This federal contract opportunity solicitation seeks construction services for a new aircraft maintenance hangar at Westover Air Reserve Base in Massachusetts. The proposed project includes constructing a high-bay hangar with reinforced concrete foundation and floor slab, masonry and metal exterior walls, electrically operated hangar doors, structural steel frame, fire protection and alarm systems, utilities, secure and non-secure communications, site improvements, and demolition of an existing building. The contract duration is estimated at 730 calendar days with a cost range between $25-100 million. NAICS code is 236220. This will be an unrestricted, full and open competition conducted by the Department of the Army Corps of Engineers Louisville District.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Regional ISO Maintenance Hangar Westover Air Reserve Base, MA

P2: 472183

Design Bid Build

Specifications Vol. 4 of 4 Certified Final Submittal

11 August 2020

W912QR20R0059

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR20R0059-0001

This page was intentionally left blank for duplex printing.

Westover Air Reserve Base, MA

Project Number: YTPM099001B P2#: 472183

Certified Final Submittal

Specifications

Volume IV

July 2020

BMcD PN 109519

Louisville District

Westover Air Reserve Base, MA

Project Number: YTPM099001B

P2#: 472183

July 2020 Burns & McDonnell 9400 Ward Parkway

Kansas City, MO 64114

CERTIFICATION PAGE

CIVIL STRUCTURAL ARCHITECTURAL

FIRE PROTECTION MECHANICAL ELECTRICAL

07/31/2020

07/31/2020 07/31/2020

07/31/2020

C5: 109519; ISO HANGAR

Westover AFRB, MA

109519

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

VOLUME I of IV

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 13.00 06 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

PROJECT TABLE OF CONTENTS Page 2

06 61 16 SOLID SURFACING FABRICATIONS

VOLUME II of IV

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13 METAL WALL PANELS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 72 13 PREFABRICATED ROOF CURBS

07 84 00 FIRESTOPPING

07 92 00.00 06 JOINT SEALANTS

07 95 00 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 13 COILING COUNTER DOORS

08 34 16.10 STEEL SLIDING HANGAR DOORS

08 34 19.10 20 ROLLING SERVICE AND FIRE DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 51 13 METAL LOCKERS

PROJECT TABLE OF CONTENTS Page 3

DIVISION 11 - EQUIPMENT

11 01 50 RIGID RAIL FALL PROTECTION SYSTEMS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 36 00 COUNTERTOPS

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 59 00 SYSTEMS FURNITURE

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 20 PRE-ENGINEERED METAL FUELING CANOPIES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 13 18.00 10 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION

21 13 25.00 10 HIGH EXPANSION FOAM (HI EX. HEF) FIRE PROTECTION SYSTEM

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 52 00 HEATING BOILERS

23 64 26 HEATING WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 TERMINAL HEATING UNITS

VOLUME III of IV

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

PROJECT TABLE OF CONTENTS Page 4

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 16.71 COLD MILLING ASPHALT PAVING

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS PAVEMENTS

32 11 23 GRADED CRUSHED AGGREGATE AND AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 ASPHALT PAVING FOR AIRFIELDS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION

33 52 10 FUEL SYSTEMS PIPING (SERVICE STATION)

33 52 23.15 POL SERVICE PIPING WELDING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

46 25 14 COALESCING OIL-WATER SEPARATORS

PROJECT TABLE OF CONTENTS Page 5

VOLUME IV of IV

APPENDIX A DRAFT SWPPP

APPENDIX B ENVIRONMENTAL REPORTS

APPENDIX C BUILDING 2426 PROJECT REFERENCE DOCUMENTS

APPENDIX D OWNER'S PROJECT REQUIREMENTS DOCUMENT

APPENDIX E BASIS OF DESIGN Cx

-- End of Project Table of Contents --

APPENDIX A

Draft SWPPP

Stormwater Pollution Prevention Plan

Louisville District U.S. Army Corps of Engineers

Project No. 109519

May 2019

Stormwater Pollution Prevention Plan prepared for

Louisville District U.S. Army Corps of Engineers

Chicopee, Massachusetts

Project No. 109519

May 2019 prepared by

Burns & McDonnell Engineering Company, Inc.

Kansas City, Missouri

COPYRIGHT © 2019 BURNS & McDONNELL ENGINEERING COMPANY, INC.

Stormwater Pollution Prevention Plan Operator Certification

Regional ISO Maintenance Hangar Project

“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”

Authorized Official Title

Signature Date

CONTRACTOR NOTIFICATION

“I understand the terms and conditions of this Stormwater Pollution Prevention Plan and the associated regulations that authorize the discharge of stormwater from construction activities associated with the Project.”

