C203 (2005; R 2012) Breaking Load and Flexural Properties of Block-Type Thermal Insulation
ASTM C272/C272M (2016) Standard Test Method for Water Absorption of Core Materials for Sandwich Constructions
ASTM C552 (2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation
ASTM C591 (2019) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM C1289 (2018a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E136 (2019) Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750 Degrees C
SECTION 07 21 13 Page 1
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-03 Product Data
Manufacturer's Standard Details; G
Block or Board Insulation; G
Vapor Retarder; G
Pressure Sensitive Tape; G
Protection Board or Coatings; G
Accessories including sealants; G
Recycled Content for Block or Board Insulation; S
SD-07 Certificates
Block or Board Insulation; G
Vapor Retarder; G
Draft Special Warranties; G
Final Special Warranties; G
SECTION 07 21 13 Page 2
Indoor Air Quality For Block Or Board Insulation; S
SD-08 Manufacturer's Instructions
Block or Board Insulation
Adhesive
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details.
Include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for protection board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.5.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before and during installation.
1.6 SAFETY PRECAUTIONS
1.6.1 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
1.7 SPECIAL WARRANTIES
1.7.1 Guarantee
Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Substantial Completion.
Submit draft and final guarantees in accordance with Section 01 78 23
OPERATION AND MAINTENANCE DATA.
SECTION 07 21 13 Page 3
1.7.2 Warranty
Provide manufacturer's material warranty for all system components for a period of three years from the date of Substantial Completion. Submit draft and final warranties in accordance with Section 01 78 23 OPERATION
AND MAINTENANCE DATA.
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Cellular Glass: ASTM C552
b. Unfaced Preformed Rigid Polyurethane and Polyisocyanurate Board:
ASTM C591
c. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:
ASTM C1289 REV A
2.1.1 Thermal Resistance
Unless otherwise indicated, Wall R-20.
2.1.2 Fire Protection Requirements
a. Flame spread index of 75 or less when tested in accordance with ASTM E84.
b. Smoke developed index of 150 or less when tested in accordance with
ASTM E84.
c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.
2.1.3 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to
ASTM D1621.
b. Block-type insulation: Block-type insulation: Flexural strength: Not less than 25 psi when measured according to ASTM C203 REV A.
c. Water Vapor Permeance: Not more than 1.1 Perms or less when measured according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
d. Water Absorption: Not more than 2 percent by total immersion, by volume, when measured according to ASTM C272/C272M.
2.1.4 Recycled Materials
Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of
SECTION 07 21 13 Page 4 this section. The minimum required recycled material contents (by weight, not volume) are:
Polyisocyanurate/Polyurethane: 9 percent
Phenolic Rigid Foam: 5 percent
Perlite Board: 75 percent post consumer paper
Provide data identifying percentage of recycled content for block or board insulation.
2.1.5 Indoor Air Quality
Provide certification of indoor air quality for block or board insulation.
2.1.6 Prohibited Materials
Do not provide materials containing asbestos.
2.2 VAPOR RETARDER AND DAMPPROOFING
2.2.1 Vapor Retarder in Framed Walls and Roofs
a. Membrane with the following properties:
(1) Water Vapor Permeance: ASTM E96/E96M: 1 Perm
(2) Maximum Flame Spread: ASTM E84: 25
(3) Combustion Characteristics: Passing ASTM E136
(4) Puncture Resistance: TAPPI T803 OM: 25
2.3 PRESSURE SENSITIVE TAPE
As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M.
2.4 ACCESSORIES
2.4.1 Adhesive
As recommended by insulation manufacturer.
2.4.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Prior to installation, ensure all areas that are in contact with the
SECTION 07 21 13 Page 5 insulation are dry and free of projections that could cause voids, compressed insulation, or punctured vapor retarders. For foundation perimeter or under slab applications, check that subsurface fill is flat, smooth, dry, and well tamped. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Provide noncombustible blocking at all spaces between heat producing devices and the floors, ceilings and roofs through which they pass.
Provide in accordance with ICC IBC Section 2111.12 Fireplace Blocking and with the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless certified for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is placed above fixture or device, 24 inches above fixture.
b. Masonry chimneys or masonry enclosing a flue: 2 inches from outside face of masonry. Masonry chimneys for medium and high heat operating appliances: Minimum clearances required by NFPA 211.
c. Vents and vent connectors used for venting products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211.
d. Gas Fired Appliances: Clearances as required in NFPA 54.
e. Oil Fired Appliances: Clearances as required in NFPA 31.
Blocking is not required if chimneys or flues are certified in writing by the chimney or flue manufacturer for use in contact with specific insulating materials.
3.3 INSTALLATION
3.3.1 Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.
