This document provides details for a federal contract solicitation to renovate an aircraft maintenance hangar and construct an addition at Homestead Air Reserve Base in Florida. The project has an estimated cost between $10-25 million and requires compliance with HUBZone price evaluation requirements. The solicitation was issued by the Department of the Army Corps of Engineers Louisville District for NAICS code 236220. Offerors must register with the System for Award Management and submit any questions via the listed portal. The full-and-open procurement has no identified incumbent and will not be awarded until appropriated funds are available for the construction work required.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Add/Repair Unscheduled Maintenance Hangar 200, Homestead ARB, FL
P2: 478240
Design-Bid-Build
Specifications Volume 1 of 3
Certified Final Design
04 August 2020
W912QR20R0078
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0078-0000
Renovation of an aircraft maintenance hangar and the construction of an addition to the hangar located at Homestead ARB, FL. The estimated cost of this construction project is between $10,000,000.00 and $25,000,000.00, in accordance with DFARS 236.204.
This a project is a Full-and-Open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.
NAICS code 236220. Size determination: $39.5 Million.
Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available
Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at w w w .sam.gov
Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.
PLEASE NOTE: SAM is completely free of charge for both registrants and users
Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:
http://projnet.org/projnet. Please see Section 00 21 00, Bidder Inquiry for further instructions.
GLENN W MOON 502.315.6177
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
04-Aug-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________590 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________04 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR
PAGE OF PAGES
1 OF
CODE 964860
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: GLENN W MOON
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: 502.315.6177 FAX:
W912QR20R0078 70
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912QR20R0078
Section 00 00 00 - Procurement and Contracting Requirements
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR20R0078
The Bidder Inquiry Key is: RCVY2R-GSQYQQ
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) days prior to the closing date stated in the solicitation.
SPECIAL INSTRUCTIONS
- Unless otherwise stated, all references to days are calendar days in accordance with FAR 52.202-1.
‐ Bid and Proposals are used interchangeably throughout this solicitation and means a response to a solicitation that, if accepted, would bind the offeror to perform the resultant contract.
‐ Page numbers throughout this solicitation may not be accurate.
Electronic Submital Instructions Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.
Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed two (2) business days prior to proposal due date.
a. Glenn Moon, Contract Specialist at Glenn.w.moon@usace.army.mil
b. Emily Moore, Contracting Officer at Emily.A.Moore@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912QR20R0078-FIRMNAME.
4. Click Upload button to send documents.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912QR20R0078-FIRMNAME-VOLUME I
W912QR20R0078-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
Section 00 10 00 - Solicitation
Homestead Air Reserve Base, FL, P2# 478240
PRICE BREAKOUT SCHEDULE
PROJECT: Add/Repair Unscheduled Maintenance Hangar 200
LOCATION: Homestead Air Reserve Base, FL
PROPOSER’S NAME:
BASE PROPOSAL
Item No. Description Unit Amount
0001 Repair and Alter Hangar 200 (EEIC 52295) JOB $ 0002 Construction Addition (Tool Room) (EEIC 52995)
JOB $
(See item description for statutory cost limit) 0003 Demolition and Sitework (EEIC 52995) JOB $
(See item description for statutory cost limit) 0004 Relocated Electrical Distribution (EEIC 52995) JOB $ 45,000.00
(See item description for statutory cost limit)
Subtotal $
OPTION ITEMS
Item No. Description Unit Amount
0005 Option 1 – Flooring Upgrade: Hangar Bay (EEIC 52295) JOB $
0006 Option 2 – First Floor Air Barrier Check (EEIC 52295) JOB $
0007 Option 3 – Second Floor Air Barrier Check (EEIC 52295) JOB $
0008 Option 4 – Second Floor Air Barrier. Check (EEIC 52295) JOB $
0009 Option 5 – Second Floor Air Barrier Check (EEIC 52295) JOB $
0010 Option 6 – Furniture Package (EEIC 6390B) JOB $
0011 Option 7 – Railing Types 3, 4 & 5 as Stainless (EEIC 52295) JOB $
Subtotal $
TOTAL BASE PROPOSAL + OPTION ITEMS $
Homestead Air Reserve Base, FL, P2# 478240
Description of Base Proposal Items
(a) Item No. 0001 “Repair and Alter Hangar 200” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No.
0002.
(b) Item No. 0002 “Construction Addition (Tool Room)” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0001. Due to statutory limitations, the cumulative total of line items 0002, 0003, and 0004 cannot exceed $1.8M. The government may not award a contract to a proposal exceeding this amount for these line items.
(c) Item No. 0003 “Demolition and Sitework” Exterior Demolition, Site Work and Site Utilities of work performed outside of a 5’-0” line outside of the building. Except that work covered in Item No. 0004 Due to statutory limitations, the cumulative total of line items 0002, 0003, and 0004 cannot exceed $1.8M. The government may not award a contract to a proposal exceeding this amount for these line items.
(d) Item No. 0004 “Relocated Electrical Distribution” includes work to be performed by Florida Power and Light. Due to statutory limitations, the cumulative total of line items 0002, 0003, and 0004 cannot exceed $1.8M. The government may not award a contract to a proposal exceeding this amount for these line items.