Signature For Responsible for

(Name)

(Position)

(Signature)

(Date)

(Company)

(Street / P.O. Box)

(City, State, Zip)

(Phone)

(Activity)

Stormwater Pollution Prevention Plan Table of Contents

USACOE TOC-1 Burns & McDonnell

TABLE OF CONTENTS

Page No.

1.0 INTRODUCTION ............................................................................................... 1-1

1.1 Project Description and Location ......................................................................... 1-2

1.2 Project Owner and Operator ................................................................................ 1-2

1.3 Stormwater Team ................................................................................................. 1-2

1.4 SWPPP Certification ............................................................................................ 1-3

1.5 Standard Permit Conditions ................................................................................. 1-3

1.5.1 Duty to Comply with Permit Conditions .............................................. 1-3

1.5.2 Notice of Permit Coverage Posting Requirements ............................... 1-4

1.5.3 Modification of NOI ............................................................................. 1-4

1.5.4 SWPPP Modifications .......................................................................... 1-4

1.5.5 Final Stabilization and Termination of Coverage ................................. 1-4

1.5.6 Retention of Records............................................................................. 1-5

2.0 CONSTRUCTION ACTIVITIES AND SITE DESCRIPTION .............................. 2-1

2.1 Nature of Construction Activity........................................................................... 2-1

2.2 Planned Sequence of Major Construction Activities ........................................... 2-1

2.3 Site Maps ............................................................................................................. 2-1

2.4 Soils...................................................................................................................... 2-1

2.5 Potential Pollutants .............................................................................................. 2-2

2.6 Receiving Waters ................................................................................................. 2-2

2.7 Threatened and Endangered Species ................................................................... 2-3

2.8 Cultural Resources ............................................................................................... 2-3

3.0 CONTROLS - STRUCTURAL PRACTICES ..................................................... 3-1

3.1 Temporary Erosion and Sediment Control Practices ........................................... 3-1

3.1.1 Construction Entrance ........................................................................... 3-1

3.1.2 Silt Fence .............................................................................................. 3-1

3.1.3 Inlet Protection ...................................................................................... 3-2

3.1.4 Concrete Washout ................................................................................. 3-2

3.2 Permanent Stormwater Management Practices ................................................... 3-2

3.2.1 Check Dams .......................................................................................... 3-2

3.2.2 Infiltration Basin ................................................................................... 3-3

4.0 CONTROLS - STABILIZATION PRACTICES .................................................. 4-1

4.1 Stabilization Practices .......................................................................................... 4-1

4.1.1 Seeding .................................................................................................. 4-1

4.1.2 Mulching ............................................................................................... 4-1

4.1.3 Fertilizer ................................................................................................ 4-2

4.2 Final Stabilization ................................................................................................ 4-2

5.0 OTHER CONTROLS ......................................................................................... 5-1

USACOE TOC-2 Burns & McDonnell

5.1 Dust Control ......................................................................................................... 5-1

5.2 Street Sweeping ................................................................................................... 5-1

5.3 Waste Materials ................................................................................................... 5-1

5.4 Sanitary Waste ..................................................................................................... 5-1

5.5 Hazardous Waste ................................................................................................. 5-2

6.0 MAINTENANCE AND INSPECTION ................................................................ 6-1

6.1 Inspection Procedures .......................................................................................... 6-1

6.1.1 Areas Requiring Inspection................................................................... 6-1

6.1.2 Inspection Requirements ....................................................................... 6-1

6.1.3 Inspection Report .................................................................................. 6-2

6.2 SWPPP Staff Training ......................................................................................... 6-3

6.3 Corrective Action ................................................................................................. 6-3

6.4 Distribution List ................................................................................................... 6-4

7.0 SPILL PREVENTION AND CONTROL ............................................................. 7-1

7.1 Materials Management Practices ......................................................................... 7-1

7.1.1 Non-Petroleum Products ....................................................................... 7-2

7.1.2 Petroleum Products ............................................................................... 7-2

7.2 Spill Response ...................................................................................................... 7-2

APPENDIX A – GENERAL PERMIT

APPENDIX B – PERMIT AUTHORIZATION

APPENDIX C – FIGURES

APPENDIX D – NOTICE OF PERMIT COVERAGE

APPENDIX E – EROSION AND SEDIMENT CONTROL PLAN

APPENDIX F – BMP SPECIFICATIONS

APPENDIX G – FORMS

APPENDIX H – SPILL REPORT FORM

APPENDIX I – TRAINING RECORDS

USACOE TOC-3 Burns & McDonnell

LIST OF TABLES

Page No.