3.3.2 Electrical Wiring
Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.
3.3.3 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.
SECTION 07 21 13 Page 6
3.3.4 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated, R-values specified herein, and with the approved insulation submittal(s).
3.4 INSTALLATION ON WALLS
3.4.1 Installation using Furring Strips
Install insulation between members as recommended by insulation manufacturer.
3.4.2 Installation on Masonry Walls
Apply board directly to masonry with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Apply in parallel courses with joints breaking midway over course below. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Seal around cutouts with sealant. Install insulation in wall cavities so that it leaves at least a nominal 1 inch air space outside of the insulation to allow for cavity drainage.
3.4.3 Adhesive Attachment to Concrete and Masonry Walls
Apply adhesive to wall and completely cover wall with insulation.
a. Full back bed method or
b. Spot method: Provide at least six spots having diameter of approximately 4 inches, located at each corner and mid points of each of the longer sides of each board.
c. As recommended by the insulation manufacturer.
d. Use only full back method for pieces of 1 square foot or less.
e. Butt all edges of insulation and seal edges with tape.
3.5 VAPOR RETARDER
Apply vapor retarder continuous across all surfaces. Overlap all joints at least 6 inches and seal with pressure sensitive tape. Seal at sills, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
3.6 ACCESS PANELS AND DOORS
Attach insulation to all access panels greater than 1 square foot and all access doors in insulated floors and ceilings. Use insulation with same R-Value as that for the floor or ceiling in which each panel occurs.
-- End of Section --
SECTION 07 21 13 Page 7
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 07 21 13 Page 8
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2017) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM D5359 (2015) Standard Specification for Glass Cullet Recovered from Waste for Use in Manufacture of Glass Fiber
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E136 (2019) Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750 Degrees C
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
SECTION 07 21 16 Page 1
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2016) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-03 Product Data
Blanket Insulation
Recycled Content for Insulation Materials; S
Vapor Retarder
Pressure Sensitive Tape
Accessories
SECTION 07 21 16 Page 2
SD-07 Certificates
Indoor Air Quality for Insulation Materials; S
Indoor Air Quality for Adhesives; S
SD-08 Manufacturer's Instructions
Insulation
1.3 CERTIFICATIONS
Submit required indoor air quality certifications and validations in one submittal package.
1.3.1 Insulation Products
Provide product certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification from certification body.
1.3.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
SECTION 07 21 16 Page 3
1.5.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings and III, blankets with reflective coverings; Class A, membrane-faced surface with a flame spread of 25 or less , except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with
ASTM E84.
2.1.1 Thermal Resistance Value (R-VALUE)
The R-Value must be as indicated on drawings.
2.1.2 Recycled Materials
Provide insulation materials containing the following minimum percentage of recycled material content by weight:
Fiberglass: 20 percent glass cullet complying with ASTM D5359
Provide data identifying percentage of recycled content for insulation materials.
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.1.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials
Provide certification of indoor air quality for insulation materials.
2.2 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials.
2.3 VAPOR RETARDER
a. 6 mil thick polyethylene sheeting conforming to ASTM D4397 and having a water vapor permeance of 1 perm or less when tested in accordance with
ASTM E96/E96M.
b. Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 1 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136 Puncture Resistance: TAPPI T803 OM: 25
2.4 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of one perm or less when tested in accordance with
SECTION 07 21 16 Page 4
ASTM D3833/D3833M.
2.5 ACCESSORIES
2.5.1 Adhesive
As recommended by the insulation manufacturer. Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168. Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives.
2.5.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.5.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is to be placed above fixture or device, 24 inches above fixture.
b. Masonry chimneys or masonry enclosing a flue: 2 inches from outside face of masonry. Masonry chimneys for medium and high heat operating appliances: Minimum clearances required by NFPA 211.
c. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211.
d. Gas Fired Appliances: Clearances as required in NFPA 54.
SECTION 07 21 16 Page 5
e. Oil Fired Appliances: Clearances as required in NFPA 31.
Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passed ASTM E136, in addition to meeting all other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Where insulation required is thicker than depth of joist, provide full width blankets to cover across top of joists. Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.3.1.4 Insulation Blanket with Affixed Vapor Retarder
Locate vapor retarder as indicated. Do not install blankets with affixed vapor retarders unless so specified. Unless the insulation manufacturer's instructions specifically recommend not to staple the flanges of the vapor retarder facing, staple flanges of vapor retarder at 6 inch intervals flush with face or set in the side of truss, joist, or stud. Avoid gaps and bulges in insulation and "fishmouth" in vapor retarders. Overlap both flanges when using face method. Seal joints and edges of vapor retarder with pressure sensitive tape. Stuff pieces of insulation into small cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.