Description of Option Items
(a) Item No. 0005 “Option 1 – Flooring Upgrade: Hangar Bay” includes credit for base floor finish and the cost of the upgrade floor finish. This option may be exercised by written notice to the contractor within 90 calendar days of Notice to Proceed.
(b) Item No. 0006 “Option 2 – First Floor Air Barrier Check” includes the installation of batt insulation and air barrier the full height and length of wall. This option may be exercised by written notice to the contractor within 210 calendar days of Notice to Proceed.
(c) Item No. 0007 “Option 3 – Second Floor Air Barrier Check” includes the installation of batt insulation and air barrier the full height and length of wall. This option may be exercised by written notice to the contractor within 210 calendar days of Notice to Proceed.
(d) Item No. 0008 “Option 4 – Second Floor Air Barrier Check” includes the installation of batt insulation and air barrier the full height and length of wall. This option may be exercised by written notice to the contractor within 210 calendar days of Notice to Proceed.
(e) Item No. 0009 “Option 5 – Second Floor Air Barrier Check” includes the installation of batt insulation and air barrier the full height and length of wall. This option may be exercised by written notice to the contractor within 210 calendar days of Notice to Proceed.
(f) Item No. 0010 “Option 6 – Furniture Package” includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the procurement and installation of items shown on the approved design drawings and specifications. Contractor shall reference provided FF&E package and specification 12 50 00 13 10 for items to be purchased and installed as part of this line item. These items will be shown as labeled on drawings by option number.
This option may be exercised by written notice to the contractor within 470 calendar days of Notice to Proceed.
(g) Item No. 0011 “Option 7 – Railing Types 3, 4 & 5 as Stainless” includes a credit for the hollow metal railing and the added cost of stainless railing. This option may be exercised by written notice to the contractor within 90 calendar days of Notice to Proceed.
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.236-7006 Cost Limitation JAN 1997
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
22.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Homestead Air Reserve Base located in Homestead, Florida – Dade County.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers – LRL ATTN: Emily Moore, Rm. 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Ileana Burns (USACE-Homestead) at (786) 415-7863 or by email at Ileana.Burns@usace.army.mil. Site visits will be allowed only between 4 August 2020 and 19 August 2020 (weekdays). Each site visit will be limited to 45 minutes. Contractors shall limit the number of attendees per visit to no more than 5 persons. On the day of the scheduled site visit the Contractor shall arrive at the new Visitor Center parking lot 15 minutes prior to the site visit start time where they wil meet with a USACE representative to be escorted on Base. All visitors must possess a valid US issued identification card/driver's license and shall be US citizens. Multiple site visits by the same persons is not prohibited, but it is strongly discouraged.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions can be found at:
https://www.acquisition.gov/
The full text of DFARS clauses and provisions can be found at:
https://www.acq.osd.mil/dpap/
Section 00 22 00 - Supplementary Instructions
SECTION 00 22 12
PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA
1. Overview
1.1 The intent of this solicitation is to select one contractor for the renovation of an aircraft maintenance hangar and the construction of an addition to the hangar located at Homestead ARB, FL. The basis of award is the Best Value Trade-Off Process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms with all the terms and conditions of the solicitation, is fair and reasonable in price, and offers the overall best value to the Government, all factors considered. The Government reserves the right to award to other than the lowest priced offeror or to other than the highest technically rated offeror, or to reject all offers.
1.2 The purpose of the project is for the comprehensive renovation of an approximately 32,000 Square Foot
(SF) aircraft maintenance hangar. Work includes installation of a fully automatic fire suppression system;
replacement of a High Expansion Foam fire suppression systems; replacement of HVAC and mechanical systems; demolition and reconfiguration of interior spaces; replacement of electrical and communications systems; replacement of interior/exterior lighting;; replacement of flooring finishes and ceiling tiles; repair of existing concrete flooring; installation of an elevator; roof; and construction of an approximate 2,000 sf addition.
1.3 Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the
Price Breakout Schedule. See paragraph 8.1 in this section and clause 252.236-7006, Cost Limitation in section 00 21 00 for further information.
2. Submittal of offers
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. The proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP.
Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals Electronically via DoD SAFE utilizing the Electronic Submittal
Instructions no later than the time and date specified in Block 13 of Standard Form 1442. Mark your proposal submission to the attention of Glenn Moon. NOTE: The Louisville District is in the Eastern Time Zone.
2.3 Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted with a table of contents and section dividers. The sections should parallel the submission requirements identified herein.
2.4 Volume I shall be submitted electronically and include the following information:
Volume I – Factor I: Past Performance Volume I – Factor II: Management Plan Volume I – Factor III: Small Business Participation Plan (All Offerors need to complete)
*NOTE: The complete Volume I shall be submitted electronically via DoD Safe utilizing the Electronic Submittal Instructions. Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit will not be evaluated.
2.5 Volume II shall be submitted electronically and shall include the following information:
Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan (Large Businesses only need to complete)
NOTE: Volume II shall be submitted electronically via DoD Safe. Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process
3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.