Table 1-1: Stormwater Team ................................................................................................... 1-3 Table 6-1: Stormwater Inspector Identification List ................................................................ 6-1 Table 6-2: Distribution List ..................................................................................................... 6-4

Stormwater Pollution Prevention Plan List of Abbreviations

USACOE i Burns & McDonnell

LIST OF ABBREVIATIONS

Abbreviation Term/Phrase/Name

ARB Air Reserve Base

BMPs best management practices

Burns & McDonnell Burns & McDonnell Engineering Company, Inc.

CFR Code of Federal Regulations

EPA U.S. Environmental Protection Agency

ESC Plan Erosion and Sediment Control Plan

ISO Isochronal inspection

MS4 Municipal Separate Storm Sewer System

NeT NPDES eReporting Tool

NOI Notice of Intent

NOT Notice of Termination

NPDES National Pollutant Discharge Elimination System

Permit EPA General Permit MAR100000

Project Regional ISO Maintenance Hangar Project

SDS Safety Data Sheet

SPCC Plan Spill Prevention, Control, and Countermeasure Plan

SWPPP Stormwater Pollution Prevention Plan

USACE Louisville District U.S. Army Corps of Engineers

USFWS U.S. Fish and Wildlife Service

Stormwater Pollution Prevention Plan Introduction

USACOE 1-1 Burns & McDonnell

1.0 INTRODUCTION

The U.S. Environmental Protection Agency (EPA) requires a National Pollutant Discharge Elimination

System (NPDES) Permit for stormwater discharges from construction activities that disturb 1 or more acres of land or from smaller sites that are part of a larger, common plan of development or sale which will disturb a cumulative total of 1 or more acres. For the purpose of the NPDES program, construction activities are defined as clearing, grading, excavation, and other construction-related activities that could lead to the generation of pollutants.

In the State of Massachusetts, Region 1 of the EPA is the permitting authority for the NPDES program.

Construction projects that will disturb 1 or more acres of land are issued a certificate of permit coverage under EPA General Permit MAR100000 (Permit), which authorizes the discharge of stormwater associated with construction activities into State waters. Stormwater discharges from construction activities associated with the Regional Isochronal Inspection (ISO) Maintenance Hangar Project (Project) for the Louisville District U.S. Army Corps of Engineers (USACE) are authorized under the Permit. The

Permit is issued pursuant to the Clean Water Act as amended (33 U.S.C. 1251 et. seq.). A copy of the

Permit is provided in Appendix A.

Coverage under the Permit is obtained by developing a Stormwater Pollution Prevention Plan (SWPPP) and then submitting a Notice of Intent (NOI) through the EPA’s NPDES eReporting Tool (NeT) at http://www.epa.gov/npdes/stormwater-discharges-construction-activities#ereporting. The NOI authorization will be included in Appendix B once received. The SWPPP described herein establishes a plan to manage the quality of stormwater runoff from construction activities associated with the Project.

This SWPPP has been developed in accordance with requirements and guidelines specified in Part 7 of the Permit. The SWPPP was also written with the assistance of and information from the EPA’s 2007

Developing Your Stormwater Pollution Prevention Plan: A Guide for Construction Sites.

This SWPPP must be used by onsite construction personnel to reduce soil erosion and to minimize the potential for sediment and other onsite pollutants to leave the Project site and enter waters of the State of

Massachusetts. The SWPPP identifies a set of best management practices (BMPs) to be implemented on the Project site; however, BMPs may need to be moved, added, or redesigned to control erosion and sedimentation to the extent practicable. The SWPPP must be updated and revised when stormwater control measures are modified due to a change in design, construction method, operation, maintenance procedure, etc.

USACOE 1-2 Burns & McDonnell

1.1 Project Description and Location

The Project will consist of the construction of a new C-5 ISO Maintenance Hangar facility at the

Westover Air Reserve Base. This project is located to along the eastern aircraft apron and will require some repaving of the existing apron. The site work includes new access drives, a parking lot, sidewalks, new security fencing, and all utilities to support the new hangar. A new fuel station will be constructed in a new location to replace the existing airside fuel station. The project also includes work to demolish an existing facility on-site, Building 2426. A General Vicinity Map showing the location of the Project can be found in Appendix C. The Project is located in Chicopee, Hampden County, Massachusetts

(42.193313, -72.545387). Construction is scheduled to begin in January 2020 and be completed by

January 2022.

Approximately 6.5 acres of the 8.2-acre site will be disturbed. Based on an evaluation of the Project site, the pre-development percent imperviousness for the Project is 64 percent, and the post-development percent imperviousness is expected to increase to 74 percent. This SWP3 has been developed to address all construction activities associated with the Project.

1.2 Project Owner and Operator

Contact information for the Project owner, USAF Westover Air Reserve Base, is provided below.