Cover these insulated cracks with vapor retarder material and tape all joints with pressure sensitive tape to provide air and vapor tightness.
3.3.1.5 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between trusses, joists, studs and other framing, SECTION 07 21 16 Page 6 such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.
3.3.1.6 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
3.3.1.7 Special Requirements for Ceilings
Place insulation under electrical wiring occurring across joists. Pack insulation into narrowly spaced framing. Do not block flow of air through soffit vents.
3.3.1.8 Access Panels and Doors
Affix blanket insulation to access panels greater than one square foot and access doors in insulated floors and ceilings. Use insulation with same R-Value as that for floor or ceiling.
3.3.2 Installation of Separate Vapor Retarder
Apply continuous vapor retarder as indicated. Overlap joints at least 6 inches and seal with pressure sensitive tape. Seal at sill, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
-- End of Section --
SECTION 07 21 16 Page 7
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 07 21 16 Page 8
SECTION 07 22 00
ROOF AND DECK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C552 (2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation
ASTM C726 (2017) Standard Specification for Mineral Wool Roof Insulation Board
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1289 (2018a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM 4450 (1989) Approval Standard for Class 1 Insulated Steel Deck Roofs
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
UNDERWRITERS LABORATORIES (UL)
UL 1256 (2002; Reprint Jul 2013) Fire Test of Roof Deck Constructions
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
SECTION 07 22 00 Page 1
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Insulation Board Layout and Attachment; G
Verification of Existing Conditions; G
SD-03 Product Data
Insulation; G
Cover Board; G
Fasteners; G
Recycled Content For Insulation; S
SD-06 Test Reports
Flame Spread Rating; G
SD-07 Certificates
Installer Qualifications; G
Certificates Of Compliance For Felt Materials; G
Indoor Air Quality For Insulation; S
SD-08 Manufacturer's Instructions
Nails and Fasteners; G
Roof Insulation; G
1.3 SHOP DRAWINGS
Submit insulation board layout and attachment indicating methods of attachment and spacing, transitions, tapered components, thicknesses of materials, and closure and termination conditions. Show locations of ridges, valleys, crickets, interface with, and slope to, roof drains. Base shop drawings on verified field measurements and include verification of existing conditions.Show location and spacing of wood nailers required for securing of insulation .
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for cover board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
SECTION 07 22 00 Page 2
1.5 MANUFACTURER'S INSTRUCTIONS
Include field of roof and perimeter attachment requirements.
Provide a complete description of installation sequencing for each phase of the roofing system. Include weatherproofing procedures.
1.6 QUALITY CONTROL
Provide certification of installer qualifications from the insulation manufacturer confirming the specific installer has the required qualifications for installing the specific roof insulation system(s) indicated.
Provide certificates of compliance for felt materials.
1.7 FIRE PERFORMANCE REQUIREMENTS
1.7.1 Insulation in Roof Systems
Comply with the requirements of ICC IBC. Roof insulation to have a flame spread rating of 75 or less when tested in accordance with ASTM E84.
Additional documentation of compliance with flame spread rating is not required when insulation of the type used for this project as part of the specific roof assembly is listed and labeled as FM Class 1 approved.
1.7.2 Thermal Barrier Requirements
Separate polyurethane or polystyrene insulation from a steel deck with a thermal barrier of glass mat gypsum roof board or other approved barrier material in accordance with the requirements of the ICC IBC or UL 1256.
1.7.3 Fire Resistance Ratings for Roofs
Provide in accordance with ICC IBC Chapter 7 and Table 721.1(3) Min Protection For Floor and Roof Systems.
1.8 CERTIFICATIONS
Provide products certified to meet indoor air quality requirements by UL 2818(Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.9 DELIVERY, STORAGE, AND HANDLING
1.9.1 Delivery
Deliver materials to the project site in manufacturer's unopened and undamaged standard commercial containers bearing the following legible information:
a. Name of manufacturer
b. Brand designation
c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification
SECTION 07 22 00 Page 3
Deliver materials in sufficient quantity to allow continuity of the work.
1.9.2 Storage and Handling
Store and handle materials in accordance with manufacturer's printed instructions. Protect from damage, exposure to open flame or other ignition sources, wetting, condensation, and moisture absorption. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.
1.10 ENVIRONMENTAL CONDITIONS
Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.
1.11 PROTECTION
1.11.1 Completed Work
Cover completed work with cover board for the duration of construction.
Avoid traffic on completed work particularly when ambient temperature is above 80 degrees F. Replace crushed or damaged insulation prior to roof surface installation.
PART 2 PRODUCTS
2.1 INSULATION
2.1.1 Insulation Types
Provide one, or an assembly of a maximum of three, of the following roof insulation materials.