3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.
3.2.1 Proposal Compliance/Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical (Volume I) and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Management Plan will be rated using Table 3 below. Factor III – Small Business Participation Plan will be rated using Table 4 below.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The SSA will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors
4.1 Proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in Federal Acquisition Regulation (FAR) 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
4.2 Volume I – Factor I – Past Performance 1st
4.3 Volume I – Factor II – Management Plan 2nd
4.4 Volume I – Factor III – Small Business Participation Plan 3rd
4.5 Volume II - Price and Pro Forma Information (Separate File)
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Pre-Award Information Not Rated
Tab E Subcontracting Plan Not Rated
4.6 Ratings:
Evaluators will apply the rating for the definition that most closely matches the evaluation.
Table 1
Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Table 2
Performance Confidence Assessments Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Table 3
Management Plan Ratings Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
TABLE 4
Small Business Participation Plan Ratings Rating Description
Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Unacceptable Proposal does not meet small business objectives.
4.7 Definitions:
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
5. Volume I – Factor I: Past Performance
5.1 Submission Requirements:
5.1.1 Provide descriptions of up to three (3) projects completed by the Prime Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be submitted by offerors and considered by the SSEB for evaluation purposes but the overall relevancy rating for such projects may be reduced depending on how much older the project is beyond the five (5) year timeframe. Projects are considered substantially complete if all commissioning activities for the project have been completed.
NOTE: An IDIQ contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
5.1.2 Projects considered similar in size will be a minimum of 20,000 square feet of comprehensive renovation or new construction inclusive of hangar bay and administrative areas combined.
5.1.3 Projects considered similar in scope to this project will be comprehensive renovation or new construction of aircraft hangars with administrative spaces. To be considered similar, projects shall include replacement or construction and testing of a High-Expansion Foam fire suppression systems; renovation or construction of administrative spaces including function layout and architectural finishes; replacement or construction of HVAC ductwork and equipment; and replacement or construction of electrical and telecommunication systems. A projects relevancy may be affected by how many of the above features of work are included in the project scope.
5.1.4 For a past project to be considered similar, the prime contractor must have self-performed at least 15 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors.
5.1.5 Additional consideration may be given for projects that contain the following features:
a) New construction or comprehensive renovation projects completed for USACE and/or
NAVFAC.
5.1.6 The following information shall be provided for each project:
a) Project Title, Location, and Contract Number/Unique Identifier
b) Current percentage of construction complete (as of the solicitation issue date) and the date it was or will be complete
a. For projects that are not yet complete, provide description of work remaining to be completed.
c) Scope of the project, to include purpose/use of facility
d) Size of the project in square feet of vertical construction
e) Portion and percentage of work that was self-performed
f) Whether the project was completed for USACE and/or NAVFAC
g) Names and phone numbers for two references on the project (e.g., the customer, prime contractor).
5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action(s).
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture agreement must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).
5.2 Evaluation Criteria:
5.2.1 The SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.
5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.
The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
5.2.3 The SSEB will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.
6. Volume I – Factor II: Management Plan
6.1 Submission Requirements:
Provide a management plan that addresses the following requested information:
a) Describe what work will be subcontracted; your process for selecting subcontractors; who will select subcontractors; who provides oversight of subcontractors; how subcontractors are coordinated; and your process for correcting poor subcontractor performance.
b) Identify and describe your commissioning firm. Narratives shall include your commissioning firm’s certifications and qualifications; years of experience; and information demonstrating experience with two projects of complexity similar to this project. The narrative shall also include a summary of systems to be commissioned.
c) Identify and describe the single Qualified Fire Protection Engineer (QFPE) that will be in responsible for commissioning and will be in responsible charge of the design for all fire alarm, mass notification, fire sprinkler, fire pump, and foam systems per Section 21 90 00 Paragraph 1.4. Provide a list of the Qualified Fire Protection Engineer’s prior relevant experience that demonstrates capabilities necessary for this contract.
d) Identify and describe up to three (3) risks specific to this project and your plan to mitigate each risk.
NOTE: The Qualified Fire Protection Engineer (QFPE) that is submitted for evaluation under this factor shall be used on the contract. Deviations or substitutions will not be permitted after award unless approved in writing by the Contracting Officer, and shall not be approved by the Contracting Officer unless the replacement QFPE is considered equal or better in comparison to the QFPE submitted with the proposal.
NOTE: There is a page limit of eight (8) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Management Plan factor. Any information that exceeds these page limits will not be evaluated.
6.2 Evaluation Criteria:
Management Plans will be evaluated based on the contractor’s approach to coordination of subcontractors;
level of understanding of the contract commissioning requirements for HVAC; level of understanding of the contract requirements for design and commissioning of the fire protection systems; and level of understanding of risks inherit to this project. Narratives that demonstrate a clear understanding of the project requirements; provide a thorough approach for successfully managing the solicited project; and demonstrate highly qualified personnel may be rated more favorably by the SSEB.
7.0 Volume I – Factor III: Small Business Participation Plan
7.1 Submission Requirements
ALL OFFERORS (both large and small businesses) ARE…