USAF Westover Air Reserve Base Rick Colburn 975 Patriot Avenue Chicopee, MA 01022 (413)-557-2433

An operator is any person associated with the Project that has operational control over the construction plans and specifications, including the ability to make modifications to the plans and specifications, and any person who has day-to-day operational control over the construction activities and can make necessary decisions to maintain compliance with Permit conditions. Where there are multiple operators associated with the same project, all operators are required to obtain Permit coverage. All operators must submit an NOI and sign the Operators Certification form, provided at the front of this SWPPP, in accordance with Appendix J of the Permit. Contact information for the Project operator(s) will be added to this SWPPP when available.

USACOE 1-3 Burns & McDonnell

Table 1-1: Stormwater Team

Name/Title Company/Address Phone/Email Role (Area of Control)

USAF Westover Air

Reserve Base

57 Patriot Avenue

Chicopee, MA 01022

(413)-557-2433

Owner’s

Representative

Onsite SWPPP implementation

SWPPP maintenance and modification

Installation and maintenance of

BMPs

Employee training

Corrective action oversight

1.4 SWPPP Certification

By signing the Contractor Notification form (located near the front of this document, copy as needed), the contractor and subcontractors signify they have read, understand, and will adhere to the SWPPP before conducting any construction work that will result in land disturbance. The signed certification confirms that USACE has notified the contractor or subcontractors that a SWPPP has been prepared for the Project, and the contractor and subcontractors must perform the necessary actions identified to comply with the

SWPPP and the Permit. To maintain compliance with the Permit, it may be necessary for the contractor or subcontractor responsible for erosion and sediment control to implement additional stormwater BMPs and pollution prevention measures that may not be indicated in this SWPPP.

1.5 Standard Permit Conditions

This section discusses Federal penalties for noncompliance with the Permit, as well as standard Permit conditions. The staff responsible for implementation of the SWPPP must be familiar with the requirements of the SWPPP and the Permit.

1.5.1 Duty to Comply with Permit Conditions

The EPA has substantial penalties for noncompliance with the Permit. USACE has a duty to comply with

Permit conditions. Failure to comply with Permit conditions is a violation of the Permit and statutes under which it was issued and is grounds for enforcement action including terminating Permit coverage, modification of Permit coverage, or denial of the Permit renewal application, as well as potential criminal, USACOE 1-4 Burns & McDonnell civil, and administrative penalties. Those responsible for SWPPP implementation must be familiar with the SWPPP and Permit requirements.

The EPA, or an authorized representative of the EPA, must be allowed onto the Project site and any location where records are kept under the conditions of the Permit. The EPA must also be allowed to inspect the Project site, sample or monitor stormwater discharges, and access and copy any required records. USACE must comply with any corrective actions required by the EPA as a result of Permit violations discovered during an inspection.

1.5.2 Notice of Permit Coverage Posting Requirements

A Notice of Permit Coverage (Appendix D) must be posted at the entrance to the Project site. It must be visible from a public road, and the font must be large enough to be readily viewed from the public right-of-way.

1.5.3 Modification of NOI

If a modification to the NOI is necessary, due to changes to the Project (e.g., the extent of disturbance has increased), a Change NOI must be submitted using EPA’s NeT. The amendment must include the

Project’s assigned permit number and the requested change. The SWPPP must be updated to reflect the modification(s).

1.5.4 SWPPP Modifications

This SWPPP must be modified, including site maps, within 7 days of any of the following conditions:

• A new operator becomes active onsite; changes are made to construction plans and erosion and sediment control BMPS; or other activities onsite are no longer accurately reflected in this

SWPPP.

• Operational control over areas of the Project site have transferred to another operator.

• State or Federal officials determine SWPPP modifications are necessary for Permit compliance, following onsite inspections.

• The EPA decides to impose additional requirements on the stormwater discharge.

• Revisions to applicable Federal, State, or local requirements affect the stormwater control measures implemented at the Project site.

1.5.5 Final Stabilization and Termination of Coverage

For any areas not covered by permanent structures, final stabilization is met when the Project has been seeded or planted to establish a uniform perennial vegetative cover that will provide a density of 70

USACOE 1-5 Burns & McDonnell percent of the native background vegetative cover for the area. In addition, construction materials, equipment, and waste have been removed from the Project site, and pollutant generating activities associated with construction activities have ceased.

Permit coverage is terminated by submitting a Notice of Termination (NOT) via the EPA’s NeT within 30 calendar days of final stabilization and completeness of the Project.

1.5.6 Retention of Records

The SWPPP and a copy of the authorized NOI must be maintained at the appropriate Project construction office from the date of Project initiation to the date of Project completion. Records must be maintained for dates when major grading occurs, construction activities temporarily or permanently cease, stabilization measures are initiated, and final stabilization is achieved. The following records must be retained for a minimum period of 3 years from the date that Permit coverage expires or is terminated:

• The SWPPP and any amendments to the SWPPP

• A copy of the Permit, the signed and certified NOI submitted to the EPA, and the acknowledgement letter from the EPA’s NeT assigning the NPDES identification number

• Data used to complete the NOI

• Reports and actions required by the Permit

• Site inspection records

• Corrective action reports

• Contractor certifications

• Clearance letters from the U.S. Fish and Wildlife Service (USFWS), Massachusetts Department of Fish and Game, Massachusetts State Historic Preservation Office, the U.S. Army Corps of

Engineers, and any other agency providing clearance

• A copy of the NOT submitted to the EPA

Stormwater Pollution Prevention Plan Construction Activities and Site Description

USACOE 2-1 Burns & McDonnell

2.0 CONSTRUCTION ACTIVITIES AND SITE DESCRIPTION

The following sections include a description of the construction activities that will take place for the

Project as well as information regarding the natural resources in and adjacent to the Project site.

2.1 Nature of Construction Activity

The Project will construct a new C-5 ISO Maintenance Hangar as well as new associated access drives, parking lot, sidewalk, fencing, fuel station, and utilities. This work will also include repaving of a portion of the existing aircraft apron. In addition to the new construction, the demolition of Building 2426, an existing facility onsite, is included in this Project. Construction activities are scheduled to begin January

2020 and end in January 2022. Major ground-disturbing activities associated with the Project include demolition/removal of nearby building and grading for the new hangar and associated facilities.

2.2 Planned Sequence of Major Construction Activities

The following is a chronological list of the planned sequence of activities and implementation of temporary BMPs for Project construction:

1. Install erosion and sediment control measures and temporary construction fence.

2. Demolish Building 2426 and existing airside fuel station.

3. Install additional inlet protection and silt fencing.

4. Construct new C-5 ISO Hangar facility and airside fueling station, including all site work (access drives, parking lot, access apron, fencing, associated utilities, and revised grading).

5. Convert sediment basin to infiltration basin.

6. Seed and/or sod the Project site.

7. Upon achievement of final stabilization, return staging area to existing conditions and submit the

NOT via EPA’s NeT.

2.3 Site Maps

The Vicinity Map, Soils Map, and Topographic Map are provided in Appendix C. The Erosion and

Sediment Control Plan (ESC Plan) is provided in Appendix E.

2.4 Soils

According to the U.S. Department of Agriculture, Natural Resources Conservation Service, Soil Survey of Hampden County, Massachusetts (http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx., accessed April 23, 2019) one soil type, Urban land is located within the Project area. The Urban land soil

USACOE 2-2 Burns & McDonnell type is commonly associated with areas of previous development. A Soils Map is provided in Appendix

C.

2.5 Potential Pollutants

The primary pollutant sources on the Project site will be disturbed soils and subsequent stormwater runoff caused by grading and site excavation operations, vehicle tracking, soil stockpiling, and debris from demolition work. BMPs must be used on the Project site to control erosion and minimize offsite sedimentation. Erosion and sediment control BMPs are discussed in further detail in Chapter 3.0 of this

SWPPP. BMPs for product specific practices are discussed in Chapters 5.0 and 7.0.

Non-stormwater discharges from active construction sites are authorized if the discharge complies with

Part 1.2.2 of the Permit. During Project construction, the following discharges may occur:

• Fire hydrant flushings

• Discharges from emergency fire-fighting activities

• Water used to wash vehicles and equipment, provided there is no discharge of soaps, solvents, or detergents

• Landscape irrigation

• Water used to control dust

• Uncontaminated and non-turbid discharges of groundwater or spring water

• Potable water, including uncontaminated waterline flushing

• Routine external building washdown, provided there is no discharge of soaps, solvents, or detergents and the external surfaces do not contain hazardous substances

• Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred

(unless all spilled material has been removed) and where soaps, solvents, or detergents have not been used

• Foundation or footing drains where flows are not contaminated with process materials such as solvents

• Construction dewatering water discharges in accordance with Part 2.4 of the Permit

• Uncontaminated air conditioning or compressor condensate

2.6 Receiving Waters

Stormwater runoff will drain to the Westover ARB Municipal Separate Storm Sewer System (MS4). Inlet protection and other BMPS will be installed during construction to collect sediment and other construction-related pollutants before they enter the storm sewer system.

USACOE 2-3 Burns & McDonnell

2.7 Threatened and Endangered Species

According to the USFWS Information for Planning and Consultation (https://ecos.fws.gov/ipac/ accessed on April 25, 2019), two federally listed threatened species, the northern long-eared bat (Myotis septentrionalis) and the small whorled pogonia (Isotria medeoloides), are listed as potentially occurring near the Project site. As per coordination with base environmental personnel, no impacts to threatened and endangered species are expected.

2.8 Cultural Resources

According to the National Register of Historic Places

(https://www.nps.gov/maps/full.html?mapId=7ad17cc9-b808-4ff8-a2f9-a99909164466, accessed on April

25, 2019), no historic properties are located on or within 1,000 feet the of Project site. Additionally, no architectural properties are listed on or nominated for inclusion in the National Register of Historic

Places. While cultural resources are not anticipated in the area of disturbance, workers must stop work immediately and notify USACE and the construction office upon discovery of items with potential historical significance, including but not limited to arrowheads, bones, old bottles or building materials, building foundations, and suspected gravesites. If human remains are unearthed during excavation work, then the area must be secured, and the local law enforcement agency must be contacted immediately.

Stormwater Pollution Prevention Plan Controls - Structural Practices

USACOE 3-1 Burns & McDonnell

3.0 CONTROLS - STRUCTURAL PRACTICES

The following sections detail the structural erosion and sediment control BMPs that must be implemented prior to the start of major earth-disturbing activities on the Project site.

3.1 Temporary Erosion and Sediment Control Practices

Erosion and sediment control BMPs must be in place prior to soil-disturbing activities and must be maintained throughout construction. To limit the potential for sediment leaving the Project site, erosion and sediment control BMPs may be required in other locations of the Project site as work progresses.

These BMPs must be evaluated by the contractor/owner’s representative in the field; if measures are changed, then the SWPPP must be modified in accordance with Chapter 6.0 of this document. The minimum temporary erosion and sediment control BMPs that will be used for the Project are discussed in the following subsections.

3.1.1 Construction Entrance

Offsite tracking of soils must be limited by utilizing an appropriately designed construction entrance. The construction entrance installed on the Project site must be maintained throughout the duration of construction. If necessary, a culvert will be installed to allow stormwater to pass under the construction entrance. The amount of sediment that is transported onto a public road surface or other paved areas by construction equipment or vehicles must be limited and cleaned up at the end of each work day. The location and installation details for the construction entrance are provided in Appendix E and F, respectively.

3.1.2 Silt Fence

Silt fence will be used to intercept and retain sediment carried by sheet flow from disturbed areas and to limit sediment-laden runoff from leaving the Project site during construction. Silt fence should be placed perpendicular to the direction of water flow and as close to topographic contours as possible, with the ends extending upslope. Silt fence should also be placed downslope of disturbed areas where sheet or rill erosion would occur and around soil stockpiles. Silt fence must be inspected and maintained on a regular basis, and sediment buildup must be removed when sediment reaches 50 percent of the height of the barrier. Silt fence may be installed with an additional wire backing to provide extra strength in locations that may receive higher stormwater runoff volumes. Location and installation details are provided in

Appendix E and F, respectively.

USACOE 3-2 Burns & McDonnell

3.1.3 Inlet Protection

Inlet protection is used to remove sediment from stormwater before it enters storm sewers. Inlet protection is typically constructed of washed gravel, crushed stone, geotextile fabrics, or other materials.

Storm drain inlet protection consists of several different types of inlet filters and traps, depending on the type of inlet. It will be up to the contractor to determine which types of inlet protection are most suitable for the specific type of storm drain inlet. Common types of inlet protection include Gutterbuddies®, Sediment Fence, Block & Gravel, Gravel & Wire Mesh, and Silt Saver®. Other types of inlet protection include rice wattles, rock socks, and coconut logs. It may be necessary to remove inlet protection in freezing weather and/or prior to snowfall. See location and typical implementation details in Appendices

E and F, respectively.

3.1.4 Concrete Washout

A concrete washout area is either a prefabricated unit or a designed measure to contain concrete washout.

These systems are typically used to contain washout water when chutes and hoppers are rinsed following concrete delivery and are implemented to reduce the discharge of pollutants through consolidation of solids and retention of liquids. Uncured concrete and associated liquids are highly alkaline. Without containment measures, these materials could leach into the soil and contaminate groundwater or discharge to a surface waterbody or wetland. If concrete washouts will be utilized onsite, the installation locations must be shown on the ESC Plan located in Appendix E. Installation specifications for concrete washouts are provided Appendix F.

3.2 Permanent Stormwater Management Practices

Permanent stormwater management BMPs are those that are left in place after construction is finished and the site is stabilized to manage stormwater flow, volume, and/or quality. An infiltration basin for stormwater collection has been designed as a permanent stormwater management feature for the Project site.

3.2.1 Check Dams

Check dams are to be installed in existing or construction-related channels/drainages to reduce runoff velocity, filter concentrated flows, and limit the amount of sediment that travels downstream. Check dams are generally used in concentrated flow areas, such as ditches and swales. These barriers must be placed so that the elevation of the outside channel edge is higher than the top of the barrier in the middle of the channel. The proposed check dams will be composed of washed gravel and will be installed as part of the forebay berm to convey water to the infiltration basin. Check dams must be maintained to remain

USACOE 3-3 Burns & McDonnell effective, and sediment must be removed from behind the device on a regular basis. For more information, refer to the locations and design details in Appendices E and F, respectively.

3.2.2 Infiltration Basin

An infiltration basin is designed to hold stormwater runoff and infiltrate the water slowly to avoid downstream flooding and stream erosion. The practice is an extremely effective water quality and peak discharge reduction measure. The infiltration basin will initially be utilized as temporary sediment basin during construction activities. Upon completion of construction activities, the infiltration basin will be cleaned out and converted to a permanent facility. The infiltration basin is designed to treat runoff from a local 2-year, 24-hour storm. Location and installation details for the infiltration basin are provided in

Appendix E and F, respectively.

Stormwater Pollution Prevention Plan Controls - Stabilization Practices

USACOE 4-1 Burns & McDonnell

4.0 CONTROLS - STABILIZATION PRACTICES

The following sections detail the stabilization practices to be implemented during and after Project construction activities.

4.1 Stabilization Practices

Stabilization measures must be initiated immediately whenever earth-disturbing activities have permanently or temporarily ceased on any portion of the Project site and will not resume for a period exceeding 14 calendar days. Temporary and permanent stabilization activities must be completed as soon as practicable, but no later than 14 calendar days after the initiation of stabilization.

As soon as practicable, but no later than 14 calendar days after the initiation of soil stabilization measures, the contractor is required to have completed:

1. For vegetative stabilization, all activities necessary to initially seed or plant the area to be stabilized; and/or

2. For non-vegetative stabilization, the installation or application of all such non-vegetative measures.

4.1.1 Seeding

The contractor or subcontractor is responsible for labor, materials, tools, equipment, and other related items required for preparing ground, sowing seeds, fertilizing, mulching and top dressing, and other soil management practices. It will be the contractor’s or subcontractor’s responsibility to check that the soil seedbed is not blown, washed, or otherwise removed from the site. The contractor or subcontractor must make repairs, including replacement of lost topsoil and mulch, to the seedbed preparation site in the event of heavy rain, wind, or other natural events that cause damage. Seeding and planting practices must adhere to the specifications provided in Appendix F.

4.1.2 Mulching

Mulching must be used in conjunction with seeding practices to enhance the success of vegetation establishment by providing erosion protection prior to the onset of vegetative growth. Mulch must be free of noxious and undesirable seed and other materials and must be crimped into the ground by means of a mechanical spreader or other approved methods. Mulching should be completed within 24 hours following the seeding operation and must be completed in accordance with requirements in Appendix F.

Stormwater Pollution Prevention Plan Controls - Stabilization Practices

USACOE 4-2 Burns & McDonnell

4.1.3 Fertilizer

Disturbed soil may need supplementation from fertilizer, and soil tests may be necessary to determine the most appropriate fertilizer for each location. Once applied, the fertilizer must be worked into the soil to limit exposure to stormwater. Fertilizer spills must be cleaned up immediately, and fertilizer must not be applied along or in a waterway. Fertilizing procedures must adhere to the specifications provided in

Appendix F.

4.2 Final Stabilization

The Project is considered finally stabilized when all soil-disturbing activities have been completed and a uniform (i.e., evenly distributed, without large bare areas) perennial vegetative cover with a density of 70 percent of the native background vegetative cover for the area has been established on all unpaved areas.

For those areas not covered by permanent vegetation control measures, an equivalent permanent stabilization measure (e.g., riprap, gabions, or geotextiles) must be used.

Stormwater Pollution Prevention Plan Other Controls

USACOE 5-1 Burns & McDonnell

5.0 OTHER CONTROLS

The following sections detail other controls to be implemented during Project construction activities to limit the potential for pollutants and sediment to reach the municipal storm sewer system or waters of the

State.

5.1 Dust Control

Preventative measures must be taken during periods of extreme drought or heavy winds when exposed soil is susceptible to wind erosion. In areas where bare soil is exposed, water or other approved and acceptable dust palliatives will be applied to the soil to limit wind erosion. Precautions should be taken not to over-water and erode soils. In addition, appropriate speed limits should be established within the

Project site to limit the generation of dust. Spoil piles should be temporarily stabilized or covered to limit wind erosion.

5.2 Street Sweeping

If sediment is observed leaving the Project site through tracking and is deposited on paved public or private roads, then it must be removed immediately through dry sweeping and not flushing.

5.3 Waste Materials

Solid and liquid waste (including sediment, asphalt, concrete millings, floating debris, paper, plastic, fabric, and construction and demolition debris) must be disposed of in accordance with applicable disposal requirements and regulations. Solid or liquid wastes must not be disposed of onsite (e.g., buried or poured), but must be taken offsite for proper disposal. Waste containers must be inspected regularly, and waste stored onsite must be protected from stormwater exposure. All waste materials, including those associated with the demolition of Building 2426, must be properly disposed of.

5.4 Sanitary Waste

The contractor and subcontractors must comply with applicable portable toilet regulations. Each contractor and subcontractor must provide sanitary facilities for its crews on the Project site for the duration of construction activities. Facilities must not be placed in low-lying areas or near a waterbody and must be positioned so they are secure and cannot be tipped over. Sanitary facilities must be used by construction personnel and must be serviced regularly by a licensed contractor. Once any facilities are brought to site, their locations should be added to the Erosion and Sediment Control Plan in Appendix E.

Stormwater Pollution Prevention Plan Other Controls

USACOE 5-2 Burns & McDonnell

5.5 Hazardous Waste

Hazardous or toxic waste must be separated from construction and domestic waste and must be stored in sealed containers constructed of suitable materials to avoid leakage or corrosion. These containers should be stored within appropriately sized secondary containment. Hazardous waste material must be disposed of in the manner specified by the manufacturer and by local, State, and Federal regulations. These regulations often include testing of materials to identify what hazards may be present and obtaining manifests or receipts to document proper disposal of materials. Spills must be cleaned up immediately and in accordance with protocols outlined in Chapter 7.0. Site personnel must be made aware of these requirements.

In areas where potential hazards are likely to be encountered, such as asbestos during demolition activities or hydrocarbon-contaminated soils near the runway, precautions should be taken to minimize the potential for further contamination prior to commencing ground-disturbing activities.

Stormwater Pollution Prevention Plan Maintenance and Inspection

USACOE 6-1 Burns & McDonnell

6.0 MAINTENANCE AND INSPECTION

Routine maintenance and inspection of BMPs is essential to minimizing erosion and sedimentation on the

Project site and protecting the water quality of receiving streams.

6.1 Inspection Procedures

A qualified person knowledgeable in the principles and practice of erosion and sediment control BMPs and pollution prevention, and who possesses the skills to assess construction site conditions that could impact water quality, is responsible for conducting regular inspections. Table 6-1 will identify personnel responsible for performing inspections prior to the start of construction, and a copy will be kept onsite.

The Project site must be inspected at a minimum, once every 7 calendar days and within 24 hours of the end of a storm event 0.5-inch or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge. Total rainfall measured for that day must be recorded in accordance with Part 4.7.1d.

Table 6-1: Stormwater Inspector Identification List

Personnel Title Contact Responsibility

6.1.1 Areas Requiring Inspection

The following areas must be routinely inspected:

• Areas that have been cleared, graded, or excavated and have not yet achieved final stabilization

• Stormwater controls, including pollution prevention measures

• Material, waste, borrow, or equipment storage and maintenance areas

• Areas where stormwater typically flows within the site, including drainages designed to divert, convey, and/or treat stormwater

• Points of discharge

• Locations where stabilization measures have been implemented

6.1.2 Inspection Requirements

During site inspections, the inspector must complete the following actions:

USACOE 6-2 Burns & McDonnell

• Verify erosion and sediment controls and pollution prevention controls are installed and operational, and determine if controls require replacement, repair, or maintenance.

• Determine the presence of conditions, if any, that could lead to spills, leaks, or other accumulations of pollutants.

• Identify locations where new or modified stormwater controls are necessary to meet the requirements of Parts 2 and 3 of the Permit.

• Check discharge points and banks of any surface waters flowing within the Project boundaries or adjacent areas for signs of visible erosion and sedimentation that are attributable to site discharge;

if discharge points are not accessible, check nearby downstream locations to the extent practicable.

• Identify incidents of noncompliance.

• If discharge is occurring at the time of an inspection:

o Identify all points of the Project site from which a discharge occurs.

o Observe and document the visual quality of the discharge (color, odor, oils, suspended solids, and other stormwater pollutants).

o Document whether stormwater controls are operating effectively, and note controls that are not operating effectively.

• Inspect locations where vehicles enter or exit the Project site for evidence of offsite sediment tracking along paved roadways.

In areas of the Project site where construction activities have permanently or temporarily ceased and will not resume for a period exceeding 14 calendar days, stabilization measures must be initiated immediately.

The inspection frequency may be reduced to once per month in areas where seeding has been completed, appropriate non-vegetative cover (e.g., hydromulch, erosion control blankets) has been provided, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .